Condition Assessment: City of Bellingham Supply System 2015 PNWS-AWWA Conference
2 Presentation Title
Presentation Topics
1. Background
2. Condition Assessment
1. Wood Stave Intake
2. Tunnel
3. Screen House
4. Pipelines
1. Industrial (48” CCP)
2. Municipal (66” steel)
3. Acknowledgements/
Questions
3 PNWS-AWWA 2015
City of Bellingham
• Population = 83,000
• 13 pump stations
• 13 storage tanks
• 400 miles of pipelines
• One supply system
– Lake Whatcom
– Wood stave intake pipeline
– Tunnel
– Screen House
– Industrial supply pipeline
– Municipal supply pipeline
Lake Whatcom
Supply
Facilities
4 PNWS-AWWA 2015
Water Supply System
5 PNWS-AWWA 2015
Wood Stake Pipe Intake
Wood
Stave
Pipe
Intake
6 PNWS-AWWA 2015
Wood Stave Intake
7 PNWS-AWWA 2015
Wood Condition
8 PNWS-AWWA 2015
Original Steel Rods and SST Bands
9 PNWS-AWWA 2015
Condition of Steel Rods
10 PNWS-AWWA 2015
Flange
11 PNWS-AWWA 2015
Sponge Inside Intake Pipe
12 PNWS-AWWA 2015
Wood Stave Intake: Results
• Wood in good condition
– Support structural components
– Stave pipe (interior and exterior)
• SST bands in good condition
• Original steel fasteners in fair condition
• Some original steel rods corroded to failure
13 PNWS-AWWA 2015
Tunnel
Tunnel
14 PNWS-AWWA 2015
Tunnel Inspection Activities
• Underwater Laser Scanning (2012)
• Man-Entry Inspection (2015)
• Tunnel Data Analysis
15 PNWS-AWWA 2015
Tunnel Profile
7,600 LF
16 PNWS-AWWA 2015
Tunnel Section
17 PNWS-AWWA 2015
Laser Scanning: Field Photos
18 PNWS-AWWA 2015
Laser Scanning: Data Gathered
5 ft
9 ft
3 ft
19 PNWS-AWWA 2015
Laser Scanning: Example Output
REFLECTION OF CRAWLER
20 PNWS-AWWA 2015
Laser Scanning: Interpretation
West
No Defect
s 81%
Mild 12%
Moderate 5%
Severe
2%
East
No Defect
s 68%
Mild 17%
Moderate 13%
Severe
2%
21 PNWS-AWWA 2015
Man-entry Tunnel Inspection
22 PNWS-AWWA 2015
Man-entry Tunnel Inspection
Stationing Crew
Inspection Crew
Insertio
n P
oin
t
Extra
ctio
n P
oin
t
23 PNWS-AWWA 2015
Man-entry Tunnel Inspection
24 PNWS-AWWA 2015
Tunnel: Results
• No major deformation
• Isolated liner defects
• Limited, minor fracture acceleration
• Next Step: Point repairs, monitoring plan
25 PNWS-AWWA 2015
Screen House
Screen
House
26 PNWS-AWWA 2015
Screen House
27 PNWS-AWWA 2015
Screen House Inspection Elements
• Traveling screen
• Slide gates
• Concrete structure
• Steel pipes
28 PNWS-AWWA 2015
Travelling Screens
29 PNWS-AWWA 2015
Slide Gate
30 PNWS-AWWA 2015
Internal Steel Pipe Condition
31 PNWS-AWWA 2015
External Steel Pipes Condition
32 PNWS-AWWA 2015
Screen House: Results
• Concrete structure in good condition
• Travelling screens in good condition
• Slide gates
– Heavy tuberculation
– Some corrosion loss
– Replacement needed
• Steel pipes (3) need rehabilitation
33 PNWS-AWWA 2015
Industrial Pipeline
Industrial
Pipeline
34 PNWS-AWWA 2015
Tiered and Adaptive Plan (TAP)
• Visual
• Corrosion Survey
Tier 1
• Test Pits
• Destructive Testing
Tier 2
• Specialty Tools
Tier 3
Lowest Cost, Identify Issues Higher Cost, Design Data
35 PNWS-AWWA 2015
Soil Corrosivity Mapping Along Industrial Pipeline
36 PNWS-AWWA 2015
Existing Cathodic Protection System
37 PNWS-AWWA 2015
Existing CP Test Stations
38 PNWS-AWWA 2015
Industrial Pipeline: Results
• Existing CP system is operational and
effective
• Condition assessment complete after Tier 1
• No further condition assessment warranted
39 PNWS-AWWA 2015
Municipal Supply Pipeline
Municipal
Pipeline
(Raw
Water)
40 PNWS-AWWA 2015
Tier 1 External - Soil Corrosivity
1,800
49,200
1,800
1,300
3,600
2200
16,300
2900
5600
1,000
10,000
100,000
0+00 2+00 4+00 6+00 8+00 10+00 12+00 14+00
Soil
Res
isti
vity
(o
hm
-cm
)
Pipeline Station
5 to 7.5 ft depth
Slightly Corrosive
Moderately Corrosive
Very Corrosive
Extremely Corrosive (<1,000)
Screen House
Trail at Silver Beach Road
Trail at WTP Access Road
ARV
WTP
41 PNWS-AWWA 2015
Tier 1 External -Stray Current Adjacent Industrial Supply Pipeline CP System
42 PNWS-AWWA 2015
Tier 2 – Internal Condition
43 PNWS-AWWA 2015
Tier 2 Internal – Concrete/Steel Pipe Joint
44 PNWS-AWWA 2015
Tier 2 Internal – Pipe Wall Thickness
45 PNWS-AWWA 2015
Tier 2 Internal - Pitting
46 PNWS-AWWA 2015
Tier 2 Internal – Coal Tar Lining
47 PNWS-AWWA 2015
Tier 2 Internal – Cement Mortar
48 PNWS-AWWA 2015
Municipal Pipeline: Results
• External Tier 1 Complete
– Corrosive soils
– Stray current
• External Next Step: Tier 2 Test Pits
– Evaluate coating/pipe condition
– Test for stray current
• Internal Tier 2 Inspection
– Coal tar enamel lining – excellent condition
– Minor corrosion at coating defects
– Localized repairs at few joints required
49 PNWS-AWWA 2015
Acknowledgments
50 Presentation Title
Thank You
Dan Buonadonna, PE
Jerry Duppong
Phil Martinez, PE
Bill Evans