concrete sheets

4
COLUMN FOOTING SCHEDULE TYPE LENGTH DEPTH ELEVATION REINFORCEMENT A 4'-0"x4'-0" 3'-0" 96'-6" 5- #4 REBAR BOTH WAYS B 3'-6x3'-6" 2'-6" 96'-6" 4- #4 REBAR BOTH WAYS C 3'-9"x3'-9" 2'-9" 96'-6" 4- #4 REBAR BOTH WAYS D 3'-6x3'-6" 2'-6" 92'-6" 4- #4 REBAR BOTH WAYS 3'-0"x3"x1/4" NOSE GUARD w/ 1/4"x2" ANCHORS WIRE MESH 7R@ 6 7/8" 4' - 0" 6T@ 11" 5' - 6" 2" STEEL GUARD RAIL 3' - 6" 3' - 0" 3' - 0" 4" SLEEVE/ 3" FROM EDGE 1' - 4" 4" DRAIN TILE 2" GUARD RAIL w/ 4" SPACING 6" 2' - 8" 4' - 6" 1' - 0" DRIP EDGE 1' - 0" 8" 8" 8" 8' - 0" 3' - 6" #3 REBAR @12"OC #4 REBAR @25"OC #6 REBAR @24"OC 6" 1' - 10" 3" 1' - 2" 5" 3/4" D x 8" L ANCHOR BOLT w/ WASHERS 3" x 3"x1/4" STEEL ANGLE w/ WELDED 1/4"x1"x8" TYPE T RUBBER DOCK BUMPER 2" 3" 99'-11" 99'-11" 96'-0" 99'-2" 2 A-1 97'-0" 96'-0" 95'-0" 94'-0" 93'-0" 92'-6" A-1 5 120 119 118 99'-11" 3' - 6" 11' - 0" 8' - 0" 5' - 6" 10' - 0" 20' - 0" 1' - 1" 7' - 0" 6' - 0" 5' - 8" - --- 1 2 3 4 A B C D - --- 27' - 6" 1' - 4" 15' - 4" 1' - 4" 24' - 10" 2' - 0" 6' - 2" 2' - 8" 17' - 10" 8" 27' - 6" 5' - 11" 1' - 4" 6' - 4" 1' - 4" 8' - 7" 14' - 4" 1' - 4" 25' - 0" 1' - 4" 33' - 10" 2' - 0" 2' - 0" 1' - 4" 2' - 0" 1' - 4" 26' - 0" 1' - 4" 5' - 10" 5' - 10" 1' - 4" 4' - 8" 1' - 4" 6' - 8" 1' - 4" 18' - 0" 1' - 4" 38' - 6" 1' - 4" 11' - 2" 16' - 0" 3' - 4" 55' - 0" 10' - 10" 3' - 4" 13' - 11" 3' - 6" 21' - 6" 3' - 6" 27' - 0" 73' - 4" 29' - 4" 3' - 6" 21' - 5" 3' - 9" 6' - 4" 15' - 0" 3' - 9" 21' - 5" 3' - 6" 4' - 0" 2' - 10" 8' - 4" 10' - 9" 3' - 4" 3" 1' - 3" 3' - 4" 40' - 3" 28' - 1" 3' - 6" 21' - 6" 3' - 6" 2' - 0" 18' - 0" EL. 96'-6" 8"x 1' - 4" FTG. 22' - 0" 2' - 0" 7 A-1 16' - 0" 8" 4" 1' - 8" E L . 9 6 ' - 6 " 1 0 " x 1 ' - 8 " F T G . 8" 26' - 10" 44' - 4" 29' - 4" 27' - 0" 70' - 0" 32' - 0" 25' - 0" 128' - 2" 28' - 6" 1' - 4" 25' - 0" 1' - 4" 2 5 ' - 0 " 2 5 ' - 0 " 2 5 ' - 0 " 7 8 ' - 4 " EL. 96'-6" 8"x 1' - 4" FTG. EL. 96'-6" 1'-0"x 2' - 0" FTG. - --- - --- - --- - --- - --- EL. 99'-10" 5" CONC. SLAB EL. 95'-6" EL. 96'-6" EL. 95'-6" EL. 96'-6" SEE DOCK DETAIL --- - 94'-10" #4 REBAR CONT. 95'-6" 8 " 1/2"x2" STEEL "L" BRACE 1' - 1" 1' - 0" 8" 4 " 4 " 2- #4 REBAR CONT. #4 REBAR @24"OC 1/2" ISO. JOINT 4 " 4" 8" 4" 8" 1' - 0" 5 " 2- #4 REBAR CONT. #4 REBAR @24"OC 8" #4 REBAR @24"OC 3- #4 REBAR CONT. 1/2" ISO. JOINT 1 ' - 4 " 1 ' - 0 " 8 " A-1 SHEET NO. OF 6 SHEET SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY II ARC 341 SECTION 001 TYLER SCHEPERS MR. NORM LACH DATE IN. SHEET TITLE BRICK DESIGNS 653 JONESVILLE RD. COLUMBUS, INDIANA 47201 NORMAN LACH SET NO. R E V I S I O N & D A T E D R A W N B Y : C H E C K E D B Y : J O B N O . TJS NL FIRST FLOOR PLAN - DOOR AND ROOM FINISH SCHEDULES - DOOR DETAILS 7/12/2011 1/4" = 1'-0" DOCK STAIR DETAIL 1/2" = 1'-0" RETAINING WALL SECTION 1 1/2" = 1'-0" BUMPER DETAIL 1/4" = 1'-0" TRUCK RAMP SECTION 1/8" = 1'-0" FOUNDATION PLAN 1 1/2" = 1'-0" TRENCH DRAIN DETAIL 3/4" = 1'-0" THICKENED SLAB DETAILS GENERAL NOTES: 1. TOP OF CONC. FOUNDATION WALL SHOWN AT 100'-0". 2. DOOR POCKET ELEVATION AT 99'-4". 3. GRADE ELEVATION AT 99'-6". 4. FIRST FLOOR SLAB ELEVATION AT 100'-0", EXCEPT WHERE NOTED. 5. ALL EXTERIOR FOUNDATION WALLS HAVE 2" RIGID INSULATION. 6. 6mm VAPOR BARRIER UNDER CONC. FLOOR SLABS. A-1 A-1 A-1 A-1 A-1 A-1 ENLARGED DOCK PLAN 1/4" = 1'-0" A-1 1 A-1 2 5 7 4 3 6 8 D B B B B C C C C A A A A B B B

Upload: tschepers

Post on 08-Apr-2016

225 views

Category:

Documents


2 download

DESCRIPTION

These sheets show my ability to create construction documentation while using multiple types of structural concrete.

TRANSCRIPT

Page 1: Concrete Sheets

COLUMN FOOTING SCHEDULETYPE LENGTH DEPTH ELEVATION REINFORCEMENT

A 4'-0"x4'-0" 3'-0" 96'-6" 5- #4 REBAR BOTH WAYS

B 3'-6x3'-6" 2'-6" 96'-6" 4- #4 REBAR BOTH WAYS

C 3'-9"x3'-9" 2'-9" 96'-6" 4- #4 REBAR BOTH WAYS

D 3'-6x3'-6" 2'-6" 92'-6" 4- #4 REBAR BOTH WAYS

3'-0"x3"x1/4"NOSE GUARDw/ 1/4"x2"ANCHORS

WIRE MESH

7R

@ 6

7/8

"

4' -

0"

6T@ 11"

5' - 6"

2" STEEL GUARD RAIL

3' -

6"

3' -

0"

3' -

0"

4" SLEEVE/3" FROM EDGE

1' - 4"

4" DRAIN TILE

2" GUARD RAILw/ 4" SPACING

6"2' - 8"

4' - 6"

1' -

0"

DRIP EDGE

1' - 0"

8"

8"

8"

8' -

0"

3' -

6"

#3 REBAR @12"OC#4 REBAR @25"OC

#6 REBAR @24"OC6"

1' -

10

"

3"

1' -

2"

5"

3/4" D x 8" LANCHOR BOLTw/ WASHERS

3" x 3"x1/4"STEELANGLEw/ WELDED1/4"x1"x8"

TYPE TRUBBER DOCKBUMPER

2"

3"

99'-11"

99'-11"

96'-0"

99'-2"

2

A-1

97'-0"

96'-0"

95'-0"

94'-0"

93'-0"92'-6"

A-15

120

119

118

99'-11"

3' -

6"

11' -

0"

8' -

0"

5' -

6"

10' - 0"20' - 0"1' - 1"7' - 0"6' - 0"5' - 8"

-

---

1 2 3 4

AB

CD

-

---

27' - 6" 1' - 4" 15' - 4" 1' - 4" 24' - 10" 2' - 0" 6' - 2" 2' - 8" 17' - 10" 8" 27' - 6"

5' -

11"

1' -

4"

6' -

4"

1' -

4"

8' -

7"

14

' - 4

"1' -

4"

25

' - 0

"1' -

4"

33

' - 1

0"

2' -

0"

2' -

0"

1' - 4"2' - 0"

1' -

4"

26

' - 0

"1' -

4"

5' -

10

"

5' -

10

"1' -

4"

4' -

8"

1' -

4"

6' -

8"

1' -

4"

18' - 0" 1' - 4" 38' - 6" 1' - 4" 11' - 2"

16' - 0" 3' - 4" 55' - 0" 10' - 10" 3' - 4" 13' - 11" 3' - 6" 21' - 6" 3' - 6"

27' - 0"73' - 4" 29' - 4"

3' -

6"

21

' - 5

"3' -

9"

6' -

4"

15

' - 0

"3' -

9"

21

' - 5

"3' -

6"

4' - 0" 2' - 10" 8' - 4" 10' - 9" 3' - 4"

3" 1' - 3"

3' - 4" 40' - 3" 28' - 1" 3' - 6" 21' - 6" 3' - 6"

2' - 0" 18' - 0"

EL. 96'-6"8"x 1' - 4" FTG.

22' - 0" 2' - 0"

7

A-1

16

' - 0

"

8"

4"

1' -

8"

EL

. 9

6'-6

"1

0"x

1' -

8"

FT

G.

8" 26' - 10" 44' - 4" 29' - 4" 27' - 0"

70' - 0" 32' - 0" 25' - 0"

128' - 2"

28' - 6" 1' - 4" 25' - 0" 1' - 4"

25

' - 0

"2

5' -

0"

25

' - 0

"

78

' - 4

"

EL. 96'-6"8"x 1' - 4" FTG.

EL. 96'-6"1'-0"x 2' - 0" FTG.

-

---

-

---

-

---

-

---

-

---

EL. 99'-10"

5" CONC. SLAB

EL. 95'-6"

EL. 96'-6"

EL. 95'-6"

EL. 96'-6"

SEE DOCK DETAIL

----

94'-10"

#4 REBARCONT.

95'-6"

8"

1/2"x2" STEEL "L" BRACE

1' - 1"

1' - 0"

8"

4"

4"

2- #4 REBAR CONT.

#4 REBAR @24"OC

1/2" ISO. JOINT

4"

4" 8" 4"

8"

1' - 0"

5"

2- #4 REBAR CONT.

#4 REBAR @24"OC

8"

#4 REBAR @24"OC

3- #4 REBAR CONT.1/2" ISO. JOINT

1' -

4"

1' -

0" 8"

A-1

SHEET NO.

OF 6 SHEET

SC

HO

OL O

F A

RC

HIT

EC

TU

RE

SO

UT

HE

RN

ILLIN

OIS

UN

IVE

RS

ITY

BU

ILD

ING

TE

CH

NO

LO

GY

II

AR

C 3

41 S

EC

TIO

N 0

01

TY

LE

R S

CH

EP

ER

SM

R. N

OR

M L

AC

H

DA

TE

IN.

SH

EE

T T

ITLE

BR

ICK

DE

SIG

NS

653 J

ON

ES

VIL

LE

RD

.C

OLU

MB

US

, IN

DIA

NA

47201

NO

RM

AN

LA

CH

SE

T N

O.

RE

VIS

ION

& D

AT

E

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JO

B N

O.

TJS

NL

FIR

ST

FLO

OR

PLA

N -

DO

OR

AN

DR

OO

M F

INIS

H S

CH

ED

ULE

S -

DO

OR

DE

TA

ILS

7/1

2/2

011

1/4" = 1'-0"DOCK STAIR DETAIL

1/2" = 1'-0"RETAINING WALL SECTION

1 1/2" = 1'-0"BUMPER DETAIL

1/4" = 1'-0"TRUCK RAMP SECTION

1/8" = 1'-0"FOUNDATION PLAN

1 1/2" = 1'-0"TRENCH DRAIN DETAIL

3/4" = 1'-0"THICKENED SLAB DETAILS

GENERAL NOTES:1. TOP OF CONC. FOUNDATION WALL SHOWN AT 100'-0".2. DOOR POCKET ELEVATION AT 99'-4".3. GRADE ELEVATION AT 99'-6".4. FIRST FLOOR SLAB ELEVATION AT 100'-0", EXCEPT WHERE NOTED.5. ALL EXTERIOR FOUNDATION WALLS HAVE 2" RIGID INSULATION.6. 6mm VAPOR BARRIER UNDER CONC. FLOOR SLABS.

A-1

A-1

A-1

A-1

A-1

A-1

ENLARGED DOCK PLAN

1/4" = 1'-0"A-1

1

A-1

2

5

7

4

3

6

8

D

B B

BB

C

C

C

CA

AA

A

B

BB

Page 2: Concrete Sheets

31_2

"41_2

"

2"

35_8

"

35_8

"

91_4

"

17_8

"

53_4

"

17_8

"

17_8

"

53_4

"

17_8

"

STEEL WIREANCHOR

35_8

"

STEEL "T" ANCHOR

75_8

"

17_8

"

47_8

" 85_8

"

STEEL WIREANCHOR

WOOD STUDANCHOR

11_2

"

55_8

"

1_2

"

17_8

"

3" 63_4

"

17_8

"

4" 73_4

"

2"

2"

8"

1'

35_8

"

17_8

"

1" 43_4

"

STEEL "T"ANCHOR

75_8

"

17_8

"

47_8

" 85_8

"

STEEL WIREANCHOR

35_8

"

111_4

"

BOLT ANCHOR

J1

J2

J3

J4

J5

J6

J7

2"

ROOM FINISH SCHEDULEROOM FLOOR BASES WALLS CEILING CLG

HTDETSHT

REMARKSNO. NAME MATL FIN. MATL FIN. MATL FIN. MATL FIN.

101 VESTIBULE WD S&V WD P GYP P CONC P 10'-0"

102 LOBBY WD S&V WD P GYP P CONC P 10'-0"

103 OFFICE CAR. -- WD P GYP P CONC P 10'-0"

104 OFFICE CAR. -- WD P GYP P CONC P 10'-0"

105 CONFERENCE RM CAR. -- WD P GYP P CONC P 10'-0"

106 STORAGE RM CAR. -- WD P GYP P CONC P 10'-0"

107 LOUNGE WD S&V WD P BR -- AC T -- 9'-0"

108 JANITOR'S CLOSET CONC. -- V -- BR -- CONC -- 10'-0"

109 MEN'S TOILET CER T W -- -- GIWT -- AC T -- 9'-0"

110 WOMEN'S TOILET CER T W -- -- GIWT -- AC T -- 9'-0"

111 SHOP AREA CONC -- V -- CONC P CONC -- 10'-0"

112 OFFICE CAR -- WD P CONC P CONC -- 10'-0"

113 MECH. RM CONC -- V -- CONC -- CONC -- 10'-0"

115 TOOL RM CONC -- V -- CONC P CONC -- 10'-0"

116 MACH. RM CONC -- V -- CONC -- CONC -- 10'-0"

201 DEMONSTRATION RM CAR -- WD P GYP P AC T -- 9'-0"

DOOR SCHEDULEDOOR DOOR FRAME

LINTEL THRESH. REMARKSNO. TYPE W HT. T CON. MATL FIN. MATL FIN. DET NO.

101 A 2 3'-0" 7'-2" 0'-1 3/4" HM GL -- AL -- A-4 -- --

102 A 2 3'-0" 7'-2" 0'-1 3/4" HM GL -- ST P 2/ A-2 J3 L2 --

103 B 3'-0" 7'-2" 0'-1 3/4" SC WD S&V ST P 2/ A-2 J3 L1 3/ A-2 T1

104 B 3'-0" 7'-2" 0'-1 3/4" SC WD S&V ST P 2/ A-2 J3 L1 3/ A-2 T1

105 B 3'-0" 7'-2" 0'-1 3/4" SC WD S&V ST P 2/ A-2 J3 L1 3/ A-2 T1

106 B 3'-0" 7'-2" 0'-1 3/4" SC WD S&V ST P 2/ A-2 J3 L1 3/ A-2 T1

107 C 2 3'-0" 7'-2" 0'-1 3/4" MC WD S&V ST P 2/ A-2 J4 L3 --

108 D 3'-0" 7'-2" 0'-1 3/4" SC WD S&V ST P 2/ A-2 J7 L3 3/ A-2 T2

109 D 3'-0" 7'-2" 0'-1 3/4" SC WD S&V ST P 2/ A-2 J L3 3/ A-2 T3

110 D 3'-0" 7'-2" 0'-1 3/4" SC WD S&V ST P 2/ A-2 J L3 3/ A-2 T3

111 C 2 3'-0" 7'-2" 0'-1 3/4" HM MET P ST P 2/ A-2 J6 L4 3/ A-2 T2

112 B 3'-0" 7'-2" 0'-1 3/4" SC GL P ST P 2/ A-2 J5 L5 3/ A-2 T4

113 C 2 3'-0" 7'-2" 0'-1 3/4" HM MET P ST P 2/ A-2 J5 L5 --

114 C 2 3'-0" 7'-2" 0'-1 3/4" HM MET P ST P 2/ A-2 J5 L5 --

115 D 3'-0" 7'-2" 0'-1 3/4" SC WD S&V ST P 2/ A-2 J5 L5 --

116 A 3'-0" 7'-2" 0'-1 3/4" HM MET P ST P 2/ A-2 J2 L6 --

117 C 3'-0" 7'-2" 0'-1 3/4" HM MET P ST P 2/ A-2 J1 -- --

118 C 3'-0" 7'-2" 0'-1 3/4" HM MET P ST P 2/ A-2 J1 -- --

119 C 3'-0" 7'-2" 0'-1 3/4" HM MET P ST P 2/ A-2 J1 -- --

120 E 8'-0" 9'-4" 0'-1" HM MET -- ST P A-4 -- --

LOOSE LINTEL SCHEDULE

MARK MATL SECTION ROUGH OPENINGBEARING AT EACH

ENDREMARKS

L1 WD 2- 2x4 w/ 1_2" PLYWD SPACER 3'-4" 0'-1 1/2"

L2 WD 2- 2x6 w/ 1_2" PLYWD SPACER 6'-0" 0'-1 1/2"

L3 ST 1 L 2 1_4 x 3 x 1/8 6'-0" / 3'-4" 0'-8"

L4 CMU / ST 6'-0" 0'-8" FILL LINTELS w/ CONC

L5 CMU 2- #3 REBAR IN NCCMU 3'-4" 0'-8" FILL LINTELS w/ CO

L6 BR 2 L 2 1_4 x 3 x 1/8 3'-4" 0'-8"

2" GAP FOR RIGIDINSUL

2- #3 REBAR IN CMU1 L 2 1_

4 x 3 x 1/8

T1

T2

T3

T4

WD CAR

CER T

CONC

WD

WD

CONCCAR

RE

F.

UP

UP

102

105

106

104

103

VESTIBULE

101

OFFICE

103

OFFICE

104

CONFERENCE RM

105

STORAGE RM

106

OFFICE

112

LOBBY

102

110

108

109

117

112

120 119

MEN'S TOILET

109

WOMEN'S TOILET

110

JANITOR CLOSET

108116

11' - 7" 14' - 1"

115

TOOL RM

114

MECH. RM

113

LOUNGE

107

SHOP AREA

111

107111

118

101

17' -

1 3

/4"

11' - 1 3/4" 14' - 1 3/4"

11' -

1 3

/4"

11' - 1 3/4" 14' - 1 3/4"

26' -

11 3

/4"

14' -

9 3

/4"

7' - 4"

9' -

0"

19' - 0"

22' - 0"4' - 8"

25' - 8"16' - 0"

34' -

8"

26' -

8"

14' -

8"

12' - 0"

14' -

8"

3' -

4"

3' -

4"

5' -

4"

3' -

4"

5' -

4"

3' -

4"

4' -

0"

14' -

10"

23' -

4"

3' -

4"

7' -

6"

2' - 0"3' - 4"5' - 4"3' - 4"5' - 0"3' - 4"4' - 8"

7' -

4"

3' -

4"

14' -

8"

3' - 0"11' - 4"

18' -

4"

3' -

4"

4' -

4"

7' - 8"3' - 4"46' - 4"3' - 0"13' - 0"

78' -

0"

28' - 4"

3' - 4"3' - 4"3' - 4"3' - 4"4' - 8"3' - 4"5' - 8"39' - 11"3' - 0"1' - 5"

2

A-2

-

---

4' - 0"3' - 4"2' - 0"

3' - 4"2' - 4"

27' - 0"29' - 4"44' - 4"28' - 0"1' - 0"

3' - 0"11' - 3"8' - 0"5' - 6"

114113

1' - 10" 6' - 0" 8' - 10" 2' - 8" 6' - 0" 17' - 8"

11' -

4"

8' - 8"

2' -

8"

3' -

4"

4' -

8"

3' -

0"

6' -

8"

129' - 8"

77' -

0"

-

---

-

---

1 2 3 4

AB

CD

-

---

MACH. RM

115

2x4 STUD @16 OCw/ 1/2" GYP

-

---

-

---

-

---

-

---

5" CONC SLABON GRADE

25' -

0"

25' -

0"

25' -

0"

70' - 0" 32' - 0" 25' - 0"

21R

21R

2' - 6"

0' - 3"

3' -

6"

3' -

0"

0' -

8"

0' - 4"2' - 2"

3' -

7"

0' -

8"

0' - 4"

4' -

9 1

/4"

0' -

6"

0' -

4"

A-2

SHEET NO.

OF ___ SHEET

SC

HO

OL O

F A

RC

HIT

EC

TU

RE

SO

UT

HE

RN

ILLIN

OIS

UN

IVE

RS

ITY

BU

ILD

ING

TE

CH

NO

LO

GY

II

AR

C 3

41 S

EC

TIO

N 0

01

TY

LE

R S

CH

EP

ER

SM

R. N

OR

M L

AC

H

DA

TE

IN.

SH

EE

T T

ITLE

BR

ICK

DE

SIG

NS

- S

CH

EP

ER

S653 J

ON

ES

VIL

LE

RD

.C

OLU

MB

US

, IN

DIA

NA

47201

OW

NE

RS

ET

NO

.

RE

VIS

ION

& D

AT

E

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JOB

NO

.

TJS

NL

FIR

ST

FLO

OR

PLA

N -

DO

OR

AN

DR

OO

M F

INIS

H S

CH

ED

ULE

S -

DO

OR

DE

TA

ILS

6/2

8/2

011

FIRST FLOOR PLAN

SCALE: 1/8" = 1'-0"

1

A-2

DOOR JAMB DETAILS

SCALE: 1 1/2" = 1'-0"

2

A-2

THRESHOLD DETAILS

SCALE: 3" = 1'-0"

3

A-2

DOOR ELEVATIONS

SCALE: 1/4" = 1'-0"

4

A-2

A B C D E

GENERAL NOTES:1. 4" CONC. ON GRADE EXCEPT WHERE NOTED.2. ALL OPENINGS ARE M.O.3. FINISHED GRADE SLOPES AWAY AT 1/4" PER 1'-0".4. ALL DOORS ARE HMF EXCEPT STOREFRONT.

Page 3: Concrete Sheets

TOP OF FOOTING

96'-6"

TOP OF FOUND. WALL

100'-0"

TOP OF HC SLAB

111'-8"

6mm VAPOR BARRIER

1/2" ISO. JOINT

A-34

1' - 8"

6"

3' -

4"

4' -

0"

4' -

8"

10"

3' -

6"

12' -

0"

4' -

4"

12' -

3"

3"

WEEP HOLES @24"OCFLASHING

1/2" SHEATHING

2" RIGID INSUL.

1/2" EDGE TRIM5/8" GYP BOARD

7/8" FURRING STRIP@16"OC

1" METAL HANGER

WIRE

1/2" BEARING PAD

1/2"x10" ANCHOR BOLT

1" RUNNER CHANNEL

4"

4"

10' -

0"

8"

1' -

0"

4"

2" RIGID INSUL.

A

A-33

4"

4"

10' -

0"

1' -

10"

4"

6mm VAPOR BARRIER

1/2" ISO. JOINT

2" RIGID INSUL.

FIRST FLOOR SLAB

100'-0"

1' - 8"

6"

3' -

4"

4' -

0"

4' -

10"

10"

3' -

6"

11' -

10"

4' -

4"

12' -

3"

CONT. REGLETFLASHINGWEDGE INSERT BOXSHIMRELIEVING ANGLEWEEL HOLES @24" OCSEALANT/ BACKUP RODLIP BRICK

WEEP HOLES @24"OCFLASHING

1/2" GYP BOARD2" RIGID INSUL.

TOP OF FOOTING

96'-6"

TOP OF WFL SLAB

111'-10"

B

2" RIGID INSUL.

INSUL.1/2" GYP BOARDFLASHING

WEEP HOLES @24"OC

2"x7" TAPERED CONC.1/2" GYP BOARD

2" RIGID INSUL.BATT. INSUL.

1/4" SHIM3/4" GYP BOARD GUARD

1x2

CAULK1" DBL GLAZED GLASS

2" RIGID INSUL.BATT. INSUL.3"x3" STEEL LINTEL2- 2x4 w/ 1/2" SPACER1/2" GYP BOARDCAULK1/4" SHIM

1x23/4" GYP BOARD GUARD

2" RIGID INSUL.BATT. INSUL.

1/2" GYP BOARDCAULK1/4" SHIM

1" DBL GLAZED GLASS

JAMB

HEAD

SILL

3' -

4"

M.O

.

3"

- 3 1

/2"

U.D

.

4' -

0"

M.O

.

3"

- 11

1/2

" U

.D

2" SCREW

2" SCREW

2" SCREW

FELT SCREW @24"OC

1/2"x10" ANCHOR BOLT

GRAVEL STOP

3" CONC. w/ 1/4" PER 1' SLOPEPEA GRAVELFELT

FLASHING

TOP OF FOOTING

96'-6"

TOP OF FOUND. WALL

100'-0"

TOP OF HC SLAB

111'-8"

6mm VAPOR BARRIER

1/2" ISO. JOINT

2" RIGID INSUL.

FLASHINGWEEP HOLES @24"OC

4" GLAZED CMU

2" RIGID INSUL.

1/2" EDGE TRIM5/8" GYP BOARD

7/8" FURRING STRIP@16"OC

1" RUNNER CHANNEL

1" METAL HANGERWIRE

1/2" BEARING PAD

4"

1' -

0"

8"

10' -

0"

4"

4"

LADDER COLLAR JOINT@16"OC

6"

12' -

0"

3"

10"

3' -

6"

12' -

3"

5" 10" 5"

2" RIGID INSUL.

1/2" ISO. JOINT

SPLICE SLEEVE

1/4" STEEL PLATE#4 REBAR

2- #4 REBAR @3"OC

1/4" STEEL PLATE

#4 REBAR

2- #4 REBAR @3"OC

1/2" BEARING PAD

1/2" BEARING PAD

6" 1' - 0" 6"

6"

3' -

4"

4' -

0"

17' -

5"

1' -

0"

3' -

6"

24' -

9"

A-37

A-38

2" CONC. SLAB

B

TOP OF FOOTING

96'-6"

TOP OF FOUND. WALL

100'-0"

SECOND FLOOR SLAB

112'-2"

TOP OF SECOND DBL TEE

124'-2"

1/2" ISO. JOINT

1/2" BEARING PADSPLICE SLEEVE

#6 REBAR - WELDED

2" RIGID INSUL.

1/4" STEEL PLATE

2- #4 REBAR @1 1/2"OC/WELDED TO PLATE

2" SELF-LEVEL CONC.

1/2" BEARING PAD

1/2" BEARING PAD

A-3

SHEET NO.

OF 6 SHEETS

SC

HO

OL O

F A

RC

HIT

EC

TU

RE

SO

UT

HE

RN

ILLIN

OIS

UN

IVE

RS

ITY

BU

ILD

ING

TE

CH

NO

LO

GY

II

AR

C 3

41

SE

CT

ION

001

TY

LE

R S

CH

EP

ER

SM

R.

NO

RM

LA

CH

DA

TE

IN.

SH

EE

T T

ITLE

BR

ICK

DE

SIG

NS

- S

CH

EP

ER

S653

JO

NE

SV

ILLE

RD

.C

OLU

MB

US

, IN

DIA

NA

47201

OW

NE

RS

ET

NO

.

RE

VIS

ION

& D

AT

E

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JOB

NO

.

TJS

NL

STA

IRW

AY

AN

D S

TO

RE

FR

ON

T D

ETA

ILS

BU

ILD

ING

ELE

VA

TIO

N A

ND

SE

CT

ION

8/5

/2011

A-4 3/4" = 1'-0"1 LOUNGE WALL SECTION

A-4 3/4" = 1'-0"2 OFFICE WALL SECTION

A-4 3" = 1'-0"3 OFFICE WINDOW DETAIL

A-4 3" = 1'-0"4 GRAVEL STOP DETAIL

A-4 3/4" = 1'-0"5 TOILET WALL SECTION

A-4 3/4" = 1'-0"6 SHOP WALL SECTION

A-4 1 1/2" = 1'-0"7 SPLICE SLEEVE DETAIL

A-4 1 1/2" = 1'-0"8 DOUBLE TEE DETAIL

Page 4: Concrete Sheets

6

A-3

2

A-3

1

A-3

5

A-3

1 2 3 4

TOP OF FOOTING

96'-6"

FIRST FLOOR SLAB

100'-0"

SECOND FLOOR SLAB

112'-2"

6"

24

' - 2

"

1' -

0"

3' -

0"

24

' - 8

"

6"

12

' - 0

"

10

"3' -

0"

12

' - 6

"

PRECAST CONCRETE PANELS

13' - 0" 8' - 4"

A-46

A-47

1 2 3 4

TOP OF FOOTING

96'-6"

FIRST FLOOR SLAB

100'-0"

SECOND FLOOR SLAB

112'-2"

12

A-4

9

A-4

15

A-4

16

A-4

10

A-4

13

A-4

11

A-4

10

' - 0

"10

"3' -

0"

6"

14

A-4

18

A-4

17

A-4

BC

6" 13' - 10" 6"

3' -

2"

4"

10

R @

6 7

/8"=

5' -

10"

11R

@ 6

7/8

"= 6

' - 4

"

12

' - 2

"

10T @ 11"= 9' - 2"

9T @ 11"= 8' - 3"

A-4

8-1

A-48-3

A-48-4

A-48-5

A-48-2

SECOND FLOOR SLAB

112'-2"

FIRST FLOOR SLAB

100'-0"

92'-6"

4

A-420' - 8"

3' - 4"

4"

3' -

2"7' - 3" 9' - 2" 4' - 3"

REGLET

CANT STOP

6"x6"x1/2" ST ANGLE

WEDGE INSERT BOX

3"x1/2" BOLT

FLASHING

1/2" BEARING PAD

FLASHING

9"x1/2" ANCHOR BOLT

FELT

PEA-SIZED GRAVEL

1/2" BEARING PAD

10" BOND BEAM

12" BOND BEAM

4" SLEEVE

1/2" BEARING PAD

4" SLEEVE

3" PIPE RAIL

1/2" ARM

2 1/4"x1/8" TOGGLE BOLT

3"x2'-6" NOSINGw/ 2" ANCHOR

1/2" ISO JOINT

1/4" BEARING PAD

4"

5"

10"

3"x1/8" SCREW

1/2" ISO JOINT

2"SCREW

7"x1/4" THRESHOLD

1/2" ISO. JOINT#4 REBAR

3/4" CORNER GUARD

10" WIRE ANCHOR

A-4

SHEET NO.

OF 6 SHEETS

SC

HO

OL O

F A

RC

HIT

EC

TU

RE

SO

UT

HE

RN

ILLIN

OIS

UN

IVE

RS

ITY

BU

ILD

ING

TE

CH

NO

LO

GY

II

AR

C 3

41 S

EC

TIO

N 0

01

TY

LE

R S

CH

EP

ER

SM

R. N

OR

M L

AC

H

DA

TE

IN.

SH

EE

T T

ITLE

BR

ICK

DE

SIG

NS

- S

CH

EP

ER

S653 J

ON

ES

VIL

LE

RD

.C

OLU

MB

US

, IN

DIA

NA

47201

OW

NE

RS

ET

NO

.

RE

VIS

ION

& D

AT

E

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JO

B N

O.

TJS

NL

ST

AIR

WA

Y A

ND

ST

OR

EF

RO

NT

DE

TA

ILS

BU

ILD

ING

ELE

VA

TIO

N A

ND

SE

CT

ION

8/5

/2011

A-4 1/8" = 1'-0"1 SOUTH ELEVATION

A-4 1/8" = 1'-0"2 BUILDING SECTION

A-4 1/4" = 1'-0"3 STOREFRONT ELEVATION

A-4 1/4" = 1'-0"4 STAIR SECTION

A-4 1/4" = 1'-0"5 STAIRWAY PLAN

A-4 1 1/2" = 1'-0"6 LOUNGE TO SHOP ROOF DETAIL

A-4 1 1/2" = 1'-0"7 OFFICE TO LOUNGE ROOF DETAIL

A-4 1" = 1'-0"8 STAIR DETAILS

A-4 3" = 1'-0"9 DETAIL 4

A-4 3" = 1'-0"10 DETAIL 5

A-4 3" = 1'-0"11 DETAIL 6

A-4 3" = 1'-0"12 DETAIL 1

A-4 3" = 1'-0"13 DETAIL 2

A-4 3" = 1'-0"14 DETAIL 3

A-4 3" = 1'-0"15 DETAIL 7

A-4 3" = 1'-0"16 DETAIL 8

A-4 3" = 1'-0"17 DETAIL 9

A-4 3" = 1'-0"18 DETAIL 10

10

'-0

" M

.O.

9'-1

1 1

/2"

U.D

.

14'-8" M.O.

14'-7 1/2" U.D.

19

A-4

RAILING DETAIL

1" = 1'-0"