![Page 1: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/1.jpg)
Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction
Midterm Report
![Page 2: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/2.jpg)
PROJECT SCOPE
Develop a Design Basis Memorandum, preliminary conceptual design, and cost estimate for an offshore Gravity Based
Structure (GBS) for the extraction of Natural Gas from the Coast of Labrador
![Page 3: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/3.jpg)
PRINCIPLE OBJECTIVES
• Design Basis Memorandum• Geotechnical Parameters• Environmental Design Criteria
• GBS Design Options• Advantages/Disadvantages• Preliminary Quantities
• Preferred Option Report• Quantities/Cost Estimates
![Page 4: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/4.jpg)
AREA OF OPERATION
![Page 5: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/5.jpg)
PROBABLE GBS SITES
![Page 6: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/6.jpg)
GBS SITE CHOSEN
![Page 7: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/7.jpg)
WHAT THEY THINK IS THERE
![Page 8: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/8.jpg)
GEOTECHNICAL North Bjarni Site Conditions
2.2 Trillion Cubic Feet of natural gasLocated 100km off the Labrador coast at a water depth of 150m10-40m layer of sediment on the ocean floor
![Page 9: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/9.jpg)
GEOTECHNICAL Design Considerations
Large design loads necessitate large foundations
Lateral load is a substantial fraction of the vertical load, therefore the overturning moment is very large
There is a major cyclic component of loads
Large settlement due to soft seabed deposits near sea floor
![Page 10: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/10.jpg)
GEOTECHNICAL Foundation Failure
Modes of Foundation Failure
![Page 11: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/11.jpg)
ENVIRONMENTAL DESIGN CRITERIA
• WAVE LOAD DATA
100 yr Wave Height 30mAssociated Wave Period 16-19 secsWave is classified as an intermediate wave
(Linear Wave Theory)
![Page 12: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/12.jpg)
ENVIRONMENTAL DESIGN CRITERIA
• WIND SPEEDS (100 yr Return)1-Hour Mean Wind Speed 44m/s3-second gust 61m/s
![Page 13: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/13.jpg)
• PACK ICE DATA Measured Depths of up to 8mMulti-year floesFlexural Strength measures up to 0.7MPaLocal Strength Parameters 10.0MPaGlobal Strength Parameters 2.4MPaCrushing Failure
ENVIRONMENTAL DESIGN CRITERIA
![Page 14: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/14.jpg)
• DESIGN ICEBERGPetro-Canada Bjarni/North Bjarni “Production Perspectives Study” (1983)20,000,000 Metric TonnesTabular Shape, 55m deep, 636m wide~2700MN Force on Impact with structure
• Hibernia – 1300MN
~335GN·m Overturning Moment• Hibernia - 84GN·m
ENVIRONMENTAL DESIGN CRITERIA
![Page 15: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/15.jpg)
GBS DESIGNSMULTIPLE LEGGED STRUCTURES
Ability to withstand moderate ice conditions
Inability to withstand the load of an iceberg
Slender legged shapes provide little to no storage
Predominant in North Sea
![Page 16: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/16.jpg)
GBS DESIGNSMULTIPLE LEGGED STRUCTURES
TROLL A
Location: North Sea
Structure Height: 472 mOcean Depth: 303 mStructure Weight: 656,000 Te
![Page 17: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/17.jpg)
GBS DESIGNSSTEPPED CASSION STRUCTURES
Good stability against overturningGeometry causes failure of ice features and energy dissipation at controlled rate Concurrent construction of major parts possibleConstructability issues due to geometry
![Page 18: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/18.jpg)
GBS DESIGNSSTEPPED CASSION STRUCTURES
STEPPED STRUCTUREConceptual Design
Location: Beaufort Sea, Labrador Sea
Ocean Depth: 50-200 m
![Page 19: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/19.jpg)
GBS DESIGNSCONICAL STRUCTURES
Wide base provides stabilityOffers reduced area at water surfaceInclined edge reduces ice loadsCurved walls allows distribution of environmental loads
Geometry reduces maximum storage
![Page 20: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/20.jpg)
GBS DESIGNSCONICAL STRUCTURES
GRAND BANKS GBSConceptual Design
Location: Atlantic Ocean
Ocean Depth: 80 to 120 m
Silo shaped cylinders provide flotation and ballast
![Page 21: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/21.jpg)
GBS DESIGNSCYLINDRICAL STRUCTURES
Provide greater stability during construction and tow outAttract higher wave and iceberg loads Greater mass resists larger ice featuresLarge flat roof causes design and constructability issues
![Page 22: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/22.jpg)
GBS DESIGNSCYLINDRICAL STRUCTURES
HIBERNIA
Structure Height: 224m
Ocean Depth: 111 m
Structure Weight: ≈ 1.1 million Te
Unique wedge shaped outer wall
![Page 23: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/23.jpg)
FINAL REPORTOutline
• GBS Design Possibilities• Design Basis Memorandum
• Methodology• Conclusions
• Conceptual Design Options (Site Specific)• Advantages/Disadvantages
• Preferred Option Report• Quantities/Cost Estimates
![Page 24: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/24.jpg)
PROJECT SCHEDULEOutstanding Items
![Page 25: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/25.jpg)
Thank You!
Questions/Comments
End of Show
![Page 26: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/26.jpg)
CELEBRITIES IN ENGINEERING
An Updated Version
![Page 27: Concrete Gravity Based Structure - Memorial …sbruneau/teaching/8700project/archive/...Concrete Gravity Based Structure Coastal Labrador Natural Gas Extraction Midterm Report PROJECT](https://reader031.vdocuments.mx/reader031/viewer/2022022015/5b5821427f8b9a31668b8d85/html5/thumbnails/27.jpg)
STAY TUNED!