![Page 1: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/1.jpg)
Concrete-Filled Tube Bridges for Accelerated Bridge Construction
Professor Dawn Lehman Professor Charles RoederMax Stephens (Former Graduate Student)
![Page 2: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/2.jpg)
What is a Concrete‐Filled Steel Tube?
o Concrete‐Filled Steel Tube (CFST) elements are circular (most common) or rectangular steel tubes filled with concrete.
o They are fully composite members maximizing the benefits of the steel and concrete:– Steel tube confines the concrete– Concrete increases stiffness and compressive strength– Local buckling is delayed
o CFT elements are not simply RC columns with steel jackets, as is commonly used in seismic retrofit
![Page 3: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/3.jpg)
Application of CFST
> CFST can be used as foundation elements (piles, shafts) and piers in elevated bridges
> Under extreme loads, inelastic deformation must be isolated to CFST component. Surrounding concrete components remain essentially elastic for large reversed cyclic displacement demands
![Page 4: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/4.jpg)
Advantages of CFST in ABC
o Relative to RC columns:o No formwork to construct, tear
down or storeo Internal reinforcement not
requiredo Self‐consolidating concreteo Smaller diameters than RC
columnso Relative to precast columns:
o Lighter facilitating placemento Length and diameters can easily
vary within a structureo Smaller diameters than RC
columnso Can also be integrated with
precast cap beams.
Photo Courtesy of MDT
![Page 5: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/5.jpg)
Accelerated Construction Sequence
![Page 6: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/6.jpg)
Accelerated Construction Sequence
![Page 7: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/7.jpg)
Accelerated Construction Sequence
![Page 8: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/8.jpg)
Accelerated Construction Sequence
![Page 9: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/9.jpg)
Accelerated Construction Sequence
![Page 10: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/10.jpg)
Accelerated Construction Sequence
![Page 11: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/11.jpg)
Accelerated Construction Sequence
Welded Dowel (WD)Embedded Ring (ER)
![Page 12: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/12.jpg)
Accelerated Construction Sequence
![Page 13: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/13.jpg)
Accelerated Construction Sequence
![Page 14: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/14.jpg)
CFST Bridge System (Funding Agency)
CFST Component:(WSDOT, ARMY)˃ Flexural Strength (6)˃ Shear Strength (21)˃ Deformation Capacity
Foundation Connection (17):(Caltrans, WSDOT, ARMY)
capbeam
columntyp.
deck
foundationtyp.
Cap Beam Connection (7) (Caltrans)
Welded Dowel (WD) Embedded Ring (ER)
Embedded Ring (ER)
RC Column to CFST Pile (ongoing with WSDOT)
![Page 15: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/15.jpg)
o Combined Loading: Flexure and Axial Strength
o Shear Strength
o Connections
Alaskan Way Viaduct (CFST piles)
Design & Implementation
![Page 16: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/16.jpg)
CFST Components
![Page 17: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/17.jpg)
Steel Tubes
o Spiral Weld Tubes o Economical, widely available, larger diameters and length than
straight seam spiral weld tubeo Fabricated by running a coil of steel through a machine that spins the
coil into a spiralo Double submerged arc weld is used to seal the spiral; continuous x‐ray
of weldo Weld provides mechanical
bondo Straight Seam Tubes
o Thicker tubes availableo More typically used
for driven pileso No mechanical bond;
low‐shrinkage concreteor binding through bending required.
![Page 18: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/18.jpg)
Comparison of Filled & Hollow Tubes
-15000
-10000
-5000
0
5000
10000
15000
-4% -3% -2% -1% 0% 1% 2% 3% 4%
Drift Ratio
Fle
xura
l Str
engt
h (
k-in
)
CFVST
HVST
CFVST Yield
CFVST Buckle
HVST Yield
HVST Buckle
• Increased Stiffness• Increased Strength• Increased Deformability• No loss of strength after buckling
Initial Buckling (~2.3% drift)
Initial Tearing (~2.7% drift)
Complete Tearing (3% drift)
![Page 19: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/19.jpg)
B6KJM31TTBYW
Simple, filled‐tube push‐through tests and 3‐point bending tests
t = ¼” d = 19 ½”
strain gagelocation typ.
rigid basesupport
air gap toallow slip
concrete filllength = 60”
appliedload
welded wiregage locationtyp.
Applied Load2.4m lb. UTM
Instrumented20 in. Dia. Tube
Tube Concrete
Conventional
LowShrinkage
Conventional
LowShrinkage
StraightSeam
SpiralWeld
4‐Test Matrix
Composite Action in CFST
![Page 20: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/20.jpg)
Composite Action
Chemical Bond/Adhesion
Mechanical BondIn Spiral Weld Tube
Mechanical bond of concreteIn spiral weld tube
![Page 21: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/21.jpg)
Shear Strength of CFST
> Current design expressions include steel tube only (Vs) or treat CFST as an RC section with Vn = Vs + Vc. Neither approach is correct
> Both underestimate the shear strength by a factor of at least two
> Testing investigated: (a) aspect ratio, (b) D/t, (c) concrete strength, (d) internal reinforcement ratio, (e) tail (anchorage) length, (f) axial load ratio
> Results show that CFST sections are very strong in shear.
21 tests on CFST specimens conducted. New expression proposed.
![Page 22: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/22.jpg)
Experimental Setup
Shear Span(Primary Test Region)
Tail Length
Pure Moment Region
Tail Length
Shear Span(Primary Test Region)
![Page 23: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/23.jpg)
Test Results: Flexural Response
> Typical shear span ratios: 1.0 and 0.5> Flexural buckling of steel tube> Vertical tube tear in constant moment region> Concrete fill crack patterns:
– Dense transverse flexural cracking inmidspan region
– Minor to no diagonal cracking in shear spans
a/D = 0.5LT = 2DD/t = 80
fcm’ = 9.5 ksiρint = 0%
clean interface
Specimen 17
Midspan
Shear Span
![Page 24: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/24.jpg)
Test Results: Shear Response
> Typical shear span ratios: 0.375 and 0.25> Evident shear strain in shear span> Inclined tube tear in shear span region> No visible deformation of steel tube in pure
moment region> Concrete fill crack patterns:
– Minor flexural cracking in midspan region– Extensive diagonal cracking in shear spans
a/D = 0.25LT = 2DD/t = 80
f’cm = 8.6/6.5
ksiρint = 0%/2%
clean interface
Specimen 14/8
Midspan
Shear Span
![Page 25: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/25.jpg)
Simulation of Shear Response
25
Steel Tube Deformations Concrete Cracking
Specimen 16 (a/D = 0.375, Fytm = 56.8 ksi, f’cm = 8.61 ksi, flex-shear)
![Page 26: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/26.jpg)
Parameter Studies
> Axial Load Ratio, P/P0
> Internal Reinforcement Ratio, ρint
> Tube Diameter‐to‐Thickness Ratio, D/t
> Concrete Strength, f’c
> Tube Steel Yield Strength, Fyt
26
Confirmed experimental conclusions
New developments
Crushing Capacity:
![Page 27: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/27.jpg)
Proposed Shear Design Expression, Vn(prop)
27
![Page 28: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/28.jpg)
Connection Tests
![Page 29: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/29.jpg)
Experimental MatrixConnection Type Loading Direction D (in) t (in) Tube Type Axial Load (P/Po)
Embedded Ring Transverse 20 0.25 Spiral Weld 0.1
Transverse 24 0.25 Straight Seam 0.05
Longitudinal 25.75 0.25 Spiral Weld 0.1
Longitudinal 24 0.25 Straight Seam 0.05
Welded Dowel
Transverse 20 0.25 Straight Seam 0.1
De‐bondedWelded DowelTransverse 20 0.25 Spiral Weld 0.1
Longitudinal 20 0.25 Spiral Weld 0.1
Reinforced Concrete
Transverse 20 0.25 Spiral Weld 0.1
![Page 30: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/30.jpg)
Test Apparatus – Long.
![Page 31: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/31.jpg)
Embedded Ring (ER) Connection
![Page 32: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/32.jpg)
o Fully restrained (Full Strength) CFST moment connection
o Tube embedded in foundation concrete
o Annular ring used to transfer overturning forces
Embedded Ring Connection
![Page 33: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/33.jpg)
Performance of ER Connection
~3.5%‐4% Drift Tube Buckling Develops
Tube Buckling Increases
~7%‐8% DriftInitiation of Tearing
Final State
![Page 34: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/34.jpg)
Response of ER Connection
buckling visible initiation of tearing
① Failure mode and loss of lateral load initiated by ductile tearing of steel tube
② Buckling does not impact performance
③ Theoretical plastic moment capacity achieved
④ Axial load capacity maintained after tearing
①
② ③
④
![Page 35: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/35.jpg)
Observed Behavior ~ Inadequate Embedment
Bisecting cracks: 0.75% drift
Interface gap: 2.5% drift
Footing uplift: 4% drift Final state: 8% drift
![Page 36: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/36.jpg)
Comparison of ER Specimen: With and Without Adequate Embedment
![Page 37: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/37.jpg)
Welded Dowel Connection (WD103L)
D (in) t (in) D/t P/Po Reinforcing Steel Fy (ksi) f’c (ksi) ρL(%) (fy/f’c)ρL
25.75 0.25 103 0.10 A706 Grade 60 68 7.7 3 0.3
![Page 38: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/38.jpg)
Performance of WD(db) Connection
3.5% Drift 7.5% Drift
9% Drift
slightrocking
Increasedrocking
Groutdamage
Exposed Spiral
![Page 39: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/39.jpg)
Performance of WD Connection
① Achieved symmetric drifts of up to 9% with no degradation
② Theoretical plastic moment capacity of CFT achieved due to similar mechanical reinforcing ratio
![Page 40: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/40.jpg)
Key Takeaways WD Connection
> Debonding longitudinal dowels decreases damage to cap beam
> Including transverse joint reinforcing in the joint improves confinement in soffit
WD80T1 @ 10% Drift WD80T2 @ 10% Drift
![Page 41: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/41.jpg)
Reinforced Concrete (RC) Connection
![Page 42: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/42.jpg)
Performance of RC Connection7.5% Drift
12% Drift
Final State
Groutdamage
Deformedspiral
Groutdamage
![Page 43: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/43.jpg)
Performance of RC Connection
north barfracture northwest and
northeastbar fracture
south barfracture
southwest andsoutheastbar fracture
Failure mode fracture of reinforcing bars (~8% drift)
Strength limited by reinforcing ratio and moment arm
![Page 44: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/44.jpg)
Hysteretic Comparison
Reinf. Concrete
Embedded CFT,D/t = 96
Welded Dowel
![Page 45: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/45.jpg)
Design/Construction
![Page 46: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/46.jpg)
Design Expressions
> Strength– Flexure– Axial– Shear
> Connection– Embedded Ring– Welded Dowel
> Standard Drawings> Comparison of RC and CFST geometriesExpressions have been implemented in WSDOT Bridge Design Manualhttp://www.wsdot.wa.gov/publications/manuals/m23‐50.htm
![Page 47: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/47.jpg)
> Method of choice for flexural strength calculation> Equilibrium‐based method
AscAcc
Ast
neutral axis
centroidFy
Fy 0.95f’c
steelstress
concretestress
P‐M Interaction Diag.
Flexural Strength: Plastic‐Stress Distribution Method
![Page 48: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/48.jpg)
Comparison with Test Data
Mp = 1.25Mps
![Page 49: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/49.jpg)
Key Considerations for ER Connection
① Annular Ring Dimensions & Weld② Embedement Depth of CFST ③ Punching Shear above Annular Ring④ Cap beam reinforcement
1
3
2
![Page 50: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/50.jpg)
Annular Ring
annularring
˃ Welded to tube to provide anchorage and stress transfer
˃ Same thickness and strength as steel tube
˃ Projects inside and outside the tube for a distance 8t
˃ Welded to the tube using CJP or fillet welds designed to transfer the tensile capacity of the steel tube
minimum filletweld size
Fu,st= ultimate strength of steel tubeFexx=tensile strength of weld metal
![Page 51: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/51.jpg)
Embedment Depth
˃ Adequate embedment must be provided to eliminate pullout from cap beam
˃ Derived using pullout model with empirical stress limits˃ 6√f’c for seismic˃ 8√f’c for yielding
Yielding:
Le
Seismic:
![Page 52: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/52.jpg)
Punching Shear
˃ Adequate depth must be provided above embedded tube to eliminate punching shear
˃ Derived using ACI procedure for flat slab to column connections
Lpc
Cc= compressive force in concreteCs=compressive force in steel
![Page 53: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/53.jpg)
Key Considerations for WD Connection
① Flange dimensions② Dowel weld length③ Anchorage depth of
headed bar④ Dowel debonded length⑤ Punching shear above
headed dowels⑥ Cap Beam Reinforcing⑦ Cap Beam Width
1
4
2
5
3
![Page 54: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/54.jpg)
Dowel to Steel Tube Welds
> Longitudinal dowels are welded to the inside of the steel tube> Weld type is flare bevel groove weld as specified in AWS D1.5> Required weld lengths based on typical limit states for flare bevel groove
welds> Strength reduction factors have been incorporated into the equations
Weld Metal
Tube Metal Yield
Tube Metal Rupture
![Page 55: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/55.jpg)
Standard Drawings
![Page 56: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/56.jpg)
Original RC Pier
CFSTPier
Concrete Strength (ksi) 4.0 4.0
Steel Strength (ksi) 60.0 50.0
Diameter (in.) 72.0 42.0
Tube Thickness (in.) ‐ 0.75
Concrete Area (in.2) 4000.0 1288
Steel Area (in.2) 101 97.19
Weight/ft of Pier (kips) 4.4 1.63
Total Pier Weight (kips) 231 85.4
Difference in Pier Weight 63% Reduction
Redesign of RC Bridge (Cold Water Creek Bridge)
![Page 57: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/57.jpg)
Summary and Conclusions
Spiral weld provides mechanical interlock and superior bond capacity
CFST bridge columns and connections are efficient relative to RC. CFST columns are stiffer and stronger for a given cross section. Material savings between 20 and 60%
The embedded connection is applicable to cap beam and foundations and capable of developing the full composite flexural strength of the CFT
Design expressions have been implemented in the WSDOT Bridge Design Manual (BDM)
CFT is a viable solution for rapid construction of bridges
![Page 58: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/58.jpg)
Works Cited
Bishop, E. (2009). Evaluation of the flexural resistance and stiffness models for circular concrete‐filled tube members subjected to combined axial‐flexural loading. Master’s thesis, University of Washington.
Roeder, C., Lehman, D., and Bishop, E. (2010). Strength and stiffness of circular concrete filled tubes. Journal of Structural Engineering, 135(12):1545‐1553.
Hannesson, G.1, Kuder, K.2, Shogren R. and Lehman, D. (2012) “The Influence of High Volume of Fly Ash and Slag on the Compressive Strength of Self‐Consolidating Concrete” Construction & Building Materials, May 2012, Pages 161‐168
Lehman, D., and Roeder, C. (2012). Foundation Connection for Circular Concrete Filled Tubes. Journal of Constructional Research, 78:212‐225.
Moon, J.1, Lehman, D. E.2, and Roeder, C. W.2 (2012). “Strength of Circular Concrete‐filled Tubes (CFT) with and without Internal Reinforcement under Combined Loading.” ASCE Journal of Structural Engineering, Permalink: http://dx.doi.org/10.1061/(ASCE)ST.1943‐541X.0000788
Stephens, M., Berg, L., Lehman, D., and Roeder, C. (2016) “Seismic CFST Column‐to‐Precast Cap Beam Connections for Accelerated Bridge Construction” ASCE Journal of Structural Engineering, In Press. DOI: 10.1061/(ASCE)ST.1943‐541X.0001505
![Page 59: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/59.jpg)
![Page 60: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/60.jpg)
Key Takeaways – ER Connection
![Page 61: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/61.jpg)
Slenderness (D/t ratio)
The local slenderness of the tube shall satisfy: D/t < 0.15E/Fy
![Page 62: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/62.jpg)
Axial Resistance
The factored resistance, Pr, of a composite CFST column subject to axial compression shall be determined as: Pr = cPn.
If Pe > 0.44Po, then: PP o
PePo
n 658.0 If Pe ≤ 0.44Po, then:
nP 0.877 eP
![Page 63: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/63.jpg)
Comparison with Buckling
Based on AISC Buckling Curve
0
0.2
0.4
0.6
0.8
1
1.2
1.4
0 0.5 1 1.5 2 2.5
Pcr,F
EM/Po or P,test/Po
Buckling parameter λ
AISC buckling curve_ EI from AISC
Han & Yan (2000)
Kloppel & Goder (1957)
Gardner & Jacobson (1967)
Fujii (1994)
Pan (1988)
Masuo et al. (1991)
Cai et al. (1984 & 1985)
Cai & Gu (1985)
Matsui et al. (1995)
Gardner (1968)_Spiral Welded Tube
Ghannam et al. (2004)
Han & Yao (2004)
![Page 64: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/64.jpg)
Length Dowels Extend into Cap Beam
The headed reinforcing extends into the cap beam to fully develop the dowels while eliminating the potential for a conical pullout failureACI Development of bars withmechanical anchors
Length to eliminate conical pullout
Le
f’g= grout strengthFy,b=yield strength of dowelΨe=bar coating factordb=dowel diameter
Ast,b= total area of dowels
![Page 65: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/65.jpg)
Dowel Debonded Length
> De‐bonded with the intent of increasing ductility– Limits strain in dowels– Limits damage to cap
beam
> Two methods to calculated de‐bonded length– Moment‐curvature
analysis– Rigid body kinematics
Ldb
Moment Curvature Approach
Rigid BodyApproach
φu= curvature limit corresponding to a maximum steel strainas obtained using a moment curvature analysis
εu= ultimate dowel bar strain
![Page 66: Concrete-Filled Tube Bridges for Accelerated Bridge ... · Concrete-Filled Tube Bridges for Accelerated Bridge Construction Professor Dawn Lehman Professor Charles Roeder Max Stephens](https://reader034.vdocuments.mx/reader034/viewer/2022052319/5b6e020a7f8b9a3b388db201/html5/thumbnails/66.jpg)
Punching Shear Requirement
˃ Adequate depth must be provided above the headed dowels to eliminate punching shear
˃ Experimental research discussed here used 4dh