Page 1: Concept Definition  Phase for  Clean  Electric Power  Systems

Concept Definition Phase for

Clean Electric Power Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Page 1 4/3/2014

Page 2: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Apollo lessons

• Start with the ultimate goal

• Characterize alternative systems

• Choose a direction

Page 2

“We will put a man on the moon before the end of the decade and return him safely to earth”

JFK May 25, 1961

Page 3: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Clean Energy goal confusion

• These are not performance goals but technology options

• Assumes that systems scale, the achievement can be incorporated into larger scale systems

• Confused by politics and public perceptions

Future of Energy objective

• Focus on the ultimate objective and whole systems– Derive interim goals derived

from ultimate objectives• Big reductions are inevitable

– Fossil fuel is a finite resource• Flexible time frame

– Sooner is better for health & environment

– Climate change may accelerate schedule

Page 3

Big (90%) reduction in fossil fuel consumption

30% renewables by 203020% wind by 2020

Page 4: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Classic concept definition• Given ultimate goals• Develop system concept models to explore, contrast, compare

alternative feasible solutions• Provide Society with factual feasible choices (m/s B)• Follow on phases can be agile

Page 4

Page 5: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Allocated wind power goals

• Compatible with clean, (10% fossil fuel) systems

• Reliable electric power systems

• Competitive cost

Page 5

Page 6: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Wincharger system• Zenith Radio “farm” (DC) radio

– ~ 750,000 systems 1930-1940s

• Provided farmers with quality radio!– Radio was most expensive

component– Battery sized for 4 days storage– High electricity cost ~ $2/kWh– Unreliable during July-August

• Did not survive rural electrification

Page 6

Page 7: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Wind systems are inefficient

• Robust systems come from interconnection of a large number of independent generators

• Reliable clean wind systems require– Full redundancy – Overbuilding wind– Additional

transmission assets.

Page 7

Page 8: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Wind + fossil fuel + storage*

Paper summary• 0.1% fossil fuel system for PJM

region appears to be technically feasible

• 3x wind energy overbuild, discard 2/3 of electricity

• ~ 24 hours storage• Full peak power fossil fuel backup

~8 hrs/yr• Stated cost ~ 38¢/kWh

Critique• Extreme events (July) drive system size• $0.38/kWh cost estimate is optimistic

(>$0.67/kWh)• Large environmental impact ~24,000 sq

miles, the size of West Virginia • Concept is sound but needs classical

concept development

Page 8

* Budischak, et al, Cost minimized combinations of wind, solar, storage, Journal of Power Sources 225, 2013, pp. 60-74

Page 9: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Basis for system concept trades

• PJM published wind & load data– CY2012

• EIA published cost estimates, – New 2018 installations– Wind, natural gas, nuclear

• 15% reserve margin• No wind contribution to

system capacity– Full redundancy

• No transmission constraints

Page 9

PJM load 2012

Curtailment begins at 25%

Page 10: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

All natural gas system• Reference

scenario– 100% emissions

• Cost includes system reserves

Page 10

Portions of this figure are taken from a paper by Gourdazi, Pavlak, “Concept trades for wind Energy Systems” accepted by ASME Power 2014 conference, July 2014

Page 11: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

NG + wind + ideal storage• Add wind + ideal storage

• Concept limit

• Ideal storage– Large size, zero cost, 100%

efficient– 100% of wind generation

displaces natural gas– Line slopes up to the right

because wind capital cost exceeds Ngas variable cost

Page 11

Portions of this figure are taken from a paper by Gourdazi, Pavlak, “Concept trades for wind Energy Systems” accepted by ASME Power 2014 conference, July 2014

Page 12: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Wind without storage

• Curtailment at PJM 2012– Begins at 26%– Bites at 50%

Page 12

Curtailed system cost

Portions of this figure are taken from a paper by Gourdazi, Pavlak, “Concept trades for wind Energy Systems” accepted by ASME Power 2014 conference, July 2014

Page 13: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Grid scale storage• Storage size is 2,135

GWh– One day at average load

• Estimated cost $200 $/kWh based on Bath Co, VA pumped hydro facility– 1,000 ft vertical elevation– 0.4 sq mile upper

reservoir– 105’ level change

• 80% round trip efficiency

• 68 Bath county facilities required

Page 13

Storage system impact

Storage state of charge

Portions of this figure are taken from a paper by Gourdazi, Pavlak, “Concept trades for wind Energy Systems” accepted by ASME Power 2014 conference, July 2014

Page 14: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Nuclear power

• Nuclear follows daily minimum

• Diurnal variations– All Ngas– Ngas & hot water

storage

Page 14

Nuclear model

Nuclear on system cost/performance

Portions of this figure are taken from a paper by Gourdazi, Pavlak, “Concept trades for wind Energy Systems” accepted by ASME Power 2014 conference, July 2014

Page 15: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Comparison with Budischak

Page 15

Portions of this figure are taken from a paper by Gourdazi, Pavlak, “Concept trades for wind Energy Systems” accepted by ASME Power 2014 conference, July 2014

Page 16: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Retail electricity prices• MD at 8% renewables,

mostly hydro pays 11 cts/kWh

• Germany with 25% renewables pays 36 cts/kWh

• Something is missing!

Page 16

Portions of this figure are taken from a paper by Gourdazi, Pavlak, “Concept trades for wind Energy Systems” accepted by ASME Power 2014 conference, July 2014

Page 17: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Conclusions• Focus on

– Ultimate goals– Complete systems

• To do– Transmission upgrades internal to the system– Congestion induced curtailment– Multiple years– Multiple regions– Storage parameter variation– Add solar PV– EIA cost refinement

Page 17

Page 18: Concept Definition  Phase for  Clean  Electric Power  Systems

Dr. Alex Pavlak; Future of Energy Initiative; 315 Dunham Ct., Severna Park, MD 21146-1670; (410)647-7334; [email protected]; http://sites.google.com/site/futureofenergyinitiative

Join the [email protected]

Page 18