OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA DESCRIPCION MED. AUXILIARES Y FACT. DE CONVERSION M3-KM M2 M3 M3 M KG PART LARGO ANCHO ALTO F.C. 1 F.C. 2 1 Código C.078000103 - - - - - - 4 49.50 2.40 1.90 902.88 - - - - - - 1 39.70 1.75 1.05 72.95 1 39.70 1.05 1.57 65.45 - 1 15.57 1.45 1.05 23.71 1 15.57 0.75 0.75 8.76 - 1 43.25 1.63 1.05 74.02 1 43.25 0.83 0.25 8.97 - 1 75.43 1.26 1.00 95.04 1 75.43 1.30 1.20 117.67 - 1 77.00 1.20 0.80 73.92 - TOTAL= ### - - 2 Código E317000000 - ### - - -4 49.50 2.40 0.40 - -190.08 - - -4 49.50 0.60 0.20 - -23.76 - - -4 49.50 0.55 1.00 - -108.90 - - -1 39.70 1.30 0.33 - -17.03 - - -1 39.70 0.30 0.50 - -5.96 - - -1 39.70 1.05 1.57 -65.45 -1 15.57 0.75 0.75 -8.76 -1 15.57 1.00 0.33 -5.14 - -1 15.57 0.30 0.50 -2.34 - -1 43.25 1.30 0.33 -18.55 - -1 43.25 0.30 0.50 -6.49 - -1 43.25 0.83 0.25 -8.97 -1 75.43 0.86 0.25 -16.22 - -1 75.43 0.30 0.55 -12.45 -1 75.43 1.30 1.20 -117.67 -1 77.00 0.30 0.40 -9.24 -1 77.00 0.80 0.40 -24.64 0.00 EXCAVACION PARA ESTRUCTURAS, PARA LAS OBRAS DE CONTENCION DE TIERRAS DE CUALQUIER PROFUNDIDAD CON EMPLEO DE EQUIPO RETROEXCAVADOR, APILAMIENTO Y/O BOTE, TRANSPORTE HASTA 200 MTS. DE DISTANCIA. INCLUYE REPERFILAMIENTO A MANO. COMPACTACION DE RELLENOS CON APISONADORES DE PERCUSION, CORRESPONDIENTE A LOS ASIENTOS DE FUNDACIONES, ZANJAS U OTROS.

Upload: jose-alberto-escalona-contreras

Post on 27-Nov-2014

458 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

1 Código C.078000103

- - -

- - -

4 49.50 2.40 1.90 902.88 - -

- - - -

1 39.70 1.75 1.05 72.95 MURO # 2

1 39.70 1.05 1.57 65.45

-

1 15.57 1.45 1.05 23.71 MURO # 1

1 15.57 0.75 0.75 8.76

-

1 43.25 1.63 1.05 74.02 MURO # 3

1 43.25 0.83 0.25 8.97

- MURO # 4 TERRAZA 1 Y 2

1 75.43 1.26 1.00 95.04

1 75.43 1.30 1.20 117.67

-

1 77.00 1.20 0.80 73.92 MURO VIALIDAD

- TOTAL= 1,443.37 - - 2 Código E317000000 - 1,443.37 - - VIENE PART. # 1

-4 49.50 2.40 0.40 - -190.08 - -

-4 49.50 0.60 0.20 - -23.76 - -

-4 49.50 0.55 1.00 - -108.90 - -

-1 39.70 1.30 0.33 - -17.03 - - MURO # 2

-1 39.70 0.30 0.50 - -5.96 - -

-1 39.70 1.05 1.57 -65.45

-1 15.57 0.75 0.75 -8.76 MURO # 1

-1 15.57 1.00 0.33 -5.14 -

-1 15.57 0.30 0.50 -2.34 -

-1 43.25 1.30 0.33 -18.55 -

-1 43.25 0.30 0.50 -6.49 -

-1 43.25 0.83 0.25 -8.97

-1 75.43 0.86 0.25 -16.22 - MURO # 4 TERRAZA 1 Y 2

-1 75.43 0.30 0.55 -12.45

-1 75.43 1.30 1.20 -117.67

-1 77.00 0.30 0.40 -9.24 MURO VIALIDAD

-1 77.00 0.80 0.40 -24.64

0.00

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

EXCAVACION PARA ESTRUCTURAS, PARA LAS

OBRAS DE CONTENCION DE TIERRAS DE

CUALQUIER PROFUNDIDAD CON EMPLEO DE

EQUIPO RETROEXCAVADOR, APILAMIENTO

Y/O BOTE, TRANSPORTE HASTA 200 MTS. DE

DISTANCIA. INCLUYE REPERFILAMIENTO A

MANO.

COMPACTACION DE RELLENOS CON

APISONADORES DE PERCUSION,

CORRESPONDIENTE A LOS ASIENTOS DE

FUNDACIONES, ZANJAS U OTROS.

Page 2: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

- TOTAL= 801.72 - - 3 Código E319100000 - - - -

4 49.50 2.40 0.15 71.28 - -

1 39.70 1.30 0.15 - 7.74 - -

1 15.57 1.00 0.15 - 2.34 - -

1 43.25 1.30 0.15 - 8.43 - -

1 75.43 0.86 0.15 9.73

1 77.00 0.80 0.15 9.24

- TOTAL= 108.76 - -

4 Código C.070112100 - - - -

4 49.50 0.45 3.60 - 320.76 - -

4 49.50 0.40 2.40 - 190.08 - -

4 49.50 0.60 0.20 - 23.76 - -

- - - -

- MURO # 2

1 39.70 1.30 0.33 17.03 ZAPATA

1 39.70 0.25 2.05 20.35 PANTALLA

- MURO # 1

1 15.57 1.00 0.33 5.14 ZAPATA

1 15.57 0.25 1.25 4.87 PANTALLA

- MURO # 2

1 43.25 1.30 0.33 18.55 ZAPATA

1 43.25 0.25 2.05 22.17 PANTALLA

- MURO # 4 TERRAZA 1 Y 2

1 75.43 0.86 0.25 16.22 ZAPATA

1 75.43 0.25 1.75 33.00 PANTALLA

- MURO VIALIDAD

1 77.00 0.80 0.25 15.40 ZAPATA

1 77.00 0.50 1.00 38.50 PANTALLA

-

-

-

-

- TOTAL= 725.83 - - 5 Código E802111210 -

20 15.60 0.559 174.41 MURO # 1

12.00 15.60 0.559 104.64

CONSTRUCCION DE BASE DE PIEDRA PICADA

CORRESPONDIENTE A OBRAS

PREPARATIVAS.

CONSTRUCCION DE MUROS DE

SOSTENIMIENTO DE CONCRETO ARMADO DE

RCC 210 KG/CM2. INCLUYE TRANSPORTE DEL

CEMENTO Y AGREGADOS HASTA 50 KM.

EXCLUYE EL REFUERZO METALICO.

DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS IGUAL O MENOR AL NO. 3, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIO.

Page 3: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

-

20 15.60 0.559 174.41 MURO # 3

12.00 15.60 0.559 104.64

-

30 75.43 0.559 1,264.96 MURO # 4 TERRAZA 1 Y 2

10 75.43 0.559 421.65 PANTALLA

-

10 77.00 0.559 430.43 MURO VIALIDAD

14 77.00 0.559 602.60 PANTALLA

-

16 49.50 0.559 442.73

-

-

TOTAL= 1,823.06

6 Código E802112210 1668 2.55 1.554 6,609.78 MUROS TERRAZAS

2409 2.55 1.554 9,546.14

927.00 1.60 0.994 1,474.30

115 49.50 0.994 5,658.35

121 49.50 0.994 5,953.56

741 4.42 0.994 3,255.57

1,112 4.55 1.554 7,862.62

1,483 1.93 0.994 2,845.02

- MURO # 2

200 2.55 0.994 506.94

200 2.55 0.994 506.94

30 39.70 0.994 1,183.85

7 1.00 1.554 10.88

400 1.60 0.994 636.16

18 39.70 0.994 710.31

14 1.00 1.554 21.76

-

78 2.15 0.994 166.69 MURO 1

78 1.75 0.994 135.68

208 1.30 0.994 268.78

5 1.00 1.554 7.77

10 1.00 1.554 15.54

-

78 2.15 0.994 166.69 MURO 3

78 1.75 0.994 135.68

208 1.30 0.994 268.78

5 1.00 1.554 7.77

DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS IGUAL O MENOR AL NO. 3, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIO.

SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS Nº 4 A Nº 7, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIOS.

Page 4: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

10 1.00 1.554 15.54

-

504 1.75 0.994 876.71 MURO # 4 TERRAZA 1 Y 2

504 1.65 0.994 826.61

25 1.00 1.554 38.85

50 1.00 1.554 77.70

1,008 1.00 0.994 1,001.95

- MURO VIALIDAD

385 1.60 0.994 612.30

385 1.45 0.994 554.90

513 1.00 0.994 509.92

513 1.00 0.994 509.92

-

-

-

TOTAL= 52,979.96

SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS Nº 4 A Nº 7, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIOS.

Page 5: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

7 Código E342020129

- - -

8 49.50 3.60 1,425.60 - - - MUROS TERRAZAS

16 0.45 3.60 25.92 - - -

-

2 43.25 1.75 151.38 MURO # 2

2 39.70 2.05 162.77 MURO # 1 Y 3

2 43.25 2.05 177.33

-

2 75.43 1.75 264.01 MURO # 4

-

2 77.00 1.00 154.00 MURO VIALIDAD

-

- - -

TOTAL= 2,361.01 -

8 Código ES/C - - - -

4 49.50 2.40 0.40 - 190.08 - -

4 49.50 0.60 0.20 - 23.76 - -

4 49.50 0.55 1.00 - 108.90 - -

1 39.70 1.30 0.33 - 17.03 - -

1 39.70 0.30 0.50 5.96

1 39.70 1.05 1.57 65.45

1 15.57 0.75 0.75 8.76

1 15.57 1.00 0.33 5.14

1 15.57 0.30 0.50 2.34

1 43.25 1.30 0.33 18.55

1 43.25 0.30 0.50 6.49

1 43.25 0.83 0.25 8.97

1 75.43 0.86 0.25 16.22

1 75.43 0.30 0.55 12.45

1 75.43 1.30 1.20 117.67

1 77.00 0.30 0.40 9.24

1 77.00 0.80 0.40 24.64

- TOTAL= 641.65 - - 9 Partida C.S/C - - - -

300 0.30 - - 90.00 -

- -

- - -

- - -

- - -

ENCOFRADO METALICO, TIPO RECTO, ACABADO OBRA LIMPIA, EN MUROS Y PANTALLAS.

BOTE DE MATERIAL DE DESECHO SIN

ARREGLO HASTA 50 KM DE DISTANCIA

INCLUYE CARGA

S/T/C DE BARBACANAS DE 4" CON TUBERIA DE

PVC REFORZADA PARA SUBDRENAJES EN

ZANJAS. EXCLUYE EL MATERIAL DEL FILTRO Y

LA EXCAVACION

Page 6: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

TOTAL= - - 90.00 - 11 C.070300000

4 49.50 3.60 712.80

8 0.45 3.60 -

-

1 43.25 1.75 75.69

1 39.70 2.05 81.39

1 43.25 2.05 88.66

-

1 75.43 1.75 132.00

-

1 77.00 1.00 77.00

-

-

TOTAL= 1,167.54

CAPA IMPERMEABILIZANTE EN MUROS A BASE DE ASFALTO, APLICADO EN FRIO

Page 7: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

1 Código C.078000103

- - -

- - -

4 49.50 2.40 1.90 902.88 - -

- - - -

1 39.70 1.75 1.05 72.95 MURO # 2

1 39.70 1.05 1.57 65.45

-

1 15.57 1.45 1.05 23.71 MURO # 1

1 15.57 0.75 0.75 8.76

-

1 43.25 1.63 1.05 74.02 MURO # 3

1 43.25 0.83 0.25 8.97

- MURO # 4 TERRAZA 1 Y 2

1 75.43 1.26 1.00 95.04

1 75.43 1.30 1.20 117.67

-

1 77.00 1.20 0.80 73.92 MURO VIALIDAD

- TOTAL= 1,443.37 - - 2 Código E317000000 - 1,443.37 - - VIENE PART. # 1

-4 49.50 2.40 0.40 - -190.08 - -

-4 49.50 0.60 0.20 - -23.76 - -

-4 49.50 0.55 1.00 - -108.90 - -

-1 39.70 1.30 0.33 - -17.03 - - MURO # 2

-1 39.70 0.30 0.50 - -5.96 - -

-1 39.70 1.05 1.57 -65.45

-1 15.57 0.75 0.75 -8.76 MURO # 1

-1 15.57 1.00 0.33 -5.14 -

-1 15.57 0.30 0.50 -2.34 -

-1 43.25 1.30 0.33 -18.55 -

-1 43.25 0.30 0.50 -6.49 -

-1 43.25 0.83 0.25 -8.97

-1 75.43 0.86 0.25 -16.22 - MURO # 4 TERRAZA 1 Y 2

-1 75.43 0.30 0.55 -12.45

-1 75.43 1.30 1.20 -117.67

-1 77.00 0.30 0.40 -9.24 MURO VIALIDAD

-1 77.00 0.80 0.40 -24.64

0.00

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

EXCAVACION PARA ESTRUCTURAS, PARA LAS

OBRAS DE CONTENCION DE TIERRAS DE

CUALQUIER PROFUNDIDAD CON EMPLEO DE

EQUIPO RETROEXCAVADOR, APILAMIENTO

Y/O BOTE, TRANSPORTE HASTA 200 MTS. DE

DISTANCIA. INCLUYE REPERFILAMIENTO A

MANO.

COMPACTACION DE RELLENOS CON

APISONADORES DE PERCUSION,

CORRESPONDIENTE A LOS ASIENTOS DE

FUNDACIONES, ZANJAS U OTROS.

Page 8: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

- TOTAL= 801.72 - -

2 Código E313110000 - - - -

4 49.50 2.40 0.40 - 190.08 - -

4 49.50 0.60 0.20 - 23.76 - -

4 49.50 0.55 1.00 - 108.90 - -

1 39.70 1.30 0.33 - 17.03 - -

1 39.70 0.30 0.50 5.96

1 39.70 1.05 1.57 65.45

1 15.57 0.75 0.75 8.76

1 15.57 1.00 0.33 5.14

1 15.57 0.30 0.50 2.34

1 43.25 1.30 0.33 18.55

1 43.25 0.30 0.50 6.49

1 43.25 0.83 0.25 8.97

1 75.43 0.86 0.25 16.22

1 75.43 0.30 0.55 12.45

1 75.43 1.30 1.20 117.67

1 77.00 0.30 0.40 9.24

1 77.00 0.80 0.40 24.64

-

- TOTAL= 641.65 - - 3 Código E319100000 - - - -

4 49.50 2.40 0.15 71.28 - -

1 39.70 1.30 0.15 - 7.74 - -

1 15.57 1.00 0.15 - 2.34 - -

1 43.25 1.30 0.15 - 8.43 - -

1 75.43 0.86 0.15 9.73

CARGA A MANO DE MATERIAL PROVENIENTE

DE LAS EXCAVACIONES PARA ASIENTO DE

FUNDACIONES, ZANJAS, U OTROS.

CONSTRUCCION DE BASE DE PIEDRA PICADA

CORRESPONDIENTE A OBRAS

PREPARATIVAS.

Page 9: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

1 75.43 1.30 0.15 14.71

- TOTAL= 114.23 - - 5 Código E351120210 1668 2.55 1.554

2409 2.55 1.554

927.00 1.60 0.994 1,474.30

115 49.50 0.994 5,658.35

TOTAL= 7,132.65

6 Código E352120210 121 49.50 0.994 5,953.56

741 4.42 0.994 3,255.57

1,112.00 4.55 1.554 7,862.62

1,483 1.93 0.994 2,845.02

SUMINISTRO, TRANSPORTE, PREPARACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLA NO.4 A NO.7, PARA INFRAESTRUCTURA

SUMINISTRO, TRANSPORTE, PREPARACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS NO.4 A NO.7 PARA SUPERESTRUCTURA.

Page 10: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

TOTAL= 19,916.77

SUMINISTRO, TRANSPORTE, PREPARACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS NO.4 A NO.7 PARA SUPERESTRUCTURA.

Page 11: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

7 Código E342010129

- - -

8 49.50 3.60 1,425.60 - - -

16 0.45 3.60 25.92 - - -

- - -

TOTAL= 1,451.52 -

8 Código C.S/C - - - -

4 49.50 0.45 3.60 - 320.76 - -

4 49.50 0.40 2.40 - 190.08 - -

4 49.50 0.60 0.20 - 23.76 - -

- - - -

- TOTAL= 534.60 - - 9 Partida 9. Código ES/C - - - -

- - - -

641.65 5.0 KM 3,208.25 - -

- - -

- - -

- - -

TOTAL= 3,208.25 - - - 10 Código C.S/C. - - - -

304 0.45 136.80 -

- - - -

- - - -

- - - -

- TOTAL= 136.80 - 11 C.070300000

4 49.50 3.60 712.80

TOTAL= 712.80

12

ENCOFRADO DE MADERA, TIPO RECTO,

ACABADO OBRA LIMPIA, EN MUROS Y

PANTALLAS.

CONCRETO DE RCC 210 KG/CM2 A LOS 28

DIAS, PARA LA CONSTRUCCION DE MUROS.

EXCLUYE EL REFUERZO METALICO Y EL

ENCOFRADO.

BOTE DE MATERIAL DE DESECHO SIN

ARREGLO HASTA 50 Km. DE DISTANCIA

INCLUYE CARGA.

S/T/C DE BARBACANAS DE 4" CON TUBERÍA DE

P.V.C. REFORZADA PARA SUB-DRENAJES EN

ZANJAS. EXCLUYE EL MATERIAL DEL FILTRO Y

LA EXCAVACIÓN.

CAPA IMPERMEABILIZANTE EN MUROS A BASE DE ASFALTO, APLICADO EN FRIO

Page 12: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

1 Código C.078000103

- - -

- - -

- - -

- - - -

1 39.70 1.75 1.05 72.95 MURO # 2

1 39.70 1.05 1.57 65.45

-

1 15.57 1.45 1.05 23.71 MURO # 1

1 15.57 0.75 0.75 8.76

-

1 43.25 1.63 1.05 74.02 MURO # 3

1 43.25 0.83 0.25 8.97

- MURO # 4 TERRAZA 1 Y 2

1 75.43 1.26 1.00 95.04

1 75.43 1.30 1.20 117.67

-

1 77.00 1.20 0.80 73.92 MURO VIALIDAD

- TOTAL= 540.49 - - 2 Código E317000000 - 540.49 - - VIENE PART. # 1

- -

- -

- -

-1 39.70 1.30 0.33 - -17.03 - - MURO # 2

-1 39.70 0.30 0.50 - -5.96 - -

-1 39.70 1.05 1.57 -65.45

-1 15.57 0.75 0.75 -8.76 MURO # 1

-1 15.57 1.00 0.33 -5.14 -

-1 15.57 0.30 0.50 -2.34 -

-1 43.25 1.30 0.33 -18.55 -

-1 43.25 0.30 0.50 -6.49 -

-1 43.25 0.83 0.25 -8.97

-1 75.43 0.86 0.25 -16.22 - MURO # 4 TERRAZA 1 Y 2

-1 75.43 0.30 0.55 -12.45

-1 75.43 1.30 1.20 -117.67

-1 77.00 0.30 0.40 -9.24 MURO VIALIDAD

-1 77.00 0.80 0.40 -24.64

0.00

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

EXCAVACION PARA ESTRUCTURAS, PARA LAS

OBRAS DE CONTENCION DE TIERRAS DE

CUALQUIER PROFUNDIDAD CON EMPLEO DE

EQUIPO RETROEXCAVADOR, APILAMIENTO

Y/O BOTE, TRANSPORTE HASTA 200 MTS. DE

DISTANCIA. INCLUYE REPERFILAMIENTO A

MANO.

COMPACTACION DE RELLENOS CON

APISONADORES DE PERCUSION,

CORRESPONDIENTE A LOS ASIENTOS DE

FUNDACIONES, ZANJAS U OTROS.

Page 13: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

- TOTAL= 221.58 - - 3 Código E319100000 - - - -

- -

1 39.70 1.30 0.15 - 7.74 - -

1 15.57 1.00 0.15 - 2.34 - -

1 43.25 1.30 0.15 - 8.43 - -

1 75.43 0.86 0.15 9.73

1 77.00 0.80 0.15 9.24

- TOTAL= 37.48 - -

4 Código C.070112100 - - - -

- -

- -

- -

- - - -

- MURO # 2

1 39.70 1.30 0.33 17.03 ZAPATA

1 39.70 0.25 2.05 20.35 PANTALLA

- MURO # 1

1 15.57 1.00 0.33 5.14 ZAPATA

1 15.57 0.25 1.25 4.87 PANTALLA

- MURO # 2

1 43.25 1.30 0.33 18.55 ZAPATA

1 43.25 0.25 2.05 22.17 PANTALLA

- MURO # 4 TERRAZA 1 Y 2

1 75.43 0.86 0.25 16.22 ZAPATA

1 75.43 0.25 1.75 33.00 PANTALLA

- MURO VIALIDAD

1 77.00 0.80 0.25 15.40 ZAPATA

1 77.00 0.50 1.00 38.50 PANTALLA

-

-

-

-

- TOTAL= 191.23 - - 5 Código E802111210 -

- MURO # 1

-

CONSTRUCCION DE BASE DE PIEDRA PICADA

CORRESPONDIENTE A OBRAS

PREPARATIVAS.

CONSTRUCCION DE MUROS DE

SOSTENIMIENTO DE CONCRETO ARMADO DE

RCC 210 KG/CM2. INCLUYE TRANSPORTE DEL

CEMENTO Y AGREGADOS HASTA 50 KM.

EXCLUYE EL REFUERZO METALICO.

DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS IGUAL O MENOR AL NO. 3, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIO.

Page 14: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

-

- MURO # 3

-

-

30 75.43 0.559 1,264.96 MURO # 4 TERRAZA 1 Y 2

10 75.43 0.559 421.65 PANTALLA

-

10 77.00 0.559 430.43 MURO VIALIDAD

14 77.00 0.559 602.60 PANTALLA

-

16 49.50 0.559 442.73

-

-

TOTAL= 1,264.96

6 Código E802112210 - MUROS TERRAZAS

-

-

-

-

-

-

-

- MURO # 2

200 2.55 0.994 506.94

200 2.55 0.994 506.94

30 39.70 0.994 1,183.85

7 1.00 1.554 10.88

400 1.60 0.994 636.16

18 39.70 0.994 710.31

14 1.00 1.554 21.76

-

78 2.15 0.994 166.69 MURO 1

78 1.75 0.994 135.68

208 1.30 0.994 268.78

5 1.00 1.554 7.77

10 1.00 1.554 15.54

-

78 2.15 0.994 166.69 MURO 3

78 1.75 0.994 135.68

208 1.30 0.994 268.78

5 1.00 1.554 7.77

DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS IGUAL O MENOR AL NO. 3, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIO.

SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS Nº 4 A Nº 7, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIOS.

Page 15: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

10 1.00 1.554 15.54

-

504 1.75 0.994 876.71 MURO # 4 TERRAZA 1 Y 2

504 1.65 0.994 826.61

25 1.00 1.554 38.85

50 1.00 1.554 77.70

1,008 1.00 0.994 1,001.95

- MURO VIALIDAD

385 1.60 0.994 612.30

385 1.45 0.994 554.90

513 1.00 0.994 509.92

513 1.00 0.994 509.92

-

-

-

TOTAL= 9,774.62

SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS Nº 4 A Nº 7, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIOS.

Page 16: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

7 Código E342020129

- - -

- - - - MUROS TERRAZAS

- - - -

-

2 43.25 1.75 151.38 MURO # 2

2 39.70 2.05 162.77 MURO # 1 Y 3

2 43.25 2.05 177.33

-

2 75.43 1.75 264.01 MURO # 4

-

2 77.00 1.00 154.00 MURO VIALIDAD

-

- - -

TOTAL= 909.49 -

8 Código ES/C - - - -

- - - -

- - - -

- - - -

1 39.70 1.30 0.33 - 17.03 - -

1 39.70 0.30 0.50 5.96

1 39.70 1.05 1.57 65.45

1 15.57 0.75 0.75 8.76

1 15.57 1.00 0.33 5.14

1 15.57 0.30 0.50 2.34

1 43.25 1.30 0.33 18.55

1 43.25 0.30 0.50 6.49

1 43.25 0.83 0.25 8.97

1 75.43 0.86 0.25 16.22

1 75.43 0.30 0.55 12.45

1 75.43 1.30 1.20 117.67

1 77.00 0.30 0.40 9.24

1 77.00 0.80 0.40 24.64

- TOTAL= 318.91 - - 9 Partida C.S/C - - - -

251 0.30 - - 75.30 -

- -

- - -

- - -

- - -

ENCOFRADO METALICO, TIPO RECTO, ACABADO OBRA LIMPIA, EN MUROS Y PANTALLAS.

BOTE DE MATERIAL DE DESECHO SIN

ARREGLO HASTA 50 KM DE DISTANCIA

INCLUYE CARGA

S/T/C DE BARBACANAS DE 4" CON TUBERIA DE

PVC REFORZADA PARA SUBDRENAJES EN

ZANJAS. EXCLUYE EL MATERIAL DEL FILTRO Y

LA EXCAVACION

Page 17: Computos Metricos de Muro de Contencion

NºDESCRIPCION Nº

MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES

PART LARGO ANCHO ALTO F.C. 1 F.C. 2

OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO

TOTAL= - - 75.30 - 11 C.070300000

-

-

-

1 43.25 1.75 75.69

1 39.70 2.05 81.39

1 43.25 2.05 88.66

-

1 75.43 1.75 132.00

-

1 77.00 1.00 77.00

-

-

TOTAL= 454.74