computos metricos de muro de contencion
TRANSCRIPT
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
1 Código C.078000103
- - -
- - -
4 49.50 2.40 1.90 902.88 - -
- - - -
1 39.70 1.75 1.05 72.95 MURO # 2
1 39.70 1.05 1.57 65.45
-
1 15.57 1.45 1.05 23.71 MURO # 1
1 15.57 0.75 0.75 8.76
-
1 43.25 1.63 1.05 74.02 MURO # 3
1 43.25 0.83 0.25 8.97
- MURO # 4 TERRAZA 1 Y 2
1 75.43 1.26 1.00 95.04
1 75.43 1.30 1.20 117.67
-
1 77.00 1.20 0.80 73.92 MURO VIALIDAD
- TOTAL= 1,443.37 - - 2 Código E317000000 - 1,443.37 - - VIENE PART. # 1
-4 49.50 2.40 0.40 - -190.08 - -
-4 49.50 0.60 0.20 - -23.76 - -
-4 49.50 0.55 1.00 - -108.90 - -
-1 39.70 1.30 0.33 - -17.03 - - MURO # 2
-1 39.70 0.30 0.50 - -5.96 - -
-1 39.70 1.05 1.57 -65.45
-1 15.57 0.75 0.75 -8.76 MURO # 1
-1 15.57 1.00 0.33 -5.14 -
-1 15.57 0.30 0.50 -2.34 -
-1 43.25 1.30 0.33 -18.55 -
-1 43.25 0.30 0.50 -6.49 -
-1 43.25 0.83 0.25 -8.97
-1 75.43 0.86 0.25 -16.22 - MURO # 4 TERRAZA 1 Y 2
-1 75.43 0.30 0.55 -12.45
-1 75.43 1.30 1.20 -117.67
-1 77.00 0.30 0.40 -9.24 MURO VIALIDAD
-1 77.00 0.80 0.40 -24.64
0.00
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
EXCAVACION PARA ESTRUCTURAS, PARA LAS
OBRAS DE CONTENCION DE TIERRAS DE
CUALQUIER PROFUNDIDAD CON EMPLEO DE
EQUIPO RETROEXCAVADOR, APILAMIENTO
Y/O BOTE, TRANSPORTE HASTA 200 MTS. DE
DISTANCIA. INCLUYE REPERFILAMIENTO A
MANO.
COMPACTACION DE RELLENOS CON
APISONADORES DE PERCUSION,
CORRESPONDIENTE A LOS ASIENTOS DE
FUNDACIONES, ZANJAS U OTROS.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
- TOTAL= 801.72 - - 3 Código E319100000 - - - -
4 49.50 2.40 0.15 71.28 - -
1 39.70 1.30 0.15 - 7.74 - -
1 15.57 1.00 0.15 - 2.34 - -
1 43.25 1.30 0.15 - 8.43 - -
1 75.43 0.86 0.15 9.73
1 77.00 0.80 0.15 9.24
- TOTAL= 108.76 - -
4 Código C.070112100 - - - -
4 49.50 0.45 3.60 - 320.76 - -
4 49.50 0.40 2.40 - 190.08 - -
4 49.50 0.60 0.20 - 23.76 - -
- - - -
- MURO # 2
1 39.70 1.30 0.33 17.03 ZAPATA
1 39.70 0.25 2.05 20.35 PANTALLA
- MURO # 1
1 15.57 1.00 0.33 5.14 ZAPATA
1 15.57 0.25 1.25 4.87 PANTALLA
- MURO # 2
1 43.25 1.30 0.33 18.55 ZAPATA
1 43.25 0.25 2.05 22.17 PANTALLA
- MURO # 4 TERRAZA 1 Y 2
1 75.43 0.86 0.25 16.22 ZAPATA
1 75.43 0.25 1.75 33.00 PANTALLA
- MURO VIALIDAD
1 77.00 0.80 0.25 15.40 ZAPATA
1 77.00 0.50 1.00 38.50 PANTALLA
-
-
-
-
- TOTAL= 725.83 - - 5 Código E802111210 -
20 15.60 0.559 174.41 MURO # 1
12.00 15.60 0.559 104.64
CONSTRUCCION DE BASE DE PIEDRA PICADA
CORRESPONDIENTE A OBRAS
PREPARATIVAS.
CONSTRUCCION DE MUROS DE
SOSTENIMIENTO DE CONCRETO ARMADO DE
RCC 210 KG/CM2. INCLUYE TRANSPORTE DEL
CEMENTO Y AGREGADOS HASTA 50 KM.
EXCLUYE EL REFUERZO METALICO.
DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS IGUAL O MENOR AL NO. 3, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIO.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
-
20 15.60 0.559 174.41 MURO # 3
12.00 15.60 0.559 104.64
-
30 75.43 0.559 1,264.96 MURO # 4 TERRAZA 1 Y 2
10 75.43 0.559 421.65 PANTALLA
-
10 77.00 0.559 430.43 MURO VIALIDAD
14 77.00 0.559 602.60 PANTALLA
-
16 49.50 0.559 442.73
-
-
TOTAL= 1,823.06
6 Código E802112210 1668 2.55 1.554 6,609.78 MUROS TERRAZAS
2409 2.55 1.554 9,546.14
927.00 1.60 0.994 1,474.30
115 49.50 0.994 5,658.35
121 49.50 0.994 5,953.56
741 4.42 0.994 3,255.57
1,112 4.55 1.554 7,862.62
1,483 1.93 0.994 2,845.02
- MURO # 2
200 2.55 0.994 506.94
200 2.55 0.994 506.94
30 39.70 0.994 1,183.85
7 1.00 1.554 10.88
400 1.60 0.994 636.16
18 39.70 0.994 710.31
14 1.00 1.554 21.76
-
78 2.15 0.994 166.69 MURO 1
78 1.75 0.994 135.68
208 1.30 0.994 268.78
5 1.00 1.554 7.77
10 1.00 1.554 15.54
-
78 2.15 0.994 166.69 MURO 3
78 1.75 0.994 135.68
208 1.30 0.994 268.78
5 1.00 1.554 7.77
DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS IGUAL O MENOR AL NO. 3, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIO.
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS Nº 4 A Nº 7, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIOS.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
10 1.00 1.554 15.54
-
504 1.75 0.994 876.71 MURO # 4 TERRAZA 1 Y 2
504 1.65 0.994 826.61
25 1.00 1.554 38.85
50 1.00 1.554 77.70
1,008 1.00 0.994 1,001.95
- MURO VIALIDAD
385 1.60 0.994 612.30
385 1.45 0.994 554.90
513 1.00 0.994 509.92
513 1.00 0.994 509.92
-
-
-
TOTAL= 52,979.96
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS Nº 4 A Nº 7, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIOS.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
7 Código E342020129
- - -
8 49.50 3.60 1,425.60 - - - MUROS TERRAZAS
16 0.45 3.60 25.92 - - -
-
2 43.25 1.75 151.38 MURO # 2
2 39.70 2.05 162.77 MURO # 1 Y 3
2 43.25 2.05 177.33
-
2 75.43 1.75 264.01 MURO # 4
-
2 77.00 1.00 154.00 MURO VIALIDAD
-
- - -
TOTAL= 2,361.01 -
8 Código ES/C - - - -
4 49.50 2.40 0.40 - 190.08 - -
4 49.50 0.60 0.20 - 23.76 - -
4 49.50 0.55 1.00 - 108.90 - -
1 39.70 1.30 0.33 - 17.03 - -
1 39.70 0.30 0.50 5.96
1 39.70 1.05 1.57 65.45
1 15.57 0.75 0.75 8.76
1 15.57 1.00 0.33 5.14
1 15.57 0.30 0.50 2.34
1 43.25 1.30 0.33 18.55
1 43.25 0.30 0.50 6.49
1 43.25 0.83 0.25 8.97
1 75.43 0.86 0.25 16.22
1 75.43 0.30 0.55 12.45
1 75.43 1.30 1.20 117.67
1 77.00 0.30 0.40 9.24
1 77.00 0.80 0.40 24.64
- TOTAL= 641.65 - - 9 Partida C.S/C - - - -
300 0.30 - - 90.00 -
- -
- - -
- - -
- - -
ENCOFRADO METALICO, TIPO RECTO, ACABADO OBRA LIMPIA, EN MUROS Y PANTALLAS.
BOTE DE MATERIAL DE DESECHO SIN
ARREGLO HASTA 50 KM DE DISTANCIA
INCLUYE CARGA
S/T/C DE BARBACANAS DE 4" CON TUBERIA DE
PVC REFORZADA PARA SUBDRENAJES EN
ZANJAS. EXCLUYE EL MATERIAL DEL FILTRO Y
LA EXCAVACION
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
TOTAL= - - 90.00 - 11 C.070300000
4 49.50 3.60 712.80
8 0.45 3.60 -
-
1 43.25 1.75 75.69
1 39.70 2.05 81.39
1 43.25 2.05 88.66
-
1 75.43 1.75 132.00
-
1 77.00 1.00 77.00
-
-
TOTAL= 1,167.54
CAPA IMPERMEABILIZANTE EN MUROS A BASE DE ASFALTO, APLICADO EN FRIO
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
1 Código C.078000103
- - -
- - -
4 49.50 2.40 1.90 902.88 - -
- - - -
1 39.70 1.75 1.05 72.95 MURO # 2
1 39.70 1.05 1.57 65.45
-
1 15.57 1.45 1.05 23.71 MURO # 1
1 15.57 0.75 0.75 8.76
-
1 43.25 1.63 1.05 74.02 MURO # 3
1 43.25 0.83 0.25 8.97
- MURO # 4 TERRAZA 1 Y 2
1 75.43 1.26 1.00 95.04
1 75.43 1.30 1.20 117.67
-
1 77.00 1.20 0.80 73.92 MURO VIALIDAD
- TOTAL= 1,443.37 - - 2 Código E317000000 - 1,443.37 - - VIENE PART. # 1
-4 49.50 2.40 0.40 - -190.08 - -
-4 49.50 0.60 0.20 - -23.76 - -
-4 49.50 0.55 1.00 - -108.90 - -
-1 39.70 1.30 0.33 - -17.03 - - MURO # 2
-1 39.70 0.30 0.50 - -5.96 - -
-1 39.70 1.05 1.57 -65.45
-1 15.57 0.75 0.75 -8.76 MURO # 1
-1 15.57 1.00 0.33 -5.14 -
-1 15.57 0.30 0.50 -2.34 -
-1 43.25 1.30 0.33 -18.55 -
-1 43.25 0.30 0.50 -6.49 -
-1 43.25 0.83 0.25 -8.97
-1 75.43 0.86 0.25 -16.22 - MURO # 4 TERRAZA 1 Y 2
-1 75.43 0.30 0.55 -12.45
-1 75.43 1.30 1.20 -117.67
-1 77.00 0.30 0.40 -9.24 MURO VIALIDAD
-1 77.00 0.80 0.40 -24.64
0.00
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
EXCAVACION PARA ESTRUCTURAS, PARA LAS
OBRAS DE CONTENCION DE TIERRAS DE
CUALQUIER PROFUNDIDAD CON EMPLEO DE
EQUIPO RETROEXCAVADOR, APILAMIENTO
Y/O BOTE, TRANSPORTE HASTA 200 MTS. DE
DISTANCIA. INCLUYE REPERFILAMIENTO A
MANO.
COMPACTACION DE RELLENOS CON
APISONADORES DE PERCUSION,
CORRESPONDIENTE A LOS ASIENTOS DE
FUNDACIONES, ZANJAS U OTROS.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
- TOTAL= 801.72 - -
2 Código E313110000 - - - -
4 49.50 2.40 0.40 - 190.08 - -
4 49.50 0.60 0.20 - 23.76 - -
4 49.50 0.55 1.00 - 108.90 - -
1 39.70 1.30 0.33 - 17.03 - -
1 39.70 0.30 0.50 5.96
1 39.70 1.05 1.57 65.45
1 15.57 0.75 0.75 8.76
1 15.57 1.00 0.33 5.14
1 15.57 0.30 0.50 2.34
1 43.25 1.30 0.33 18.55
1 43.25 0.30 0.50 6.49
1 43.25 0.83 0.25 8.97
1 75.43 0.86 0.25 16.22
1 75.43 0.30 0.55 12.45
1 75.43 1.30 1.20 117.67
1 77.00 0.30 0.40 9.24
1 77.00 0.80 0.40 24.64
-
- TOTAL= 641.65 - - 3 Código E319100000 - - - -
4 49.50 2.40 0.15 71.28 - -
1 39.70 1.30 0.15 - 7.74 - -
1 15.57 1.00 0.15 - 2.34 - -
1 43.25 1.30 0.15 - 8.43 - -
1 75.43 0.86 0.15 9.73
CARGA A MANO DE MATERIAL PROVENIENTE
DE LAS EXCAVACIONES PARA ASIENTO DE
FUNDACIONES, ZANJAS, U OTROS.
CONSTRUCCION DE BASE DE PIEDRA PICADA
CORRESPONDIENTE A OBRAS
PREPARATIVAS.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
1 75.43 1.30 0.15 14.71
- TOTAL= 114.23 - - 5 Código E351120210 1668 2.55 1.554
2409 2.55 1.554
927.00 1.60 0.994 1,474.30
115 49.50 0.994 5,658.35
TOTAL= 7,132.65
6 Código E352120210 121 49.50 0.994 5,953.56
741 4.42 0.994 3,255.57
1,112.00 4.55 1.554 7,862.62
1,483 1.93 0.994 2,845.02
SUMINISTRO, TRANSPORTE, PREPARACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLA NO.4 A NO.7, PARA INFRAESTRUCTURA
SUMINISTRO, TRANSPORTE, PREPARACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS NO.4 A NO.7 PARA SUPERESTRUCTURA.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
TOTAL= 19,916.77
SUMINISTRO, TRANSPORTE, PREPARACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS NO.4 A NO.7 PARA SUPERESTRUCTURA.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
7 Código E342010129
- - -
8 49.50 3.60 1,425.60 - - -
16 0.45 3.60 25.92 - - -
- - -
TOTAL= 1,451.52 -
8 Código C.S/C - - - -
4 49.50 0.45 3.60 - 320.76 - -
4 49.50 0.40 2.40 - 190.08 - -
4 49.50 0.60 0.20 - 23.76 - -
- - - -
- TOTAL= 534.60 - - 9 Partida 9. Código ES/C - - - -
- - - -
641.65 5.0 KM 3,208.25 - -
- - -
- - -
- - -
TOTAL= 3,208.25 - - - 10 Código C.S/C. - - - -
304 0.45 136.80 -
- - - -
- - - -
- - - -
- TOTAL= 136.80 - 11 C.070300000
4 49.50 3.60 712.80
TOTAL= 712.80
12
ENCOFRADO DE MADERA, TIPO RECTO,
ACABADO OBRA LIMPIA, EN MUROS Y
PANTALLAS.
CONCRETO DE RCC 210 KG/CM2 A LOS 28
DIAS, PARA LA CONSTRUCCION DE MUROS.
EXCLUYE EL REFUERZO METALICO Y EL
ENCOFRADO.
BOTE DE MATERIAL DE DESECHO SIN
ARREGLO HASTA 50 Km. DE DISTANCIA
INCLUYE CARGA.
S/T/C DE BARBACANAS DE 4" CON TUBERÍA DE
P.V.C. REFORZADA PARA SUB-DRENAJES EN
ZANJAS. EXCLUYE EL MATERIAL DEL FILTRO Y
LA EXCAVACIÓN.
CAPA IMPERMEABILIZANTE EN MUROS A BASE DE ASFALTO, APLICADO EN FRIO
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
1 Código C.078000103
- - -
- - -
- - -
- - - -
1 39.70 1.75 1.05 72.95 MURO # 2
1 39.70 1.05 1.57 65.45
-
1 15.57 1.45 1.05 23.71 MURO # 1
1 15.57 0.75 0.75 8.76
-
1 43.25 1.63 1.05 74.02 MURO # 3
1 43.25 0.83 0.25 8.97
- MURO # 4 TERRAZA 1 Y 2
1 75.43 1.26 1.00 95.04
1 75.43 1.30 1.20 117.67
-
1 77.00 1.20 0.80 73.92 MURO VIALIDAD
- TOTAL= 540.49 - - 2 Código E317000000 - 540.49 - - VIENE PART. # 1
- -
- -
- -
-1 39.70 1.30 0.33 - -17.03 - - MURO # 2
-1 39.70 0.30 0.50 - -5.96 - -
-1 39.70 1.05 1.57 -65.45
-1 15.57 0.75 0.75 -8.76 MURO # 1
-1 15.57 1.00 0.33 -5.14 -
-1 15.57 0.30 0.50 -2.34 -
-1 43.25 1.30 0.33 -18.55 -
-1 43.25 0.30 0.50 -6.49 -
-1 43.25 0.83 0.25 -8.97
-1 75.43 0.86 0.25 -16.22 - MURO # 4 TERRAZA 1 Y 2
-1 75.43 0.30 0.55 -12.45
-1 75.43 1.30 1.20 -117.67
-1 77.00 0.30 0.40 -9.24 MURO VIALIDAD
-1 77.00 0.80 0.40 -24.64
0.00
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
EXCAVACION PARA ESTRUCTURAS, PARA LAS
OBRAS DE CONTENCION DE TIERRAS DE
CUALQUIER PROFUNDIDAD CON EMPLEO DE
EQUIPO RETROEXCAVADOR, APILAMIENTO
Y/O BOTE, TRANSPORTE HASTA 200 MTS. DE
DISTANCIA. INCLUYE REPERFILAMIENTO A
MANO.
COMPACTACION DE RELLENOS CON
APISONADORES DE PERCUSION,
CORRESPONDIENTE A LOS ASIENTOS DE
FUNDACIONES, ZANJAS U OTROS.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
- TOTAL= 221.58 - - 3 Código E319100000 - - - -
- -
1 39.70 1.30 0.15 - 7.74 - -
1 15.57 1.00 0.15 - 2.34 - -
1 43.25 1.30 0.15 - 8.43 - -
1 75.43 0.86 0.15 9.73
1 77.00 0.80 0.15 9.24
- TOTAL= 37.48 - -
4 Código C.070112100 - - - -
- -
- -
- -
- - - -
- MURO # 2
1 39.70 1.30 0.33 17.03 ZAPATA
1 39.70 0.25 2.05 20.35 PANTALLA
- MURO # 1
1 15.57 1.00 0.33 5.14 ZAPATA
1 15.57 0.25 1.25 4.87 PANTALLA
- MURO # 2
1 43.25 1.30 0.33 18.55 ZAPATA
1 43.25 0.25 2.05 22.17 PANTALLA
- MURO # 4 TERRAZA 1 Y 2
1 75.43 0.86 0.25 16.22 ZAPATA
1 75.43 0.25 1.75 33.00 PANTALLA
- MURO VIALIDAD
1 77.00 0.80 0.25 15.40 ZAPATA
1 77.00 0.50 1.00 38.50 PANTALLA
-
-
-
-
- TOTAL= 191.23 - - 5 Código E802111210 -
- MURO # 1
-
CONSTRUCCION DE BASE DE PIEDRA PICADA
CORRESPONDIENTE A OBRAS
PREPARATIVAS.
CONSTRUCCION DE MUROS DE
SOSTENIMIENTO DE CONCRETO ARMADO DE
RCC 210 KG/CM2. INCLUYE TRANSPORTE DEL
CEMENTO Y AGREGADOS HASTA 50 KM.
EXCLUYE EL REFUERZO METALICO.
DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS IGUAL O MENOR AL NO. 3, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIO.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
-
- MURO # 3
-
-
30 75.43 0.559 1,264.96 MURO # 4 TERRAZA 1 Y 2
10 75.43 0.559 421.65 PANTALLA
-
10 77.00 0.559 430.43 MURO VIALIDAD
14 77.00 0.559 602.60 PANTALLA
-
16 49.50 0.559 442.73
-
-
TOTAL= 1,264.96
6 Código E802112210 - MUROS TERRAZAS
-
-
-
-
-
-
-
- MURO # 2
200 2.55 0.994 506.94
200 2.55 0.994 506.94
30 39.70 0.994 1,183.85
7 1.00 1.554 10.88
400 1.60 0.994 636.16
18 39.70 0.994 710.31
14 1.00 1.554 21.76
-
78 2.15 0.994 166.69 MURO 1
78 1.75 0.994 135.68
208 1.30 0.994 268.78
5 1.00 1.554 7.77
10 1.00 1.554 15.54
-
78 2.15 0.994 166.69 MURO 3
78 1.75 0.994 135.68
208 1.30 0.994 268.78
5 1.00 1.554 7.77
DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS IGUAL O MENOR AL NO. 3, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIO.
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS Nº 4 A Nº 7, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIOS.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
10 1.00 1.554 15.54
-
504 1.75 0.994 876.71 MURO # 4 TERRAZA 1 Y 2
504 1.65 0.994 826.61
25 1.00 1.554 38.85
50 1.00 1.554 77.70
1,008 1.00 0.994 1,001.95
- MURO VIALIDAD
385 1.60 0.994 612.30
385 1.45 0.994 554.90
513 1.00 0.994 509.92
513 1.00 0.994 509.92
-
-
-
TOTAL= 9,774.62
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLAS Nº 4 A Nº 7, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE SERVICIOS.
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
7 Código E342020129
- - -
- - - - MUROS TERRAZAS
- - - -
-
2 43.25 1.75 151.38 MURO # 2
2 39.70 2.05 162.77 MURO # 1 Y 3
2 43.25 2.05 177.33
-
2 75.43 1.75 264.01 MURO # 4
-
2 77.00 1.00 154.00 MURO VIALIDAD
-
- - -
TOTAL= 909.49 -
8 Código ES/C - - - -
- - - -
- - - -
- - - -
1 39.70 1.30 0.33 - 17.03 - -
1 39.70 0.30 0.50 5.96
1 39.70 1.05 1.57 65.45
1 15.57 0.75 0.75 8.76
1 15.57 1.00 0.33 5.14
1 15.57 0.30 0.50 2.34
1 43.25 1.30 0.33 18.55
1 43.25 0.30 0.50 6.49
1 43.25 0.83 0.25 8.97
1 75.43 0.86 0.25 16.22
1 75.43 0.30 0.55 12.45
1 75.43 1.30 1.20 117.67
1 77.00 0.30 0.40 9.24
1 77.00 0.80 0.40 24.64
- TOTAL= 318.91 - - 9 Partida C.S/C - - - -
251 0.30 - - 75.30 -
- -
- - -
- - -
- - -
ENCOFRADO METALICO, TIPO RECTO, ACABADO OBRA LIMPIA, EN MUROS Y PANTALLAS.
BOTE DE MATERIAL DE DESECHO SIN
ARREGLO HASTA 50 KM DE DISTANCIA
INCLUYE CARGA
S/T/C DE BARBACANAS DE 4" CON TUBERIA DE
PVC REFORZADA PARA SUBDRENAJES EN
ZANJAS. EXCLUYE EL MATERIAL DEL FILTRO Y
LA EXCAVACION
NºDESCRIPCION Nº
MED. AUXILIARES Y FACT. DE CONVERSIONM3-KM M2 M3 M3 M KG OBSERVACIONES
PART LARGO ANCHO ALTO F.C. 1 F.C. 2
OBRA: PROYECTO DE URBANISMO PARA 144 V.M DESARROLLO “PRIMERA SABANA”, SECTOR EL TENDALITO PRIMERA SABANA MUNICIPIO BOCONO. PARROQUIA EL CARMEN, ESTADO TRUJILLO
TOTAL= - - 75.30 - 11 C.070300000
-
-
-
1 43.25 1.75 75.69
1 39.70 2.05 81.39
1 43.25 2.05 88.66
-
1 75.43 1.75 132.00
-
1 77.00 1.00 77.00
-
-
TOTAL= 454.74
CAPA IMPERMEABILIZANTE EN MUROS A BASE DE ASFALTO, APLICADO EN FRIO