PRESUPUESTO DE OBRAS OBRA: CODIGO COVENIN DESCRIPCION UIND CANTIDAD P. UNIT. (Bs) VIVIENDAS 1 E.311.110.150 M3 7.53 91.90 2 E.313.110.000 M3 9.04 30.63 3 E.319.100.000 M3 4.79 144.78 4 E.319.200.000 M3 55.95 139.62 5 E.323.000.120 M3 11.52 535.15 6 E.325.000.120 M3 13.39 544.58 7 E.326.001.120 M3 55.40 555.90 8 E.334.000.120 M3 7.52 569.73 9 E.341.010.S/C M2 474.80 217.41 10 E.341.010.110 M2 43.51 19.75 11 E.342.010.114 M2 50.16 22.51 12 E.351.110.210 KG 4,560.68 7.30 13 E.351.200.250 Kgf 353.84 6.39 14 E.362.110.000 Kgf 2,489.20 28.72 15 E.362.120.000 Kgf 3,519.09 25.08 16 E.362.130.000 Kgf 2,547.90 24.18 17 E.362.400.001 Pza 190.00 150.00 18 E.391.S/C.002 M2 1,305.30 353.60 19 E.421.104.301 M2 1,305.30 40.78 20 E.411.041.015 M2 2,304.21 122.28 21 E.412.102.003 M2 3,374.13 27.35 22 E.412.110.007 M2 190.00 20.64 23 E.412.201.001 M2 860.88 27.93 24 E.414.094.050 M2 57.00 136.36 25 E.437.071.015 M 315.12 200.80 26 E.S/C PZA 38.00 546.12 27 E.S/C PZA 57.00 488.95 CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER PORTUGUESA EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES,ZANJAS, UOTROS, HASTA PROFUNDIDADES COMPRENDIDAS ENTRE 0,00 Y 1,50 M CARGA A MANO DE MATERIAL PROVENIENTE DE LAS EXCAVACIONES PARA EL ASIENTO DE FUNDACIONES,ZANJAS U OTROS CONSTRUCCION DE BASE DE PIEDRA PICADA CORRESPONDIENTE A OBRAS PREPARATIVAS.INCLUYE EL MATERIAL Y EXCLUYE TRANSPORTE DEL MATERIAL CONSTRUCCION DE BASE DE GRANZON NATURAL CORRESPONDIENTE A OBRAS PREPA-RATIVAS INCLUYE EL SUMINISTRO, CORTE CARGA Y ROYALTY DEL MATERIAL. CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASES Y ESCALONES, EXCLUYE TRANSPORTE DE AGREGADOS, REFUERZO CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO CORRIENTE, PARA LA CONSTRUCCION DE VIGAS DE RIOSTRA,TIRANTES Y FUNDACIONES DE PARED, EXCLUYE TRANSPORTE DE AGREGADOS, REFUERZO METALICO Y EL ENCOFRADO CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO PULIDO, PARA LA CONSTRUCCION DE BASE DE PAVIMENTO.EXCLUYE TRANSPORTE DE AGREGADOS,REFUERZO METALICO Y EL ENCOFRADO CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO CORRIENTE, PARA LA CONSTRUCCION DE MACHONES,VIGAS DE CORONA,DINTELES,ARRIOSTRE.DE PAREDES.EXCLUYE EL TRANSPORTE DEL AGREGADO, REFUERZO METALICO Y EL ENCOFRADO ENCOFRADO METALICO TIPO RECTO,ACABADO CORRIENTE EN LOSACERO PARA TECHOS CON PLETINAS DE 4" ENCOFRADO DE MADERA TIPO RECTO,ACABADO CORRIENTE EN CABEZALES DE PILO- TES,BASES Y ESCALONES,PEDESTALES,VIGAS DE RIOSTRA,TIRANTES,FUNDACIONESDE PARED,LOSAS DE FUNDACION,VIGAS DE FUNDACION Y BASES DE PAVIMENTO. ENCOFRADO DE MADERA TIPO RECTO,ACABADO CORRIENTE EN MACHONES,VIGAS DECORONAS, DINTELES Y VIGAS DE RISOTRA SUMINISTRO,TRANSPORTE,PREPARACION Y COLOCACION DE ACERO DE REFUERZOFY=4.200 kgf/cm2,UTILIZANDO CABILLAS INFERIORES A (1/2 PULG) SUMINISTRO,TRANSPORTE,PREPARACION Y COLOCACION DE MALLA SOLDADA DEACERO.(6 * 6) SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE COLUMNAS, INCLUYE SU TRANSPORTE HASTA 50 KMS DE DISTANCIA (100mmX100mm) SUMINISTRO,CONFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE VIGAS PERFIL RECTANGULAR ESTRUCTURAL 120x60 MM,INCLUYE SU TRANSPORTE HASTA 50 KMS DE DISTANCIA SUMINISTRO,CONFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE CORREAS CON TUBO RECTANG. 2 1/2 X 1", INCLUYEN SU TRANSPORTE HASTA 50 KMS DE DISTANCIA SUMINISTRO Y COLOCACION DE ANCLAJES METALICOS DE 20*20 CMe=6mm.CUATRO CABILLAS 0=1/2".LONGITUD 45 CM. S/T/C DE CUBIERTA DE TECHO CON LAMINAS DE ACERO ESTRUCTURAL GALVANIZADO PARA ENCOFRADO COLABORANTE, CALIBRE 24 (e= 0.60 mm) INCLUYE AGREGADO ARROCILLO, ARENA LAVADA Y MALLA ELECTROSOLDADA. CAPA IMPERMEABILIZANTE EN LOSAS O PLACAS HORIZONTALES CON MEMBRANA ASFALTICA (MANTO) DE ESPESOR 3 MM REFORZADA CON VELO DE FIBRA DE VIDRIO CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO , ACABADO CORRIENTE e=15 cms. NO INCLUYE MACHONES,DINTELES Y BROCALES. INCLUYE TRANSPORTEDE LOS BLOQUES HASTA 50 KMS CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASE CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON CERAMICA NACIONAL, BLANCA O DE COLOR, DE PRIMERA, INCLUYE FRISO BASE. CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO DE CEMENTO ACABADO RUSTICO. INCLUYE FRISO BASE CONSTRUCCION DE REVESTIMIENTO EN PISOS CON BALDOSAS DE CERAMICA NACIONAL. INCLUYE MORTERO BASE. SUMINISTRO,TRANSPORTE Y COLOCACION DE MARCOS DE CHAPA DOBLADA DE HIE-RRO EN PAREDES DE 15 CMS, PARA PAREDES. SUMIISTRO, CONFECCION E INSTALACION DE PUERTA METALICA TIPO 1 SEGUN DETALLE PUERTA DE LAMINA DE HIERRO CAL: 18 (0,90 X 2,06 MTS) INCLUYE LA CERRADURA SUMIISTRO, CONFECCION E INSTALACION DE PUERTAS ENTAMBORADA DE LAMINA DE MADERA CAL.18 (0,74 X 2,06 MTS) INCLUYE LA CERRADURA DE POMO.

Upload: may-rengel

Post on 08-Nov-2015

72 views

Category:

Documents


9 download

DESCRIPTION

practica

TRANSCRIPT

PRESUPUESTOPRESUPUESTO DE OBRASOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESANCODIGO COVENINDESCRIPCIONUINDCANTIDADP. UNIT. (Bs)TOTAL (Bs)VIVIENDASMATERIAL (Bs. F.)EQUIPO (Bs. F.)M. OBRA (Bs. F.)MATERIAL (Bs. F.)EQUIPO (Bs. F.)M. OBRA (Bs. F.)1E.311.110.150EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES,ZANJAS, UOTROS, HASTA PROFUNDIDADES COMPRENDIDAS ENTRE 0,00 Y 1,50 MM37.5391.90692.01A1ACONDICIONAMIENTO DEL TERRENO0.07.23684.782E.313.110.000CARGA A MANO DE MATERIAL PROVENIENTE DE LAS EXCAVACIONES PARA EL ASIENTO DE FUNDACIONES,ZANJAS U OTROSM39.0430.63276.800.01.70355.553E.319.100.000CONSTRUCCION DE BASE DE PIEDRA PICADA CORRESPONDIENTE A OBRAS PREPARATIVAS.INCLUYE EL MATERIAL Y EXCLUYE TRANSPORTE DEL MATERIALM34.79144.78693.20648.980.4443.784E.319.200.000CONSTRUCCION DE BASE DE GRANZON NATURAL CORRESPONDIENTE A OBRAS PREPA-RATIVAS INCLUYE EL SUMINISTRO, CORTE CARGA Y ROYALTY DEL MATERIAL.M355.95139.627,812.353,385.224,128.90298.244,034.194,138.271,382.35A19,554.815E.323.000.120CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASES Y ESCALONES, EXCLUYE TRANSPORTE DE AGREGADOS, REFUERZOM311.52535.156,164.89B14,969.6066.851,128.444,969.6066.851,128.44B16,164.896E.325.000.120CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO CORRIENTE, PARA LA CONSTRUCCION DE VIGAS DE RIOSTRA,TIRANTES Y FUNDACIONES DE PARED, EXCLUYE TRANSPORTE DE AGREGADOS, REFUERZO METALICO Y EL ENCOFRADOM313.39544.587,293.01B25,777.1684.781,431.075,777.1684.781,431.07B27,293.017E.326.001.120CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO PULIDO, PARA LA CONSTRUCCION DE BASE DE PAVIMENTO.EXCLUYE TRANSPORTE DE AGREGADOS,REFUERZO METALICO Y EL ENCOFRADOM355.40555.9030,796.77B323,898.95385.776,512.058E.334.000.120CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO CORRIENTE, PARA LA CONSTRUCCION DE MACHONES,VIGAS DE CORONA,DINTELES,ARRIOSTRE.DE PAREDES.EXCLUYE EL TRANSPORTE DEL AGREGADO, REFUERZO METALICO Y EL ENCOFRADOM37.52569.734,286.67D13,245.7758.21982.689E.341.010.S/CENCOFRADO METALICO TIPO RECTO,ACABADO CORRIENTE EN LOSACERO PARA TECHOS CON PLETINAS DE 4"M2474.80217.41103,227.4610E.341.010.110ENCOFRADO DE MADERA TIPO RECTO,ACABADO CORRIENTE EN CABEZALES DE PILO-TES,BASES Y ESCALONES,PEDESTALES,VIGAS DE RIOSTRA,TIRANTES,FUNDACIONESDE PARED,LOSAS DE FUNDACION,VIGAS DE FUNDACION Y BASES DE PAVIMENTO.M243.5119.75859.22B32,165.9214.39844.8311E.342.010.114ENCOFRADO DE MADERA TIPO RECTO,ACABADO CORRIENTE EN MACHONES,VIGAS DECORONAS, DINTELES Y VIGAS DE RISOTRAM250.1622.511,129.02D12,496.9615.931,113.095,742.7374.142,095.78D17,912.6512E.351.110.210SUMINISTRO,TRANSPORTE,PREPARACION Y COLOCACION DE ACERO DE REFUERZOFY=4.200 kgf/cm2,UTILIZANDO CABILLAS INFERIORES A (1/2 PULG)KG4,560.687.3033,285.49B327,337.103,550.492,397.8913E.351.200.250SUMINISTRO,TRANSPORTE,PREPARACION Y COLOCACION DE MALLA SOLDADA DEACERO.(6 * 6)Kgf353.846.392,259.27B32,134.624.19120.4614E.362.110.000SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE COLUMNAS, INCLUYE SU TRANSPORTE HASTA 50 KMS DE DISTANCIA (100mmX100mm)Kgf2,489.2028.7271,498.01C153,458.5716,613.341,426.1053,458.5716,613.341,426.10C171,498.0115E.362.120.000SUMINISTRO,CONFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE VIGAS PERFIL RECTANGULAR ESTRUCTURAL 120x60 MM,INCLUYE SU TRANSPORTE HASTA 50 KMS DE DISTANCIAKgf3,519.0925.0888,251.75C254,247.5731,315.982,688.1954,247.5731,315.982,688.19C288,251.7516E.362.130.000SUMINISTRO,CONFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE CORREAS CON TUBO RECTANG. 2 1/2 X 1", INCLUYEN SU TRANSPORTE HASTA 50 KMS DE DISTANCIAKgf2,547.9024.1861,610.49C335,542.4724,007.212,060.8035,542.4724,007.212,060.80C361,610.4917E.362.400.001SUMINISTRO Y COLOCACION DE ANCLAJES METALICOS DE 20*20 CMe=6mm.CUATRO CABILLAS 0=1/2".LONGITUD 45 CM.Pza190.00150.0028,500.00B328,500.000.00.081,870.683,940.457,477.34B393,288.4718E.391.S/C.002S/T/C DE CUBIERTA DE TECHO CON LAMINAS DE ACERO ESTRUCTURAL GALVANIZADO PARA ENCOFRADO COLABORANTE, CALIBRE 24 (e= 0.60 mm) INCLUYE AGREGADO ARROCILLO, ARENA LAVADA Y MALLA ELECTROSOLDADA.M21,305.300.000.00C40.0445.440.00.0445.440.0C40.019E.421.104.301CAPA IMPERMEABILIZANTE EN LOSAS O PLACAS HORIZONTALES CON MEMBRANA ASFALTICA (MANTO) DE ESPESOR 3 MM REFORZADA CON VELO DE FIBRA DE VIDRIOM21,305.3040.7853,224.2443,858.08158.589,207.5943,858.08158.589,207.59C553,224.2420E.411.041.015CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO , ACABADO CORRIENTE e=15 cms. NO INCLUYE MACHONES,DINTELES Y BROCALES. INCLUYE TRANSPORTEDE LOS BLOQUES HASTA 50 KMSM22,304.21122.28281,751.18D2143,616.21103,333.9834,801.00143,616.21103,333.9834,801.00D2281,751.1821E.412.102.003CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASEM23,374.1327.3592,275.12F125,493.5949,794.7416,986.8022E.412.110.007CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON CERAMICA NACIONAL, BLANCA O DE COLOR, DE PRIMERA, INCLUYE FRISO BASE.M2190.0020.643,920.79F220,534.79203.493,717.3023E.412.201.001CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO DE CEMENTO ACABADO RUSTICO. INCLUYE FRISO BASEM2860.8827.9324,048.18F16,504.4616,939.5863.1631,998.0566,734.3217,049.95F1115,782.3324E.414.094.050CONSTRUCCION DE REVESTIMIENTO EN PISOS CON BALDOSAS DE CERAMICA NACIONAL. INCLUYE MORTERO BASE.M257.00136.367,772.65F26,160.4413.57391.3026,695.22217.054,108.60F231,020.8725E.437.071.015SUMINISTRO,TRANSPORTE Y COLOCACION DE MARCOS DE CHAPA DOBLADA DE HIE-RRO EN PAREDES DE 15 CMS, PARA PAREDES.M315.12200.8063,274.25D462,789.8156.67427.7726E.S/CSUMIISTRO, CONFECCION E INSTALACION DE PUERTA METALICA TIPO 1 SEGUN DETALLE PUERTA DE LAMINA DE HIERRO CAL: 18 (0,90 X 2,06 MTS) INCLUYE LA CERRADURAPZA38.00546.1220,752.54D419,776.63375.83975.9127E.S/CSUMIISTRO, CONFECCION E INSTALACION DE PUERTAS ENTAMBORADA DE LAMINA DE MADERA CAL.18 (0,74 X 2,06 MTS) INCLUYE LA CERRADURA DE POMO.PZA57.00488.9527,870.28D427,075.00139.29655.9928E.S/CSUMIISTRO, CONFECCION E INSTALACION DE PUERTAS PUERTAS ENTAMBORADA DE LAMINA DE MADERA CAL.18 (0,70 X 2,06 MTS) INCLUYE LA CERRADURA DE POMO.PZA19.00471.708,962.26D48,265.0041.27655.99117,906.44613.072,715.65D4121,235.1529E.S/CSUMIISTRO, CONFECCION E INSTALACION DE VENTANA PANORAMICA DE 1,15 X 0,95 M (INCLUYE PASADOR DE PISTON Y VIDRIOS ESCARCHADOSPZA264.00448.71118,460.46D5116,160.001,740.69559.7730E.S/CSUMIISTRO, CONFECCION E INSTALACION DE VENTANA PANORAMICA DE 0,95 X 0,85 M (INCLUYE PASADOR DE PISTON Y VIDRIOS ESCARCHADOSPZA66.00454.3029,983.75D529,040.00383.98559.7731E.S/CSUMIISTRO, CONFECCION E INSTALACION DE VENTANA PANORAMICA DE 0,75 X 0,35 M (INCLUYE PASADOR DE PISTON Y VIDRIOS ESCARCHADOSPZA33.00242.177,991.55D57,260.00171.78559.77152,460.002,296.451,679.31D5156,435.7632E.461.000.201ESMALTE EN VIGAS METALICAS. ALMA LLENAM22,078.5236.7776,423.37F430,114.3045,741.31567.7633E.461.000.101ESMALTE EN COLUMNAS METALICAS.M21,848.0053.9299,641.23F426,774.3972,299.09567.7634E.461.000.701ESMALTE EN PUERTAS METALICASM2489.4615.667,664.33F47,091.395.19567.7635E.461.000.801ESMALTE EN MARCOS METALICASM22,497.4414.7336,778.99F436,183.6727.56567.7636E.461.001.031ESMALTE EN VENTANAS METALICAS BATIENTES, CORREDERAS O PAO FIJOM2278.5216.544,606.05F44,035.283.01567.7637E.462.000.702BARNIZ EN PUERTAS DE MADERA, INCLUYE FONDO SELLADORM2794.0116.1012,782.59F411,769.72568.42444.46115,968.75118,644.583,283.23F3237,896.5638E.463.000.503CAUCHO INTERIOR/EXTERIOR EN PAREDES.M214,711.1024.88365,956.67F477,618.53287,770.38567.7677,618.53287,770.38567.76F4365,956.6739E.511.111.019I.E.TUBERIA PLASTICA RIGIDA LIVIANA,P.V.C.,EMBUTIDA DIAMETRO 1/2 PULG(16 m.m.)M4,455.0016.0771,572.91A268,295.602,947.90329.4140E.521.222.023I.E. CABLE DE COBRE TRENZADO,REVESTIDO,THW,CALIBRE 12.AWG (2.32 mm)M13,200.004.0353,248.36E3138,689.10978.87263.6941E.541.211.110I.E.INTERRUPTORES (SWITCHES) COMBINABLES SIMPLES,CON TAPA DE PLASTICO,PUENTE Y TORNILLO,,10 A.PZA396.0027.5110,895.20E39,900.00711.84283.3642E.541.211.120I.E.INTERRUPTORES (SWITCHES) COMBINABLES DOBLES,CON TAPA DE PLASTICO,PUENTE Y TORNILLO,,10 A.PZA66.0051.223,380.48E32,970.00127.12283.3643E.521.222.030I.E. CABLE DE COBRE ,TRENZADO,REVESTIDO,TW,CALIBRE 10.AWG. (2.95 mm)M6,600.004.6230,491.63E369,344.55408.54263.6944E.551.120.412I.E. TABLERO METALICO, CONVERTIBLE, EMBUTIDO,CON PUERTA,2 FASE+ NEUTRO, 4 CIRCUITOS, BARRA DE 125 A. NO INCLUYE BREAKERPZA19.00205.953,913.14E33,424.86204.92283.3645E.542.221.120I.E. TOMACORRIENTE UNIVERSAL 1208 DOBLE CON TAPA, PUENTE Y TORNILLO TRES POLOS. COMBINABLE, DOBLE, UNA (1) FASE , 20 A.PZA924.0054.1049,992.33E348,048.001,660.97283.3646E.561.110.020I.E. INTERUPTOR TERMOMAGNETICO (BREAKER) CON ENCHUFE 1 POLO 10 KA ICC120/240 V,CAP 20 APZA264.0055.9814,777.62E313,200.001,294.26283.3647E.581.511.S/CI.E. BOMBILLO 75 W - 110 V CLARO DE APLIQUE PARA INSTALACION SUPERFICIAL.PZA726.008.195,944.41E34,356.001,305.05283.3648E.592.002.000I.E. PUNTO DE LUZ EMBUTIDO EN PARED. CON TUBERIA EMT D=1/2 PULG Y CABLE T.H.W # 12 AWG.PTO209.0023.724,958.10E34,075.50553.19329.4149E.591.110.000I.E. PUNTO DE TOMACORRIENTE EMBUTIDO EN PARED. CON TUBERIA EMT D=1/2 PULG. Y CABLE T.H.W # 12 AWG.PTO266.0022.576,004.64E35,054.00621.23329.4150E.S/CSUMINISTRO TRANSP Y COLOCACION DE DE CAJA PARA MEDIDOR. INCLUYE CABEZOTE Y TUBERIA CONDUIT DE 1 PULGPZA66.00182.9712,075.88E311,571.78174.69329.41310,633.7910,009.722,714.77E3323,358.2751E.611.130.019I.S. TUBERIA AGUAS CLARAS,DE P.V.C.,D= 1/2" plg (16 mm). 150 psiAMBIENTE EXTERIOR AL RECINTO SANITARIO.INCLUYE CONEXIONES.M342.0019.016,500.97A26,169.6829.22302.0752E.612.142.102I.S. TUBERIA DE AGUAS RESISUALES, P.V.C D= 4 plg (102 mm),e=2.2 mmAMBIENTE EXTERIOR AL RECINTO SANITARIO.INCLUYE CONEXIONES.M285.0037.0310,553.42A210,221.2730.08302.0753E.613.101.051I.S. TUBERIA PARA VENTILACION DE,P.V.C. D= 2 plg (51 mm) E=1.8m.m.AMBIENTE EXTERIOR AL RECINTO SANITARIO.INCLUYE CONEXIONES.M41.8045.251,891.63A21,577.0712.50302.0786,263.613,019.711,235.61A290,518.9354E.621.100.051I.S. PUNTOS DE AGUAS CLARAS DE P.V.C. DIAMETRO 1/2 PULG.(13 m.m)AMBIENTE INTERIOR AL RECINTO SANITARIOPTO95.0022.672,153.97E21,840.5411.36302.0755E.622.221.051I.S. PUNTOS DE AGUAS RESIDUALES DE P.V.C. D=2 PULG (51m.m.).E=1.8 m.m.AMBIENTE INTERIOR AL RECINTO SANITARIO.INCLUYE CONEXIONES,EXCAVACIONY ARRIONAMIENTO EN CONCRETO.PTO76.0017.771,350.65E1687.148.52654.9956E.622.222.102I.S. PUNTOS DE AGUAS RESIDUALES DE P.V.C.D=4 PULG (102m.m.).E=2.2 m.mAMBIENTE INTERIOR AL RECINTO SANITARIO.INCLUYE CONEXIONES,EXCAVACIONY ARRIONAMIENTO EN CONCRETO.PTO38.0055.572,111.47E11,437.0119.48654.9957E.632.001.019I.S. SUMINISTRO Y TRANSPORTE DE LLAVE DE PASO TIPO GLOBO DE BRONCE DIAMETRO 3/4 plg (19 mm). (150 PSI)PZA33.0055.001,815.00E21,815.000.00.03,655.5411.36302.07E23,968.9758E.660.S/C.111I.S. SUMINISTRO,TRANSPORTE E INSTALACION DE BATEAS DE GRANITO 50 x 80 C/ APOYO DE UNA PONCHERA, RECTANGULAR,INCLUYE GRIFERIAPZA33.00169.675,599.11E410,350.78297.560.059E.661.110.111I.S. SUMINISTRO,TRANSPORTE E INSTALACION DE LAVAMANOS PARA COLGAR DEUNA LLAVE,BLANCO O COLOR CLARO,ANCHO MENOR DE 54 CMS.,RECTANGULAR,INCLUYE GRIFERIAPZA33.00411.9913,595.64E413,213.5319.7447.9460E.661.314.115I.S. SUMINISTRO,TRANSPORTE E INSTALACION DE LAVAPLATO DE ACERO INOXIDABLE DE UNA PONCHERA CON ESCURRIDOR, RECTANGULAR, INCLUYE GRIFERIA.PZA33.00706.0123,298.42E420,358.3639.472,900.5961E.662.111.111I.S. SUMINISTRO,TRANSPORTE E INSTALACION DE W.C. DE ASIENTO,TANQUE BA-JO, DESCARGA AL PISO, BLANCO O COLOR CLRO, LINEA ECONOMICA. INCL.GRIFERIAPZA33.0093.053,070.66E429,183.5514.80108.8162E.666.110.001SI.S. SUMINISTRO,TRANSPORTE E INSTALACION DE DUCHA DE UNA LLAVE.INCLUYE GRIFERIA Y REGADERA. (PLASTICAS)PZA33.00175.245,782.82E44,787.457.89987.4863E.666.311.051I.S. SUMINISTRO , TRANSPORTE E INSTALACION DE CENTRO PISO CIRCULAR ESTANDAR DE BRONCE PARA TUBO DE DESCARGA DE 2 PLG DE DIAMETRO 51mmPZA57.0059.053,365.78E11,862.740.01,503.0364E.666.381.102I.S. SUMINISTRO,TRANSPORTE E INSTALACION DE TAPA DE REGISTRO CIRCULAR DE BRONCE, PARA TUBO DE DESCARGA DE 4 PULGADAS DE DIAMETRO (102 m.m.)PZA19.00117.352,229.69E1977.160.01,252.534,964.0528.004,065.53E19,057.5965E.802.305.000CONCRETO DE FC=180 KGF/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE TANQUILLAS. CORRESPONDIENTE A OBRAS DE SERVICIO .EXCLUYE EL TRANSPORTE DEL AGREGADO, REFUERZO METALICO Y EL ENCOFRADOPZA19.00241.014,579.14E43,233.15510.97835.0281,126.82890.454,879.85E486,897.11SUB-TOTAL Bs. F.0.0TOTAL Bs. F.0.0

A.P.U.ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUNIDAD DE VIVIENDADescripcinUnidadCantidadBS. F UNIDADTOTAL NO PLANIFICADOMaterialesEquiposMano de ObraBS. F UNIDADTOTAL NO PLANIFICADOUBICACIN:PIRITUCONSTRUCCION DE CASAS AISLADAS DIFERENTES SECTORESS.G.33.000.00.00.0672,460.65109,118.230.00.0Part. No.:1Fecha:4/10/120.0Descripcin:EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES,ZANJAS, UOTROS, HASTA PROFUNDIDADES COMPRENDIDAS ENTRE 0,00 Y 1,50 M0.00.0Rendimiento:8.000000.0Cdigo:E.311.110.150Unidad:M3Cantidad:7.53Total Presupuesto Bs.F.:0.0Total Bs.F.:0.00.0MATERIALES0.00.0No.DescripcinUnd.Cant.Desp.PrecioTotal0.00.010.00020.00030.00040.00050.000Total Materiales:0.00COSTO UNITARIO MATERIALES0.000.0EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1JUEGO DE PICO, PALA Y CARRETILLA2.000.00800480.007.6820.0030.0040.0050.00Total Equipos:7.68Costo Unitarios Equipos:0.967.23MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1OBRERO DE PRIMERA6.0077.5338.25229.50465.162CAPORAL0.2593.1138.259.5623.2830.00.040.00.050.0SubTotal Mano de Obra:239.06488.430.00%Prestaciones Sociales:0.00Total General Mano de Obra:727.50Costo Unitario de Mano de Obra:90.94684.78COSTO DIRECTO SUBTOTAL A:91.900.00%Administracin y Gastos Generales:0.00SUBTOTAL B:91.900.00%Imprevisto Utilidad:0.00SUBTOTAL C:91.90ING.PRECIO UNITARIO SIN IMPUESTO:91.90C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):91.90ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:2Fecha:Descripcin:CARGA A MANO DE MATERIAL PROVENIENTE DE LAS EXCAVACIONES PARA EL ASIENTO DE FUNDACIONES,ZANJAS U OTROSRendimiento:24.00000Cdigo:E.313.110.000Unidad:M3Cantidad:9.04MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal10.00020.00030.00040.00050.000Total Materiales:0.00COSTO UNITARIO MATERIALES0.000.0EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1JUEGO DE PICO, PALA Y CARRETILLA2.000.00800480.007.6820.0030.0040.0050.00Total Equipos:7.68Costo Unitarios Equipos:0.322.89MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1OBRERO DE PRIMERA6.0077.5338.25229.50465.162CAPORAL0.2593.1138.259.5623.2830.00.040.00.050.0SubTotal Mano de Obra:239.06488.430.00%Prestaciones Sociales:0.00Total General Mano de Obra:727.50Costo Unitario de Mano de Obra:30.31273.91COSTO DIRECTO SUBTOTAL A:30.630.00%Administracin y Gastos Generales:0.00SUBTOTAL B:30.630.00%Imprevisto Utilidad:0.00SUBTOTAL C:30.63ING.PRECIO UNITARIO SIN IMPUESTO:30.63C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):30.63ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:3Fecha:Descripcin:CONSTRUCCION DE BASE DE PIEDRA PICADA CORRESPONDIENTE A OBRAS PREPARATIVAS.INCLUYE EL MATERIAL Y EXCLUYE TRANSPORTE DEL MATERIALRendimiento:30.00000Cdigo:E.319.100.000Unidad:M3Cantidad:4.79MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PIEDRA TRITURADA DE 1"M31.101.00122.00135.54134.21.34220.00030.00040.00050.000Total Materiales:135.54COSTO UNITARIO MATERIALES135.54648.98EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1PALA REDONDA2.000.01000082.351.652CARRETTILLA DE RUEDAS NEUMATICAS CAP=55L1.000.003500318.881.1230.0040.0050.00Total Equipos:2.76Costo Unitarios Equipos:0.090.44MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1OBRERO DE PRIMERA2.0077.5338.2576.50155.062MAESTRO DE OBRA DE 1a0.25132.8538.259.5633.2130.00.040.00.050.0SubTotal Mano de Obra:86.06188.270.00%Prestaciones Sociales:0.00Total General Mano de Obra:274.34Costo Unitario de Mano de Obra:9.1443.78COSTO DIRECTO SUBTOTAL A:144.780.00%Administracin y Gastos Generales:0.00SUBTOTAL B:144.780.00%Imprevisto Utilidad:0.00SUBTOTAL C:144.78ING.PRECIO UNITARIO SIN IMPUESTO:144.78C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):144.78ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:4Fecha:Descripcin:CONSTRUCCION DE BASE DE GRANZON NATURAL CORRESPONDIENTE A OBRAS PREPA-RATIVAS INCLUYE EL SUMINISTRO, CORTE CARGA Y ROYALTY DEL MATERIAL.Rendimiento:40.00000Cdigo:E.319.200.000Unidad:M3Cantidad:55.95MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1GRANZON NATURALM31.00000.060.0060.006002COSTO AGREGADO DE TRANSPORTEM31.00000.00.500.500.5030.00040.00050.000Total Materiales:60.50COSTO UNITARIO MATERIALES60.503,385.22EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1COMPACTADORA RANA1.001.0000002,649.602,649.602CAMIONETA FORD F- 1500.500.003310182,500.00302.0430.0040.0050.00Total Equipos:2,951.64Costo Unitarios Equipos:73.794,128.90MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1CAPORAL DE EQUIPO0.5093.1138.2519.1346.562CHOFER DE 2DA (DE 3 A 8 TON)0.2588.6038.259.5622.153OBRERO DE 1RA1.0077.5638.2538.2577.5640.00.050.0SubTotal Mano de Obra:66.94146.270.00%Prestaciones Sociales:0.00Total General Mano de Obra:213.20Costo Unitario de Mano de Obra:5.33298.24COSTO DIRECTO SUBTOTAL A:139.620.00%Administracin y Gastos Generales:0.00SUBTOTAL B:139.620.00%Imprevisto Utilidad:0.00SUBTOTAL C:139.62ING.PRECIO UNITARIO SIN IMPUESTO:139.62C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):139.62ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:5Fecha:Descripcin:CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASES Y ESCALONES, EXCLUYE TRANSPORTE DE AGREGADOS, REFUERZORendimiento:12.00000Cdigo:E.323.000.120Unidad:M3Cantidad:11.52MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1CEMENTO GRIS PORTLAND TIPO I 42.5 KG-PMVSACO8.400.032.75275.10275.102PIEDRA PICADAM30.915.00000122.00116.57111.025.5513ARENA LAVADA (PMVP)M30.445.0000085.0039.2737.41.874AGUA TARIFA INDUSTRIALM30.160.02.800.450.448050.000Total Materiales:431.39COSTO UNITARIO MATERIALES431.394,969.60EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1MEZCLADORA TIPO TROMPO CAP=0.33 m3, 8.2 HP(DIESEL)1.000.00250015,430.0038.582CARRETON BUGGI 150 L RUEDAS DE GOMA2.000.0035003,613.4425.293CUCHARA DE 6'' BELLOTA REF.5842-C2.000.010000126.002.524PALA RECTANGULAR2.000.010000124.002.485CEPILLO ALBAILERIA TIPO PALUSTRA, MANGO1.000.01000076.400.76Total Equipos:69.63Costo Unitarios Equipos:5.8066.85MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA0.50132.8538.2519.1366.432ALBAIL DE 1RA1.00104.1438.2538.25104.143MAQUINISTA DE CONCRETO DE 1RA1.0093.1138.2538.2593.114AYUDANTE1.0083.0538.2538.2583.055OBRERO DE 1RA6.0077.5638.25229.50465.36SubTotal Mano de Obra:363.38812.090.00%Prestaciones Sociales:0.00Total General Mano de Obra:1,175.46Costo Unitario de Mano de Obra:97.961,128.44COSTO DIRECTO SUBTOTAL A:535.150.00%Administracin y Gastos Generales:0.00SUBTOTAL B:535.150.00%Imprevisto Utilidad:0.00SUBTOTAL C:535.15ING.PRECIO UNITARIO SIN IMPUESTO:535.15C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):535.15ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:6Fecha:Descripcin:CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO CORRIENTE, PARA LA CONSTRUCCION DE VIGAS DE RIOSTRA,TIRANTES Y FUNDACIONES DE PARED, EXCLUYE TRANSPORTE DE AGREGADOS, REFUERZO METALICO Y EL ENCOFRADORendimiento:11.00000Cdigo:E.325.000.120Unidad:M3Cantidad:13.39MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1CEMENTO GRIS PORTLAND TIPO I 42.5 KG-PMVSACO8.400.032.75275.10275.102PIEDRA PICADAM30.915.00000122.00116.57111.025.5513ARENA LAVADA (PMVP)M30.445.0000085.0039.2737.41.874AGUA TARIFA INDUSTRIALM30.160.02.800.450.448050.000Total Materiales:431.39COSTO UNITARIO MATERIALES431.395,777.16EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1MEZCLADORA TIPO TROMPO CAP=0.33 m3, 8.2 HP(DIESEL)1.000.00250015,430.0038.582CARRETON BUGGI 150 L RUEDAS DE GOMA2.000.0035003,613.4425.293CUCHARA DE 6'' BELLOTA REF.5842-C2.000.010000126.002.524PALA RECTANGULAR2.000.010000124.002.485CEPILLO ALBAILERIA TIPO PALUSTRA, MANGO1.000.01000076.400.76Total Equipos:69.63Costo Unitarios Equipos:6.3384.78MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA0.50132.8538.2519.1366.432ALBAIL DE 1RA1.00104.1438.2538.25104.143MAQUINISTA DE CONCRETO DE 1RA1.0093.1138.2538.2593.114AYUDANTE1.0083.0538.2538.2583.055OBRERO DE 1RA6.0077.5638.25229.50465.36SubTotal Mano de Obra:363.38812.090.00%Prestaciones Sociales:0.00Total General Mano de Obra:1,175.46Costo Unitario de Mano de Obra:106.861,431.07COSTO DIRECTO SUBTOTAL A:544.580.00%Administracin y Gastos Generales:0.00SUBTOTAL B:544.580.00%Imprevisto Utilidad:0.00SUBTOTAL C:544.58ING.PRECIO UNITARIO SIN IMPUESTO:544.58C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):544.58ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:7Fecha:Descripcin:CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO PULIDO, PARA LA CONSTRUCCION DE BASE DE PAVIMENTO.EXCLUYE TRANSPORTE DE AGREGADOS,REFUERZO METALICO Y EL ENCOFRADORendimiento:10.00000Cdigo:E.326.001.120Unidad:M3Cantidad:55.40MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1CEMENTO GRIS PORTLAND TIPO I 42.5 KG-PMVSACO8.400.032.75275.10275.102PIEDRA PICADAM30.915.00000122.00116.57111.025.5513ARENA LAVADA (PMVP)M30.445.0000085.0039.2737.41.874AGUA TARIFA INDUSTRIALM30.160.02.800.450.448050.000Total Materiales:431.39COSTO UNITARIO MATERIALES431.3923,898.95EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1MEZCLADORA TIPO TROMPO CAP=0.33 m3, 8.2 HP(DIESEL)1.000.00250015,430.0038.582CARRETON BUGGI 150 L RUEDAS DE GOMA2.000.0035003,613.4425.293CUCHARA DE 6'' BELLOTA REF.5842-C2.000.010000126.002.524PALA RECTANGULAR2.000.010000124.002.485CEPILLO ALBAILERIA TIPO PALUSTRA, MANGO1.000.01000076.400.76Total Equipos:69.63Costo Unitarios Equipos:6.96385.77MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA0.50132.8538.2519.1366.432ALBAIL DE 1RA1.00104.1438.2538.25104.143MAQUINISTA DE CONCRETO DE 1RA1.0093.1138.2538.2593.114AYUDANTE1.0083.0538.2538.2583.055OBRERO DE 1RA6.0077.5638.25229.50465.36SubTotal Mano de Obra:363.38812.090.00%Prestaciones Sociales:0.00Total General Mano de Obra:1,175.46Costo Unitario de Mano de Obra:117.556,512.05COSTO DIRECTO SUBTOTAL A:555.900.00%Administracin y Gastos Generales:0.00SUBTOTAL B:555.900.00%Imprevisto Utilidad:0.00SUBTOTAL C:555.90ING.PRECIO UNITARIO SIN IMPUESTO:555.90C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):555.90ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:8Fecha:Descripcin:CONCRETO DE FC=200 KGF/CM2 A LOS 28 DIAS,ACABADO CORRIENTE, PARA LA CONSTRUCCION DE MACHONES,VIGAS DE CORONA,DINTELES,ARRIOSTRE.DE PAREDES.EXCLUYE EL TRANSPORTE DEL AGREGADO, REFUERZO METALICO Y EL ENCOFRADORendimiento:9.00000Cdigo:E.334.000.120Unidad:M3Cantidad:7.52MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1CEMENTO GRIS PORTLAND TIPO I 42.5 KG-PMVSACO8.400.032.75275.10275.102PIEDRA PICADAM30.915.00000122.00116.57111.025.5513ARENA LAVADA (PMVP)M30.445.0000085.0039.2737.41.874AGUA TARIFA INDUSTRIALM30.160.02.800.450.448050.000Total Materiales:431.39COSTO UNITARIO MATERIALES431.393,245.77EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1MEZCLADORA TIPO TROMPO CAP=0.33 m3, 8.2 HP(DIESEL)1.000.00250015,430.0038.582CARRETON BUGGI 150 L RUEDAS DE GOMA2.000.0035003,613.4425.293CUCHARA DE 6'' BELLOTA REF.5842-C2.000.010000126.002.524PALA RECTANGULAR2.000.010000124.002.485CEPILLO ALBAILERIA TIPO PALUSTRA, MANGO1.000.01000076.400.76Total Equipos:69.63Costo Unitarios Equipos:7.7458.21MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA0.50132.8538.2519.1366.432ALBAIL DE 1RA1.00104.1438.2538.25104.143MAQUINISTA DE CONCRETO DE 1RA1.0093.1138.2538.2593.114AYUDANTE1.0083.0538.2538.2583.055OBRERO DE 1RA6.0077.5638.25229.50465.36SubTotal Mano de Obra:363.38812.090.00%Prestaciones Sociales:0.00Total General Mano de Obra:1,175.46Costo Unitario de Mano de Obra:130.61982.68COSTO DIRECTO SUBTOTAL A:569.730.00%Administracin y Gastos Generales:0.00SUBTOTAL B:569.730.00%Imprevisto Utilidad:0.00SUBTOTAL C:569.73ING.PRECIO UNITARIO SIN IMPUESTO:569.73C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):569.73ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:9Fecha:Descripcin:ENCOFRADO METALICO TIPO RECTO,ACABADO CORRIENTE EN LOSACERO PARA TECHOS CON PLETINAS DE 4"Rendimiento:40.00000Cdigo:E.341.010.S/CUnidad:M2Cantidad:474.80MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1BOMBONA DE OXIGENO INDUSTRIAL (CONTENIDOCIL0.010.0100056.000.560.560.0000562ACETILENO (CONTENIDO DE BOMBONA)CIL0.010.01000167.001.671.670.0001673ELECTRODO R10 E6013 3.25 MM. 1/8" X 350KG0.010.0100010.000.100.10.000014PLETINA 4"KG1.004.6800018.2919.1518.290.855972Total Materiales:21.48COSTO UNITARIO MATERIALES21.4810,196.90EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO DE OXIACETILENO1.001.00001,300.001,300.002ESMERIL1.001.00001,449.001,449.003ANDAMIO TUBULAR DE UN CUERPO2.001.0000880.001,760.004SOLDADORA ELECTRICA LINCOLN Y CORTADORA1.001.00003,500.003,500.0050.0060.00Total Equipos:8,009.00Costo Unitarios Equipos:200.2395,066.83MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA1.00132.8538.2538.25132.852MONTADOR1.00104.1438.2538.25104.143SOLDADOR DE 1RA1.00104.1438.2538.25104.144OBRERO DE 1RA2.0077.5638.2576.50155.1250.0SubTotal Mano de Obra:191.25496.250.00%Prestaciones Sociales:0.00Total General Mano de Obra:687.50Costo Unitario de Mano de Obra:17.198,160.63COSTO DIRECTO SUBTOTAL A:217.410.00%Administracin y Gastos Generales:0.00SUBTOTAL B:217.410.00%Imprevisto Utilidad:0.00SUBTOTAL C:217.41ING.PRECIO UNITARIO SIN IMPUESTO:217.41C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):217.41ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:10Fecha:Descripcin:ENCOFRADO DE MADERA TIPO RECTO,ACABADO CORRIENTE EN CABEZALES DE PILO-TES,BASES Y ESCALONES,PEDESTALES,VIGAS DE RIOSTRA,TIRANTES,FUNDACIONESDE PARED,LOSAS DE FUNDACION,VIGAS DE FUNDACION Y BASES DE PAVIMENTO.Rendimiento:40.00000Cdigo:E.341.010.110Unidad:M2Cantidad:43.51MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1MADERA CUARTON AURORA 5 X 10 cmM30.00573,980.8522.6922.69084502MADERRA TABLA D/SAQUI SAQUI CEPILLADAM30.00534,900.0025.9725.9703CLAVOS DE 4" CAL.8 CAJA 25 KgfKG0.15007.461.121.119040.000Total Materiales:49.78COSTO UNITARIO MATERIALES49.782,165.92EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1CEPILLO DE CARPINTERO STANLEY DE 15"1.000.01200654.987.862CINTA METRICA 5m. ACERO. STANLEY1.000.0100049.350.493NIVEL DE 3 BURBUJAS DE 14" STANLEY2.000.0100041.180.824ESCUADRA METALICA ALUMINIO MARCA ESPN (60X40cm)2.000.01000105.732.115MARTILLO PARA CARPINTERO2.000.0100052.311.056SERRUCHO 26"1.000.0100089.250.89Total Equipos:13.23Costo Unitarios Equipos:0.3314.39MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1OBRERO DE PRIMERA2.0077.5638.2576.50155.122AYUDANTE2.0083.0538.2576.50166.103CARPINTERO DE 2a1.0093.1138.2538.2593.114MAESTRO CARPINTERO 1a1.00132.8538.2538.25132.8550.0SubTotal Mano de Obra:229.50547.180.00%Prestaciones Sociales:0.00Total General Mano de Obra:776.68Costo Unitario de Mano de Obra:19.42844.83COSTO DIRECTO SUBTOTAL A:19.750.00%Administracin y Gastos Generales:0.00SUBTOTAL B:19.750.00%Imprevisto Utilidad:0.00SUBTOTAL C:19.75ING.PRECIO UNITARIO SIN IMPUESTO:19.75C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):19.75ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:11Fecha:Descripcin:ENCOFRADO DE MADERA TIPO RECTO,ACABADO CORRIENTE EN MACHONES,VIGAS DECORONAS, DINTELES Y VIGAS DE RISOTRARendimiento:35.00000Cdigo:E.342.010.114Unidad:M2Cantidad:50.16MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1MADERA CUARTON AURORA 5 X 10 cmM30.00573,980.8522.6922.69084502MADERRA TABLA D/SAQUI SAQUI CEPILLADAM30.00534,900.0025.9725.9703CLAVOS DE 4" CAL.8 CAJA 25 KgfKG0.15007.461.121.119040.000Total Materiales:49.78COSTO UNITARIO MATERIALES49.782,496.96EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1CEPILLO DE CARPINTERO STANLEY DE 15"1.000.01200654.987.862CINTA METRICA 5m. ACERO. STANLEY1.000.0100049.350.493NIVEL DE 3 BURBUJAS DE 14" STANLEY2.000.0100041.180.824ESCUADRA METALICA ALUMINIO MARCA ESPN (60X40cm)2.000.01000105.735MARTILLO PARA CARPINTERO2.000.0100052.311.056SERRUCHO 26"1.000.0100089.250.89Total Equipos:11.12Costo Unitarios Equipos:0.3215.93MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1OBRERO DE PRIMERA2.0077.5638.2576.50155.122AYUDANTE2.0083.0538.2576.50166.103CARPINTERO DE 2a1.0093.1138.2538.2593.114MAESTRO CARPINTERO 1a1.00132.8538.2538.25132.8550.0SubTotal Mano de Obra:229.50547.180.00%Prestaciones Sociales:0.00Total General Mano de Obra:776.68Costo Unitario de Mano de Obra:22.191,113.09COSTO DIRECTO SUBTOTAL A:22.510.00%Administracin y Gastos Generales:0.00SUBTOTAL B:22.510.00%Imprevisto Utilidad:0.00SUBTOTAL C:22.51ING.PRECIO UNITARIO SIN IMPUESTO:22.51C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):22.51ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:12Fecha:Descripcin:SUMINISTRO,TRANSPORTE,PREPARACION Y COLOCACION DE ACERO DE REFUERZOFY=4.200 kgf/cm2,UTILIZANDO CABILLAS INFERIORES A (1/2 PULG)Rendimiento:1,000.00000Cdigo:E.351.110.210Unidad:KGCantidad:4,560.68MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1CABILLA ESTRIADA 1/2 4200 K/CM2 PESO 0,994 KG/MKG1.0500001.0000003.563.783.7380.037382ALAMBRE LISO GALV CAL 18KG0.0100001.00000013.000.130.130.00133TRANSPORTE DE ACERO HASTA 50 KMKG1.0500001.992.092.0874040.00050.000Total Materiales:5.99COSTO UNITARIO MATERIALES5.9927,337.10EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1DOBLADORA DE CABILLA HASTA 1 3/81.000.0100077,340.38773.402CINTA MTRICAS 3 MTS2.000.0100025.500.513TENAZA DE 82"2.000.01000154.503.094ALICATE2.000.0100074.801.5050.0Total Equipos:778.50Costo Unitarios Equipos:0.783,550.49MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO CABILLERO0.5092.2038.2519.1346.102CABILLERO DE 1ERA2.0083.3138.2576.50166.623CABILLERO DE 2DA1.0074.4938.2538.2574.494AYUDANTES1.0066.4438.2538.2566.4450.0SubTotal Mano de Obra:172.13353.650.00%Prestaciones Sociales:0.00Total General Mano de Obra:525.78Costo Unitario de Mano de Obra:0.532,397.89COSTO DIRECTO SUBTOTAL A:7.300.00%Administracin y Gastos Generales:0.00SUBTOTAL B:7.300.00%Imprevisto Utilidad:0.00SUBTOTAL C:7.30ING.PRECIO UNITARIO SIN IMPUESTO:7.30C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):7.30ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:13Fecha:Descripcin:SUMINISTRO,TRANSPORTE,PREPARACION Y COLOCACION DE MALLA SOLDADA DEACERO.(6 * 6)Rendimiento:1,000.00000Cdigo:E.351.200.250Unidad:KgfCantidad:353.84MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1MALLA ELECTROSOLDADA 6''x6'' (ROLLO=120 M2) 1.33 K/M2KG1.003.000005.765.935.760.17282COSTO AGREGADO DE TRANSPORTEM31.000.00.100.100.1030.00040.00050.000Total Materiales:6.03COSTO UNITARIO MATERIALES6.032,134.62EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO MENOR PARA MALLA SOLDADA1.000.0049302,400.0011.8320.0030.0040.0050.00Total Equipos:11.83Costo Unitarios Equipos:0.014.19MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO CABILLERO0.50115.2538.2519.1357.632CABILLERO DE 1RA1.00104.1438.2538.25104.143AYUDANTE1.0083.0538.2538.2583.0540.00.050.0SubTotal Mano de Obra:95.63244.820.00%Prestaciones Sociales:0.00Total General Mano de Obra:340.44Costo Unitario de Mano de Obra:0.34120.46COSTO DIRECTO SUBTOTAL A:6.390.00%Administracin y Gastos Generales:0.00SUBTOTAL B:6.390.00%Imprevisto Utilidad:0.00SUBTOTAL C:6.39ING.PRECIO UNITARIO SIN IMPUESTO:6.39C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):6.39ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:14Fecha:Descripcin:SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE COLUMNAS, INCLUYE SU TRANSPORTE HASTA 50 KMS DE DISTANCIA (100mmX100mm)Rendimiento:1,200.00000Cdigo:E.362.110.000Unidad:KgfCantidad:2,489.20MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1BOMBONA DE OXIGENO INDUSTRIAL (CONTENIDOCIL0.010.0100056.000.560.560.0000562ACETILENO (CONTENIDO DE BOMBONA)CIL0.010.01000167.001.671.670.0001673ELECTRODO R10 E6013 3.25 MM. 1/8" X 350KG0.010.0100010.000.100.10.000014PERFIL RECT. 100 X 100 X 2.25MM 8,96 K/MKG1.004.6800018.2919.1518.290.85597250.000Total Materiales:21.48COSTO UNITARIO MATERIALES21.4853,458.57EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO DE OXIACETILENO1.001.00001,300.001,300.002ESMERIL1.001.00001,449.001,449.003ANDAMIO TUBULAR DE UN CUERPO2.001.0000880.001,760.004SOLDADORA ELECTRICA LINCOLN Y CORTADORA1.001.00003,500.003,500.0050.0Total Equipos:8,009.00Costo Unitarios Equipos:6.6716,613.34MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA1.00132.8538.2538.25132.852MONTADOR1.00104.1438.2538.25104.143SOLDADOR DE 1RA1.00104.1438.2538.25104.144OBRERO DE 1RA2.0077.5638.2576.50155.1250.0SubTotal Mano de Obra:191.25496.250.00%Prestaciones Sociales:0.00Total General Mano de Obra:687.50Costo Unitario de Mano de Obra:0.571,426.10COSTO DIRECTO SUBTOTAL A:28.720.00%Administracin y Gastos Generales:0.00SUBTOTAL B:28.720.00%Imprevisto Utilidad:0.00SUBTOTAL C:28.72ING.PRECIO UNITARIO SIN IMPUESTO:28.72C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):28.72ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:15Fecha:Descripcin:SUMINISTRO,CONFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE VIGAS PERFIL RECTANGULAR ESTRUCTURAL 120x60 MM,INCLUYE SU TRANSPORTE HASTA 50 KMS DE DISTANCIARendimiento:900.00000Cdigo:E.362.120.000Unidad:KgfCantidad:3,519.09MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1BOMBONA DE OXIGENO INDUSTRIAL (CONTENIDOCIL0.010.0100056.000.560.560.0000562ACETILENO (CONTENIDO DE BOMBONA)CIL0.010.01000167.001.671.670.0001673ELECTRODO R10 E6013 3.25 MM. 1/8" X 350KG0.010.0100010.000.100.10.000014PERFIL RECT. 120 X 60 X 2.50MM 6,74 K/MKG1.004.6800012.5013.0912.50.58550.000Total Materiales:15.42COSTO UNITARIO MATERIALES15.4254,247.57EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO DE OXIACETILENO1.001.00001,300.001,300.002ESMERIL1.001.00001,449.001,449.003ANDAMIO TUBULAR DE UN CUERPO2.001.0000880.001,760.004SOLDADORA ELECTRICA LINCOLN Y CORTADORA1.001.00003,500.003,500.0050.0Total Equipos:8,009.00Costo Unitarios Equipos:8.9031,315.98MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA1.00132.8538.2538.25132.852MONTADOR1.00104.1438.2538.25104.143SOLDADOR DE 1RA1.00104.1438.2538.25104.144OBRERO DE 1RA2.0077.5638.2576.50155.1250.0SubTotal Mano de Obra:191.25496.250.00%Prestaciones Sociales:0.00Total General Mano de Obra:687.50Costo Unitario de Mano de Obra:0.762,688.19COSTO DIRECTO SUBTOTAL A:25.080.00%Administracin y Gastos Generales:0.00SUBTOTAL B:25.080.00%Imprevisto Utilidad:0.00SUBTOTAL C:25.08ING.PRECIO UNITARIO SIN IMPUESTO:25.08C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):25.08ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:16Fecha:Descripcin:SUMINISTRO,CONFECCION Y COLOCACION EN ESTRUCTURAS METALICA DE CORREAS CON TUBO RECTANG. 80mmX40mm, INCLUYEN SU TRANSPORTE HASTA 50 KMS DE DISTANCIARendimiento:850.00000Cdigo:E.362.130.000Unidad:KgfCantidad:2,547.90MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1BOMBONA DE OXIGENO INDUSTRIAL (CONTENIDOCIL0.010.0100056.000.560.560.0000562ACETILENO (CONTENIDO DE BOMBONA)CIL0.010.01000167.001.671.670.0001673ELECTRODO R10 E6013 3.25 MM. 1/8" X 350KG0.010.0100010.000.100.10.000014PERFIL RECT. 2 1/2 X 1" X 1.10MM 1.490 K/MKG1.004.6800011.1011.6211.10.5194850.000Total Materiales:13.95COSTO UNITARIO MATERIALES13.9535,542.47EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO DE OXIACETILENO1.001.000001,300.001,300.002ESMERIL1.001.000001,449.001,449.003ANDAMIO TUBULAR DE UN CUERPO2.001.00000880.001,760.004SOLDADORA ELECTRICA LINCOLN Y CORTADORA1.001.000003,500.003,500.0050.0Total Equipos:8,009.00Costo Unitarios Equipos:9.4224,007.21MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA1.00132.8538.2538.25132.852MONTADOR1.00104.1438.2538.25104.143SOLDADOR DE 1RA1.00104.1438.2538.25104.144OBRERO DE 1RA2.0077.5638.2576.50155.1250.0SubTotal Mano de Obra:191.25496.250.00%Prestaciones Sociales:0.00Total General Mano de Obra:687.50Costo Unitario de Mano de Obra:0.812,060.80COSTO DIRECTO SUBTOTAL A:24.180.00%Administracin y Gastos Generales:0.00SUBTOTAL B:24.180.00%Imprevisto Utilidad:0.00SUBTOTAL C:24.18ING.PRECIO UNITARIO SIN IMPUESTO:24.18C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):24.18ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:17Fecha:Descripcin:SUMINISTRO Y COLOCACION DE ANCLAJES METALICOS DE 20*20 CMe=6mm.CUATRO CABILLAS 0=1/2".LONGITUD 45 CM.Rendimiento:20.00000Cdigo:E.362.400.001Unidad:PzaCantidad:190.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1ANCLAJE METALICO PARA APOYO DE COLUMNASpza1.000.0150.00150.00150020.00030.00040.00050.000Total Materiales:150.00COSTO UNITARIO MATERIALES150.0028,500.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal10.0020.0030.0040.0050.00Total Equipos:0.00Costo Unitarios Equipos:0.000.0MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal10.00.020.00.030.00.040.00.050.0SubTotal Mano de Obra:0.000.000.00%Prestaciones Sociales:0.00Total General Mano de Obra:0.00Costo Unitario de Mano de Obra:0.000.0COSTO DIRECTO SUBTOTAL A:150.000.00%Administracin y Gastos Generales:0.00SUBTOTAL B:150.000.00%Imprevisto Utilidad:0.00SUBTOTAL C:150.00ING.PRECIO UNITARIO SIN IMPUESTO:150.00C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):150.00ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:18Fecha:Descripcin:S/T/C DE CUBIERTA DE TECHO CON LAMINAS DE ACERO ESTRUCTURAL GALVANIZADO PARA ENCOFRADO COLABORANTE, CALIBRE 24 (e= 0.60 mm) INCLUYE AGREGADO ARROCILLO, ARENA LAVADA Y MALLA ELECTROSOLDADA.Rendimiento:128.00000Cdigo:E.391.S/C.002Unidad:M2Cantidad:1,305.30MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1ELECTRODO E-6013 3,25 MM-1/8'' x 350mmKG0.020.027.000.0002DISCO ABRASIVO PARA ESMERIL 7''PIEZA0.0120.400.0003LAMINA ACANALADA LOSACERO CAL.24 AU=76.2cms 4.89kg/mlM1.030.0275.030.0004ARROCILLOM30.10120.0012.001205ARENA LAVADAM30.01100.001.00106MALLA ELECTROSOLDAD 6*6 (1.33 KG/M2KG1.005.765.765.7607CEMENTO GRISSACO0.1732.505.535.5250Total Materiales:0.00COSTO UNITARIO MATERIALES0.000.0EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1ESMERIL DE BANCO 8'' 3/4 H.P.2.000.002701,449.007.822SOLDADORA LINCOLN AC-225 AMP1.000.003503,500.0012.253EQUIPO DE OXIACETILENO C/ACCESORIOS COMBIGET1.000.003501,300.004.554ANDAMIO TUBULAR2.000.00350880.006.165EQUIPO DE ALBAILERIA1.000.009991,290.9012.90Total Equipos:43.68Costo Unitarios Equipos:0.34445.44MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1OBRERO DE PRIMERA2.0096.9538.2576.50193.902AYUDANTE5.00103.8138.25191.25519.053MAESTRO DE OBRAS DE 1a0.25166.0638.259.5641.524SOLDADOR DE 1a1.00130.1838.2538.25130.18SubTotal Mano de Obra:315.56884.650.00%Prestaciones Sociales:0.00Total General Mano de Obra:1,200.21Costo Unitario de Mano de Obra:0.920.0COSTO DIRECTO SUBTOTAL A:0.000.00%Administracin y Gastos Generales:0.00SUBTOTAL B:0.000.00%Imprevisto Utilidad:0.00SUBTOTAL C:0.00ING.PRECIO UNITARIO SIN IMPUESTO:0.00C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):0.00ANALISIS DE PRECIO UNITARIOOBRA:PIRITUUBICACIN:CONSTRUCCION DE BASE DE PIEDRA PICADA CORRESPONDIENTE A OBRAS PREPARATIVAS.INCLUYE EL MATERIAL Y EXCLUYE TRANSPORTE DEL MATERIALPart. No.:19Fecha:Descripcin:CAPA IMPERMEABILIZANTE EN LOSAS O PLACAS HORIZONTALES CON MEMBRANA ASFALTICA (MANTO) DE ESPESOR 3 MM REFORZADA CON VELO DE FIBRA DE VIDRIORendimiento:90.00000Cdigo:E.421.104.301Unidad:M2Cantidad:1,305.30MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1MANTO ASFALTICO STANDARD E= 3 MM PMVPM21.000.028.3028.3028.302PRAIMERGALN0.1053.005.305.3030.00040.00050.000Total Materiales:33.60COSTO UNITARIO MATERIALES33.6043,858.08EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO SOPLETE C/BOMBONA (EXCLUYE GAS)1.000.00851,290.9010.9320.030.040.050.0Total Equipos:10.93Costo Unitarios Equipos:0.12158.58MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO IMPERMEABILIZADOR1.00144.0638.2538.25144.062IMPERMEABILIZADOR DE 1RA1.00130.1838.2538.25130.183AYUDANTE2.00103.8138.2576.50207.6240.00.050.0SubTotal Mano de Obra:153.00481.860.00%Prestaciones Sociales:0.00Total General Mano de Obra:634.86Costo Unitario de Mano de Obra:7.059,207.59COSTO DIRECTO SUBTOTAL A:40.780.00%Administracin y Gastos Generales:0.00SUBTOTAL B:40.780.00%Imprevisto Utilidad:0.00SUBTOTAL C:40.78ING.PRECIO UNITARIO SIN IMPUESTO:40.78C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):40.78ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:20Fecha:Descripcin:CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO , ACABADO CORRIENTE e=15 cms. NO INCLUYE MACHONES,DINTELES Y BROCALES. INCLUYE TRANSPORTEDE LOS BLOQUES HASTA 50 KMSRendimiento:40.00000Cdigo:E.411.041.015Unidad:M2Cantidad:2,304.21MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1BLOQUE DE CONCRETO 15 X 20 X 40 CMPZA13.005.00003.9453.7851.222.5612AGUA TARIFA INDUSTRIALM30.012.800.040.039203ARENA LIGADA POLVILLO (PMVP)M30.055.0000130.866.876.5430.327154CEMENTO GRIS PORTLAND DE 42.5 KG NO REGUSCO0.0532.751.641.6375050.000Total Materiales:62.33COSTO UNITARIO MATERIALES62.33143,616.21EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPOS VARIOS DE ALBAILERIA1.000.008471,290.9010.932HERRAMIENTAS MENORES1.000.008472,703.4722.903ANDAMIO TUBULAR DE UN CUERPO2.001.00000880.001,760.0040.050.0Total Equipos:1,793.83Costo Unitarios Equipos:44.85103,333.98MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 2DA0.50115.2538.2519.1357.632ALBAIL DE 1RA2.00104.1438.2576.50208.283AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:172.13432.010.00%Prestaciones Sociales:0.00Total General Mano de Obra:604.13Costo Unitario de Mano de Obra:15.1034,801.00COSTO DIRECTO SUBTOTAL A:122.280.00%Administracin y Gastos Generales:0.00SUBTOTAL B:122.280.00%Imprevisto Utilidad:0.00SUBTOTAL C:122.28ING.PRECIO UNITARIO SIN IMPUESTO:122.28C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):122.28ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:21Fecha:Descripcin:CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASERendimiento:120.00000Cdigo:E.412.102.003Unidad:M2Cantidad:3,374.13MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1MORTERO CAL-ARENA-CEMENTO 1:2:+10% (MATEM30.023.00302.656.236.0530.181592MORTERO FINO PARA ENLUCIR (MATERIALES)M30.015.00251.621.321.25810.06290530.00040.00050.000Total Materiales:7.56COSTO UNITARIO MATERIALES7.5625,493.59EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPOS VARIOS DE ALBAILERIA1.000.008471,290.9010.932ANDAMIO TUBULAR DE UN CUERPO2.001.00000880.001,760.0030.040.050.0Total Equipos:1,770.93Costo Unitarios Equipos:14.7649,794.74MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 2DA0.50115.2538.2519.1357.632ALBAIL DE 1RA2.00104.1438.2576.50208.283AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:172.13432.010.00%Prestaciones Sociales:0.00Total General Mano de Obra:604.13Costo Unitario de Mano de Obra:5.0316,986.80COSTO DIRECTO SUBTOTAL A:27.350.00%Administracin y Gastos Generales:0.00SUBTOTAL B:27.350.00%Imprevisto Utilidad:0.00SUBTOTAL C:27.35ING.PRECIO UNITARIO SIN IMPUESTO:27.35C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):27.35ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:22Fecha:Descripcin:CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON CERAMICA NACIONAL, BLANCA O DE COLOR, DE PRIMERA, INCLUYE FRISO BASE.Rendimiento:20.00000Cdigo:E.412.110.007Unidad:M2Cantidad:190.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PEGO BLANCO MONTELUCO 20Kgf/SACOSACO0.033.000023.600.810.79060.0237182CERAMICA CARABOBO 33X33cm UNICOLOR BLANCO LISOM21.055.000091.00100.3395.554.77753LANILLA DE ACERO # 5ROLLO0.202.000034.006.946.80.13640.000Total Materiales:108.08COSTO UNITARIO MATERIALES108.0820,534.79EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1CORTADORA DE CERMICA HASTA 60 RUBI1.000.010001,500.0015.002CINTA MTRICA 3 MTS SIN FORRO T-0101.000.0100028.000.283NIVEL DE 3 BURBUJAS1.000.0100050.200.504CUCHARAS PLANAS DE 6"2.000.01000126.002.525PALA REDONDA2.000.0100082.351.656TOBO PLASTICO CAP= 10 LTS2.000.0100073.531.47Total Equipos:21.42Costo Unitarios Equipos:1.07203.49MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1OBRERO DE PRIMERA2.0077.5638.2576.50155.122AYUDANTE1.0083.0538.2538.2583.053MAESTRO DE OBRA DE 2a0.25115.2538.259.5628.8140.00.050.0SubTotal Mano de Obra:124.31266.980.00%Prestaciones Sociales:0.00Total General Mano de Obra:391.30Costo Unitario de Mano de Obra:19.563,717.30COSTO DIRECTO SUBTOTAL A:20.640.00%Administracin y Gastos Generales:0.00SUBTOTAL B:20.640.00%Imprevisto Utilidad:0.00SUBTOTAL C:20.64ING.PRECIO UNITARIO SIN IMPUESTO:20.64C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):20.64ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:23Fecha:Descripcin:CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO DE CEMENTO ACABADO RUSTICO. INCLUYE FRISO BASERendimiento:90.00000Cdigo:E.412.201.001Unidad:M2Cantidad:860.88MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1MORTERO CAL-ARENA-CEMENTO 1:2:+10% (MATEM30.023.00302.656.236.0530.181592MORTERO FINO PARA ENLUCIR (MATERIALES)M30.015.00251.621.321.25810.06290530.00040.00050.000Total Materiales:7.56COSTO UNITARIO MATERIALES7.566,504.46EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPOS VARIOS DE ALBAILERIA1.000.00851,290.9010.932ANDAMIO TUBULAR DE UN CUERPO2.001.0000880.001,760.0030.040.0Total Equipos:1,770.93Costo Unitarios Equipos:19.6816,939.58MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 2DA0.50115.2538.2519.1357.632ALBAIL DE 1RA2.00104.1438.2576.50208.283AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:172.13432.010.00%Prestaciones Sociales:0.00Total General Mano de Obra:604.13Costo Unitario de Mano de Obra:0.7063.16COSTO DIRECTO SUBTOTAL A:27.930.00%Administracin y Gastos Generales:0.00SUBTOTAL B:27.930.00%Imprevisto Utilidad:0.00SUBTOTAL C:27.93ING.PRECIO UNITARIO SIN IMPUESTO:27.93C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):27.93ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:24Fecha:Descripcin:CONSTRUCCION DE REVESTIMIENTO EN PISOS CON BALDOSAS DE CERAMICA NACIONAL. INCLUYE MORTERO BASE.Rendimiento:90.00000Cdigo:E.414.094.050Unidad:M2Cantidad:57.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PEGO BLANCO MONTELUCO 20Kgf/SACOSACO0.033.000023.600.810.79060.0237182CERAMICA CARABOBO 33X33cm UNICOLOR BLANCO LISO ANTIRESBALANTEM21.055.000091.00100.3395.554.77753LANILLA DE ACERO # 5ROLLO0.202.000034.006.946.80.13640.00050.000Total Materiales:108.08COSTO UNITARIO MATERIALES108.086,160.44EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1CORTADORA DE CERMICA HASTA 60 RUBI1.000.010001,500.0015.002CINTA MTRICA 3 MTS SIN FORRO T-0101.000.0100028.000.283NIVEL DE 3 BURBUJAS1.000.0100050.200.504CUCHARAS PLANAS DE 6"2.000.01000126.002.525PALA REDONDA2.000.0100082.351.656TOBO PLASTICO CAP= 10 LTS2.000.0100073.531.47Total Equipos:21.42Costo Unitarios Equipos:0.2413.57MANO DE OBRA0.0No.DescripcinCant.JornalBonoTotal BonoTotal Jornal1OBRERO DE PRIMERA2.0077.5638.2576.50155.122AYUDANTE1.0083.0538.2538.2583.053MAESTRO DE OBRA DE 2a0.25115.2538.259.5628.8140.0SubTotal Mano de Obra:124.31266.980.00%Prestaciones Sociales:0.00Total General Mano de Obra:391.30Costo Unitario de Mano de Obra:6.86391.30COSTO DIRECTO SUBTOTAL A:136.360.00%Administracin y Gastos Generales:0.00SUBTOTAL B:136.360.00%Imprevisto Utilidad:0.00SUBTOTAL C:136.36ING.PRECIO UNITARIO SIN IMPUESTO:136.36C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):136.36ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:25Fecha:Descripcin:SUMINISTRO,TRANSPORTE Y COLOCACION DE MARCOS DE CHAPA DOBLADA DE HIE-RRO EN PAREDES DE 15 CMS, PARA PAREDES.Rendimiento:50.00000Cdigo:E.437.071.015Unidad:MCantidad:315.12MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1MARCO ENVOLVENTE HIERRO CAL 18 P/PUERTAM1.0098.0098.009802MORTERO DE CEMENTO 1:4M30.00420.001.261.2603PUNTALES PARA ENCOFRADOUND4.0025.00100.00100040.00050.000Total Materiales:199.26COSTO UNITARIO MATERIALES199.2662,789.81EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1NIVEL DE 3 BURBUJAS 14" STANLEY1.000.0100050.200.502PALA REDONDA1.000.0100082.350.823TOBO PLASTICO CAP= 10 LT DE ALBAILERIA1.000.0700073.535.154CUCHARA DE 6" BELLOTA O SIMILAR1.000.02000126.002.5250.0Total Equipos:8.99Costo Unitarios Equipos:0.1856.67MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA0.25132.8538.259.5633.212ALBAIL DE 1RA1.00104.1438.2538.25104.143AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:124.31303.450.00%Prestaciones Sociales:0.00Total General Mano de Obra:427.77Costo Unitario de Mano de Obra:1.36427.77COSTO DIRECTO SUBTOTAL A:200.800.00%Administracin y Gastos Generales:0.00SUBTOTAL B:200.800.00%Imprevisto Utilidad:0.00SUBTOTAL C:200.80ING.PRECIO UNITARIO SIN IMPUESTO:200.80C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):200.80ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:26Fecha:Descripcin:SUMIISTRO, CONFECCION E INSTALACION DE PUERTA METALICA TIPO 1 SEGUN DETALLE PUERTA DE LAMINA DE HIERRO CAL: 18 (0,90 X 2,06 MTS) INCLUYE LA CERRADURARendimiento:10.00000Cdigo:E.S/CUnidad:PZACantidad:38.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PUERTA METALICAM21.00440.00440.0044002BISAGRA 3"X3", E =2 MM TIPO BRONCEADAJGO1.5012.0018.001803ELECTRODO PARA HERRERIAKG0.2521.755.445.437504MORTERO CEMENTO ARENA 1:1 (CAPA IMPERM,M30.05420.0021.002105CERRADURA PARA PUERTA EXTERIOR METALICAPZA0.30120.0036.00360Total Materiales:520.44COSTO UNITARIO MATERIALES520.4419,776.63EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO LIVIANO TALLER HERRERIA1.000.026873,384.3590.942EQUIPOS DE HERRERIA PARA INSTALACION1.000.004001,991.417.9730.040.0Total Equipos:98.90Costo Unitarios Equipos:9.89375.83MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA0.50132.8538.2519.1366.432MONTADOR1.00104.1438.2538.25104.143SOLDADOR DE 1RA1.00104.1438.2538.25104.144SOLDADOR DE 2DA1.0093.1138.2538.2593.115AYUDANTE2.0083.0538.2576.50166.106OBRERO DE 1RA2.0077.5638.2576.50155.12SubTotal Mano de Obra:286.88689.040.00%Prestaciones Sociales:0.00Total General Mano de Obra:975.91Costo Unitario de Mano de Obra:25.68975.91COSTO DIRECTO SUBTOTAL A:546.120.00%Administracin y Gastos Generales:0.00SUBTOTAL B:546.120.00%Imprevisto Utilidad:0.00SUBTOTAL C:546.12ING.PRECIO UNITARIO SIN IMPUESTO:546.12C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):546.12ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:27Fecha:Descripcin:SUMIISTRO, CONFECCION E INSTALACION DE PUERTAS ENTAMBORADA DE LAMINA DE MADERA CAL.18 (0,74 X 2,06 MTS) INCLUYE LA CERRADURA DE POMO.Rendimiento:8.00000Cdigo:E.S/CUnidad:PZACantidad:57.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PUERTA ENTAMBORADA DE MADERAM21.00340.00340.0034002CERRADURA AMBOS POMOS LIBRESPZA1.00135.00135.00135030.00040.00050.000Total Materiales:475.00COSTO UNITARIO MATERIALES475.0027,075.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA CARPINTERIA1.000.008302,355.3819.5520.030.040.050.0Total Equipos:19.55Costo Unitarios Equipos:2.44139.29MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO CARPINTERO DE 2DA0.25115.2538.259.5628.812CARPINTERO DE 1RA1.00105.1438.2538.25105.143AYUDANTE2.0083.0538.2576.50166.104OBRERO DE 1RA2.0077.5638.2576.50155.1250.0SubTotal Mano de Obra:200.81455.170.00%Prestaciones Sociales:0.00Total General Mano de Obra:655.99Costo Unitario de Mano de Obra:11.51655.99COSTO DIRECTO SUBTOTAL A:488.950.00%Administracin y Gastos Generales:0.00SUBTOTAL B:488.950.00%Imprevisto Utilidad:0.00SUBTOTAL C:488.95ING.PRECIO UNITARIO SIN IMPUESTO:488.95C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):488.95ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:28Fecha:Descripcin:SUMIISTRO, CONFECCION E INSTALACION DE PUERTAS PUERTAS ENTAMBORADA DE LAMINA DE MADERA CAL.18 (0,70 X 2,06 MTS) INCLUYE LA CERRADURA DE POMO.Rendimiento:9.00000Cdigo:E.S/CUnidad:PZACantidad:19.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PUERTA ENTAMBORADA DE MADERAM21.00300.00300.0030002CERRADURA AMBOS POMOS LIBRESPZA1.00135.00135.00135030.00040.00050.000Total Materiales:435.00COSTO UNITARIO MATERIALES435.008,265.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA CARPINTERIA1.000.008302,355.3819.5520.030.040.050.0Total Equipos:19.55Costo Unitarios Equipos:2.1741.27MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO CARPINTERO DE 2DA0.25115.2538.259.5628.812CARPINTERO DE 1RA1.00105.1438.2538.25105.143AYUDANTE2.0083.0538.2576.50166.104OBRERO DE 1RA2.0077.5638.2576.50155.1250.0SubTotal Mano de Obra:200.81455.170.00%Prestaciones Sociales:0.00Total General Mano de Obra:655.99Costo Unitario de Mano de Obra:34.53655.99COSTO DIRECTO SUBTOTAL A:471.700.00%Administracin y Gastos Generales:0.00SUBTOTAL B:471.700.00%Imprevisto Utilidad:0.00SUBTOTAL C:471.70ING.PRECIO UNITARIO SIN IMPUESTO:471.70C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):471.70ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:29Fecha:Descripcin:SUMIISTRO, CONFECCION E INSTALACION DE VENTANA PANORAMICA DE 1,15 X 0,95 M (INCLUYE PASADOR DE PISTON Y VIDRIOS ESCARCHADOSRendimiento:15.00000Cdigo:E.S/CUnidad:PZACantidad:264.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1VENTANA PANORAMICA DE 1,15 X 0,95 MPZA1.00440.00440.00440020.00030.00040.00050.000Total Materiales:440.00COSTO UNITARIO MATERIALES440.00116,160.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO LIVIANO TALLER HERRERIA1.000.026873,384.3590.942EQUIPOS DE HERRERIA PARA INSTALACION1.000.004001,991.417.9730.040.050.0Total Equipos:98.90Costo Unitarios Equipos:6.591,740.69MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA0.50132.8538.2519.1366.432AYUDANTE2.0083.0538.2576.50166.103OBRERO DE 1RA2.0077.5638.2576.50155.1240.00.050.00.0SubTotal Mano de Obra:172.13387.650.00%Prestaciones Sociales:0.00Total General Mano de Obra:559.77Costo Unitario de Mano de Obra:2.12559.77COSTO DIRECTO SUBTOTAL A:448.710.00%Administracin y Gastos Generales:0.00SUBTOTAL B:448.710.00%Imprevisto Utilidad:0.00SUBTOTAL C:448.71ING.PRECIO UNITARIO SIN IMPUESTO:448.71C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):448.71ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:30Fecha:Descripcin:SUMIISTRO, CONFECCION E INSTALACION DE VENTANA PANORAMICA DE 0,95 X 0,85 M (INCLUYE PASADOR DE PISTON Y VIDRIOS ESCARCHADOSRendimiento:17.00000Cdigo:E.S/CUnidad:PZACantidad:66.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1VENTANA PANORAMICA DE 0,95 X 0,85 M`ZA1.00440.00440.00440020.00030.00040.00050.000Total Materiales:440.00COSTO UNITARIO MATERIALES440.0029,040.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO LIVIANO TALLER HERRERIA1.000.026873,384.3590.942EQUIPOS DE HERRERIA PARA INSTALACION1.000.004001,991.417.9730.040.050.0Total Equipos:98.90Costo Unitarios Equipos:5.82383.98MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA0.50132.8538.2519.1366.432AYUDANTE2.0083.0538.2576.50166.103OBRERO DE 1RA2.0077.5638.2576.50155.1240.00.050.0SubTotal Mano de Obra:172.13387.650.00%Prestaciones Sociales:0.00Total General Mano de Obra:559.77Costo Unitario de Mano de Obra:8.48559.77COSTO DIRECTO SUBTOTAL A:454.300.00%Administracin y Gastos Generales:0.00SUBTOTAL B:454.300.00%Imprevisto Utilidad:0.00SUBTOTAL C:454.30ING.PRECIO UNITARIO SIN IMPUESTO:454.30C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):454.30ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:31Fecha:Descripcin:SUMIISTRO, CONFECCION E INSTALACION DE VENTANA PANORAMICA DE 0,75 X 0,35 M (INCLUYE PASADOR DE PISTON Y VIDRIOS ESCARCHADOSRendimiento:19.00000Cdigo:E.S/CUnidad:PZACantidad:33.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1VENTANA PANORAMICA DE 0,75 X 0,35 MPZA1.00220.00220.00220020.00030.00040.00050.000Total Materiales:220.00COSTO UNITARIO MATERIALES220.007,260.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO LIVIANO TALLER HERRERIA1.000.026873,384.3590.942EQUIPOS DE HERRERIA PARA INSTALACION1.000.004001,991.417.9730.040.050.0Total Equipos:98.90Costo Unitarios Equipos:5.21171.78MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO DE OBRA DE 1RA0.50132.8538.2519.1366.432AYUDANTE2.0083.0538.2576.50166.103OBRERO DE 1RA2.0077.5638.2576.50155.1240.00.050.0SubTotal Mano de Obra:172.13387.650.00%Prestaciones Sociales:0.00Total General Mano de Obra:559.77Costo Unitario de Mano de Obra:16.96559.77COSTO DIRECTO SUBTOTAL A:242.170.00%Administracin y Gastos Generales:0.00SUBTOTAL B:242.170.00%Imprevisto Utilidad:0.00SUBTOTAL C:242.17ING.PRECIO UNITARIO SIN IMPUESTO:242.17C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):242.17ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:32Fecha:Descripcin:ESMALTE EN VIGAS METALICAS. ALMA LLENARendimiento:80.00000Cdigo:E.461.000.201Unidad:M2Cantidad:2,078.52MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PINTURA DE ESMALTEGAL0.05265.1813.2613.25902SOLVENTE MONSOLVEN BROCHASGAL0.01156.121.091.0928403MATERIALES PARA PINTARS.G0.0027.310.110.1092404TRANSPORTE DE MATERIALES AL SITIO DE LA OBRA%1.650.020.030.027225050.000Total Materiales:14.49COSTO UNITARIO MATERIALES14.4930,114.30EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1ANDAMIO TUBULAR DE UN CUERPO2.001.00000880.001,760.002BROCHA 2"2.000.0070037.840.5330.040.050.0Total Equipos:1,760.53Costo Unitarios Equipos:22.0145,741.31MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO PINTOR0.25115.2538.259.5628.812PINTOR DE 1RA2.00105.1438.2576.50210.283AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:162.56405.190.00%Prestaciones Sociales:0.00Total General Mano de Obra:567.76Costo Unitario de Mano de Obra:0.27567.76COSTO DIRECTO SUBTOTAL A:36.770.00%Administracin y Gastos Generales:0.00SUBTOTAL B:36.770.00%Imprevisto Utilidad:0.00SUBTOTAL C:36.77ING.PRECIO UNITARIO SIN IMPUESTO:36.77C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):36.77ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:33Fecha:Descripcin:ESMALTE EN COLUMNAS METALICAS.Rendimiento:45.00000Cdigo:E.461.000.101Unidad:M2Cantidad:1,848.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PINTURA DE ESMALTEGAL0.05265.1813.2613.25902SOLVENTE MONSOLVEN BROCHASGAL0.01156.121.091.0928403MATERIALES PARA PINTARS.G0.0027.310.110.1092404TRANSPORTE DE MATERIALES AL SITIO DE LA OBRA%1.650.020.030.027225050.000Total Materiales:14.49COSTO UNITARIO MATERIALES14.4926,774.39EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1ANDAMIO TUBULAR DE UN CUERPO2.001.0000880.001,760.002BROCHA 2"2.000.007037.840.5330.040.050.0Total Equipos:1,760.53Costo Unitarios Equipos:39.1272,299.09MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO PINTOR0.25115.2538.259.5628.812PINTOR DE 1RA2.00105.1438.2576.50210.283AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:162.56405.190.00%Prestaciones Sociales:0.00Total General Mano de Obra:567.76Costo Unitario de Mano de Obra:0.31567.76COSTO DIRECTO SUBTOTAL A:53.920.00%Administracin y Gastos Generales:0.00SUBTOTAL B:53.920.00%Imprevisto Utilidad:0.00SUBTOTAL C:53.92ING.PRECIO UNITARIO SIN IMPUESTO:53.92C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):53.92ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:34Fecha:Descripcin:ESMALTE EN PUERTAS METALICASRendimiento:50.00000Cdigo:E.461.000.701Unidad:M2Cantidad:489.46MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PINTURA DE ESMALTEGAL0.05265.1813.2613.25902SOLVENTE MONSOLVEN BROCHASGAL0.01156.121.091.0928403MATERIALES PARA PINTARS.G0.0027.310.110.1092404TRANSPORTE DE MATERIALES AL SITIO DE LA OBRA%1.650.020.030.027225050.000Total Materiales:14.49COSTO UNITARIO MATERIALES14.497,091.39EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1BROCHA 2"2.000.007037.840.5320.030.040.050.0Total Equipos:0.53Costo Unitarios Equipos:0.015.19MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO PINTOR0.25115.2538.259.5628.812PINTOR DE 1RA2.00105.1438.2576.50210.283AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:162.56405.190.00%Prestaciones Sociales:0.00Total General Mano de Obra:567.76Costo Unitario de Mano de Obra:1.16567.76COSTO DIRECTO SUBTOTAL A:15.660.00%Administracin y Gastos Generales:0.00SUBTOTAL B:15.660.00%Imprevisto Utilidad:0.00SUBTOTAL C:15.66ING.PRECIO UNITARIO SIN IMPUESTO:15.66C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):15.66ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:35Fecha:Descripcin:ESMALTE EN MARCOS METALICASRendimiento:48.00000Cdigo:E.461.000.801Unidad:M2Cantidad:2,497.44MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PINTURA DE ESMALTEGAL0.05265.1813.2613.25902SOLVENTE MONSOLVEN BROCHASGAL0.01156.121.091.0928403MATERIALES PARA PINTARS.G0.0027.310.110.1092404TRANSPORTE DE MATERIALES AL SITIO DE LA OBRA%1.650.020.030.027225050.000Total Materiales:14.49COSTO UNITARIO MATERIALES14.4936,183.67EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1BROCHA 2"2.000.007037.840.5320.030.040.050.0Total Equipos:0.53Costo Unitarios Equipos:0.0127.56MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO PINTOR0.25115.2538.259.5628.812PINTOR DE 1RA2.00105.1438.2576.50210.283AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:162.56405.190.00%Prestaciones Sociales:0.00Total General Mano de Obra:567.76Costo Unitario de Mano de Obra:0.23567.76COSTO DIRECTO SUBTOTAL A:14.730.00%Administracin y Gastos Generales:0.00SUBTOTAL B:14.730.00%Imprevisto Utilidad:0.00SUBTOTAL C:14.73ING.PRECIO UNITARIO SIN IMPUESTO:14.73C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):14.73ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:36Fecha:Descripcin:ESMALTE EN VENTANAS METALICAS BATIENTES, CORREDERAS O PAO FIJORendimiento:49.00000Cdigo:E.461.001.031Unidad:M2Cantidad:278.52MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PINTURA DE ESMALTEGAL0.05265.1813.2613.25902SOLVENTE MONSOLVEN BROCHASGAL0.01156.121.091.0928403MATERIALES PARA PINTARS.G0.0027.310.110.1092404TRANSPORTE DE MATERIALES AL SITIO DE LA OBRA%1.650.020.030.027225050.000Total Materiales:14.49COSTO UNITARIO MATERIALES14.494,035.28EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1BROCHA 2"2.000.0070037.840.5320.030.040.050.0Total Equipos:0.53Costo Unitarios Equipos:0.013.01MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO PINTOR0.25115.2538.259.5628.812PINTOR DE 1RA2.00105.1438.2576.50210.283AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:162.56405.190.00%Prestaciones Sociales:0.00Total General Mano de Obra:567.76Costo Unitario de Mano de Obra:2.04567.76COSTO DIRECTO SUBTOTAL A:16.540.00%Administracin y Gastos Generales:0.00SUBTOTAL B:16.540.00%Imprevisto Utilidad:0.00SUBTOTAL C:16.54ING.PRECIO UNITARIO SIN IMPUESTO:16.54C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):16.54ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:37Fecha:Descripcin:BARNIZ EN PUERTAS DE MADERA, INCLUYE FONDO SELLADORRendimiento:60.00000Cdigo:E.462.000.702Unidad:M2Cantidad:794.01MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1BARNIZ NATURALGLN0.05175.898.798.794502SELLADOR NITRO P/CARPINTERIAGLN0.05115.005.755.7503MATERIALES TIPO 1 PARA PINTARGPO0.0127.870.280.2787040.00050.000Total Materiales:14.82COSTO UNITARIO MATERIALES14.8211,769.72EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPOS VARIOS DE PINTURA1.000.03001,431.7842.9520.030.040.050.0Total Equipos:42.95Costo Unitarios Equipos:0.72568.42MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO PINTOR0.25115.2538.259.5628.812PINTOR DE 1RA2.00104.1438.2576.50208.283AYUDANTE1.0083.0538.2538.2583.0540.00.050.0SubTotal Mano de Obra:124.31320.140.00%Prestaciones Sociales:0.00Total General Mano de Obra:444.46Costo Unitario de Mano de Obra:0.56444.46COSTO DIRECTO SUBTOTAL A:16.100.00%Administracin y Gastos Generales:0.00SUBTOTAL B:16.100.00%Imprevisto Utilidad:0.00SUBTOTAL C:16.10ING.PRECIO UNITARIO SIN IMPUESTO:16.10C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):16.10ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:38Fecha:Descripcin:CAUCHO INTERIOR/EXTERIOR EN PAREDES.Rendimiento:90.00000Cdigo:E.463.000.503Unidad:M2Cantidad:14,711.10MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1PINTURA ACROVINILICA INTERIOR EXTERIOR AV 2000GAL0.03300159.805.275.273402MATERIALES PARA PINTARS.G0.0001027.870.000.002787030.00040.00050.000Total Materiales:5.28COSTO UNITARIO MATERIALES5.2877,618.53EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1ANDAMIO TUBULAR DE UN CUERPO2.001.0000880.001,760.002BROCHA 2"2.000.007037.840.5330.040.050.0Total Equipos:1,760.53Costo Unitarios Equipos:19.56287,770.38MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO PINTOR0.25115.2538.259.5628.812PINTOR DE 1RA2.00105.1438.2576.50210.283AYUDANTE2.0083.0538.2576.50166.1040.00.050.0SubTotal Mano de Obra:162.56405.190.00%Prestaciones Sociales:0.00Total General Mano de Obra:567.76Costo Unitario de Mano de Obra:0.04567.76COSTO DIRECTO SUBTOTAL A:24.880.00%Administracin y Gastos Generales:0.00SUBTOTAL B:24.880.00%Imprevisto Utilidad:0.00SUBTOTAL C:24.88ING.PRECIO UNITARIO SIN IMPUESTO:24.88C.I.V.12.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):24.88ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:39Fecha:Descripcin:I.E.TUBERIA PLASTICA RIGIDA LIVIANA,P.V.C.,EMBUTIDA DIAMETRO 1/2 PULG(16 m.m.)Rendimiento:120.00000Cdigo:E.511.111.019Unidad:MCantidad:4,455.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1TUBO PVC ELECTRICIDAD D=1/2"M1.009.009.00902PEGAMENTO PARA PVC (PAVCO O SIMILAR)GLN0.00181.100.180.181103CURVA PVC ELECTRICIDAD D=1/2 "PZA0.505.002.502.504MORTERO CEMENTO ARENA 1:3 (MATERIALES)M30.01410.003.653.649050.000Total Materiales:15.33COSTO UNITARIO MATERIALES15.3368,295.60EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1HERRAMIENTAS MENORES1.000.00852,703.4722.902EQUIPO PARA TUBERIA ELECTRICA1.000.00688,273.2756.5130.040.050.0Total Equipos:79.40Costo Unitarios Equipos:0.662,947.90MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.50115.2538.2519.1357.632ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.050.0SubTotal Mano de Obra:95.63233.790.00%Prestaciones Sociales:0.00Total General Mano de Obra:329.41Costo Unitario de Mano de Obra:0.07329.41COSTO DIRECTO SUBTOTAL A:16.070.00%Administracin y Gastos Generales:0.00SUBTOTAL B:16.070.00%Imprevisto Utilidad:0.00SUBTOTAL C:16.07ING.PRECIO UNITARIO SIN IMPUESTO:16.07C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):16.07ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:40Fecha:Descripcin:I.E. CABLE DE COBRE TRENZADO,REVESTIDO,THW,CALIBRE 12.AWG (2.32 mm)Rendimiento:300.00000Cdigo:E.521.222.023Unidad:MCantidad:13,200.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1CABLE TW N 12 AWGM1.105.00009.0010.409.90.4952TEIPE NEGRO N 33 3/4ROLLO0.015.00007.500.080.0750.003753TRANSPORTE DE MATERIALES AL SITIO DE LA OBRA%1.650.00000.020.030.0330Total Materiales:10.51COSTO UNITARIO MATERIALES10.51138,689.10EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1VOLTA-AMPERIMETRO KIORUTZO ANALOGO1.000.00301,973.625.922CINTA PASACABLES 60M 1/41.000.0050374.721.873CINTA PASACABLES 50M 1/81.000.0050607.503.044CINTA MTRICA 3MTS1.000.010027.300.275ESCALERA 7 TRAMOS TIPO TIEJERA1.000.0050356.821.786CINTA MTRICA 25 MTS1.000.0100183.161.837JUEGO DE ALICATES 6 PIEZAS1.000.0100370.103.708JUEGO DE ATORNILLADORES PLANOS1.000.0100315.503.169PINZA PELACABLES AUTOMTICA1.000.010067.040.67Total Equipos:22.25Costo Unitarios Equipos:0.07978.87MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1ELECTRICISTA DE 1ERA1.00104.1438.2538.25104.142AYUDANTE1.0083.0538.2538.2583.05SubTotal Mano de Obra:76.50187.190.00%Prestaciones Sociales:0.00Total General Mano de Obra:263.69Costo Unitario de Mano de Obra:0.88263.69COSTO DIRECTO SUBTOTAL A:4.030.00%Administracin y Gastos Generales:0.00SUBTOTAL B:4.030.00%Imprevisto Utilidad:0.00SUBTOTAL C:4.03ING.PRECIO UNITARIO SIN IMPUESTO:4.03C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):4.03ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:41Fecha:Descripcin:I.E.INTERRUPTORES (SWITCHES) COMBINABLES SIMPLES,CON TAPA DE PLASTICO,PUENTE Y TORNILLO,,10 A.Rendimiento:30.00000Cdigo:E.541.211.110Unidad:PZACantidad:396.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1INTERRUPTOR, 6A 250V/10A 125V 1 VIA PLASTICOPZA1.0025.0025.0025020.00030.00040.00050.000Total Materiales:25.00COSTO UNITARIO MATERIALES25.009,900.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA INSTALACION ELECTRICA1.000.00757,228.9053.9320.030.040.050.0Total Equipos:53.93Costo Unitarios Equipos:1.80711.84MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.20115.2538.257.6523.052ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.050.0SubTotal Mano de Obra:84.15199.210.00%Prestaciones Sociales:0.00Total General Mano de Obra:283.36Costo Unitario de Mano de Obra:0.72283.36COSTO DIRECTO SUBTOTAL A:27.510.00%Administracin y Gastos Generales:0.00SUBTOTAL B:27.510.00%Imprevisto Utilidad:0.00SUBTOTAL C:27.51ING.PRECIO UNITARIO SIN IMPUESTO:27.51C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):27.51ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:42Fecha:1/28/00Descripcin:I.E.INTERRUPTORES (SWITCHES) COMBINABLES DOBLES,CON TAPA DE PLASTICO,PUENTE Y TORNILLO,,10 A.Rendimiento:28.00000Cdigo:E.541.211.120Unidad:PZACantidad:66.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1INTERRUPTOR, 6A 250V/10A 125V 1 VIA PLASTICOPZA1.0045.0045.0045020.00030.00040.00050.000Total Materiales:45.00COSTO UNITARIO MATERIALES45.002,970.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA INSTALACION ELECTRICA1.000.00757,228.9053.9320.030.040.050.0Total Equipos:53.93Costo Unitarios Equipos:1.93127.12MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.20115.2538.257.6523.052ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.050.0SubTotal Mano de Obra:84.15199.210.00%Prestaciones Sociales:0.00Total General Mano de Obra:283.36Costo Unitario de Mano de Obra:4.29283.36COSTO DIRECTO SUBTOTAL A:51.220.00%Administracin y Gastos Generales:0.00SUBTOTAL B:51.220.00%Imprevisto Utilidad:0.00SUBTOTAL C:51.22ING.PRECIO UNITARIO SIN IMPUESTO:51.22C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):51.22ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:43Fecha:Descripcin:I.E. CABLE DE COBRE ,TRENZADO,REVESTIDO,TW,CALIBRE 10.AWG. (2.95 mm)Rendimiento:180.00000Cdigo:E.521.222.030Unidad:MCantidad:6,600.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1CABLE TW N 10 AWGM1.105.00009.0010.409.90.4952TEIPE NEGRO N 33 3/4ROLLO0.015.00007.500.080.0750.003753TRANSPORTE DE MATERIALES AL SITIO DE LA OBRA%1.650.00000.020.030.0330Total Materiales:10.51COSTO UNITARIO MATERIALES10.5169,344.55EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1VOLTA-AMPERIMETRO KIORUTZO ANALOGO1.000.00301,973.625.922CINTA PASACABLES 60M 1/41.000.0050374.721.873CINTA PASACABLES 50M 1/81.000.0050607.503.044CINTA MTRICA 3MTS1.000.010027.300.275ESCALERA 7 TRAMOS TIPO TIEJERA1.000.0050356.821.786CINTA MTRICA 25 MTS1.000.0100183.161.837JUEGO DE ALICATES 6 PIEZAS1.000.0100370.103.708JUEGO DE ATORNILLADORES PLANOS1.000.0100315.503.169PINZA PELACABLES AUTOMTICA1.000.010067.040.67Total Equipos:11.14Costo Unitarios Equipos:0.06408.54MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1ELECTRICISTA DE 1ERA1.00104.1438.2538.25104.142AYUDANTE1.0083.0538.2538.2583.05SubTotal Mano de Obra:76.50187.190.00%Prestaciones Sociales:0.00Total General Mano de Obra:263.69Costo Unitario de Mano de Obra:1.46263.69COSTO DIRECTO SUBTOTAL A:4.620.00%Administracin y Gastos Generales:0.00SUBTOTAL B:4.620.00%Imprevisto Utilidad:0.00SUBTOTAL C:4.62ING.PRECIO UNITARIO SIN IMPUESTO:4.62C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):4.62ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:44Fecha:Descripcin:I.E. TABLERO METALICO, CONVERTIBLE, EMBUTIDO,CON PUERTA,2 FASE+ NEUTRO, 4 CIRCUITOS, BARRA DE 125 A. NO INCLUYE BREAKERRendimiento:5.00000Cdigo:E.551.120.412Unidad:PZACantidad:19.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1TABLERO 4 CIRC. SIN BREAKERPIEZA1.000.0000180.00180.001800.000000182CEMENTO PORTLAND GRISSACO0.015.000032.750.190.176850.00884253ARENA LAVADAM30.003.000085.000.070.0680.0020440.00050.000Total Materiales:180.26COSTO UNITARIO MATERIALES180.263,424.86EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA INSTALACION ELECTRICA1.000.00757,228.9053.9320.030.040.050.0Total Equipos:53.93Costo Unitarios Equipos:10.79204.92MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.20115.2538.257.6523.052ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.050.0SubTotal Mano de Obra:84.15199.210.00%Prestaciones Sociales:0.00Total General Mano de Obra:283.36Costo Unitario de Mano de Obra:14.91283.36COSTO DIRECTO SUBTOTAL A:205.950.00%Administracin y Gastos Generales:0.00SUBTOTAL B:205.950.00%Imprevisto Utilidad:0.00SUBTOTAL C:205.95ING.PRECIO UNITARIO SIN IMPUESTO:205.95C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):205.95ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:45Fecha:Descripcin:I.E. TOMACORRIENTE UNIVERSAL 1208 DOBLE CON TAPA, PUENTE Y TORNILLO TRES POLOS. COMBINABLE, DOBLE, UNA (1) FASE , 20 A.Rendimiento:30.00000Cdigo:E.542.221.120Unidad:PZACantidad:924.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1TOMACORRIENTE DOBLE TRES POLOSPZA1.0052.0052.0052020.00030.00040.00050.000Total Materiales:52.00COSTO UNITARIO MATERIALES52.0048,048.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA INSTALACION ELECTRICA1.000.00757,228.9053.9320.030.040.050.0Total Equipos:53.93Costo Unitarios Equipos:1.801,660.97MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.20115.2538.257.6523.052ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.00.050.0SubTotal Mano de Obra:84.15199.210.00%Prestaciones Sociales:0.00Total General Mano de Obra:283.36Costo Unitario de Mano de Obra:0.31283.36COSTO DIRECTO SUBTOTAL A:54.100.00%Administracin y Gastos Generales:0.00SUBTOTAL B:54.100.00%Imprevisto Utilidad:0.00SUBTOTAL C:54.10ING.PRECIO UNITARIO SIN IMPUESTO:54.10C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):54.10ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:46Fecha:Descripcin:I.E. INTERUPTOR TERMOMAGNETICO (BREAKER) CON ENCHUFE 1 POLO 10 KA ICC120/240 V,CAP 20 ARendimiento:11.00000Cdigo:E.561.110.020Unidad:PZACantidad:264.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1BREAKER 1P 20A 120/240PIEZA1.000.000050.0050.00500.000000520.00030.00040.00050.000Total Materiales:50.00COSTO UNITARIO MATERIALES50.0013,200.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA INSTALACION ELECTRICA1.000.00757,228.9053.9320.030.040.050.0Total Equipos:53.93Costo Unitarios Equipos:4.901,294.26MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.20115.2538.257.6523.052ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.00.050.0SubTotal Mano de Obra:84.15199.210.00%Prestaciones Sociales:0.00Total General Mano de Obra:283.36Costo Unitario de Mano de Obra:1.07283.36COSTO DIRECTO SUBTOTAL A:55.980.00%Administracin y Gastos Generales:0.00SUBTOTAL B:55.980.00%Imprevisto Utilidad:0.00SUBTOTAL C:55.98ING.PRECIO UNITARIO SIN IMPUESTO:55.98C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):55.98ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:47Fecha:Descripcin:I.E. BOMBILLO 75 W - 110 V CLARO DE APLIQUE PARA INSTALACION SUPERFICIAL.Rendimiento:30.00000Cdigo:E.581.511.S/CUnidad:PZACantidad:726.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1BOMBILLO 75 W - 110 VONID1.006.006.006020.00030.00040.00050.000Total Materiales:6.00COSTO UNITARIO MATERIALES6.004,356.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA INSTALACION ELECTRICA1.000.00757,228.9053.9320.030.040.050.0Total Equipos:53.93Costo Unitarios Equipos:1.801,305.05MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.20115.2538.257.6523.052ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.00.050.0SubTotal Mano de Obra:84.15199.210.00%Prestaciones Sociales:0.00Total General Mano de Obra:283.36Costo Unitario de Mano de Obra:0.39283.36COSTO DIRECTO SUBTOTAL A:8.190.00%Administracin y Gastos Generales:0.00SUBTOTAL B:8.190.00%Imprevisto Utilidad:0.00SUBTOTAL C:8.19ING.PRECIO UNITARIO SIN IMPUESTO:8.19C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):8.19ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:48Fecha:Descripcin:I.E. PUNTO DE LUZ EMBUTIDO EN PARED. CON TUBERIA EMT D=1/2 PULG Y CABLE T.H.W # 12 AWG.Rendimiento:30.00000Cdigo:E.592.002.000Unidad:PTOCantidad:209.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1TUBO PVC ELECTRICIDAD D = 1/2"PZA1.009.009.00902CURVA PVC ELECTRICIDAD D = 1/2"PZA1.005.005.00503CAJETIN METAL OCTAGONAL DE 4''PZA1.005.505.505.5040.00050.000Total Materiales:19.50COSTO UNITARIO MATERIALES19.504,075.50EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1HERRAMIENTAS MENORES1.000.00852,703.4722.902EQUIPO PARA TUBERIA ELECTRICA1.000.00688,273.2756.5130.040.050.0Total Equipos:79.40Costo Unitarios Equipos:2.65553.19MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.50115.2538.2519.1357.632ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.00.050.0SubTotal Mano de Obra:95.63233.790.00%Prestaciones Sociales:0.00Total General Mano de Obra:329.41Costo Unitario de Mano de Obra:1.58329.41COSTO DIRECTO SUBTOTAL A:23.720.00%Administracin y Gastos Generales:0.00SUBTOTAL B:23.720.00%Imprevisto Utilidad:0.00SUBTOTAL C:23.72ING.PRECIO UNITARIO SIN IMPUESTO:23.72C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):23.72ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:49Fecha:Descripcin:I.E. PUNTO DE TOMACORRIENTE EMBUTIDO EN PARED. CON TUBERIA EMT D=1/2 PULG. Y CABLE T.H.W # 12 AWG.Rendimiento:34.00000Cdigo:E.591.110.000Unidad:PTOCantidad:266.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1TUBO PVC ELECTRICIDAD D = 1/2"PZA1.009.009.00902CURVA PVC ELECTRICIDAD D = 1/2"PZA1.005.005.00503CAJETINES METAL RECTANGULARES 4"X2"PZA1.005.005.005040.00050.000Total Materiales:19.00COSTO UNITARIO MATERIALES19.005,054.00EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1HERRAMIENTAS MENORES1.000.00852,703.4722.902EQUIPO PARA TUBERIA ELECTRICA1.000.00688,273.2756.5130.040.050.0Total Equipos:79.40Costo Unitarios Equipos:2.34621.23MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.50115.2538.2519.1357.632ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.00.050.0SubTotal Mano de Obra:95.63233.790.00%Prestaciones Sociales:0.00Total General Mano de Obra:329.41Costo Unitario de Mano de Obra:1.24329.41COSTO DIRECTO SUBTOTAL A:22.570.00%Administracin y Gastos Generales:0.00SUBTOTAL B:22.570.00%Imprevisto Utilidad:0.00SUBTOTAL C:22.57ING.PRECIO UNITARIO SIN IMPUESTO:22.57C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):22.57ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:50Fecha:Descripcin:SUMINISTRO TRANSP Y COLOCACION DE DE CAJA PARA MEDIDOR. INCLUYE CABEZOTE Y TUBERIA CONDUIT DE 1 PULGRendimiento:30.00000Cdigo:E.S/CUnidad:PZACantidad:66.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1CAJA PARA MEDIDORPZA1.00125.00125.0012502CABEZAL 3/4" CON CONECTORPZA1.0023.3423.3423.3403TUBERIA CONDUIT DE 1 PULGPZA1.0026.9926.9926.99040.00050.000Total Materiales:175.33COSTO UNITARIO MATERIALES175.3311,571.78EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1HERRAMIENTAS MENORES1.000.00852,703.4722.902EQUIPO PARA TUBERIA ELECTRICA1.000.00688,273.2756.5130.040.050.0Total Equipos:79.40Costo Unitarios Equipos:2.65174.69MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO ELECTRICISTA0.50115.2538.2519.1357.632ELECTRICISTA DE 2DA1.0093.1138.2538.2593.113AYUDANTE1.0083.0538.2538.2583.0540.00.050.0SubTotal Mano de Obra:95.63233.790.00%Prestaciones Sociales:0.00.Total General Mano de Obra:329.41Costo Unitario de Mano de Obra:4.99329.41COSTO DIRECTO SUBTOTAL A:182.970.00%Administracin y Gastos Generales:0.00SUBTOTAL B:182.970.00%Imprevisto Utilidad:0.00SUBTOTAL C:182.97ING.PRECIO UNITARIO SIN IMPUESTO:182.97C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):182.97ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:51Fecha:Descripcin:I.S. TUBERIA AGUAS CLARAS,DE P.V.C.,D= 1/2" plg (16 mm). 150 psiAMBIENTE EXTERIOR AL RECINTO SANITARIO.INCLUYE CONEXIONES.Rendimiento:42.00000Cdigo:E.611.130.019Unidad:MCantidad:342.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1TUBO PVC A.B. D= 1/2" PRESION AGUA FRIAM1.0014.1314.1314.1302CODO PVC 90 GRADOS A.B. D=1/2"PZA0.336.602.182.17803TEE PVC A.B. D=1/2"PZA0.334.501.491.48504TEFLON PROFESIONAL 19 MM X 15M X 0.2 MMRLL0.102.470.250.247050.000Total Materiales:18.04COSTO UNITARIO MATERIALES18.046,169.68EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA INSTALACIONES SANITARIAS (P.V.C.)1.000.0100359.943.5920.030.040.050.0Total Equipos:3.59Costo Unitarios Equipos:0.0929.22MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO PLOMERO DE 1RA0.25115.2538.259.5628.812PLOMERO DE 1RA1.00104.1438.2538.25104.143AYUDANTE1.0083.0538.2538.2583.0540.050.0SubTotal Mano de Obra:86.06216.000.00%Prestaciones Sociales:0.00Total General Mano de Obra:302.07Costo Unitario de Mano de Obra:0.88302.07COSTO DIRECTO SUBTOTAL A:19.010.00%Administracin y Gastos Generales:0.00SUBTOTAL B:19.010.00%Imprevisto Utilidad:0.00SUBTOTAL C:19.01ING.PRECIO UNITARIO SIN IMPUESTO:19.01C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):19.01ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:52Fecha:Descripcin:I.S. TUBERIA DE AGUAS RESISUALES, P.V.C D= 4 plg (102 mm),e=2.2 mmAMBIENTE EXTERIOR AL RECINTO SANITARIO.INCLUYE CONEXIONES.Rendimiento:34.00000Cdigo:E.612.142.102Unidad:MCantidad:285.00MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1TUBO PVC A.N. TIPO REFORZADO D = 4" (E=M1.0024.7424.7424.7402YEE PVC P/AGUAS NEGRAS 4" 45 GRDSPZA0.3322.907.637.6325703PEGAMENTO PVC TANGIT ENVASE 950 GRS 1/4ENV0.01181.102.682.6802804LIMPIADOR DE TUBOS PVC TANGITLT0.01109.630.810.811262050.000Total Materiales:35.86COSTO UNITARIO MATERIALES35.8610,221.27EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA INSTALACIONES SANITARIAS (P.V.C.)1.000.0100359.943.5920.030.040.050.0Total Equipos:3.59Costo Unitarios Equipos:0.1130.08MANO DE OBRANo.DescripcinCant.JornalBonoTotal BonoTotal Jornal1MAESTRO PLOMERO DE 1RA0.25115.2538.259.5628.812PLOMERO DE 1RA1.00104.1438.2538.25104.143AYUDANTE1.0083.0538.2538.2583.0540.00.050.0SubTotal Mano de Obra:86.06216.000.00%Prestaciones Sociales:0.00Total General Mano de Obra:302.07Costo Unitario de Mano de Obra:1.06302.07COSTO DIRECTO SUBTOTAL A:37.030.00%Administracin y Gastos Generales:0.00SUBTOTAL B:37.030.00%Imprevisto Utilidad:0.00SUBTOTAL C:37.03ING.PRECIO UNITARIO SIN IMPUESTO:37.03C.I.V.0.00%Impuesto (I.V.A.):0.00PRECIO UNITARIO (Bs.F.):37.03ANALISIS DE PRECIO UNITARIOOBRA:CONSTRUCCION DE VIVIENDA PAREADA EN EL URBANISMO LA DEMOCRACIA DE PIRITU MUNICIPIO ESTELLER DEL ESTADO PORTUGUESAUBICACIN:PIRITUPart. No.:53Fecha:Descripcin:I.S. TUBERIA PARA VENTILACION DE,P.V.C. D= 2 plg (51 mm) E=1.8m.m.AMBIENTE EXTERIOR AL RECINTO SANITARIO.INCLUYE CONEXIONES.Rendimiento:12.00000Cdigo:E.613.101.051Unidad:MCantidad:41.80MATERIALESNo.DescripcinUnd.Cant.Desp.PrecioTotal1TUBO PVC AN NORMA 2" LONG. 3mM1.100.00003.163.483.4760.00000003482CODO PVC AN DE 45 D=2"PZA1.000.000015.7215.7215.720.00000015723PEGAMENTO P/TUBOS PVC TANGUIT ENVASE 950 Grs.ENVASE0.081.0000181.1014.6314.4880.144884CODO PVC AN DE 90 D=2"PZA1.000.00003.903.903.90.000000003950.000Total Materiales:37.73COSTO UNITARIO MATERIALES37.731,577.07EQUIPOSNo.DescripcinCant.Cop/DepPrecioTotal1EQUIPO PARA INSTALACIONES SANITARIAS (P.V.C.)1.000.0100359.943.5920.030.040.050.