Complexity is a term very often used to express difficulties in organisational change programs or (IT related) projects. Instead of using complexity as excuse for failure assessing complexity is a much more attractive option.

TRANSCRIPT

Page 1: Complexity in projects

Complexity in projects

November 2011

Definitions, impact and determining factors of complexity

Page 2: Complexity in projects

No. 2© Logica 2011. All rights reserved

Complexity in projects (1)

• Complexity affects project result/value/performance (negatively) is a widely accepted opinion confirmed by studies and research

Source: Managing Project Complexity: PhD dissertation, Marian Bosch-Rekveldt (15 November 2011)

Page 3: Complexity in projects

No. 3© Logica 2011. All rights reserved

Complexity in projects (2)

• This presentation contains two studies:1. Is a study of 46 projects determining the

relation between assessing complexity in IT related projects and the achieved result (value)

2. Is a study of 8 projects defining and determining complexity and elements of complexity, and how complexity can be handled

Page 4: Complexity in projects

No. 4© Logica 2011. All rights reserved

Complexity in projects (3)

• Definitions of complexity are ambiguous and can be related to amongst others:− Competencies (of involved people)

− Technology

− Organisation

− Environment

− Available time

− (Local) circumstances

− .....

Page 5: Complexity in projects

No. 5© Logica 2011. All rights reserved

Complexity in projects (4)

• Frameworks or concepts that support to grasp complexity:− (General) System theory (Bertalanffy, 1956)

− TOE Framework (TU Delft, 2011)

− TOP-mix (Changing IT in six, 2010)

− Temporal Structuring in Organizations (Organization Science (2002)

− …Technology

• Applications

• Middleware

• Infrastructure

Organisation

• Processes

• Structure

• Location

People

• Attitude

• Knowledge

• Skills

TOP-mix

(P)(P)(T) (O)

(P)

(P)

(O)(-)

(T,O,P)

(T,O,P)(O)

(O)

(P)

(O)

() = Relation from TOE -> TOP)

Page 6: Complexity in projects

No. 6© Logica 2011. All rights reserved

Content

• Study 1

• Study 2

• Key references and contact

Page 7: Complexity in projects

No. 7© Logica 2011. All rights reserved

Content

• Study 1

• Study 2

• Key references and contact

Page 8: Complexity in projects

No. 8© Logica 2011. All rights reserved

Study 1: Background (1)

• 46 projects (or situations) in the context of IT innovation and organisational change were faced with the question (in a questionnaire of over 60 questions):

Do you think that the complexity of changes and renewals has been assessed well enough?

• Data is collected on a quick scan basis between 2007 and 2009 from (international) organisations in the Netherlands in private and public sector.

Source: Leading principles of IT related organisational change (2010): http://www.slideshare.net/ldohmen/iba-frame-study-results-20100416

Page 9: Complexity in projects

No. 9© Logica 2011. All rights reserved

Study 1: Results and findings (1)

• In the collection of 46 projects complexity was:− Not assessed for 14 projects

− Sometimes assessed for 25 projects

− Mostly assessed for 7 projects

− Always assessed for 0 projects

Complexity of projects has

little/no attention

Page 10: Complexity in projects

No. 10© Logica 2011. All rights reserved

0,0

1,0

2,0

3,0

4,0

5,0

6,0

7,0

8,0

9,0

10,0

Relation between result* achieved and complexity

(not/mostly) assessed

Study 1: Results and findings (2)

* Aspects of results are amongst others:- Result is an improvement - Result fits objective - Result meets expectation - Result has direct positive effect on work situation - Result is properly absorbed - Result score (value) is expressed on a scale from

1 (very poor) to 10 (excellent)

Complexity not assessed

Complexity mostly assessed

Average result* (value) achieved

14 projects

7 projects

Some key findings:- Assessing complexity mostly leads to an increase of result/value of 46% (average

result 4.6 as reference)

Relation between result* and complexity (not/mostly) assessed

4.6

6.7

Page 11: Complexity in projects

No. 11© Logica 2011. All rights reserved

Study 1: Results and findings (3)

*Project size is based on number of people involved:- Small: number of involved people < 100

- Medium sized: number of involved people > 100 and < 500

- Large: number of involved people > 500

- X: number of involved people is unknown

# projects

5 2

4 1

4 0

1 4

14 7

Some key findings:- The impact (value decrease) of not assessing complexity increases when project size grows

Relation between result and complexity of projects not/mostly assessed

Complexity Not assessed Mostly asessed

Result for small* projects 5,8 6,5

Result for medium-sized* projects 5,0 6,0

Result for large* projects 3,3 -

Result for for X* projects 2,0 7,0

Average result 4,6 6,7

Page 12: Complexity in projects

No. 12© Logica 2011. All rights reserved

Study 1: Data on project level

Complexity not assessed Complexity mostly assessed

Project size Projects / cases Result achieved Result achieved Projects / cases Project size

Small projects Project 1 7,0 5,0 Project 15 Small projects

Project 2 6,0 8,0 Project 16

Project 3 5,0

Project 4 5,0

Project 5 6,0

Average result small 5,8 6,5 Average result small

Medium size projects Project 6 6,0 6,0 Project 17 Medium size projects

Project 7 4,0

Project 8 5,0

Project 9 5,0

Average result medium 5,0 6,0 Average result medium

Large projects Project 10 1,0 Large projects

Project 11 2,0

Project 12 4,0

Project 13 6,0

Average result large 3,3 - Average result large

Not known Project 14 2,0 7,0 Project 18 Not known

8,0 Project 19

6,0 Project 20

7,0 Project 21

Average result unknown 2,0 7,0 Average result unknown

Number of projects: 14 Average result 4,6 6,7 Average result Number of projects: 7

* Average result is calculated based on result achieved per individual project

* *

Page 13: Complexity in projects

No. 13© Logica 2011. All rights reserved

Content

• Study 1

• Study 2

• Key references and contact

Page 14: Complexity in projects

No. 14© Logica 2011. All rights reserved

Study 2: Background

Within many organisations changes are made by means of projects. IT projects are notorious for their low success rate. In recent years a link was made between project complexity and project failure. Logica is interested in this connection and offered a position to research complexity in IT projects. This research focuses on analyzing which literature about project complexity is available and which frameworks for measuring project complexity already exist. Eight cases have been analyzed, each of which focused on a project in the financial services sector. The case studies were performed by keeping interviews with project managers and analyzing project documentation. The main research question is:

Which (combination of) factors determine the complexity of IT projects and how can these successfully be managed?

Source: Complexity in IT-projects (Master thesis Jorden van Helvoort – TU Delft (November 2011)

Page 15: Complexity in projects

No. 15© Logica 2011. All rights reserved

Study 2: Findings and conclusions

• Findings and conclusions are based on the TOE Framework of the TU Delft (slide #5)• To successfully manage these dominant complexity elements in IT projects, a project

manager has three main management measures at his disposal:

1.Manage communication: This is achieved through face‐to‐face communication, formal information exchange, stakeholder management, interface management, or committing information to paper or digital format, like repositories and knowledge bases.

2.Manage realism: This is achieved through strict agreements on changes to the project scope or quality, making smart choices in selecting technology, standardizing software tools, limiting conversions of data, limiting the amount of different systems and always testing solutions extensively to ensure added‐value to the client.

3.Manage engagement: This is achieved through reducing the team size wherever possible, building relationships based on trust, always use monitoring and control, replacing project members or stakeholders with the wrong attitude, creating a sense of a common goal, knowing the organization, finding multiple project sponsors, being aware of early warning signs of project failure, timing stakeholders participation and looking for intrinsic motivation among the project team and stakeholders.

Source: Complexity in IT-projects (Master thesis Jorden van Helvoort – TU Delft (November 2011)

Page 16: Complexity in projects

No. 16© Logica 2011. All rights reserved

Content

• Study 1

• Study 2

• Key references and contact

Page 17: Complexity in projects

No. 17© Logica 2011. All rights reserved

Key references

• Managing project complexityhttp://repository.tudelft.nl/view/ir/uuid%3Aa783e581-bc7a-4efa-adcb-7e9201840367/

• Kampioen organisatieveranderinghttp://www.unibook.com/nl/Leon-Dohmen/Kampioen-organisatieverandering

• Leading principles of IT related organisational changehttp://www.slideshare.net/ldohmen/iba-frame-study-results-20100416

• Master thesis Jorden van Helvoort: Complexity in IT projects

• Regie voeren over organisatieverandering met ICThttp://www.sdu.nl/catalogus/9789012125895

• Changing IT in sixhttp://www.vangorcum.nl/EN_toonBoek.asp?PublID=4552

• It’s About Time: Temporal Structuring in Organizationshttp://orgsci.journal.informs.org/content/13/6/684.abstract

Page 18: Complexity in projects

No. 18© Logica 2011. All rights reserved

For questions and special requests – Contact

Management of (Information) TechnologyLeon Dohmen | Principal Management Consultant –

IT Management Consultancy

T: +31 40 2957 777 | M: +31 6 1737 [email protected]

Page 19: Complexity in projects

Logica is a leading IT and business services company, employing 39,000 people across 36 countries. It provides business consulting, systems integration,

and IT and business process outsourcing services. Logica works closely with its customers to release their potential – enabling change that increases their efficiency, accelerates growth and manages risk. It applies its deep industry knowledge, technical excellence and global delivery expertise to help its

customers build leadership positions in their markets. Logica is listed on both the London Stock Exchange and Euronext (Amsterdam) (LSE: LOG; Euronext:

LOG). More information is available at www.logica.com

Logica Nederlands B.V.: Consultancy and

Professional Services -Practice IT management