COMPLETED PROJECTS Santa Monica High A synthetic turf atheltic field to replace the former grass athetic field SMASH/John Muir Construction of a new pedestrian gate for additional control of access to the campus Webster Elementary Modernization included replacing the fire alarm system with a fully automatic system. John Adams Middle School Landscaping near the athletic field, including tree planters and built-in bench seating. A teaching garden was installed for educational purposes Lincoln Middle School Installation of 4 relocatable classrooms and a new 6” fire sprinkler line to service the pending replacement of Classroom Building C Juan Cabrillo Elementary Installation of a new fence and entry gate to provide a welcoming environment and secure perimeter Point Dume Replacement of the main gas supply lines & all of the heating units serving the building McKinley Elementary Reconfiguration of the main entrance, main office, a new welcoming & inviting courtyard with planters and built-in bench seating John Adams Middle School A new attendance office and front entrance, a newly remodeled art classroom, and a new fire system installed. Malibu MS & HS Replacement of the fire alarm system. Lincoln Middle School Former library and rooms 218, 220 and 222 were renovated to accommodate four new classrooms, two science labs, and a shared prep room Will Rogers Elementary Modernization included the installation of a new front entry and reconfiguration of the front office and reception, creating a new and welcoming environment for visitors. Grant Elementary Construction of a new entry for improved security and visual appeal, as well as landscaping and outdoor benches. Olympic High School Landscaping by a local SMMUSD alumnus to visually enhance the site District-wide technology upgrades LANs moved to 1Gbs, 84 acres of wireless coverage throughout all schools and district office, replacement of old phone systems, and new technology in the classrooms including projector/screens, voice and audio amplification, document camera, integrated lecterns, and 1093 teacher and student laptops. OCT.2010 FEB.2011 MAR.2011 MAY 2011 NOV. 2011 OCT.2011 AUG.2011 JULY 2011 JAN.2012 MAR.2013 MAR.2013 For project inquiries please contact the FIP Office at 310.450.8338 x70380 See all your Measure BB projects at fip.smmusd.org SEPT.2010 SEPT. 2010 JULY 2010 SEPT. 2010 JULY 2010

Upload: others

Post on 08-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COMPLETED PROJECTSfip.smmusd.org/downloads/completed-projects.pdf · COMPLETED PROJECTS Santa Monica High A synthetic turf atheltic field to replace the former grass athetic field

COMPLETED PROJECTS

Santa Monica HighA synthetic turf atheltic field to replace the

former grass athetic field

SMASH/John MuirConstruction of a new pedestrian gate for additional control of access to the campus

Webster ElementaryModernization included replacing the fire

alarm system with a fully automatic system.

John Adams Middle SchoolLandscaping near the athletic field, including tree planters and built-in bench seating. A

teaching garden was installed for educational purposes

Lincoln Middle SchoolInstallation of 4 relocatable classrooms and

a new 6” fire sprinkler line to service the pending replacement of Classroom

Building C

Juan Cabrillo ElementaryInstallation of a new fence and entry gate to

provide a welcoming environment and secure perimeter

Point DumeReplacement of the main gas supply lines & all of the heating units serving the building

McKinley ElementaryReconfiguration of the main entrance, main office, a new welcoming & inviting courtyard

with planters and built-in bench seating

John Adams Middle SchoolA new attendance office and front entrance,

a newly remodeled art classroom, and a new fire system installed.

Malibu MS & HSReplacement of the fire alarm system.

Lincoln Middle SchoolFormer library and rooms 218, 220 and 222 were renovated to accommodate four new

classrooms, two science labs, and a shared prep room

Will Rogers ElementaryModernization included the installation of a new front entry and reconfiguration of the front office and reception, creating a new and welcoming environment for visitors.

Grant Elementary Construction of a new entry for improved

security and visual appeal, as well as landscaping and outdoor benches.

Olympic High SchoolLandscaping by a local SMMUSD alumnus

to visually enhance the site

District-wide technology upgrades

LANs moved to 1Gbs, 84 acres of wireless coverage throughout all schools and district office, replacement of old phone systems, and new technology in the classrooms including projector/screens, voice and audio amplification, document camera, integrated lecterns, and 1093 teacher and student laptops.

OCT.2010 FEB.2011 MAR.2011 MAY 2011

NOV. 2011 OCT.2011 AUG.2011 JULY 2011

JAN.2012 MAR.2013 MAR.2013

For project inquiries please contact the FIP Office at 310.450.8338 x70380

See all your Measure BB projects at fip.smmusd.org

SEPT.2010 SEPT. 2010 JULY 2010SEPT. 2010 JULY 2010