COMPLETED PROJECTS
Santa Monica HighA synthetic turf atheltic field to replace the
former grass athetic field
SMASH/John MuirConstruction of a new pedestrian gate for additional control of access to the campus
Webster ElementaryModernization included replacing the fire
alarm system with a fully automatic system.
John Adams Middle SchoolLandscaping near the athletic field, including tree planters and built-in bench seating. A
teaching garden was installed for educational purposes
Lincoln Middle SchoolInstallation of 4 relocatable classrooms and
a new 6” fire sprinkler line to service the pending replacement of Classroom
Building C
Juan Cabrillo ElementaryInstallation of a new fence and entry gate to
provide a welcoming environment and secure perimeter
Point DumeReplacement of the main gas supply lines & all of the heating units serving the building
McKinley ElementaryReconfiguration of the main entrance, main office, a new welcoming & inviting courtyard
with planters and built-in bench seating
John Adams Middle SchoolA new attendance office and front entrance,
a newly remodeled art classroom, and a new fire system installed.
Malibu MS & HSReplacement of the fire alarm system.
Lincoln Middle SchoolFormer library and rooms 218, 220 and 222 were renovated to accommodate four new
classrooms, two science labs, and a shared prep room
Will Rogers ElementaryModernization included the installation of a new front entry and reconfiguration of the front office and reception, creating a new and welcoming environment for visitors.
Grant Elementary Construction of a new entry for improved
security and visual appeal, as well as landscaping and outdoor benches.
Olympic High SchoolLandscaping by a local SMMUSD alumnus
to visually enhance the site
District-wide technology upgrades
LANs moved to 1Gbs, 84 acres of wireless coverage throughout all schools and district office, replacement of old phone systems, and new technology in the classrooms including projector/screens, voice and audio amplification, document camera, integrated lecterns, and 1093 teacher and student laptops.
OCT.2010 FEB.2011 MAR.2011 MAY 2011
NOV. 2011 OCT.2011 AUG.2011 JULY 2011
JAN.2012 MAR.2013 MAR.2013
For project inquiries please contact the FIP Office at 310.450.8338 x70380
See all your Measure BB projects at fip.smmusd.org
SEPT.2010 SEPT. 2010 JULY 2010SEPT. 2010 JULY 2010