WHO WE ARE
Smartech Italian Engineering Consultancy is a newly established civil engineering partnership. It is
constituted of companies and highly specialized professionals with extensive experience and cutting edge
know-how in all fields of civil engineering and consulting. This permanent partnership turns its services
particularly to the international markets.
WHY TOGETHER
Consulting Companies | Complementary Disciplines | Different ExperiencesSynergy
Vision
MissionWe joined our technical capacities and our staff resources to strengthen
our approach enabling Smartech to deliver tailored solutions to our Clients
Innovative Thinking | Cutting-edge Technology |
Holistic and Multidisciplinary Approach
WHERE WE ARE AND OUR STRENGHTS
Presently Smartech can rely on the active involvement in some international projects, in different
engineering sectors. Specifically, Smartech has gained international experience carrying out
infrastructure projects in Algeria, South Africa, Mozambique, Zambia, Oman, Iraq, Kazakhstan,
Philippines and Venezuela.
OFFICES PROJECTS
LocationsPresent in 9
Countries
Turnover > 6,5 Million €
Personnel >90 staff
SMARTECHItalian Independent Consultancy
OUR CORE BUSINESS
INFRASTRUCTURE AND TRANSPORTATIONRoads, Highways, Bridges, Tunnels, Railways, Airports, Harbours, Ports, Traffic Studies
URBAN PLANNING, ARCHITECTURE AND BUILDINGSUrban/Regional plans, Geotechnics and Structural design, Public and private buildings design, Design and supervision of infrastructure works
TELECOMMUNICATION INFRASTRUCTURESFibre Optic Broadband Infrastructure, Radio Links and wireless networksUrban Video Surveillance Systems
WATER RESOURCES MANAGEMENTDams, Irrigations and Drainage Systems, Hydrologic Modelling, Channels, Site Restoration
SECURITY SYSTEMSVideo Surveillance Systems, Street Lighting, Fire Protection Systems
WATER SUPPLY & SANITATIONWater and Wastewater Networks and Infrastructures
Detailed design and ConstructionSupervision for the realization of a6,6 Km long bypass road,realization of a vehicular underpassand and cycle-pedestrian underpassunder the existing railway.Realization of 5 roundabouts and 3bridges.
BYPASS ROAD OF THE CITY OF MOGLIANO
VENETO
CLIENT
Province of Treviso
PROJECT DURATION
4 years
COMPLETION DATE
2008
COUNTRY
Italy
BRIDGES
50 mts
ROAD
6,6 km
WADI ADAIINTERCHANGE BRIDGE, MUSCAT MUNICIPALITY
Detailed Structural design for 2urban road viaducts with compositecross section, with span lenghts up to55 mt.
CLIENT
SCL Costruzionie Montaggi Srl
PROJECT DURATION
1 years
COMPLETION DATE
2010
COUNTRY
Sultanate of Oman
LENGHT
1,340 mt and 2,270 mt
Structural detailed design withoptimization of the under structures(piers, abutments and relatedfoundations of different types: shallowand deep piles, pits) for 24 railwayviaducts in a highly seismic site.The viaducts are made of a sequenceof supported spans with lengthvariables between 30 mt and 60 mt,for a total length of 8700 mt.
RAILWAY BRIDGES FOR THE NEW RAILROAD BETWEEN
SAN JUAN DE LOS MORROS-SAN FERNANDO
DE APURE, AND CHAGUARAMAS-CABRUTA
CLIENT
Impregilo
PROJECT DURATION
1,5 years
COMPLETION DATE
2009
COUNTRY
Venezuela
LENGHT
8700 mt
Ayala Bridge, is a steel truss bridgeover the Pasig River in Manila.In 2015, the bridge was closed inMarch for structural repairs, whichincluded strengthening of the bridge'sfoundations, and lifting thestructure by some 70 centimetres.
AYALA BRIDGE, MANILA
CLIENT
Freyssinet (France)
PROJECT DURATION
11 months
COMPLETION DATE
2015
COUNTRY
Philippines
BRIDGES
139 mts – width 25 mts
The Cityringen project will form a new circular line in the city center and will consist of two 17.4 km tunnels and 17 new stations (two of which are transfer stations) all at 30 mt below ground level. Structural Detailed Design and optimization of supporting structures of excavations of 14 stations. The work includes metal structures of self-balanced shoring poles and bulkheads and excavation containment diaphragms of up to about 25 mt in depth.
METRO OF COPENHAGENCITYRINGEN
CLIENT
OMBA Impianti &Engineering on behalfof Salini-Impregilo
PROJECT DURATION
15 months
COMPLETION DATE
2014
COUNTRY
Denmark
TUNNELS LENGHT
17,4 km
Access Road to Airport. The works concern the widening of about 1,2 Km long road in order to achieve a 4-lane road and the construction of 2 roundabouts (Diameters 103 and 91 mt).Parking system. Design of 8 car parks for more than 2.800 parking spaces. The project includes the construction of road infrastructure, technological systems, hydraulic works, landscaping and environmental mitigation and construction of pedestrian walkways covered by roofs.
VENICE AIRPORTACCESS ROAD AND PARKING SYSTEM
CLIENT
ANAS / SAVE SpA
PROJECT DURATION
15 months
COMPLETION DATE
2014 – on going
COUNTRY
Italy
PARKING SPACES
2800
The main objectives of the project are:• improve the mobility of citizens,
decreasing travel costs and time;• increasing flow while diminishing
private car traffic and consequently decreasing air pollution;
• decrease transportation costs by a rationalization of the system and a reduction of the management and maintenance expenses.
LIGHT RAIL TRANSIT (LRT) SYSTEM IN CAGLIARI
SARDINIA
CLIENT
ARST – Regional Transport of SardiniaProject
PROJECT DURATION
34 months
COMPLETION DATE
December 2014
COUNTRY
Italy
Traffic flow simulation to provide assessment factors on the suitability of the road network projects. Evaluation of the efficiency of the road system to be designed, providing instructions and considerations in order to give useful support tool to the project designer.
TRANSPORT ANDMOBILITY PLANNING
PROJECT DURATION
Since 2000
COMPLETION DATE
On-going
COUNTRY
Italy
CLIENT
Municipalities and Local Transportation Authorities
Structural Final and Detaileddesign of the Multipurpose buildingserving the contiguous luxury hotel.The design includes the theatre, theconference hall and the Spa includingswimming pool.
ASTANA EXPO 2017 ENERGY HALL AND PODIUM, ASTANA
CLIENT
SETIN Srl
PROJECT DURATION
6 months
COMPLETION DATE
June 2015
COUNTRY
Kazakhstan
Project Financing for the design, restructuring, maintenance and management of a part of the building complex called ex Cinema Rossini, located in the historic center of Venice.The project encompassed the realization of three cinema halls, a restaurant, a supermarket, a bar and two apartments.
RESTRUCTURING AND RECOVERY OF CINEMA
ROSSINI, VENICE
CLIENT
Venice Municipality /FinRoss S.r.l.
PROJECT DURATION
3 years
COMPLETION DATE
April 2012
COUNTRY
Italy
URBAN AND INDUSTRIAL PLANNING AND URBAN
FACILITIES
EARTHFILL DAM SHEWASOOR,
REGION OF KURDISTAN
CLIENT
Kurdistan Regional Government – Ministry Of Agriculture
PROJECT DURATION
2 years
COMPLETION DATE
2012
COUNTRY
Iraq
LENGTH
330 mt
Detailed design and Assistance to the Client during the constructionKey figures:• Maximum height: 46 mt; • crest Width: 10 mt;• maximum capacity: 7,808,360 m³; • catchment area: 103.67 km²; • excavation volume for cofferdam,
dam, bottom outlet and spillway 500,000 m³;
• volume of the dam body 1,100,000 m³.
CONCRETE GRAVITY DAM, REGION OF KURDISTAN
CLIENT
Kurdistan Regional Government – Ministry Of Agriculture
PROJECT DURATION
2 years
COMPLETION DATE
2012
COUNTRY
Iraq
Preliminary, Final and Detailed design; assistance to the Client during the construction.Key figures:• height of the Dam: 25.50 mt; • crest Width: 7 mt;• maximum capacity: 2,112,500 m³; • reservoir area: 0.17 km²;• catchment area: 456 km²; • spillway Project Flood: 1,372 m3/s;• spillway global length: 75 mt.
LENGTH
150 mt
RIVER SANGRO: MASTER PLAN FOR RIVER BASIN
MANAGEMENT AND FLOOD CONTROL OF THE URBAN AND INSUSTRIAL AREA
CLIENT
Abruzzo Region
PROJECT DURATION
2 years
COMPLETION DATE
2009
COUNTRY
Italy
Master Plan, Preliminary and Detailed designs for Integrated Water Resources Management.Activities performed:• data gathering; • topographical surveys;• geological studies including a
geomorphologic survey;• hydrological, geological an
geomorphologic analysis;• building of hydraulic model; • development of an intervention
plan including the definition of priority measures.
ALTO CHIAMPO WATER AUTHORITY: DUE
DILIGENCE AND REVISION OF TERRITORIAL WATER
RESOURCES PLAN, VICENZA
CLIENT
Acque del Chiampo SpA
PROJECT DURATION
2 years
COMPLETION DATE
2011
COUNTRY
Italy
Project Area:10 municipalities (268 Km²),92,000 Inhabitants;
Objectives:• re-organisation of water
management services based on efficiency, effectiveness and financial criteria and “Industrial” management of water management services.
Main project’s activities performed:• survey of existing assets and
current management practices; • assess current service level and
set target service levels;• survey of current water resources
use and surface/ground water quality;
• definition of the Investment Program;
• definition of the Organization and Management Model;
• topographical surveys;• geological studies including a
geomorphologic survey;• definition of the Financial Plan;• tariff Calculation.
REHABILITATION AND UPGRADING OF WATER SUPPLY & SANITATION
SYSTEM IN CHOMA
CLIENT
Ministry of Local Government and Housing
PROJECT DURATION
1,5 years
COMPLETION DATE
2017
COUNTRY
Zambia
Detailed design and preparation of bidding documents for the Choma Town Water Supply and Sewerage Services Improvement Project; project and Contract Management; construction Supervision.
UPGRADING OFMODENA SEWAGE TREATMENT PLANT
CLIENT
Municipality of Modena and HERA
PROJECT DURATION
6 years
COMPLETION DATE
on-going
COUNTRY
Italy
Detailed Design and Works Supervision;• the plant serves the city of
Modena and other surrounding municipalities for a total capacity of 500,000 PE;
• total treatment capacity: 35,524 m³/year
UNDERWATER SEWER TO COLLECT WATER SPILLAGE AND DELIVER IT TO THE
FINAL MAIN SEWER NETWORK IN PROXIMITY TO THE FIUME BRENTA
CLIENT
Thetis SpA
PROJECT DURATION
2 years
COMPLETION DATE
2011
COUNTRY
Italy
Preliminary, Final, Detailed Design and Works Supervision.
Network Designed
TELECOMMUNICATION INFRASTRUCTURE IN
FRIULI VENEZIA GIULIA REGION
CLIENT
Insiel SpA
PROJECT DURATION
5 years
COMPLETION DATE
on-going
COUNTRY
Italy
Design for the creation of fiber optic network along the entire territorial fabric of the Region (7,845 Km²).To date, more than 12 projects have been carried out, including Works Supervision and testing for a total of more than 1,500 Km of built backbone network.
BACKBONE NETWORK
+1500 km
CITIES SERVED
+140
WIRED INDUSTRIAL AREAS
+30
Broadband infrastructure technology also allows the implementation of other types of innovative urban services. Making use of the broadband infrastructure it is possible to implement video surveillance, security systems, wi-fi network and urban internet, interactive information boards/panels with changing messaging system, street lighting, etc.
SECURITY SYSTEMS, VIDEO SURVEILLANCE
AND SMART CITIES