COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
Jack Up Barge JB118 Abu Dhabi 2 Months TLQ Mobilisation Assistance 2015
LNG Easy Pte Ltd --- Singapore / China 7 Months Pre-FEED of FSU & LNG Regas Projects 2015
SAJSAJ Technical Services
(M) Sdn BhdD18 - Halcyon II Singapore 4 Months Consultancy of Piping Engineer 2015
Bumi Armada Berhad Armada Hibiscus Singapore 1 MonthModification Engineering for Upgrade of Armada
Hibiscus Accommodation2015
Jack Up Barge JB114 Abu Dhabi 2 Months TLQ Mobilisation Assistance 2015
CEC InternationalEP1,
EP4Singapore 2 Weeks Establish Variable load worksheet for EP1 & EP4 2015
MODEC INC
FPSO Cidade de
Compos dos
Goytacazes
Singapore 2 Months
Consultancy of Structural Designer for Petrobas
FPSO Cidade De Campos Dos Goytacazes MV29
Project
2015
LNG Easy Pte Ltd --- Singapore / China 1 month Pre-FEED of FSU & LNG Regas Terminal in China 2015
Page 1 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
First E & POML 83 & 85,
OML 71 & 72Singapore 11 Months
Project Management and providing the marine
facilities required to develop and produce the filelds
which cover FPSO for OML 83 and 85 and a MOPU
solution (including a FSO & Tanker Offloading
system) for OML 71 and OML 72
2015
CE ThailandCompass Energy
ThailandEP4 (Ex-Richmond) Singapore 1 Month Design of EP4 Export Pump Skid Storage Platform 2015
CEC International EP3 Singapore 4 MonthsGlobal & Fatigue Analysis for jacking & operating
condition of EP3 (Self-Elevating Platform)2015
GMS GMS Singapore --- Malaysia 3 daysInspection of 2 units Semi-Submersible for Purchase
Option2015
First Reserve
International Limited
Bertam Field block
PM307Singapore 1 Week FPSO Inspection in Singapore Shipyard 2015
Larastia AD6 Malaysia 3 Days Site Inspection of AD6 rig (Self-Elevating Platform) 2015
CEC International EP4 (Ex-Richmond) Singapore 6 WeeksStrength Analysis EP 4 (ex-Richmond-Semi-
Submersible)2014
Jack Up Barge --- Malaysia 6 MonthsProject Management of TLQ Fabrication &
Construction2014
Page 2 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
Jack Up Barge --- Singapore 2 weeks Review of TLQ Blast Calculation Analysis 2014
Satu Marine CESANO Rig Indonesia 2 weeksRig Condition Survey of CESANO & Budget
Preparation 2014
LEKOIL Limited Lekoil FSO Singapore Ongoing Project Management Consultancy 2014
EMAS AMCPipelay Barge Lewek
ChampionSingapore 3.5 months Engineering on Crane Upgrade for Lewek Champion 2014
Coastal Energy EP 1 Singapore 8 weeks Proposal on Protection Frame for Fuel Gas
Compressor(EP1)2014
EMAS AMCPipelay Barge Lewek
ConstellationSingapore 1 Week
Site Inspection, Supervision & Engineering of Cooling
Water System of Lewek Constellation 2014
Premier Oil Lewek EMAS FPSO Vietnam 4 Months Condition Survey & Reporting for Lewek EMAS FPSO 2014
EMAS AMCPipelay Barge Lewek
ChampionSingapore Ongoing
Design & Engineering Services of Anti Heeling
System for M/V Lewek Champion 2014
Page 3 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
EMAS AMCPipelay Barge Lewek
ConstellationChina/Singapore 4 weeks Cooling Water System Engineering & Inspection 2014
EMAS AMCPipelay Barge Lewek
ConstellationSingapore 6 months Engineering Assistance for Lewek Constellation 2014
GE Energy E&I Design Singapore CompleteModification and upgrade of Electrical System for
MOPU (EP3 and EP4)2014
EMAS AMCPipelay Barge Lewek
ConstellationSingapore 12 weeks
Structural Analysis & Design of Pipe Reel Cradle
Modification 2014
EMAS AMCPipelay Barge Lewek
ChampionSingapore 2 Months
Additional Basic and Detailed Design for 1000 T
Crane Cooling Water System2014
MODEC INCProject
Commisioning Singapore 12 Months
Map Process Development Commisioning
Compass IT Mobile 2014
BAM International Submersible Barge Singapore 1 Week Design of Submersible Barge 2014
Petrofac Pte Ltd FPSO Opportunity Singapore 2 WeeksProvision of Consultant Services for Refurbishment
of FPSO 2014
Page 4 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
Muller Dordrecht Steel Barge China 1 Week Independent Condition Survey of Steel Barge 2013
Jack-Up Barge B.V. JB 115, 117, 118 The Netherland 2 MonthsConstruction & Project Consultancy for Various
Upgrades to jack up barges2013
EMAS AMCPipelay Barge Lewek
ConstellationSingapore 12 Months
Consultancy and Engineering Services for The
Modification to Lewek Constellation2013
EMAS AMCPipelay Barge Lewek
ChampionSingapore 12 Months
Engineering and Design for Various Upgrade for
Lewek Champion 2013
Bumi Armada BerhadAccommodation
BargeMalaysia 24 Months
Consultancy of Project Manager for Design and
Construction of an Accommodation Barge2013
Kongsberg Maritime FSO Gagak Rimang Singapore 12 weeks Provision of Turnkey Solution for Dehumidifier
Containers2013
M7 OffshorePetroleo Nautipa
FPSOSingapore 8 weeks Consultancy for Structural Scope on MEG Tank Skid 2013
Rubicon Offshore
International
Rubicon Intrepid
FPSOSingapore 6 Weeks Provision of E&I Consultant for Rubicon 2013
Page 5 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
M7 OffshorePetroleo Nautipa
FPSOSingapore 8 weeks
Consultancy for Structural Scope on Fuel Gas
Module2013
Compass Energy
ThailandE&I Design Singapore 2 weeks E&I Design for GE Energy 2013
MODEC FPSO MV26 Singapore 4 Months Provision of FPSO MV26 Piping Designer 2013
Bumi Armada Berhad Tuah 303-307 China 8 MonthsProvision of Project Management Team for
Newbuild in Xiamen2013
Jack-Up Barge B.V. Jack-Up Barge JB118 Singapore 2 Months Review & Design of Sea-Fastening of Items onboard
JB1182013
BW Offshore FPSO Espoir Singapore 2 MonthsProvision of Accommodation Engineer for FPSO
Espoir Life Extension2013
CEC International EP4 (Ex-Richmond) Singapore 2 WeeksStructural Modification for New Genset on
Richmond2013
DVB Bank Dalian Developer Singapore 2 months Engineering Study for Dalian Developer 2013
Page 6 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
BAM International BAM IB909 Singapore 1 WeekProvision of Site Inspector for Maintenance
Programme2013
Seatrans AS EM Leader Singapore 1 Month Conversion for EM Leader 2013
BAM International Crane Barge Singapore 1 Month Engineering Review Consultancy Services 2013
Jack-Up Barge B.V. Jack-Up Barge JB118 Singapore 1 MonthTo provide basic design for additional fuel oil system
for JB 118 DP22012
Premier Oil FPSO LEWEK EMAS Vietnam 1 Month Boiler Failure Assessment 2012
Premier Oil FPSO LEWEK EMAS Vietnam 1 Month Benchmark Survey of FPSO LEWEK EMAS 2012
HA-CE Engineering Crane Barge Singapore 9 months Engineering Design of Crane Barge 2012
CEC International MOPU Singapore 1 MonthStructural Analysis of Deck Extension for Ex-
Richmond2012
Page 7 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
Keppel Verolme Prime Exerter The Netherland 22 Months Project Consultancy Services 2012
CEC International SKL-C Fixed Platform Singapore 2 weeks Engineering Design for New Piping & Structural
Outfittings on SKL-C2012
CEC International Soraya MOPU Singapore 2 MonthsStructural Design and Analysis for Soraya
Installations in Thailand2012
BAM International Self-Elevating Unit China 2 YearsProject Management Team for Marine Construction
of Jack-Up2012
CEC International
Soraya, Seafox 3,
Seafox 6, SKL-C Fixed
platform
Thailand 2 MonthsSite Verification and Update of GA drawing for
Soraya, SF 3, SF 6, and SKL-C2012
PTSC Asia Pacific Pte Ltd PTSC Lamson FPSO singapore 20 monthsConsultancy of Project Controls Manager for FPSO
Conversion project in Singapore Shipyard2012-2014
CEC International SKL-C Fixed Platform Singapore 5 months
Engineering, Procurement, Construction, Installation
and Commissoning of Portable Power Generation
System for offshore fixed platform in Thailand
2012
BigLift Shipping / HA-CE
Engineering
Heavylift
Transportation
Vessel
Singapore 3 months Conceptual and Basic Engineering Design and
Analysis for Heavylift Transportation Vessel2012
Page 8 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
CEC International Seafox 6 MOPU Singapore 3 MonthsEngineering Design and Analysis of VSD Platform for
Seafox 6 MOPU 2012
BC Petroleum / Thome
Oil & GasBalai Cluster SFRSC Singapore 12 Months
Engineering Consultancy and Project Management
for Conversion of Early Production Vessel (EPV)2012
STX / HA-CE EngineeringHeavylift Semi-
Submersible VesselSingapore 4 Months
Engineering Design and Analysis of Removable
Buoyancy Casing for Heavylift Semi-Submersible
Transportation Vessel
2012
CEC International Seafox 3 MOPU Singapore 2 MonthsEngineering Design and Analysis of VSD Platform for
Seafox 3 MOPU 2012
Jack-Up Barge B.V. Jack-Up Barge JB118 China 18 Months
Project Management, Construction Supervision and
Engineering Support for Windmill Installation Jack-
Up
2012
Drydocks World NORA L206 Jack-Up Indonesia 1 Month
Technical Inspection and Project Budget Estimation
for Re-activation of NORA L206 Multi-Purpose Jack-
Up
2012
Drydocks World Awassi Indonesia 8 Months
Conversion of Container vessel to Livestock Carrier.
Compass is hired to get a failed project back on track
with Project Management, Site Supervision, Client
Interfacing and Engineering Support
2012
CEC International Soraya MOPU Singapore 2 Months
Engineering Design and FEM Analysis of Crane
Pedestal for installation of Offshore Crane on Soraya
MOPU
2011-2012
Page 9 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
MODEC / MISCPetronas LNG FSRU
TerminalSingapore 8 Months
Engineering and Construction Consultancy for LNG
FSU Conversion (Malaysia Field)2011-2012
CEC International Seafox 3 MOPU Thailand 4 Months
Project Management, Engineering Design, FEM
Analysis, for Conversion to Mobile Offshore
Production Unit (MOPU)
2011
Petrofac International Berantai FPSO Singapore 6 Months
Engineering and Construction Consultancy, FPSO
Conversion Budget Estimation, Module Fabrication
Site Supervision
2011
Saacke GmbH / PromorPapa Terra P-63
FPSOChina 11 Months
Detailed Engineering, 3D-Modelling, FEM Analysis,
Fatigue Analysis and Construction Supervision of
FPSO topside skids
2011-2012
CEC International Soraya MOPU Singapore 8 Months
Project Management, Detailed Engineering and
Commissioning for Re-Classification, Upgrading and
Modifications on Mobile Offshore Production Unit
(MOPU)
2011
SMIT SMIT Kamara Singapore 2 Months
Engineering Design and FEM Analysis for installation
of HiPAP system on Offshore Support Vessel SMIT
Kamara
2011
AcergyBorealis 5000 Heavy-
lift Crane VesselSingapore 4 Months
Engineering Design and FEM Analysis for sea-
fastening and stowage of PES substructure, ROV
Deck House and Pipe stanchions. Stability studies
and towage plan for sea freight.
2011
KongsbergBW Offshore TSB
FPSOSingapore 8 Months
Engineering Design and Project Management of E-
House for BW Offshore TSB FPSO2010-2011
Page 10 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
Workfox B.V. Seafox 5 Singapore 24 MonthsProject Management support for construction of
Windmill Installation Jack-Up2010-2012
Jack-Up Barge B.V. Jack-Up Barge JB117 Indonesia 16 Months
Project Management, Construction Management
and Engineering Support for Windmill Installation
Jack-up in Batam, Indonesia
2010-2011
DeepBlue CENDOR FPSO Singapore 3 Months FEED study of marine piping system design 2010
DeepBlue Chevron FSO Singapore 3 Months FEED study of marine piping system design 2010
ASL Shipyard
PetroVietnam
Kamari FSO Metering
Skid
Vietnam 6 MonthsProject Management, Design, Engineering and
Commissioning of a Metering Skid for Kamari FSO2009-2010
MODECPSVM BP Angola
FPSOSingapore 12 Months
Project Management, Design, Modelling and
Engineering of E-House and LER for FPSO to be
operated in Angola
2009-2010
MODECPSVM BP Angola
FPSOSingapore 14 Months
Project Management, Mechanical Handling Study for
FPSO including topsides, machinery space, deck2009-2010
MODECPSVM BP Angola
FPSOSingapore 8 Months
Project Management, Design, Modelling and
Engineering of Flare Tower on FPSO to be operated
in Angola
2009
Page 11 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
NuCoastal (Thailand)
LimitedSoraya MOPU Singapore 8 Months
Project management, design, engineering,
procurement, for accommodation refurbishment
and classification of Jack up unit
2009
Worskhips Contractors
B.VSeafox 6 MOPU Thailand 3 Months
Project Management, Design, Engineering,
Compliance Review for Conversion to Mobile
Offshore Production Unit (MOPU)
2009
SMIT SMIT Borneo Singapore 1 Month
Review barge SMIT Borneo for entry India.
Necessary certificates and documentation to be
made available to flag state approval.
2009
MODEC Jubilee FPSO Singapore 6 Months Engineering Structural Analysis of Flare Tower 2009
NuCoastal (Thailand)
LimitedSoraya MOPU Singapore 8 Months
Project Management, Design, Engineering,
Procurement, Towage and Installation from cold
stacked condition to production.
2009
PT Arpeni Pratama
Ocean Line Tbk
LPG VLGC
ConsultancyIndonesia 2 Weeks
Feasibility study for increasing cargo capacity of LPG
VLGC tanker2009
Genting Oil & Gas FPSO Consultancy Indonesia 6 Months Evaluation of shipyards for FPSO newbuilding 2007
LGT Shipping Pte. Ltd.Gas Concord LPG-
FSOSingapore 12 Months
Project management, Engineering Structural, Naval
Architecture for the Conversion of LPG VLGC to FSO2006
Gogain Investments Ltd
Soraya MOPU
Upgrade and
Refitting
Indonesia 10 Months
Project management, design, engineering,
procurement and site supervision for upgrade and
refit of Jack-up rig "Soraya" to MOPU
2006
Page 12 of 13
COMPASS ENERGY TRACK RECORD
CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR
SUPPLIED
PetroChina Jabung
International Ltd
Petrocom Mooring
System ModificationIndonesia 6 Months
Design, Engineering, Procurement and Installation of
modifications to mooring system to allow FSO to
anchor alongside offshore terminal (previously
spread moored)
2005
LGT Shipping Pte. Ltd.
Upgrade and Re-
certification of VLGC
Gas Concord
Singapore 24 MonthsPurchase, Docking, Upgrade and Re-certification of
VLGC followed by Time Charter2004
PetroChina Petrocom FSO Singapore 36 MonthsDesign, Engineering, Procurement and Conversion of
Tanker to Project Management of Conversion of FSO2003