company update - web.waskitaprecast.co.id
TRANSCRIPT
PT Waskita Beton Precast Tbk
Company Update
PT. WASKITA BETON PRECAST, Tbk2Q - 2018
PT Waskita Beton Precast Tbk
Who We Are
Karawang Plant (2016)
2
PT Waskita Beton Precast Tbk
Organization Structure
3
PT Waskita Karya (Persero) Tbk
59.99%
PT Waskita Beton Precast Tbk
99.99%
PT Waskita Karya Realty
77.11%
PT Waskita Toll Road
PT Waskita Karya Energi
99.99%
PT Waskita Beton Precast Tbk
VisionTo Become Leading Company In Indonesia In Manufacturing
Sector of Precast, Readymix, Quarry, Construction Service And Post-tension Precast Concrete
Establishment of Precast Division
Establishment of PT WaskitaBeton Precast as subsidiary
October 2014
2013
20142015
2016
IPO PT Waskita BetonPrecast Tbk
September 2016
0.62
0.80
1.802.65
5x
We have grown significantly since our first inception in 2013
Public
59.99% 40.01%
2017
3.25
MSCIMay 2017
X
3.75
2018
Precast Division
Production Capacity (Million Ton per Year)
LQ-45 & Kompas 100
January 2018
IDX Top 10 Blue
May 2018 Buyback 7%Jul – Dec 2017
1H : 3.50
PT Waskita Beton Precast Tbk
Precast Readymix
Construction Services
Cibitung(350,000 ton)
Sidoarjo(400,000 ton)
Palembang(200,000 ton)
Kalijati(250,000 ton)
Karawang(450,000 ton)
Bojonegara(350,000 ton)
Subang(350,000 ton)
Klaten(150,000 ton)
Sadang(375,000 ton)
Gasing(350,000 ton)
Legundi(275,000 ton)
Plant (11) Batching Plant (58)
5
Our main products are Precast and Readymix Concrete
57%
30%
13%
Jabodetabek1. Becakayu2. Cakung3. Desari4. Karawaci5. Bocimi 2,36. Japek 1,37. Kunciran – serpong8. Kunciran – parigi9. Cinere – serpong10. Cctw 211. Cibitung – cilincing
Grup PPKA1. Sedomulyo2. Kayuagung 1,2
Sumatera1. Lampung2. Jakabaring 2,33. Bandar agung4. Gunung batin5. Wonokerto
Grup PPTR1. Balamoa 2
Grup PBTR1. Petarukan2. Bojong3. Warung Asem
Grup BSTR1. Kandeman2. Tulis3. Gringsing4. Sumberagung5. Pegandon6. Rejosari7. Kaliwungu 1,28. Ngaliyan
Grup Soker1. Masaran2. Banaran3. walikukun
Grup Paspro1. Muneng 1,22. Tongas3. Grati 14. Leces
Grup Salboy1. Tingkir2. Ampel3. Boyolali4. Banyudono
Grup Legundi1. Legundi2. Tanjung3. boboh4. Tebaloan
6. Menggala7. Bujung dewa8. Gilang tunggal9. Wonorejo10. Bumi harapan11. Srigedungmulya12. Simpang
pematang
PT Waskita Beton Precast Tbk
We have developed a number of Product LineupP
rod
uk
Pre
cast
L GUTTERU DITCH CCSP U GUTTER DIAFRAGMA WALLFCSP
BOX GIRDER PCI GIRDER
PCU GIRDER
PCT GIRDER SPUN PILE 60cmSQUARE PILE
RC PLATE BARRIER HALF SLABFULL SLAB VOIDED SLAB
SPUN PILE 1,2m
K100 – K1000Pro
du
k R
ead
ymix
6
PT Waskita Beton Precast Tbk
800,000
1,800,000
2,650,000
3,250,000
3,750,000
58%
64%
70%70.93%
40%
45%
50%
55%
60%
65%
70%
75%
-
800,000
1,600,000
2,400,000
3,200,000
4,000,000
2014 2015 2016 2017 2018F
Precast Production Volume as per July 2018 : 848,600 Ton
Precast Capacity & Utility
• In 2017, plant’s capacity and precastproduction is 4 times from 2014
• Our production Capicity Now Is 3,250,000Ton / Year
Precast Volume Production
‘14-’17CAGR 64%
‘14-’17CAGR 60%
Capacity expansion ensures our future growth
7
463,200
1,160,000
1,561,229
2,056,983
848,600
2014 2015 2016 2017 2018 7M
PT Waskita Beton Precast Tbk
Becakayu (December - 2017)
Our Competitive Edge
8
PT Waskita Beton Precast Tbk
Synergy with WSKT Group has given us competitive advantages
9
Tahun 2014 2015 2016 2017 2018F
(IDR) 4.1 T 2.6 T 12.2 T 11 T POTENTIALS
Projects
Bekasi-Cawang-Kp.Melayu(Becakayu Seksi 1-2)
Pejagan Pemalang(Seksi 3)
Pejagan Pemalang (Seksi 4) Cinere -SerpongTol Tebing Tinggi – PematangSiantar
Pejagan Pemalang (Seksi 1-2)
Kuala Tanjung Port Cimanggis Cibitung Paket 2 Legundi - Bunder KLBM (Tambahan)
Depok - Antasari Tollroad MKTT Pemalang BatangTerbanggi Besar – Kayu Agung
Jembatan Penajam
Solo - Ngawi (Seksi 1-2)
Batang SemarangPematang Panggang KayuAgung (PPKA)
Probowangi
Ngawi Kertosono Bogor Ciawi 2 – 4 Kediri – Kertosono Japek SelatanCimanggis CibitungPaket 1
LRT – PalembangCileunyi – sumedang –dawuan (Cisumdawu)
Kediri-Kertosono
Legundi – Bunder Jakarta - Cikampek Bandara Kulon Progo
Kayu Agung- Palembang –Betung
Gempol - Porong Teluk Lamong
Pasuruan – Probolinggo Cibitung - Cilincing RDMP V Balikpapan
PT Waskita Beton Precast Tbk
4,4085,870
15,051
21,208
14,607
2014 2015 2016 2017 7M18
Obtains higher marketing performance
10
(In Rp Billion)
• New Contract per end of July 2018: Rp3.93 Trilion
Orderbook as per July 2018 : Rp14.61 Trilion (including carry over 2017 of Rp 10.68 Trilion)
New Contract Orderbook
4,099
2,655
12,227
11,032
3,927
2014 2015 2016 2017 7M18
*
PT Waskita Beton Precast Tbk
These competitive edges are reflected in our contract achievement
11
No Project in 2018 Value (Rp Bn)
1 Tol Cibitung – Cilincing, Full Slab dan Spun Pile 1,125.83
2 Proyek Terbanggi Besar – Kayu Agung 354.84
3 Tol Tebing Tinggi Indrapura 325.00
4 Tol Semarang Batang 261.19
5 Proyek JTTS Pekanbaru 241.61
6 Tol Krasakan-Probolinggo 212.31
7 NCICD – Spun pile 121.95
No Project in 2017 Value (Rp Bn)
1 Tol Batang - Semarang seksi 1-5, Precast & Readymix 1,651.46
2 Tol Pematang Panggang - Kayu Agung, Readymix, PCI Girder, Spun pile, Full Slab 1,436.36
3 Tol Krian-Legundi Bunder-Manyar, Readymix, PCI Girder & Spun Pile 1,032.06
4 Tol Jakarta - Cikampek II (Elevated), Precast & Readymix 959.47
5 Tol Becakayu seksi 2D, Precast & Readymix 664.21
6 Tol Cibitung Cilincing , Precast & Readymix 643.12
7 Tol Pejagan Pemalang seksi IV, Precast & Readymix 462.86
8 LRT Palembang, Readymix 441.19
PT Waskita Beton Precast Tbk
Quarry Mixer Truck
We own majority of our Mixer Trucks in operation for Readymix
Concrete to provide better operating margin
Location
Bojanegara, Cilegon
Pasuruan, Lumbang
Rumpin, Bogor
Salatiga, Boyolali
Talun, Pekalongan
Efficiencies are pushed forward to support better margin
12
PT Waskita Beton Precast Tbk
Performance Delivered Performance Delivered
13
PT Waskita Beton Precast Tbk
Solo Kertosono
(90.1%)
LRT Palembang
(99.9%)
CCTW I & II
(90.8% & 27%)
Becakayu
(94.3%)
Jakarta – Cikampek Elevated
(55.4%)
Batang – Semarang
(61.3%)
Legundi – Bunder
(57.6%)
Bogor – Ciawi –Sukabumi
(57.6%)
Major Contracts
14
PT Waskita Beton Precast Tbk
702
1,028
7,4067,317
874
1,861
7,5277,257
2014A 2015A 2016A 2017A 2018
FY 1H
-
761
3,356
4,988
45
2,421
3,978
5,687
2014A 2015A 2016A 2017A 2018
FY 1H
500
3,002
6,3297,603
1,178
5,551
6,760
7,443
2014A 2015A 2016A 2017A 2018
FY 1H
1,203
4,332
13,734
14,920
2,052
7,412
14,28714,700
2014A 2015A 2016A 2017A 2018
FY 1H
CAGR167%
Total Liabilities
Interest Bearing Debt
(in IDR Billion)
CAGR59%
CAGR86%
Total Asset
Total Equity
*Notes: CAGR is only for 2015-2017 audited period
Balance Sheet Position
15
CAGR156%
Page 15
PT Waskita Beton Precast Tbk
140
334
635
1,000
107
341 436
691
2014A 2015A 2016A 2017A 2018
FY 1H
149
451
1,230
1,908
132
589705
1,324
2014A 2015A 2016A 2017A 2018
FY 1H
495
2,225
3,498
5,156
687
1,300
1,988
2,699
2014A 2015A 2016A 2017A 2018FY 1H
642
2,644
4,717
7,104
817
1,869
2,668
3,846
2014A 2015A 2016A 2017A 2018FY 1H
Revenues Cost of Revenues
EBITDA Net Profit
(in IDR Billion)
CAGR64%
Note: • CAGR is only for 2015-2017 audited period• 2014’s figures are for the period from September to December 2014 is the Full Year Figure for the period from January to December 2014
CAGR52%
CAGR106%
CAGR73%
1,025
149
Profit and Loss Statements
16Page 16
PT Waskita Beton Precast Tbk
- -
0.45
0.68
0.05
1.30
0.53
0.78
2014A 2015A 2016A 2017A 2018
FY 1H
19.98%
25.12%
8.57%
13.67%12.24%
18.32%
5.80%
9.52%
2014A 2015A 2016A 2017A 2018
FY 1H
1.96
0.41
2.32
1.521.36
0.74
2.03
1.48
2014A 2015A 2016A 2017A 2018
FY 1H
11.67%
7.72%
4.62%6.70%
5.21%4.60% 3.05%
4.70%
2014A 2015A 2016A 2017A 2018
FY 1H
Return on Equity Ratio Return on Assets Ratio
Debt to Equity Ratio Current Ratio
93%CAGR
-29%CAGR -6%CAGR
Financial Ratio
17*Notes: CAGR is only for 2015-2017 audited period
4%CAGR
Page 17
PT Waskita Beton Precast Tbk
(in IDR Million)
Financial Statement : Profit & Loss
18
2014A 2015A 2016A 2017A 6M 2018
Revenues 641,931 2,644,320 4,717,150 7,104,158 3,846,149
Cost of Revenues (495,226) (2,224,890) (3,497,932) (5,155,967) (2,699,116)
Gross Profit 146,705 419,430 1,219,218 1,948,191 1,147,033
Gross Profit Margin 22.85% 15.86% 25.85% 27.42% 29.82%
Operating Cost (4,802) (56,075) (106,391) (414,515) (96,937)
Operating Profit 141,903 363,355 1,112,827 1,533,676 1,050,096
Operating Profit Margin 22.11% 13.74% 23.59% 21.59% 27.30%
Other Income/expense 794 1,778 52,111 88,120 10,310
142,697 365,132 1,164,938 1,621,796 1,060,406
- (19,582) (197,594) (465,562) (214,773)
Net Profit Before Tax 142,697 345,550 967,344 1,156,234 845,633
Tax Expense/Income (2,392) (11,181) (332,525) (155,904) (154,946)
Net Profit 140,305 334,370 634,819 1,000,330 690,687
Net Profit Margin 21.86% 12.64% 13.46% 14.08% 17.96%
EBITDA 149,201 450,734 1,229,953 1,908,480 1,323,755
23.24% 17.05% 26.07% 26.86% 34.42%EBITDA Margin
Profit Before Fin Charges, Net Rev of JV &
TaxTotal Fin Charges & Net Rev of JV
PT Waskita Beton Precast Tbk
Financial Statement: Financial Position
19
2014A 2015A 2016A 2017A 6M 2018
980,931 1,054,582 11,296,401 11,574,944 10,973,431
221,676 3,277,827 2,437,866 3,344,604 3,726,850
1,202,607 4,332,409 13,734,267 14,919,548 14,700,281
LIABILITAS
Total Current Liabilities 500,442 2,541,512 4,877,850 7,593,432 7,430,060
Total Non-Current Liabilities - 460,071 1,450,916 9,461 13,125 Total Liabilities 500,442 3,001,583 6,328,766 7,602,893 7,443,185
EQUITY
Total Equity 702,165 1,207,585 7,405,501 7,316,655 7,257,096
1,202,607 4,209,168 13,734,267 14,919,548 14,700,281
ASET
Total Liabilities and Equity
Total Current Assets
Total Non-Current Assets
Total Assets
(in IDR Million)
PT Waskita Beton Precast Tbk
Financial Statement: Cash Flow
20
(in IDR Million)
2014A 2015A 2016A 2017A 6M 2018
Net Cash from Operations Activities (42,794) (686,135) (3,034,906) (2,413,797) 52,390
Net Cash from Investing Activities (63,829) (123,555) (833,320) (1,302,336) (438,332)
Net Cash From Financing Activities 378,844 635,655 7,975,859 538,660 (51,191)
272,221 (174,035) 4,107,634 (3,177,473) (437,133)
- 272,221 98,186 4,205,820 1,028,346
272,221 98,186 4,205,820 1,028,346 591,213 Cash and Cash Equivalents at the end of the
year
Cash and Cash Equivalents at the beginning of
the year
Net Increase/(Decrease) in Cash and Cash
Equivalents
DisclaimerThis material is for information only, and we are not soliciting any action based upon it. This report is not to be construed as an offer to sell or thesolicitation of an offer to buy any security in any jurisdiction where such an offer or solicitation would be illegal. The information herein has beenobtained from sources believed to be reliable, but we do not warrant that it is accurate or complete, and it should not be relied upon as such.Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice. It is intended for theuse by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, orredistributed to others without written permission of PT Waskita Beton Precast Tbk.
Thank You
Head Office: Gedung Teraskita Jakarta, 3 & 3A Floor Jl. MT. Haryono Kav. No. 10A Cawang, Jakarta 13340Ph. (+6221) 22892999Website: www.waskitaprecast.co.id