company profile pt austindo aufwind new energy · company profile pt austindo aufwind new energy a...
TRANSCRIPT
Company Profile
PT Austindo Aufwind New EnergyA member of PT Austindo Nusantara Jaya Tbk.
Atrium Mulia 3A-Floor Suite 02Jl. H.R Rasuna Said Kav B10-11, Jakarta Selatan 12910
DKI Jakarta IndonesiaPhone: +62 21 2965 1777 Fax: +62 21 2965 1788
•Palm Oil Know How
•Regional Competence
•Initial Project Location
•Renewables Know How
•Strategic Competence
•Operational Know How
AANE JOINT VENTURE
Established in 2008
Address:
Atrium Mulia 3A-Floor Suite 02
Jl. H.R Rasuna Said Kav B10-11, Jakarta Selatan 12910
DKI Jakarta Indonesia
Business: Build, Own, Operate Biomass based renewable energy facility Independent Power Producers (IPP) for the national electricity
company PLN Customized Renewable Energy Solutions
OUR PROJECT – BELITUNG
Location: Jangkang Village, Belitung Island
Waste water 60 TPH Palm Oil Mill Effluent
(POME)
CDM and Electricity Generation
Digester constructed in 2011
Flaring Operation in 2012
PPA signed with PLN in 2012
Commercial Operation Date: December 2013
OUR PROJECT – BELITUNG
KONDISI AWAL
Normally Palm Oil treat its POME at 9-10 open pond which release Methane (CH4) emission and Carbon Dioxide (CO2)
Both Methane and Carbon Dioxide are Green House Gasses (GHG)
The destruction effect of GHG from Methane is 21 times than Carbon Dioxide
But Methane itself are flammable gas which can be use as fuel (i.e.. Natural Gas has 99% of Methane)
CH4 CH4CH4
CH4
CH4
CH4
FLOW CHART
Palm Oil Mill Effluent (POME)
Biogas
Bubbles
Effluent inlet
Effluent outlet
CH4
CO2
CH4
Traces gas
CH4
CH4
CO2
Biogas Outlet
Agitation/mixing
Anaerobic Digester
Flaring Unit
Gas ScrubberChiller Dryer
with HE Gas Blower
MWM Gas Engine 1800 kW
TransformerMetering Panel
Grid PLNHouses
Soil conditioner
Methanne CH455%-60%
Cleaned biogas with H2S max 100 PPM
Biogas treatmentfor Gas Engine
Flare CH4 if not use
Low Voltage 400 V
Medium Voltage20 kV
Medium Voltage20 kV
Liquid waste / effluent
OUR TECHNOLOGY
CLEAN BIOGAS DIGESTER TECHNOLOGY
Covered Lagoon Enhanced Anaerobic reactor
Soil Liner insulation
Air-supported Roof
Double Fermentation sequences
Double Membrane roof system
Enclosed Flaring System
Human Machine Interface Gas Analyzer
WE USE OUR OWN PROPRIETARY TECHNOLOGY
<- Click to see videoVideo
OUR TECHNOLOGY
Air Supported Roof Technology Function to keep/protect the form of
digester gas storage from wind and rain
Gas storage capacity up to 15000 m3
Excellent for gas engine that’s need continually gas feeding.
Agitator inside the digester for better process.
:: Other Technology
OUR APPLIED TECHNOLOGY
CDM Compatible Flaring Unit Guarantee technology for durability and free
maintenance
Enclosed flare for
Enclosed flares for more complete combustion and
protect the safety of the environment
Safety features for safe and good operation
OUR APPLIED TECHNOLOGY
CDM Compatible Gas
Analyzer Diagnostic for process control
Human Machine Interface (HMI) for
easier monitoring and control
Automatic logging data for CDM
Measure CH4, H2S, H2, CO2 for optimal
control and safety
OUR APPLIED TECHNOLOGY
Gas Treatment & Utilization Biological scrubber to reduce H2S that
corrosive gas
Gas Engine Generator Set with high
efficiency and durability
Custody metering with PLN panel for
billing transaction
OUR PROJECT – BELITUNG
Biogas Plant AANE Jangkang Belitung is the first in Indonesia signed a PPA and operates on the grid to PLN.
Property of © PT Austindo Aufwind New Energy 2013
www.anj-group.com
KEY POINTS
PLTBg AANE
Belitung
1,8 MW
With >80%
capacity factor
About
12 Mil kWh / year
±2000 houses
With 900VA
Biogas = Natural Gas Methane Energy
KEY POINTS
Emission
Reduction
More than
21,000 TON
GHG of
4,421
Cars
CO2
of
8,95 Mil
Liters
Gasoline
https://www.epa.gov/energy/greenhouse-gas-equivalencies-calculator
Biogas FIT histories:
PERMEN ESDM No. 9 th.2012 tariff 975 IDR/kWh
PERMEN ESDM No. 27 th.2014 tariff 1050 IDR/kWh x FT 1,5 (for Bangka Belitung) = 1575 IDR/kWh
PERMEN ESDM No. 21 th.2016 tariff 10,64 cent USD/kWh x FT 1,5 (for Bangka Belitung) x 85% (for operation IPP) = 14 cent USD/kWh
PT. Austindo Aufwind New Energy
Atrium Mulia, 3A Floor suite 3A-02
Jl. H.R. Rasuna Said, Kav. B10-11
Jakarta Selatan 12910
Phone: (021) 29651777
Fax : (021) 29651788
CONTACT US
Thomas Wagner [email protected]
Mark [email protected]