Business Name: Byrne Construction Pty Ltd Business Type: Civil & Construction Primary Contact,

Dwaine Byrne Mobile: 0404 889 439 Email: [email protected]

Office: 7 Gentle Road

Medina WA 6167

Postal: PO Box 629 Kwinana WA 6167

Contact: Tel 08 9439 6094

Fax 08 9439 3429 Email [email protected]

ABN: 99 105 099 367

Page 3: Company profile March 2013 Byrne Construction

Page 3

What we do Concrete supply and placing

Steel fixing

Tilt Panel Construction/Erection

Formwork supply and install

Suspended Slabs

Bridge Construction

Mining Construction

Pre Cast Construction

Pre Cast Yard - 1600m2

Labour Hire

Plant and Machinery Bobcats

Telehandlers

Loaders

Roller and compaction equipment

Vibrating Screeds

Lighting Tower

Compressor

Scaffolding

Boom lifts

Scissors Lifts

Excavators – 22 , 13 , 8 , 6 , 2 & 1.5 Tonne Machines

40 Tonne Rough Terrain Crane / Flat Bed Crane

Concrete & Formwork associated equipment

Water Carts

Page 4: Company profile March 2013 Byrne Construction

Page 4

About us

Byrne Construction Pty Ltd is a civil and construction company. It was incorporated in the year of 2003. Dwaine has been in construction for 30 years and has worked on various projects throughout Australia. Dwaine always had hands on approach to work regardless with the position he held.

Our Specialty is concrete and formwork throughout Australia. The projects that we have been involved of the highest standards of quality and safety in the industry and therefore we adopt the approved policies and procedures as our own.

With our vast array of experience behind us we feel we are in a prime position to expand on the services we can provide and the clients we do business with.

Byrne Construction believes that the success of our company

Lies in our people. We thrive on delivering a safe working Environment to every project we endeavor.

Page 5: Company profile March 2013 Byrne Construction

Page 5

Our Projects

Page 6: Company profile March 2013 Byrne Construction

Page 6

Xstrata Zinc Filter Plant Upgrade Location: Queensland Our Client: IPS Duration: 8 Months The works of this project included;

Placing 1300m3 concrete.

Ring Beam installation.

Zinc Building.

Concrete slabs.

Lead Storage Building.

Transfer stations.

Formwork.

Reinforcing.

Earthworks.

Hadrian Dyno Noble Project

Page 7: Company profile March 2013 Byrne Construction

Page 7

Location: Port Hedland, WA Our Client: IPS Duration: 6 months

The works of this project included;

Construction of an explosive plant.

Placing 1000m3 Concrete.

Foundation.

Pedestals.

Slabs.

Earthworks.

Formwork / Reinforcement.

South Perth Apartments Location: Perth, WA Our Client: DAVROB Duration: 1 Year

The works of this project included;

Premium Luxury Apartments.

Placing 1000m3.

Retaining Walls.

Suspended slabs.

Columns.

Lift shafts.

Reinforcement.

Earthworks.

Page 8: Company profile March 2013 Byrne Construction

Page 8

Glen Iris / Rathmines Water Tanks Location: Bunbury, WA Our Client: Omega Construction Duration: 8 Months

The works of this project included;

8 Metre high Water Tank.

Placing 800 m3 Concrete.

Concrete Bases.

Concrete Slabs.

Earthworks.

Footings.

Panel formwork.

Fremantle Ports

Location: Fremantle, WA Our Client: Marine & Civil Duration: 3 Months

The works of this project included;

Extension to Wharf.

Precast pile caps.

Placing 500m3 Concrete.

Reinforcement.

Concrete slabs.

Worked in strict tolerances.

Page 9: Company profile March 2013 Byrne Construction

Page 9

Gorgon Jetty Pre – Assembly

Location: Henderson, WA Our Client: Leighton’s Duration: 24 months

The works of this project included;

The Gorgon LNG Jetty.

Construction of Caissons.

Formwork installation.

Concrete Placemen.

Labour hire.

Page 10: Company profile March 2013 Byrne Construction

Page 10

Gorgon Pipe Rack Ballast Blocks

Location: Medina/ Casting Yard, WA Our Client: Omega Construction Duration: 2 Months

The works of this project included;

Construct 250 pipe supports.

Strict environmental policies.

Worked in strict tolerances.

Pre cast Yard used to manufacture.

Concrete Placement.

Pre fab moulds.

Utah Point Pre Cast Pile Caps

Location: Medina / Casting Yard, WA Our Client: Marine & Civil Duration: 2 Months

The works of this project included; Construct 300 precast piles.

Worked in strict tolerances.

Concrete Placement.

Steel moulds.

Transported to Port Headland.

Pre Cast Yard used to manufacture.

Page 11: Company profile March 2013 Byrne Construction

Page 11

Coral Bay –Water Storage Tank

Location: Coral Bay, WA Our Client: DM Civil Duration: 3 Months The works of this project included;

Construction of a radius 5 Metre high Water Tank.

Radius formwork.

Reinforcement.

Concrete Placement.

Page 12: Company profile March 2013 Byrne Construction

Page 12

SGA – Southern Gateway Alliance

Location: Perth to Bunbury Our Client: Leighton’s Duration: 18 Months The works of this project included;

Construction of 7 bridges.

Placing 5000 M3 concrete.

Abutments/ Pier columns.

Reinforcement.

Formwork / Earthworks.

Page 13: Company profile March 2013 Byrne Construction

Page 13

CSBP/ Ammonium Nitrate Plant Expansion

Location: Kwinana, WA Our Client: Marine & Civil Duration: 24 Months The works of this project included;

Expansion to CSBP Plant.

Placing 10,000 M3 Concrete.

Bases, Pedestals.

Pre Cast Panels.

Large Concrete slabs.

Radius bases.