company profile feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our...

23
Pinnacle Infotech Global Leader in BIM Consulting & Engineering Services WWW.PINNACLECAD.COM | Revolutionizing Construction

Upload: others

Post on 26-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Pinnacle InfotechGlobal Leader in BIM Consulting & Engineering Services

WWW.PINNACLECAD.COM | Revolutionizing Construction

Page 2: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

COMMITMENT

We are committed to our core values and corporate mission:

§�Maximizing client value by adopting the latest technologies and innovations

Improving project efficiency by streamlining §�

workflow and providing high quality services

Saving time by using a large global team §�

to leverage time zone advantages

Reducing client costs by up to 30% by §�

harnessing a highly experienced global work force

Management Team ………. Page 13

Client Testimonials ………. Page 22

Introduction

Locations & Countries Served

Global Delivery Centers Country Wise Evolution

Service Offered & Capabilities

Core BIM Expertise

Facilitating top Industry Verticals

BIM Services for AEC Industry

BIM Modeling Services

BIM Engineering Services

BIM Consulting Services

BIM Service Offerings to the Construction Arena BIM Execution Plan - Setting the BIM Objectives

BIM Engineering & Modeling

Manpower Strength

Projected Manpower Growth

Employee Background

Page 3 ……….

……….

……….

Page 3

Page 6

INDEX

IT Infrastructure ………. Page 09

Awards & Honors ………. Page 12

Policies ………. Page 10

Work Process ………. Page 11

02WWW.PINNACLECAD.COM | Revolutionizing Construction

Iconic Projects Completed

Airport Projects

Dubai International Airport Expansion - Concourse 4New Orleans International Airport Concourse D, Kenner, LAIndira Gandhi International, New Delhi, India

………. Page 16

Commercial

Hilton Waterfront Beach Resort, Huntington Beach, California, USA

Hospital

King Abdullah Specialized Hospital, Saudi ArabiaCalida Horizon Ridge Skilled Nursing Facility, Henderson, Nevada, USA

Infrastructure

Dubai Metro 2020, Doha, Ad Dawhah, Qatar

High Rise

World’s Tallest Tower (KSA) –Jeddah Tower – Super Tall Skyscraper

Stadium Orlando City Soccer Stadium, Florida, USABase Ball Stadium - Ball Park of Palm Beaches, West Palm Beach, Florida, USALusail Stadium, Qatar

Residential

Innovative Hub - Msheireb Downtown Phase III, Doha, State of Qatar

Ambuja Patna City Center, India - Commercial & Residential Real Estate

Educational

Student Accommodation Building – Bath, UK

University Building CMU Tepper Building – Level 2 - University – Pittsburgh, Pennsylvania, USA

Page 3: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Locations & Countries Served

Durgapur, Kolkata, Jaipur (India) & overseas offices in Houston (USA), London (UK), Dubai (UAE), Calolziocorte (Italy) & Zurich (Switzerland)

Introduction

Pinnacle Infotech offers innovative BIM Engineering & BIM Consulting solutions to Architecture, Engineering & Construction (AEC) firms worldwide. Clients use BIM services for construction projects to facilitate project coordination, collaboration, assets & risk management, logistics planning and cost optimization. We have more than 1251+ BIM professionals to collaborate across different time zones with global delivery centers in India (Durgapur, Kolkata & Jaipur), USA (Houston), UK (London), UAE (Dubai), Italy (Calolziocorte) and Switzerland (Zurich) for offering quick turnarounds on complex project management. BIM implementation helps our clients to assemble projects in a virtual environment for identifying and correcting potential problems before construction. Pinnacle believes “Construction is all about Preconstruction”. We have successfully executed 5051+ BIM

projects for our clients in USA, Asia & South East Asia, Middle East, Europe and UK. We are one of the market leaders since 2003, providing BIM solutions to the international market. Our team has successfully executed BIM projects in 36 countries across 6 continents. Few of the iconic BIM projects executed in USA, Asia, Middle East & Gulf Cooperation Council (GCC), Europe & Australia across industries include largest Airports, Hospitals, Stadium, High Rise Towers, Infrastructure, University Campuses, Industrial Plants, Retail Chains, Shopping Malls, Restaurants, Dams, Bridges and more. Our process orientation & quality control is as per ISO 9001:2008 and ISO 14001:2015 standards. We have earned 1151+ satisfied clients across the world through BIM services and garner long term association with them.

Global Delivery Centers

03WWW.PINNACLECAD.COM | Revolutionizing Construction

Canada

CA

Aruba

Brazil

FinlandSwedenNorway

Ireland

France

Turkey

SAUDI ARABIA

Delhi

Hyderabad

Sanghai

Japan

Singapore

WA

Production Centres

AZ

Puerto Rico

Australia

Columbia

Iraq

Kazakhstan

LibyaMexico

Rwanda

Sri Lanka

OR

NV

MT

TX

PA

NYMI

MA

NJRI

CO

MN

OK

OHIN VANC

ALGASC

FL

MDDCIL

West Indies

LA

TNKY

Lebanon

USA

INDIAOman

Kuwait

UAE

BahrainJordan

Israel

QatarRiyadh

SWITZERLAND

Denmark EUROPE

BelgiumNetherlands

Malaysia

China

UK

DURGAPUR

KOLKATA

JAIPURDUBAI

Abu Dhabi

ITALY

LONDON

HOUSTON

Germany

Global Leader in BIM Engineering

Page 4: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Country Wise Evolution

04WWW.PINNACLECAD.COM | Revolutionizing Construction

1

47

14

22

3439

0

5

10

15

20

25

30

35

40

1991 2003 2004 2008 2014 2016 2018

AustraliaBahrainBangladeshBelgiumBrazilCanadaChinaDenmarkFranceGermany

IndiaIndonesiaIraqIrelandIsraelItalyJapanJordanKazakhstanKuwait

LebanonLibyaMalaysiaMexicoNetherlandsNew ZealandNorway OmanQatarRwanda

Saudi ArabiaSingaporeSri LankaSwitzerlandTurkeyUAEUKUSAWest Indies

List of Countries Served

Page 5: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Dubai Business Centre, UAE

Global Delivery Locations

05WWW.PINNACLECAD.COM | Revolutionizing Construction

State of the Art Facility @ Durgapur, India

Pinnacle Infotech's Durgapur Production Centre spread over 380,000 sq ft (12 Acres) with refreshing landscape has a unique appeal to the employees, that helps them boost their personal and professional development.

Jaipur Production Centre, India

Salient features of this world class facility include Production capacity of almost 1100 persons with world class infrastructure and recreational facilities.

Kolkata Production Centre, India

Pinnacle's Kolkata Office at Ecospace, New Town, Rajarhat is a world-class production facility with modern infrastructure, serving the Indian and Middle East clients.

Texas Business Centre, USA

USA is one of the leading market segments of Pinnacle withdelivery center in Houston, Texas.

London Business Centre, UK

The office in London is providing world-class BIM solutions and implementation for the UK construction sector.

Pinnacle is providing MEP BIM Services in the Middle East for more than 10 years and continuing for the key projects in the region.

Page 6: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Services Offered & Capabilities

Pinnacle offers end-to-end BIM Services allowing clients to get complete control of construction projects. Our BIM engineers work with 3D, 4D, 5D and 6D BIM to facilitate project coordination, collaboration, asset management, risk mitigation, logistic planning and cost estimate. We follow a structured work process for all our projects starting from Design Validation, 3D Modeling, Coordination, Constructability Review, Value Engineering, Shop/Sleeve/Spool Drawings (pre-fab), Quantity Take-Off, As-Built updation, Scan to BIM and Facilities Management

Core BIM ExpertiseOur core BIM expertise lies in 3D Modeling & Visualization, Site Logistics, Clash Coordination, Bill of Materials (BOQ), Shop Drawings, Digital Prefabrication, Fabrication/Spool Drawings, Marketing BIM Presentation, 3D Model Conversion from Laser Scan/Point Cloud Data, Facilities Management, Construction Documentation, 4D Construction Simulation and Revit Family Creation.

Facilitating Top Industry VerticalsSince BIM Services are gaining popularity, Owners, Architects & Home Builders, Structural & MEP Engineers, GCs and Concrete, Mechanical, Plumbing, Electrical, Fire-Protection & Drywall Contractors are adopting this technology to a great extent. In this regard, Pinnacle has emerged as one of the leading BIM service providers in the globe.

BIM Modeling Services

We generate coordinated models using BIM and allow our clients to check possible interference among all building systems through 3D BIM Modeling Services. Our 3D BIM models help the construction companies to visualize schematic structures before construction and thus can offer better project planning for our clients. We detect clashes for eliminating major system conflicts before installation.

BIM Engineering Services

Pinnacle's BIM engineering solutions create real value for AEC firms by saving construction cost, avoiding error at design stage and reducing rework. We innovate construction process through the implementation of advanced BIM technologies. Our engineers enhance construction workflow and quality of design and building through BIM. We offer customized solution to improve the workflow of the developer, contractor, consultant or facility management companies. Our comprehensive BIM engineering services include constructability review, design validation, value engineering, design services and modularization.

06WWW.PINNACLECAD.COM | Revolutionizing Construction

BIM Services for AEC Industry

BIM Consulting Services

Building Information Modeling is important for all stakeholders in construction industry. Pinnacle specializes in BIM consulting and helps firms in BIM implementation. The importance of implementing the right technology with a view to future needs is critical. Pinnacle transforms current business processes with the use of latest software applications. We review the current processes and ensure that we can define, train and implement BIM technology for improving overall processes.

Page 7: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

BIM Service Offerings to the Construction Arena

1. 3D BIM Modeling 2. 3D Visualization3. Laser Scan/Point Cloud Data4. 4D Construction Simulation5. BIM Constructability Review & Clash Coordination6. Construction Document Management7. Digital Pre-fabrication8. Fabrication/Spool Drawings9. Facilities Management10. Marketing BID Presentation11. Pre-Construction Site Logistics12. Bill of Materials13. Shop Drawings14. Revit Family Creation15. BIM Model Auditing

Services Offered & Capabilities

BIM Consulting Services

BIM Execution Plan

BIM Strategy Formulation

IT Infrastructure Planning

Key Resource Hiring & Training

Template & Content Creation

BIM Execution Plan - Setting the BIM Objectives

BIM Model

Architecture

Structure

Electrical

Mechanical & Plumbing

Fire Protection

Shop Drawings

Change & Contract Management

Quantity Take Off (MTO)

Facilities Management

Design Development

Value Engineering

Constructability Review

MEP Co-ordination

07WWW.PINNACLECAD.COM | Revolutionizing Construction

BIM Engineering Services

1. Constructability Review2. MEP Design Validation3. Modularization4. Value Engineering

Page 8: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

08WWW.PINNACLECAD.COM | Revolutionizing Construction

involvement and quick time bound program. Pinnacle Infotech is poised to deliver the best BIM engineering solutions to clients globally by nurturing and maintaining the highest level of innovation, commitment, productivity and quality.

Pinnacle's significant contribution to Building Information Modeling is made possible with the key players of the management team. Since inception, this BIM and CAD service provider has set a platform to realize your business goals. Pinnacle is constantly adding value to client's business through integration, production, sustainable mock-up, stakeholder

Projected Manpower Growth

Employee Background

Manpower Strength

2002

212

2006

352

2010

529

2016

636

2017

880

2018

1,250

Dec.' 2019

1,550

0

200

400

600

800

1,000

1,200

1,400

1,600

8%

24%

42%

11% 10%

2%

11%

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

Architects Civil Engineer Mechanical Electrical CAD R&D Support

Services Offered & Capabilities

PROJECTED

Page 9: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Pinnacle owns a 380,000 sq ft campus in Durgapur – one of the largest industrial cities in India. The campus with refreshing landscape has a unique appeal to the employees that helps them boost their personal and professional development. Pinnacle’s Construct-ability Installation Lab, spread across more than 2000 sq ft gives construction site experience to employees, integrating theoretical learning with practical experience.

§ Hardware – Pinnacle's world-class fully owned production facility at Durgapur is equipped with more than 800 HP Z series high end workstations 12 HP Proliant servers, Perimeter security Fortigate 240D connected with multiple ISPs, CISCO switches of 4507, 3560 and 2960, HP DJ T920 &T610 series of plotters, advanced scanners and other peripherals with 24x7 high-speed internet. We have layer 3 LAN through CISCO switches for fast throughput with the backbone of fiber connectivity. Pinnacle has EMC VNXe 3200 series with high availability configuration and 40 TB of useable space for data storage. We are using Symantec Backup EXE for data backup.

§ Software – Our experts develop automated software routines and processes that rely on high standard quality at all stages of aesthetics, presentation, completeness, accuracy and conformance to specifications.

We work on all major software applications –

Revit Software Suite (Revit MEP, Revit Architecture & Revit §Structure) MicroStation Bentley AutoCAD AutoCAD § § § §§ § § § � Architecture AutoCAD MEP SysQue Navisworks

�� § § § § Inventor Civil 3D Plant Design Suite Pro/Engineer �� § § § Tekla Structure Solidworks Autodesk Fabrication Suite

§ § § Quickpen Allplan Cadpipe A-360 Collaboration �� § § § § Autodesk BIM 360 Glue Sketch Up ETAP Lux Level

Calculation 3DS Max Photoshop Illustrator Blue § § § §beam and Newforma§

§ Network – Our workstations are equipped with the latest computer models and servers have proper back-up system to support in crisis. Moreover, 99.99% data and voice network help us to make clear client communication.

§ Backups – Software updates are regularly applied to the workstations and the efficiency of the servers is kept in mind. Uninterrupted Internet service and secure data and voice network ensure communication between employees and clients. Back-up generators provide power during emergency.

IT Infrastructure

09WWW.PINNACLECAD.COM | Revolutionizing Construction

Page 10: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Policies

§ Security – We are equipped with access advanced control system that monitors the computer workstations and the Tech Campus as a whole for unauthorized access. Security and access control system at the main campus of Pinnacle ensures logical and physical security of all resources – including information & Human capital. Information security is implemented through deployment of robust UTM box Fortigate 240D at the perimeter with Anti-Virus, Anti-spam devices and anti-intrusion systems.

§ IT – Information security is implemented through deployment of robust UTM box Fortigate 240D at the perimeter along with Anti-Virus, Anti-spam devices and anti-intrusion systems. A host of CCTV cameras keep vigilance on every individual, crossing the main entrance.

§ HR – Pinnacle’s welcoming and on-boarding process include HR Interaction, Technical Short listing, Practical Assessment, Personality Evaluation and Consistent Excellence

§ HR Interaction – the first step to selection process is a face-to-face interview with our HR Expert. We try to gauge how much the candidate shares the passion for excellence, quality and client satisfaction. We look out for proactive, self-motivated and zealous people who want to boost their learning curve.

§ Technical Short listing – We refine candidate screening from a technical expert already working in the field. Detailed reporting after interview includes the insight of the interviewer, which helps us fill up the open position with the ideal candidate. We conduct written test to check Quantitative Aptitude, Reasoning abilities, English Comprehension, Grammar & language & other Technical tests. Candidates get selected through HR, Technical & Management Round of Interview.

§ Practical Assessment – Conducting employee interviews for technical jobs can be a huge challenge. We need to know whether the applicant we’re hiring has the necessary experience and skills. Top-notch technology professionals already serving companies with their expertise are eager to work on our interviewing assignment to select the right candidate.

§ Personality Evaluation – Our innovative interviewing process for personality evaluation helps us take the right decision to get the true insight into a candidate’s technical prowess. This reduces the probability of bad hires. We receive resume via job site, internal reference, company website, email, walk-in, job fair & shortlist candidates to send filled candidate application form/self-assessment sheet

§ Consistent Excellence – We recruit candidates having consistent excellence in construction technologies across various BIM software platforms required in today’s tech-driven, global marketplace.

§ Disaster Recovery – The city of Durgapur has its own back-up power system, providing the campus with a reliable and continuous power supply.

In case of any major fault in the power supply system, the company's own back-up system and generators are ready to support uninterrupted service.

We have an 11 KVA power supply and ample DG support of 100 KVA. A number of heavy duty (20 KV) UPS systems are on the standby to provide filtered power to all nodes.

Pinnacle has well defined processes pertaining to central server & back-up system to support normal working process and for disaster recovery. An abrupt power failure can be handled promptly as the company is equipped with its in-house backup system for power supply.

Pinnacle has power station with battery backup by GE digital high end UPS systems Pinnacle has well planned disaster management program with a regular back backup kept at remote places.

The IT staff is well trained to support the project team continuously and also during disaster recovery. The data connectivity is supported by backup links to provide 99.99% uptime.

10WWW.PINNACLECAD.COM | Revolutionizing Construction

Page 11: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Work Process

Pinnacle BIM Workflow Integration & Collaboration

11WWW.PINNACLECAD.COM | Revolutionizing Construction

CLIENTArchitects / Engineers / General Contractors / Sub-Contractors

ESTIMATION TEAM

CO

NTR

AC

T S

TAG

E

US BASED

RELATIONSHIP MANAGER

Inputs/Redline Markups/ Comments

PROJECT

FEEDBACK

Deliv

era

ble

s Escalation

BIM PROJECT MANAGER (Point of Contact)

• Kick off Meeting(Upon receipt of Project Order)

• Web Meetings

• RFIs/Clarifications

• Progress Status

• Change Management

• File Delivery

• Quality Check - Stage3

(Checklists, Coordinated Model, Client standard, RFIs)

• Invoice

• Project Closure

SERVICE DETAILS1• Bill of Material

• Rendering

• Walkthrough/Animation

• 4D/5D Phasing

23

Architecture Civil Structure

• 3D Model• General Arrangement Plans

• Assist Material Selection Detailing

• Code interpretation

• Concept 3D Model (LOD100/200)

• Outline Drawings

• Concrete volume• Rendering and Animation

Architecture Civil Structure

• 3D Model• Construction documentation• Assist Design options

• Assist Space Planning

• Constructability Report

• Rendering /Animation

• Shop/Lift Drawing and Details

• Reinforcement Drawings and Bar bending Schedule (BBS)

• Detailing

• Redline updates• RFI

• Bill of Materials

Mechanical Electrical Plumbing Fire Protection

• 3D Model• General Service Layout

• Design Assist

Mechanical Electrical Plumbing Fire Protection

• 3D Model• Individual Service Drawings

• Combined Service Drawings

• Assist Load Calculation• Assist Design Development

• Constructability Review

• RFI

4

Architecture Civil Structure• 3D Model

• Constructability Review

Mechanical Electrical Plumbing Fire Protection

• 3D Model

• Constructability Review

• Service Layout Modification

• Clash Report Generation

• Lead in Coordination Process

• Project Sign-off

• Combine Service Drawing

• RFI Management

5

Architecture Civil Structure

• Shop Drawing

• Lift Drawing and Details

• Bill of Material

Mechanical Electrical Plumbing Fire Protection

• Shop Drawing

• Fabrication Drawing

• Spool Drawing

• Bill of Material

6• Scan to BIM

• Asset Information Model

• COBie

• 2D Drawings/Redline Update

• Document Collaboration

• Bill of Materials

Center of Excellence

• Process Monitoring

• Tool Support

• Technical Support

• Research & Development

• Knowledge Sharing

• Project Health Check

SERVICES

OU

TPU

T

EXEC

UTI

ON S

TAG

E

QU

ALI

TY C

HEC

K -

Sta

ge 1

& S

tage

2As p

er S

chem

atic, IF

C, R

ece

ived In

form

ation, L

ate

st I

nputs

, Code, S

peci

fica

tion C

heck

list, Q

ualit

y C

heck

list, E

quip

ment s

ubm

itta

l, R

FI re

sponse,

Constr

uct

abili

ty, M

ark

up, C

om

ments

1

Business Presentation

2

Design Development Support

3

Pre-Construction Support

4

BIM Modeling & Coordination Support

5

Construction Support

6

As-Built Support

MARKETING TEAM

Request For Proposal/Scope

Scope Clarification&

Proposal

Agreement / Purchase Order

SERVICES

Page 12: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Awards & Honors

Pinnacle has won accolades in the form of numerous awards and recognition from the Government, Industry and other prestigious Associations, which includes excellence awards, innovation awards, top exporter and highest job creator awards.

CRISIL AwardPinnacle received CRISIL Rating of 'SME-1' in December 2014 and 2016 respectively.

AutodeskIn October 2014, Autodesk — the world leader in 3D design, engineering and entertainment software announced that Pinnacle would standardize BIM solutions across all sectors.

INFOCOMPinnacle received Telegraph Infocom SME Award in 2014 for being the Most Innovative Small and Medium Enterprise.

NDTVPinnacle received NDTV Design & Architecture award in 2014 for the City Centre Patna project.

DeloittePinnacle also received Deloitte Technology Fast 500 award in 2014 for 86% growth rate in Technology as per Asia Pacific Ranking and Deloitte Technology Fast 50 India award in 2015.

STPIPinnacle is the winner of an excellence award for Top Exporter & Highest Job creator (IT/ITES) in West Bengal Tier II/III cities in STPI for the year 2012-13 & 2013 -14, 2014-15, , 2015-16 and 2017.

ISO 9001:2008Pinnacle Infotech Solutions at S.S.B. Sarani, Bidhannagar, Durgapur – 713212 has been certified with ISO 9001:2008 as per Quality Management System Standard by Det Norske Veritas.

Other RecognitionsMoreover, Pinnacle has received Certificate of Recognition for BIM Summit Qatar, Notable IT Initiative for Advantage Bengal (Webel) and TIE (The Indus Entrepreneurs) Global Award.

NASSCOMPinnacle Infotech has been recognized by NASSCOM – the premier trade body & chamber of commerce of IT-BPO industries in India as one of the top 100 IT Innovators in 2006. NASSCOM has ranked Pinnacle as one of the Top 50 IT innovators thrice in 2006, 2007, 2008 and 2011. It has been awarded by NASSCOM in Emerge Innovation Category in 2011 and has been awarded continuously in 2009-10, 2011-12, 2012-13 and 2014-15.

NASSCOM EAST IT Awards 2017Pinnacle Infotech received Runner Up award in Best Enterprise Category during NASSCOM EAST IT Awards 2017. Pinnacle won the prestigious Runner up Award for exceptional contribution in the IT Sector with exemplary works and projects delivered. The award was given on 6th of July at JW Marriott; Kolkata at 6 pm. Hon'ble Chief Minister, Mamata Banerjee was the chief guest at the event. The award evening was also attended by all the NASSCOM Executive Council members and many other eminent guests.

12WWW.PINNACLECAD.COM | Revolutionizing Construction

Page 13: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Executive Management Team

13WWW.PINNACLECAD.COM | Revolutionizing Construction

Wg Cdr. Soban Singh BishtGeneral Manager, India

Mr. Soban Singh Bisht has 30+ years of experience in Human Resource practice. He is the Head HR & Administration and the Chief architect for team building and people management of Pinnacle Infotech.

Konstantinos PavlidisSenior BIM Project Manager, UAE

Konstantinos has over 18 years of experience in Project management, BIM deployment, Construction and Architecture, managing major construction and design projects in GCC and Europe.

Scott PittmanVice President, USA

Mr. Scott Pittman. Scott comes with vast knowledge of core construction background in USA and brings technological rigor of enterprise level operations and the state of the art best practice in management techniques.

Bimal PatwariCEO & Founder, Pinnacle Infotech

Mr. Bimal Kumar Patwari is the 1st generation Entrepreneur & founder of Pinnacle Infotech Solutions – the global leader in providing Engineering and BIM solutions to International Construction Industry, Architects and Engineering firms.

Chip BranscumDirector of Engineering, USA

Chip Branscum, with an impressive 33 years’ experience in engineering design and management has joined team Pinnacle as the Director of Engineering.

David BrownRegional Director, UK

David Brown is the head of Pinnacle’s BIM Business in the UK. An RIBA Chartered Architect with 35 years’ experience, including 19 years with one of the country’s leading residential developers in the design and construction of complex high end houses and flats.

Leonidas I. TzevelekasSenior BIM project Manager, Qatar

Mr. Leonidas I. Tzevelekas is currently deputed as a BIM Manager at Pinnacle Infotech HBK-CRCC JV since July 2017.

Sapna PatwariDirector, India

Mrs. Sapna Patwari is the 1st generation Entrepreneur and Co-founder of Pinnacle Infotech Solutions. She is the Director of Pinnacle Infotech Solutions and manages the senior core team of HRD and Administration.

Page 14: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

14WWW.PINNACLECAD.COM | Revolutionizing Construction

Operations Management Team

Robert E. Lee IIIRelationship Manager, USA

Robert E. Lee III, a certified CAD/ BIM manager has joined Pinnacle as a skilled relationship manager, who is passionate about taking on new challenges, building relationships with clients and supporting them in every area of their needs.

Antoinette CunninghamRelationship Manager, USA

Ms. Antoinette Cunningham has joined Pinnacle as a Relationship Manager for the Structural Engineering & Concrete Contractor Division. Antoinette has over 20 years of experience in drafting, structural design, modeling & content creation.

Bill StrabelMEP Construction Consultant, USA

Bill Strabel brings a vast knowledge and background in the MEP world. He has a Mechanical Engineering degree with over 28 years of design and construction management experience in Industrial Process Plants, Laboratory Design and Construction.

Brandon MooreRelationship Manager, USA

With more than eleven years of experience in mechanical and plumbing trades from design-fabrication-construction, Brandon Moore is methodical and conversant in Client Relationship Management, International Business

Development, Contract Management, and New Market Penetration.

Aeron FinkeRelationship Manager, USA

Aeron has over 18 years ofexperience working as one of the lead electrical designer using AutoCAD and Revit.

Lindsey SpearsManager, BIM Services, USA

Lindsey Spears comes with a BS in Engineering, Graphics & Design with a dual emphasis in Mechanical and Architectural Design.

Sarvesh KekatpureSenior Manager, USA

Mr. Sarvesh has perfect understanding of Pinnacle’s clients and industry needs with years of extensive accomplishments within diverse environments.

Biswanath TodiOperation Manager, USA

Mr. Biswanath Todi specializes in CAD drafting and handles all building documentation and CAD platforms like AutoCAD, MicroStation.

Page 15: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

15WWW.PINNACLECAD.COM | Revolutionizing Construction

Operations Management Team

Fady Samir BoshraBIM Manager, UAE

A Mechanical Engineer and a BIM Accredited Professional from Green Building Research Institute with over 7 years of experience in managing BIM production team, preparing BIM strategy, BIM execution plan & BIM standards.

Luke PannellMEP Project Coordinator, UK

Luke Pannell is BIM Coordinator for MEP Projects executed in the UK. A dedicated professional, Luke, started his career as Electrical CAD Designer and IT Coordinator and moved on getting more specialized and focused on his segment of the AEC Industry.

Du Plooy de LangeInformation Manager (CDE), UAE

Du Plooy, a BIM application Specialist is associated with Pinnacle InfoTech as CDE Manager. As an expert in Common Data Environment, Du Plooy de Lange is working in the BIM industry for over thirteen years.

Hugo MarquesSenior BIM Architect, UAE

Hugo Almeida Marques is a Certified BIM Manager & Registered Architect with over 10 years of diverse experience in Architecture, Engineering & Construction.

Serife Ece BoyaciogluSenior BIM Coordinator, UAE

With more than eight years of experience in Aviation, Residential Structure, Hydroelectric Power Plant, EPC and many other global projects, Serife Ece Boyacioglu is currently working as a Senior BIM coordinator at Pinnacle.

Sougato BanerjeeDeputy General Manager, Mechanical | India

Sougato has over 17 years of experience as BIM Project Manager in National & International Projects ranging from Residential, Commercial, Airport, Hospital, Shopping Malls, Hotels, Office Buildings and Housing Complex.

Soumen MukherjeeDeputy General Manager, Civil India

Soumen has more than 18 years of experience on national & international projects ranging from Residential, Commercial, Airport, Hospital, Shopping Malls, dam and more.

Biprajit NagDeputy General Manager, Architecture | India

Biprajit Nag is a Virtual Design & Construction (VDC) professional with proven skills, construction education and diverse experience of over 19 years in project execution from conception through execution,

virtual design and construction and has an extensive industry and client experience.

Balraj Singh ShekhawatAssistant General Manager, MEPIndia

A Mechanical Engineer from IIMT with over 14 years of experience in MEP Coordination, including 6+ years in BIM. He has Project Site Experience of around 6 years in Gulf and 2 years in India.

Page 16: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Landmark BIM Projects

Significant BIM projects includes Jeddah Tower at Jeddah, Kingdom of Saudi Arabia, Dubai International Airport, Muscat Airport, Delhi International Airport (T3), New York University, Julphar Pharmaceutical Plant, Msheireb Downtown Construction

Project Statistics – Industry Verticals

Iconic Projects Completed

BIM implementation helps our clients to assemble projects in a virtual environment for identifying and correcting potential problems before construction. We have delivered projects in New York, California, Florida, Virginia, Saudi Arabia, Dubai, Muscat, Delhi, Patna and other places.

Project Statistics – Segment Wise

16WWW.PINNACLECAD.COM | Revolutionizing Construction

(Doha), Dubai Festival City, University of California Health Longmont Hospital, Santa Ana College, Kolter Hotel in Tampa, Florida, Ambuja Patna City Center, Rosslyn Central Place in Arlington County, Virginia, USA & several others.

5%

12%

5%

10%

14%

17%

8%

22%

7%

0%

5%

10%

15%

20%

25%

Airport Healthcare Commercial Industrial Residential High riseEducation Stadium Hospitality

0%

10%

20%

30%

40%

50%

60%

MEP Architecture BIMConsulting

& Management

DesignEngineering

GeneralContractor

HomeBuilders

Concrete Mixed Use & Others

51%

9% 8%5%

12%

1%

9%

4%

Page 17: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

17WWW.PINNACLECAD.COM | Revolutionizing Construction

Landmark BIM Projects

AIRPORT PROJECTS EXECUTED

Dubai International Airport Expansion – Concourse 4

§ Started in Feb, 2014 & completed in May 2016§ Total Area: 33,184,222 Sq Mt

§ BIM Project management & review§ 3D BIM Modeling & coordination (MEP)§ Constructability review and Value Engineering§ Detailed Quantity Take-off (QTO)§ Modularization and Shop Drawings § As built Updation

Scope of Work

New Orleans International Airport Concourse D, Kenner, LA

§ BIM Planning and Management 3D modeling of sheet metal, Shop Drawings & 2D drawings §

for sheet metal Co-ordination based on the clash reports§ As Built update as per the mark-up§ Facilities Management & BOQ §

§ Started in April, 2016 and ongoing§ Architect: Leo A Daly§ Project Area 927,000 Sq Ft.

Scope of Work

Indira Gandhi International Airport, New Delhi, India

§ BIM Start Date: Oct, 2007 BIM End Date: May, 2010§ Project Area: 502,000 sq. m.§

§ BIM for Terminal 3 & Runways, Passenger Terminal Building, Domestic & International PIER Sight line report generation for Air Traffic Control § Simulated structures of Raft Foundation and Column § Creation of Arrival & Mezzanine level Concrete Structure § Generation of complete set of simulations for Interior §

Structural Model Clash detection among all services - Structure, HVAC, §

Structure, SA Duct Quantity Estimation and Construction phasing as per §

established turnaround time

Scope of Work

High Rise - Jeddah Tower – Super Tall Skyscraper (Under Construction)

Iconic Projects Completed

Page 18: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

§ Started in May, 2014 and ongoing Architect: Adrian Smith + Gordon Gill Architecture§ MEP Contractor – INMA§ General Contractor- Saudi Binladin Group§ Owner- Jeddah Economic Company§ Total Area–6,132,791sq.ft. § Total Floors – 252 Levels + 4 Basements § Hotel & Service Apartments – 24 Levels § Residential Floors – 63 Levels§ Office Floors – 8 Levels§ MEP Floors – 34 Levels § Sky Lobby, Sky Terrace, Spire & Balcony floors – 123 Levels §

3D BIM Modeling for MEPFP services as well as the § Architectural and Concrete Structure Shop Drawing Creation of Mechanical (CHW & Duct Work), §

Plumbing (Drainage & Water Supply), Electrical (Light, Power, Fire Alarm & Containment), Fire Protection & Builder Work (Slab & Wall Penetration) Coordinated Service Drawings (Schematics/Riser Diagram §

& Enlarged Plan)

Scope of Work

Orlando City Soccer Stadium, Florida, USA

§ BIM Start Date: March, 2016 BIM End Date: August, 2016 § Project Area: 473,260 Sq.ft§ Architect: Populous Architects § MEP Engineer: Walter P. Moore§ General Contractor: Barton Malow Company§ MEP Sub Contractor: Coastal Mechanical (Plumbing) & §

USA Eastern Corporation Developer/Owner: Orlando Sports Holding, LLC §

§ Creation of 3D Model for Plumbing & Sub roof support system and wall panel for Coordination among Architectural, Structural & MEP trades, Hanger placement in the Model Sleeve Drawing & Shop drawing preparation of Sub roof §

support system from Design Development Stage Metal Panel Quantity Take-off§

Scope of Work

STADIUM

18WWW.PINNACLECAD.COM | Revolutionizing Construction

Base Ball Stadium - Ball Park of Palm Beaches, West Palm Beach, Florida, USA

§ BIM Start Date: March, 2016 BIM End Date: August, 2016 § Project Area: 473,260 Sq.ft§ Architect: Populous Architects § MEP Engineer: Walter P. Moore§ General Contractor: Barton Malow Company§ MEP Sub Contractor: Coastal Mechanical (Plumbing) & §

USA Eastern Corporation Developer/Owner: Orlando Sports Holding, LLC §

3D Modeling of Electrical Equipment, Coordination and §

Constructability Analysis Virtual Construction of the project in BIM enabling §

independent review of the constructability issues

Scope of Work

Lusail Stadium, Qatar (Under Construction)

§ BIM Start Date: June, 2016 Project Area: 153,697 sq. m.§

Creation of Architectural, Structural & Revit Models §

at LOD 200§ 4D Construction Animation depicting sequence of construction

Scope of Work

Iconic Projects Completed

Page 19: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

§ Entire Site Model creation with Periphery Buildings & Site Logistic representation

RESIDENTIAL

Innovative Hub - Msheireb Downtown Phase III, Doha, State of Qatar

§ Project Start Date: July, 2013 End Date: March, 2014§ Project Area: 390,193 sq.m.§ Team – 35 Engineers§ Floors - 14 buildings including a 22-storey hotel, 4 basement §

levels offering parking space to 2,200 vehicles, retail spaces, upscale apartments, townhouses, mosques, hotels, cultural & entertainment center Client: Conspel Qatar WLL§ Architect: Diwan Al Emara§ Engineer: Buro Happold§ MEP Contractor: Atelier Ten§ General Contractor: Obayashi & HBK joint venture§ Owner of the Project: Msheireb Properties§

BIM 3D modeling (Architecture, Structure & MEPF) § Clash coordination among services§ RFI creation/response§ 2D shop drawing creation§ Coordinated shop drawing creation§ Embedment drawings creation for Electrical trade§ Builder works for slab & core wall§

Scope of Work

19WWW.PINNACLECAD.COM | Revolutionizing Construction

Ambuja Patna City Center, India – Commercial & Residential Real Estate

§ BIM Start Time: December 2012 BIM End Date: Ongoing§

Project Area: 1,000,000 Sq.Ft.§

Developer: Ambuja Realty Development Ltd.§

MEP Contractor: Pankaj Dharkar & Associates, Hydro §

Mechanical, Saent Architect: Salient§

Structural Engineer: MN Consultants§

§ 3D BIM Model Creation in LOD 500 for Architectural, Structural, Site Utility, Site Logistics, MEP & Fire Protection trades 3D coordination (clash mitigation, visualization)§

4D capabilities (scheduling, phasing, sequencing)§

Quantity Take-Off§

Presentations (Renderings, Walkthroughs and Mock-Ups)§

Coordinated Drawings (Shop Drawings, Sleeve Drawings, §

Insert Drawings, Isometric views) Constructability Review (Model Updation to reflect changes §

resulting from Design changes, RFI Updation, As-Built Updation)§

Scope of Work

Student Accommodation Building – Bath, UK

EDUCATIONAL

Iconic Projects Completed

Page 20: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

§ BIM Start Date: 11/16/2016 BIM End Date:12/2/2016§

Floors - 6 floors, including ground for post graduate §

students on the west side of campus, Project Area - 6561.15 sq. mt., considering exterior §

shell, core, structural foundation, slab & column Architect: Stride Treglown Limited§

Developer/Owner: Bath University, Claverton Down, UK§

Bidder: Midas Construction Ltd.§

Scope of Work

§ 3D BIM Model Creation for Architectural, Structural & Site elements Architectural 3D Modeling included exterior facade of §

the building (Walls, Ceilings, Floors/Slabs, Doors, Windows, Openings, Elevators, Escalators, Railings, Roofs and more) Structural 3D modeling comprised of §

footings/foundation, beams, columns, slabs and structural walls and the Site Modeling included the topography with basic landscaping, roads, parking and road curbs 4D phasing animation depicting construction sequence §

per construction schedule/program -- Animation showed the building development with the movements of Logistics i.e. Cranes, Dumpers and other construction equipment

University Building CMU Tepper Building – Level 2 - University – Pittsburgh, Pennsylvania, USA

§ BIM Start Date: August, 2016 BIM End Date: November, 2016§

Project Area: 64,740 Sq ft§

Team Size: 3 Engineers§

Facts at a glance:§

Architect: Moore Ruble Yudell§

MEP Engineer: Buro Happold§

Sub Contractor: McKamish, Inc§

Developer/Owner: Carnegie Mellon University, David §

A. Tepper Quadrangle

20WWW.PINNACLECAD.COM | Revolutionizing Construction

3D modeling of plumbing & mechanical services§ Clash coordination with other trades§ Shop drawing creation§ Sleeve drawing creation for slab§ Sleeve drawing creation for wall§

Scope of Work

HOSPITAL

King Abdullah Specialized Hospital, Saudi Arabia

COMMERCIAL

Hilton Waterfront Beach Resort, Huntington Beach, California, USA

§ BIM Start Date: March, 2016 BIM End Date: December, 2016§ Project Area:212,720 Sq ft§

Scope of Work

3D BIM Model Creation§ Preparation of Shop Drawing & Spool Drawing of Mechanical §

and Plumbing components (including associated accessories, fittings & equipment)

Iconic Projects Completed

Page 21: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Calida Horizon Ridge Skilled Nursing Facility, Henderson, Nevada, USA

§ BIM Start Date: August, 2016 BIM End Date: October, 2016§ Project Area: 120,000 Sq ft§ Architect: James L. Zak§ Design Architect: WZ Architecture§ Sub Contractor: Atlas Mechanical Inc§ Developer/Owner: The Calida Group§

Creation of 3d BIM Model & Shop Drawings of Sheet § metal and Mechanical Piping of all buildings Trade coordination was done as per the clash report§ As-built Update as per mark-up drawings§ Facility Management §

Scope of Work

INFRASTRUCTUREDubai Metro 2020, Doha, Ad Dawhah, Qatar

§ BIM Start Date November, 2015 BIM End Date: January, 2016§ Project Area: 484,000 Sq. ft§ Team Size: 6 Engineers§ General Contractor: Obayashi§ Developer/Owner: Roads and Transport Authority (Dubai)§

Scope of Work

§ 3D modeling of the architectural and structural element of the expo station Video presentation of route 2020 showing the §

construction methodology 4D simulation of the expo station, ending with a walk-§

through showing the proposed condition

21WWW.PINNACLECAD.COM | Revolutionizing Construction

3D Modeling for ACS & MEP trades (5560 Model Creation § for MEP trades - HVAC, PHE/FF, ELE, ELV, Coordination) Clash Coordination, Basic Coordination between AR & ST §

with MEP Shop Drawing Creation (Approximately 800) for main §

architectural and MEP elements Model Updation as per DAR comments & SRC § BOQ Extraction from LOD 400 Model§

Scope of Work

§ BIM Start Date: Nov 2016 BIM End Date: March 2017§ Project Area: 1,333,960 Sq ft§ Architect: Perkins + Will§ Engineer: DAR§ General Contractor: Nesma & Partners§ Developer/Owner: National Guard Health Affairs§

Iconic Projects Completed

Page 22: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

Client Testimonials

“Everything adhered to the construction documents exactly as expected. Good price and quick modeling service.”

Sam Tupp The Whiting-Turner Contracting Company

“I've been satisfied with the Pinnacle team on this job, just like the others we've worked on together. Great job from everyone, keep up the good work!!”

Robert PickettMechanical Construction Company, L.L.C.

“The drawings were what we had discussed and they were done on time. Communication on missing items and issues was very good by Pinnacle. Pinnacle follows up to make sure they have the answers needed and are very professional.”

Michael A RiveraHeating & Plumbing Engineers INC

“Communication between different time zones has its challenges. One must be completely clear about what they want and offer. Considering the 11:30 hr difference I am very pleased with the results. The correspondence I received was cordial and concise. The product I received was prompt and well developed.”

Patrick MadridU.S. Engineering Company

“I was given exactly what I asked for. Everyone was very helpful and responsive. Thanks to everyone who worked on this for us. We were in a short turn around schedule and did not have the manpower to respond. I believe Pinnacle is a great resource for supplementing our force. Construction is unpredictable and keeping ample coordination manpower for all situations is difficult. Thanks again.”

Larry J. Randolph, Mechanical ContractorTD Industries, USA

“Pinnacle has been a real asset to the project. Their team is very knowledgeable and efficient at the BIM process and has provided an end product that is very useful to not only the construction coordination and installation, but also the end users of the facility.”

Chuck KonKolicsThe Whiting-Turner Contracting Company

“My experience in working with Pinnacle has been very good. Pinnacle assisted Baker on a very complex and demanding project and Pinnacle’s hard work, dedication and attention to detail really contributed to our team’s success on the project. Thanks to the Pinnacle team members for their hard work, dedication, and quality work that they provided to Baker on this project.”

Kevin McGuireBaker Concrete Construction, Inc.

“This was a difficult project because we changed CAD platforms half way through. Thank you for working with us on all the changes and revisions to complete the job.”

Jason PechaIron Mechanical

“This was our first experience with Pinnacle, and we at Waldrop were satisfied with the level of performance by the Pinnacle team. We were under extreme pressure to deliver under a tight deadline and your team aided us in doing so. We appreciate your workand look forward to other successful projects together.”

Jamie PorterfieldWaldrop Mechanical Services

22WWW.PINNACLECAD.COM | Revolutionizing Construction

Page 23: Company Profile Feb 2019 - pinnaclecad › wp-content › uploads › ...implementation helps our clients to assemble projects in a virtual ... Pinnacle has EMC VNXe 3200 series with

ww

w.p

innacl

eca

d.c

om

Italy Office

Phone: + 39 0341630070Email: [email protected]

Nunki di M.Brossa,Via Calvi, 10 - 23801Calolziocorte, LC - Italy

Jaipur Office

Plot No - IT-A-016-E, Mahindra World City, (Jaipur) LTD, PO - Mahindra World City, Tehsil -Sanganer, Jaipur - 302037

Pinnacle Infotech Solutions

Pinnacle Infotech Inc.

6161 Savoy Drive #1125,Houston, TX 77036Phone: 713 780 2135Fax: 713 780 8784Email: [email protected]

USA Office

Biswanath TodiOperations ManagerCell: 832 283 6628

International Office Locations

UAE Office

Office No – 307, 3rd Floor, Building No. 7 PO Box - 345869, Dubai Outsource ZoneDubai, UAE

Pinnacle Infotech Technologies FZ-LLC

Kuntal Chakraborty

Phone: +971 55 736 3498Email: [email protected]

India Office Locations

Pinnacle Infotech Solutions

S.S.B. Sarani, Bidhannagar, DurgapurWest Bengal, India - 713212Phone: +91 343 6602222 / 6602231–35Fax: +91 343 6602230

Durgapur Office UK Office

Pinnacle Infotech Limited

Switzerland Office

c/o, Transcon InternationalSpirackerstrasse 258044 GockhausenSwitzerland

Kolkata Office

Plot - II/F/11, Block - 4B, 4th Floor, Room No. 402,Ecospace Business Park, New Town, Rajarhat, Kolkata - 700156

Pinnacle Infotech Solutions

Email: [email protected]

Email: [email protected]

Email: [email protected]

Pinnacle Infotech Inc.

Texas, US

Dubai, UAE

Lecco, Italy

Kolkata, India

Durgapur, IndiaJaipur, India

London, UKZurich, Switzerland

David BrownPhone: +44 77 9852 8673Email: [email protected]

Bernhard Kössler

Email: [email protected]

Phone: +41 56 535 3267

The Barley Mow Centre, 10 Barley Mow Passage, London, W4 4PH, UK