ISO 9001:2008 CERTIFIED COMPANY

@ SADARA

INDUSTRIAL SERVICES CONTRACTING & TRADING

COMPANY PROFILE

THERMAL INSULATION AND STANDING SEAM PANEL INSULATION SYSTEM FOR STORAGE TANKS

Introduction Letter

OUR PREVIOUS PROJECT REFERENCES

QC Policy

HS & E Policy

Our Client List

OUR STRENGTH & INFRA STRUCTURE

CONTENTS

Safety certificate

Client Appreciations

Fabrication & Erection

Office Exterior & Interior

Material Stock & Stock Yard

Our Location

Standing Seam Panel Insulation

COMPARISON BETWEEN CONVENTIONAL INSULATION & STANDING SEAM PANEL

CONVENTIONAL INSULATION STANDING SEAM PANEL SYSTEM

1 Scaffolding Required No Scaffolding Required

2 More Work Duration On Tank Less Duration Of Work On Tank

3 Job Safety Risk Is More Less Risk

4 Expensive Less Expensive

5 Maintenance Required Maintenance Free

6 Insulation Support Rings Required No Welded Part On The Shell

7 Moisture Entry After Long Use Tightly Sealed Seams Avoid Moisture Entry

8 Less Structural Strength Superior In Structural Strength

9 May Damage On Heavy Wind It Withstand Heavy Wind

10 Less Durability High Durability With Good Performance

11 Suitable For Small Tanks Suitable For Big Diameter Tanks

STANDING SEAM PANEL TANK INSULATION SYSTEM@YASREF

S.No PROJECT NAME

WORK SITE CLIENT CONTRACTOR DURATION No. Of Tanks

1Yanbu Export

Refinery Project

YASREF ARAMCO +

SINOPEC

ENPPI / YANBU STEEL

Oct ‘13 to may ‘14

4

2 SADARA Port & SASREF Tanks

Project

SASREF ARAMCO+

SHELL

ACBI May ‘14 toJune ‘14

1

3 AROMATICS SADARAARAMCO

+DOW

CORNING

JGC Sep ‘14 toNov ‘14

2

4 SADARAKing Fahd

Industrial Port, Jubail

ARAMCO+

DOW CORNING

ACBI Aug ‘14 toJan ‘15

13

5RABIGH PHASE II PETRO

CHEMICAL PROJECT

PETRORABIGHARAMCO

+ SUMITOMO CHEMICAL

PETROFAC / HIDADA

Dec’15 10

RECENTLY COMPLETED / ON GOING PROJECTS

Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT

START DATE

PROJECT END DATE

1INSTALLATION OF HOT AIR DUCT INSULATION

SCAFFOLDING & INSULATION

AL-YAMAMA STEEL CO., YANBU

DANIELLE, ITALYALA

INTERNATIONAL CONTRACTING.

19-12-06 10-06-07

2

SUPPLY & INSTALLATION OF INSULATION OF COLD BOX PACKAGE, BOILER, ECONOMIZER, DUCT &

CHIMNEY

SCAFFOLDING & INSULATION

NATPET, YANBUAL-JOMAIH &

PETROBAU SA CO. LTD.

NASEER S AL-HAJRI CO.

02-07-07 18-09-08

3

INSTALLATION OF HOT & COLD INSULATION FOR

CRISTAL EXPANSION PROJECT

SCAFFOLDING & INSULATION

CRISTAL, YANBU AK-KIM KIMYA AK-KIM KEMYA 05-03-08 06-06-08

4SUPPLY & INSTALLATION

OF SCAFFOLDINGSCAFFOLDING

PETRORABIGH(JOINT VENTURE

OF SAUDI ARAMCO& SUMITOMO

CHEMICAL,JAPAN)

TECNICAS REUNIDAS (TR)

- 24-06-08 22-12-08

5SUPPLY & INSTALLATION

OF HOT INSULATION (PORT AREA)

SCAFFOLDING & INSULATION

YANSAB, YANBUYANSAB/FLUOR

ARABIA LTD.CAT CO. 25-02-08 01-05-08

6SUPPLY OF COLD

INSULATION & CLADDING MATERIALS

SCAFFOLDING & INSULATION

YANSAB, YANBUYANSAB/FLUOR

ARABIA LTD.- 10-05-09 10-10-09

7INSTALLATION OF COLD

INSULATIONSCAFFOLDING & INSULATION

YANSAB, YANBUYANSAB/FLUOR

ARABIA LTD.CAT CO. 08-01-09 30-07-09

8SUPPLY OF HDPUF

MATERIAL FOR COLD SHOE

SCAFFOLDING & INSULATION

YANSAB, YANBUYANSAB/FLUOR ARABIA LTD...

- 10-01-09 30-07-09

9SUPPLY & INSTALLATION

OF DUCT INSULATIONSCAFFOLDING & INSULATION

SWCC, YANBU KANOO PROJECTSYANBU STEEL

CO.01-03-10 20-06-10

10SUPPLY & INSTALLATION

OF SCAFFOLDING FOR TANK PAINTING

SCAFFOLDING & INSULATION

YANSAB, YANBU TECHNIPOLAYAN DESCON

18-01-08 23-03-08

11SUPPLY & INSTALLATION

OF INSULATION FOR THREE RE-BOILERS

SCAFFOLDING & INSULATION

YANPET, YANBU OLAYAN DESCON - 23-03-10 27-08-10

12SUPPLY & INSULATION OF

SEA WATER SNUBBER DUCT

SCAFFOLDING & INSULATION

SAMREF, YANBU(SAUDI ARAMCO

MOBILE REFINERY COMPANY)

SAMREF, YANBU(SAUDI ARAMCO

MOBILE REFINERY COMPANY)

JAMJOOM WESCON

15-05-10 23-10-10

13

FRP ANNULAR SPACE COVERS –SUPPLY FABRICATION & INSTALLATION

INSULATION YANSABYANSAB/FLUOR

ARABIA LTD.- 29-09-09

05-10-09

RECENTLY COMPLETED/ON GOING PROJECTS

Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT

START DATE

PROJECT END DATE

14INSULATION WORK FOR TANK 242 F-1

SCAFFOLDING & INSULATION

SAMREF, YANBU(SAUDI

ARAMCO MOBILE

REFINERY COMPANY)

YANBU STEEL COM. YANBU

YANBU STEEL COM. YANBU

02-03-10 15-05-10

15

SUPPLY OF MATERIAL AND SERVICES FOR THE

INSTALLATION OF INSULATION &

CLADDING.

SCAFFOLDING & INSULATION

SAMREF, YANBU(SAUDI

ARAMCO MOBILE

REFINERY COMPANY)

OLAYAN DESCONOLAYAN DESCON

09-02-10 05-05-10

16

SUPPLY & INSTALLATION OF

BOILER INSULATION (7 BOILERS)

SCAFFOLDING, REFRACTORY&

INSULATIONSWCC, YANBU

HARRIS PYE MARINE LTD.

- 25-02-11 04-12-11

17

SUPPLY & INSTALLATION OF HOT

AIR DUCT & DUST COLLECTOR

INSULATION.

SCAFFOLDING & INSULATION

SWCC SWCC, YANBU -. 20-04-10 05-08-10

18SUPPLY &

INSTALLATION OF INSULATION

SCAFFOLDING, FIREPROOFING & INSULATION

CRISTAL CRISTAL EXPANSION - 16-08-11 03-03-12

19

SUPPLY & INSTALLATION OF INSULATION ON 3

TANKS

SCAFFOLDING & INSULATION

PETROMIN JEDDAH

OLAYAN DESCON - 30-03-11 12-07-11

20SUPPLY &

INSTALLATION OF INSULATION

SCAFFOLDING, FIREPROOFING & INSULATION

TAYSEER AL-SHAIK

PHOSPHATE

TAYSEER AL-SHAIK PHOSPHATE PLANT

- 03-01-11 07-05-11

21SUPPLY &

INSTALLATION OF INSULATION

INSULATIONACCL PLANT

JUBAILARABIAN ETIMAD - 20-05-11 20-11-12

22SUPPLY &

INSTALLATION OF INSULATION

INSULATION & FIREPROOFING

MADA GYPSUMKHALID ABDULLAH

ABU DUNQER (KAAD) -YANBU

- 20-07-11 03-10-11

23

RE-ROUTING OF ELECTRICAL &

INSTRUMENTATION CABLES

ELECTRICAL SWCC, YANBUBADAR A.

MOHAMMED AL-MULIHI

- 30-03-12 19-05-12

24

DISMANTLING & REINSTALLATION OF NEW CO2 RECOVERY

PLANT

MECHANICAL JOB

SWCC, YANBU BUSE - 25-03-12 02-09-12

25

DISMANTLING & REINSTALLATION OF NEW CO2 RECOVERY

PLANT

MECHANICAL JOB

SWCC, SHOAIBHA

BUSE - 28-12-11 08-04-12

RECENTLY COMPLETED/ON GOING PROJECTS

Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT

START DATE

PROJECT END DATE

26 THIRD BOILER PROJECT

INSULATION JOB FOR

EQUIPMENTS & PIPE

NATPET LURGI

ABDULLA FALEH AL-

DOSSARY & PARTNER CO.

15-03-12 03-08-12

27

SUPPLY & INSTALLATION OF

INSULATION & REFRACTORY JOB FOR

BOILER

INSULATION & REFRACTORY

LUBEREF(SAUDI

ARAMCO LUBRICATING OIL REFINING AND PETRO

CHEMICAL CO.)

HARRIS PYE MARINE LTD.

- 22-05-12 18-09-12

28BOILER SHUT DOWN

JOB

INTERNAL SCAFFOLDING FOR BOILERS

(5NOS), PHASE I SWCC

SWCC , YANBU GEMS - 02-08-12 25-05-13

29PIPE LINE REPAIR

WORKINSULATION

SABIC GAS, YANBU

AL-SAMAMAT CO. - 20-09-12 25-10-12

30STEAM LINE & VALVE REPLACEMENT JOB

INSULATION & SCAFFOLDING

JOB

ROYAL COMMISSION

HOSPITAL YANBU

AL-SAMAMAT CO. - 30-04-12 03-07-12

31MANIFA CO-

GENERATION & MAIN SUBSTATION PROJECT

INSTALLATION OF INSULATION WORK FOR PIPE & EQUIPMENTS

ARAMCOTECNICAS REUNIDAS

GULF CO. LTD (TR)- 10-01-13 23-03-13

32MARAFIQ STG UNITS 5

& 6 PROJECT

INTERNAL SCAFFOLDING

FOR HFO STORAGE TANKS

(2NOS)

MARAFIQ , YANBU

JACOBS / HANWHA ENGINEERING & CONSTRUCTION

GLOBAL SUHAIMI CO.

10-10-12 25-12-12

33 KLIN REPAIR WORKREFRACTORY LINING JOB

PCC MICROWHITE,

YANBU- - 22-12-12 19-01-13

34PIPE LINE FROM

SATORP TO JUBAIL INDUSTRIAL PORT

PIPE & EQUIPMENT

INSULATION JOB

SATORP(SAUDI

ARAMCO TOTAL REFINING AND

PETRO CHEMICAL CO.)

PENTAIR THERMAL MANAGEMENT.

- 08-02-13 12-05-13

35PIPE INSULATION AT

TANK FARM AREAPIPE

INSULATIONYANBU CEMENT

CO.YANBU STEEL CO. - 15-01-13 19-04-13

36CIVIL WORK &

ROOFINGCIVIL WORK& ROOFING JOB

MADA CARPET MADA CARPET - 15-01-13 16-02-13

37CABLE REPLACEMENT

FOR BOILER 7

ELECTRICAL CABLE

REPLACEMENT

SWCC PHASE II YANBU

SWCCBADAR A.

MOHAMMED AL-MULIHI

22-12-12 24-12-12

RECENTLY COMPLETED/ON GOING PROJECTS

Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT

START DATE

PROJECT END DATE

38SATORP-JUBAIL

EXPORT REFINERY PROJECT

FABRICATION & INSTALLATION

OF HAVC DUCTING &

PIPING

SATORP(SAUDI

ARAMCO TOTAL REFINING AND

PETRO CHEMICAL CO.)

DAYIM PUNJ LLOYD - 11-02-13 17-04-13

39

COLD INSULATION & PAINTING ON

AMMONIA TANK-AL-BAIRUNI

INSULATION, PAINTING &

SCAFFOLDINGSABIC OLAYAN DESCON - 13-03-13 25-08-13

40

EXTERNAL & INTERNAL SCAFFOLDING FOR

TANKS AT IBN RUSHD II U & O PROJECT & SAB-

TANK AREA

SCAFFOLDING IBN RUSHD CTCI CORPORATION - 25-05-13 29-09-13

41COLD INSULATION OF

CO2 TANKS SWCC, YANBU

INSULATION SWCC BUSE GASTEK - 01-04-13 08-07-13

42SCAFFOLDING WORK-

YASREF FOR FIRE PROOFING

SCAFFOLDING

YASREF(YANBU

ARAMCO SINOPEC

REFINERY)

GLOBAL SUHAIMI - 25-02-13 30-09-14

43FIRE PROOFING WORK

– YERP (EPC-3 )FIRE PROOFING

YASREF(YANBU

ARAMCO SINOPEC

REFINERY)

DEALIM KCC 28-06-13 05-12-13

44

FIRE PROOFING WORK – YERP INTER

CONNECTING SYSTEM SP6 PACKAGE

FIRE PROOFING

YASREF(YANBU

ARAMCO SINOPEC

REFINERY)

MMG - 02-06-13 10-05-14

45

SUPPLY OF SCAFFOLDING

MATERIALS YERP -SP3 PROJECT

SCAFFOLDING MATERIALS

SUPPLY

YASREF(YANBU

ARAMCO SINOPEC

REFINERY)

SAUDI TECHINT - 20-02-13 18-04-13

468” PARA XYLENE LINE &

20” FUEL OIL LINE AT PACKAGE 8 IN SATORP

HOTINSULATION

SATORP(SAUDI

ARAMCO TOTAL REFINING AND

PETRO CHEMICAL CO.)

AYTB - 25-08-13 10-01-14

47CABLE TERMINATION &

GLANDING AT PACKAGE 9 IN SATORP

ELECTRICAL WORK

SATORP(SAUDI

ARAMCO TOTAL REFINING AND

PETRO CHEMICAL CO.)

DAYIM PUNJ LLOYDPENTAIR

THERMAL MANAGEMENT

08-09-13 25-12-13

48

STANDING SEAM PANEL INSULATION

FOR 4 TANKS AT ENPPI-YASREF SITE

INSULATION WITH

STANDING SEAM PANEL

SYSTEM

YASREF(YANBU

ARAMCO SINOPEC

REFINERY)

ENPPI YANBU STEEL 25-11-2013 25-05-2014

RECENTLY COMPLETED/ON GOING PROJECTS

Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT

START DATE

PROJECT END DATE

49INSULATION JOB-IBN RUSHD SHUTDOWN

YANBUINSULATION IBN RUSHD OLAYAN DESCON - 25-02-13 25-04-13

50CIVIL WORK- RABIGH

POWER PLANT

POTA FOUNDATION

SUPPORT

RABIGH POWER PLANT

GE ENERGY - 27-03-13 04-04-13

51SCAFFOLDING WORK-

RABIGH POWER PLANTSCAFFOLDING

RABIGH POWER PLANT

GE ENERGY - 02-03-13 25-06-13

52INSULATION MATERIAL

SUPPLY-DPL SITE-SATORP

INSULATION MATERIAL

SUPPLY

SATORP(SAUDI

ARAMCO TOTAL REFINING AND

PETRO CHEMICAL CO.)

PENTAIR - 30-06-13 04-07-13

53INSULATION-PIPE LINE-

YERPINSULATION

YASREF(YANBU

ARAMCO SINOPEC

REFINERY)

AL-SHALAWI INTL. HOLDING CO.

- 20-09-13 04-11-13

54SCAFFOLDING & INSULATION-IBN

RUSHD (CTCI-PROJECT

SCAFFOLDING & INSULATION

IBN RUSHD AL SAMAMATH - 08-08-13 12-09-13

55SCAFFOLDING

COLUMN-IBN RUSHD YANBU

SCAFFOLDING COLUMN

IBN RUSHD YANBU

OLAYAN DESCON - 23-04-13 30-07-13

56INTERNAL

SCAFFOLDING-SWCC YANBU

INTERNAL SCAFFOLDING

SWCC YANBU GEMS - 01-06-13 18-06-13

57PIPE INSULATION-

YANPETINSULATION YANPET OLAYAN DESCON - 25-03-13 30-06-13

58

TURBINE REPAIRING WORK- TIHAMA POWER PLANT,

QUNFUDAH

SCAFFOLDINGTIHAMA

POWER PLANTGENERAL ELECTRIC

INTERNATIONAL INC.- 11-09-13 12-03-14

59INSULATION &

SCAFFOLDING-LUBREF JEDDAH

INSULATION & SCAFFOLDING

LUBEREF JEDDAH(SAUDI

ARAMCO LUBRICATING OIL REFINING AND PETRO

CHEMICAL CO.)

HARRIS PYE - 02-09-13 18-11-13

60INSULATION WORK-SAUDI KAYAN JUBAIL

INSULATIONSAUDI KAYAN

JUBAILOLAYAN DESCON - 10-09-13 06-10-13

61INSULATION WORK-IR-II AROMATIC PROJECT

INSULATION IBN-RUSHD CTCI - 13-09-13 04-11-13

RECENTLY COMPLETED/ON GOING PROJECTS

RECENTLY COMPLETED/ON GOING PROJECTS

Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT

START DATEPROJECT

END DATE

62HADEED

STRAIGHTENING SHOP PROJECT-JUBAIL

INSULATIONHADEED (SABIC)

TAMIMI INDUSTRIAL SERVICE

- 08-12-13 03-03-14

63AL YER HYDROGEN PLANT PROJECT -

YANBUINSULATION

YASREF(YANBU

ARAMCO SINOPEC

REFINERY)

MMG - 20-12-13 13-11-14

64

UPGRADING HOUT ONSHORE CRUDE

FACILITIES, KJO-AL-KHAFJI

TANK INSULATION

KHAFJI JOINT OPERATION

(KJO)

HIDADA CONTRACTING CO.

LTD.- 26-01-14 27-04-14

65 SHINX PROJECT, JAZAN INSULATIONNATIONAL TITANIUM

DIOXIDE CO.OUTOTEC - 13-04-14 21-11-14

66SADARA AROMATICS,

PROJECT, JUBAIL

STANDING SEAM

INSULATIONSADARA JGC - 23-09-14 12-11-14

67SCAFFOLDING-C604

HAIL SECSCAFFOLDING SEC-HAIL

ISCOSA INDUSTRIES & MAINTENANCE

LTD.- 21-02-14 12-06-14

68ELASTOMER INDUSTRIES

CLADDING JOB ELASTOMER INDUSTRIES

HASHIM AL-MUBARAK EST

- 01-29-14 18-2-14

69SUPPLY AND INSULATION

PIPE INSULATION

JOB LUBREF ARABIAN ETIMAAD - 02-1-14 25-4-2014

70SWCC YANBU BOWAREGE 2

DUCT FABRICATION

&INSTALLATION OF DUCT

SWCC YANBU

GOLTENH - 30-08-14 04-09-14

71FIRE PROOFING

(YANPET) FIRE PROOFING YANPET AYTB - 11-11-14 28-12-14

72MP STEAM LINE

INSULATION(YANPET) INSULATION YANPET AL-DOSSARY - 03-12-14 30-12-14

73SALT HEATER UNIT

INSULATION INSULATIONCRISTAL-YANBU

NASSER AL HAJRI - 03-12-14 06-12-14

74INSULATION

(ARABIAN CBI) INSULATION YANPET AYTB - 05-11-14 29-12-14

75REMOVAL AND

INSULATION (SWCC JEDDAH)

INSULATION SWCC

JEDDAH HARRIS PYE - 23-10-14 ONGOING

76SADARA

METERING-RACK INLET FACILITY

INSULATION SADARA FLOUR CAT 06-05-14 14-06-14

Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT

START DATEPROJECT

END DATE

77SADARA PORT TANK

FARM PROJECT

STANDIND SEAM PANEL INSULATION

SADARA CHEMICAL

COMPARABIAN CBI - 19-05-14 13-12-14

78PIPING REPLACEMENT FOR GAS DRYER, FDP-1

FACILITYINSULATION KJO OLAYAN - 20-08-14 14-09-14

79SUPPLY AND REFRACTORY

WORK(SEC RABIGH

REFRACTORY SEC RABIGH

POWER PLANT BABCOCK BORIS SERVICE ARABIA

- 10-11-14 21-01-15

80 HGU PROJECT INSULATION YASREF AIR LIQUIDE GLOBAL

E&C SOLUTIONS- 01-01-15 1-19-15

81SUPPLY &INSTALL STEAM JACKETING

STEAMJACKETING

YASREF ENPPI - 05-01-15 24-01-15

82SWEC, SHUAIBAH,

Boiler MaintenanceSCAFFOLDING SEC THERM SERVICE - 21-01-15 28-05-2015

83LIN TANK PROJECT,

PETRORABIGHINSULATION PETROJET PETROFAC PETROJET 11-02-15 4-04-2015

84 SWCC, YANBU PHASE-3 CIVIL SWCC SAMSUNG RCC 05-03-2015 08-05-2015

85 SOYA SHUTDOWN MECHANICAL,

SCAFFOLDING&PAINTING

SOYA - - 7-03-2015 16-05-2015

86 SIIMCO INSULATION SIIMCO AMANA CAD 21-03-15 01-07-2015

87AL-BAYRONI AMMONIA

TANK PROJECT

INSULATION,SCAFFOLDING&

PAINTING

AL-BAYRONI(SABI

C)

OLAYAN DESCON- 12-04-15 ONGOING

88SWCC SHUTDOWNPROJECT, YANBU

INSULATION SWCC BELLELI - 05-05-15 15-06-15

89 SWCC , YANBUINSULATION&SCAFFOLDING

SWCC NOMEC - 03-06-15ONGOING

90 JAZAN -SPHINXREFRACTORY

WORK- OUTOTEC - 13-07-2013 27-08-2015

91SOYA BEAN CRUSHING

CO.ELECTRICAL SOYA - - 02-08-15 ONGOING

RECENTLY COMPLETED/ON GOING PROJECTS

Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT

START DATEPROJECT

END DATE

92JEDDAH UNITED SUGAR

CO.

REFACTORY, INSULATION & SCAFFOLDING

- BAB COCK - 08-08-2015 03-09-2015

93SOYA BEAN CRUSHING

CO.

STEEL STRUCTURE ERECTION

SOYA - - 25-08-2015 ONGOING

94SOYA BEAN CRUSHING

CO.CIVIL WORK SOYA - - 26-08-15 02-09-15

95LUBEREF EXTENSION

PROJECTTANK BOTTOM

INSULATIONLUBEREF YANBU STEEL - 08-09-2015 21-09-2015

96YANSAB CHIMNEY

MODIFICATION HOT

INSULATIONYANSAB DESCON ENGG. -

ABOUT TO START

97YANSAB DRINIKING

WATER LINE REPLACEMENT

COLD INSULATION

YANSAB AL DOSSARY -ABOUT TO

START

98YANSAB DRINIKING

WATER LINE

STANDINGSEAM

INSULATION PETRORABIGHPETROFAC HIDADA ABOUT TO

START

99SUPPLY AND

INSTALLATION OF INSULATION FOR PIPES

HOT INSULATION PETRORABIGH

JGCOLAYAN DESCON

24-10-2015

100REFURBISHMENT WORK@ CRISTAL

ECNOMIC CITY

MAITENANCE WORKS

CRISTAL - - 17-11-2015

RECENTLY COMPLETED/ON GOING PROJECTS

NATIONAL GUARD

MITSUBISHI SHOWROOM

NAMLA SIGNAL

TOYOTA SIGNAL

Google Map Location -24.061395,38.126590

Head OfficePB No. 6329Dammam 31442Tel : +966(0) 13 834 0371Fax : +966(0) 13 833 4594

Operating OfficePB No. 1697Yanbu Al-Bahr 41911Tel : +966(0) 14 390 7250Fax : +966(0) 14 390 7260

Email : [email protected] : www.clearvisionarabia.com