company profile · 2020. 11. 2. · piping & instrument diagram standard drawing for all...
TRANSCRIPT
COMPANY PROFILE
Engineering, Procurement, Construction & Installation
Oil & Gas
PT. REKA SARANA NUSANTARA
Head Office : GKM Green Tower Level 20, Jln. TB Simatupang No. KAV.89.G, Kel. Kebagusan, Kec. Pasar Minggu, Kota Adm. Jakarta Selatan, Prov. DKI Jakarta, Telp: 021-508-971-702-3, Email: [email protected]
Construction Office : Ruko Buana Raya, No.A35, Jln. Ledjend. Suprapto, Sei Langkai, Sagulung, Batam, KEPRI Telp. 0778-74332663,Email. [email protected], Website, www.bbtbatam.com
1 of 25
PT. REKA SARANA NUSANTARA
: No. Kav. 89.G, Kel. Kebagusan, Kec. Pasar Minggu,: Kota Adm. Jakarta Selatan, Prov. DKI Jakarta
Name of Company
Established
DirectorHead Office Address
: www.bbtbatam.com
Phone No. : 0778 - 7432663
: PT. REKA SARANA NUSANTARA
: February 13th , 2020
: Mutiara Sakti Hasibuan: GKM Green Tower Level 20 Jln. TB Simatupang
Phone No. / Fax. No.
: 021-5089-7170-23 / 021-5089-7170-XX
Website
Construction Office : Ruko Buana Raya, No.A35, Jln. Ledjend. Suprapto,: Kel. Sei Langkai, Kec. Sagulung, Batam, KEPRI
Type Of Business : Oil & Gas (Engineering, Procurement, Construction: & Intallation)
2 of 25
PT. REKA SARANA NUSANTARA
Introduction
Vision
Mission
We Would like to introduce PT. Reka Sarana Nusantara (RSN) a National Company, which was established in February 2020 with Jakarta as its Head Office & Fabrication/Construction Office in Batam.
Construction Batam Office was operated as Engineering , Fabrication & Supplier since May 2009, with Old Company name is PT. Batam of the Best Team (BBT)
Our Company specializes in the Oil & Gas Onshore/Offshore Industry with strengths in Engineering, Procurement, Fabrication & Installation c/w Pre-Commissioning & Commissioning.
We Provide Quality Management, Quality HSE & Quality Productsincluding Quality Equipment with competitive rates.
Our company Software, Equipment & Labor are supporting with experience from the Oil & Gas industry it's, we are optimistic about the prospects. Therefore, we will give our best to ensure that our clients are satisfied.
For further information, please do not hesitate to contacts anytime.
Be a leading company which is able competence in national or international scope, focusing on professionalism, punctuality, quality standard and customer's satisfaction in Oil and Gas Company.
Give services based on the commitment of trust and the customer’s satisfaction and Increases Strong, prosperous and professional human resources.
3 of 25
PT. REKA SARANA NUSANTARA
Our Scope Product Supplies
Engineering Design
Procurement
Engineering Design Procurement Construction Installation (Offshore)
Management Project Design Calculation for all decipline Stress Analyzes for all decipline Project Specification Procedures Engineering Schedule Process Flow Diagram Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported
Procurement Schedule Equipments Specification Materials Specification Equiment List Materials Take off Bill of Materials Approved Vendor List Purchasing Delivery Order Out Standing Delivery Progress Controller & Reported Document Controller & Reported
4 of 25
PT. REKA SARANA NUSANTARA
Construction
Yard Management Yard & Workshop Layout c/w Facility Main Equipment, Tools & Consumable List Fabrication Schedule Fabrication & Testing Procedure for all decipline Blasting & Painting Pocedure for all decipline QHSE Procedure c/w ITP QA/QC Procedure c/w ITP Fabrication & Erection Sequence Engineering Shop Detail Drawing for all decipline NDE/NDT Map Detail Drawing for all decipline Test Block Diagram Drawing for all decipline Materials Receiving & Werehousing Materials Inspection Leak Seat Test (a Specially for Anualy Valve's) Out Standing Delivery (Return Material Rejected) Welding Procedure Specification (WPS) Welding Quality Test (WQT) Fabrication & Assembly (Jig & Support) Blasting & Painting as Premier Coated of Row Materials Prefabrication of all decipline as per Shop Detail Drawing NDT/NDE Report of Prefabration result Erection of all decipline as Shop Datail Drawing NDT/NDE Report of Erection Joint Result Testing for all Decipline Precommissioning Final Painting & Tuch-up Loadout of all Part (Jacket & Top Side and/or Module) Ship-Loose Materials Seafastening & Teidown Shipment Insurance Seal Out Progress Controller & Reported Document Controller & Reported
5 of 25
PT. REKA SARANA NUSANTARA
Installation
Offshore Hook-up Management Crane Barge c/w Facility Crew Barge c/w Facility Main Equipment, Tools & Consumable List Offshore Hoo-up Schedule QHSE Procedure for Offshore Hook-up c/w ITP QA/QC Procedure fro Offshore Hook-up c/w ITP Installation and/or Hook-up Procedure & Sequence Installation Jacket in accordance with Survey Point Installation of Jacket Pile's Flooding & Grouting Activitie's Intallation Tie-In Point of Pipeline and J-Tube Final Painting & Tuch-up of Jacket c/w Accessories Part's Precommissioning & Commissioning Jacket c/w Accessories
Part's Installation of Top Side Platform and/or Module c/w
Accessories Part's Connected of all Hook-up Joint's (Welded, Threaded, Bolted &
Clamp) Connection Point's Testing of all Hook-up Joint's & Tie-In Point Connection's Final Painting & Tuch-up of Top Side Platform and/or Module
c/w Accessories Part's Precommissioning & Commissioning Top Side Platform and/or
Module c/w Accessories Part's Start-up Line Process System & Equipments Installation Offshore Hook-up Completion Progress Controller & Reported Document Controller & Reported
6 of 25
PT. REKA SARANA NUSANTARA
Management Organization Chart
Project Organization Chart
7 of 25
PT. REKA SARANA NUSANTARA
Engineering Capability & Software
Engineering Capability & Software
8 of 25
PT. REKA SARANA NUSANTARA
Jacket Drawing
JACKET 2D DRAWING
JACKET 3D MODELING
9 of 25
PT. REKA SARANA NUSANTARA
Jacket Shop Detail Drawing
Jacket Member Drawing
10 of 25
PT. REKA SARANA NUSANTARA
Jacket Profiling Detail Drawing
Top Side / Module Drawing
TOP SIDE / MODULE 3D MODELING
11 of 25
PT. REKA SARANA NUSANTARA
Top Side / Module Shop Detail Drawing
TOP SIDE / MODULE 2D DRAWING
12 of 25
PT. REKA SARANA NUSANTARA
Top Side / Module NDT Map Drawing
Piping c/w Pipe Support Drawing
13 of 25
PT. REKA SARANA NUSANTARA
Flushing & Test Block Drawing
Fabrication Sequence Drawing
14 of 25
PT. REKA SARANA NUSANTARA
Jacket Fabriation Procedure Drawing
Top Side/Module Fabriation Procedure Drawing
15 of 25
PT. REKA SARANA NUSANTARA
Jacket Load Out Drawing
Jacket Load Out Drawing (With Flooting Crane Methode)
Jacket Load Out Drawing (With Skiding Methode)
16 of 25
PT. REKA SARANA NUSANTARA
Top Side/Module Load Out Drawing
Seafastening, Seal Out & Hook-Up Photo's
17 of 25
PT. REKA SARANA NUSANTARA
Fab. & Install Pressure Vessel & Boiler Photos
Fabrication & Installation Storage Tanks
18 of 25
PT. REKA SARANA NUSANTARA
Soil Investigation Work at PT. NSB Photos
Fabrication New Jetty at PT. NSB Photos
19 of 25
PT. REKA SARANA NUSANTARA
Civil Work at Baiturrahim Batam Photos
Civil Work at Apartement Batam Photos
20 of 25
PT. REKA SARANA NUSANTARA
Civil work Sekupang Batam Highway Photos
21 of 25
PT. REKA SARANA NUSANTARA
Construction Experience List
22 of 25
PT. REKA SARANA NUSANTARA
23 of 25
PT. REKA SARANA NUSANTARA
18 Jul - 24 Agus 2018
24 of 25
PT. REKA SARANA NUSANTARA
PT. RSN LEGAL DOCUMENT SUPPORTING
THANK YOU
Agus - Dec 2018
Jan - Jul 2019
25 of 25