company presentation
TRANSCRIPT
HISTORY
• Incorporation of “Rope Access Calgary”
• First project completed. Petro Canada/Suncor.
• Opened first office in Calgary, AB.
• Landed first US client for Canada needs.
• Opened Vancouver, B.C office.
• Exceeded 100,000 field hours.
• Incorporation of “R.A.C
Group, International, Equipment”.
• Became Affiliated/sustaining members.
– CANWEA, Construction Safety Association
• Awarded COR in province of Alberta for safety.
• Opened office in Houston, Texas.
• Probationary member with IRATA.
2009
2010
2011
R.A.C TEAM
• Energetic, responsive management team.
• Active roster of 40 technicians.
• Large Inactive roster of technicians.
SPRAT
IRATA
Confined Space Rescue
OFA I, II, III, EMT & EMR
TDG
EXPERIENCED
EDUCATED
PROFESSIONAL
• 8 full time level 3’s
• 15 active level 3’s through in house
training. (January 2012)
Provincially Certified Rescue Team Leaders
HETS Class D Lead Rescuer
CAA Levels I, II & III
H2S
Certified Rigger
We appreciate the commitment
and reactivity of your team.
Looking forward to work with your
team on further projects.
Martin Duroyon - Site Manager
Freyssinet International
“ “
Key Projects:
Talisman Center
• 45 Technicians.
• 16 miles of cable replaced.
• 24hrs per day coverage on site.
Calgary, AB. Jan 2010 – March 2011
Key Projects:
Canada Place sails replacement
• 35 Technicians and Ground Support.
• Supply of all safety and access rigging
• On-site project management.
Vancouver, BC. July 2010 – March 2011
RAC took the time up front to
understand local regulations that
applied to their work and developed
their daily work plans to maximize
safety and productivity.
Jim Gorton, GSC – Senior Superintendent
Ledcor Construction Limited
“ “
Key Projects:
Arch Connecting BC Place
• Provide SPRAT Level training and supply technical access equipment for
members of Local 97 Ironworkers.
• Design, deliver and maintain access to 60 rotating rigging points 22hrs per
day for term of project.
• Helped to integrate rope access planning and procedures with union and
heavy steel construction procedures.
• Supervised over 1000 on rope hours injury free.
Vancouver, BC. April 2011 – July 2011
Key Projects:
Structural Steel Coating
Application
BC Place – Masts Coatings
• Sprat Level 1 training to 16 union painters.
• Supply over $100,000.00 of rope, rigging, safety and rescue equipment.
• Over 6000 on rope hours LTA free.
• R.A.C technicians supervised CCS contracted employees from Local 38 & Local
97. (A further 1750+ on rope hours incident free.)
Vancouver, BC. May 2011 – August 2011
Key Projects:
Kinnear Centre For Creativity
• 960 injury free hours.
• 48,000lbs of imported Brazilian Iron wood
• 600+ pieces installed, 1200+ brackets
Banff, AB. June 2010 – July 2010
SAFETY COMMITMENTS
Equipment inspected, logged and maintained.
High ratio of Level 3 supervision.
Quarterly advanced scenario rescue (Onsite – Offsite)
development sessions.
2.49 LTA/100,000 hours on rope. (2010)
IRATA & SPRAT guidelines, respect and separations
utilizing different entities.
Providing above & beyond job pre-planning by highly
qualified level 3.
“Associations are a great tool for advertising. However providing
in house policies, procedures and a solid track record will
continue to separate the committed from the wannabe’s.”
Jay Burbine. VP, CSO R.A.C Group
RAC demonstrated their commitment to safety by
following their own respective occupational health and
safety program. They conducted detailed pre-planning and
preparation of their work activities and provided the
required training and supervision of their own workforce as
well as to the trade contractor's personnel working under
their respective scopes of work and responsibility.
Jason Davidson–
Health, Safety and Environment Supervisor
PCL Constructors Westcoast Inc.
“ “
Direction – Focus
• Continue to focus on delivering quality, dependable service to existing clients.
• Develop relationships with new clients in Western Canada, US,through referral, new ventures and advertising.
• Offer support and management for all industries in need of access solutions through relationships.
• Aggressive sales & marketing for the offshore and oilfield market.
Workforce – Focus
• Educate clients, open eyes on potential opportunities.
• Maintain close relationships with clients, workforce.
• Support requests on fast response, problem solving, cost saving…
• Passionate about our trade to deliver the best quality service.
• Highest level of safety with unique and detailed involvement in job-planning and successful job completion.
“I personally take pride in what RAC has become today, especially due to the daily
involvement of our workforce and quality services offered to our clients. The education
and respect that they bring is unique and innovative”…
Morgan Portet – CEO – RAC Group
Provide a complete and experienced team of Rope Access Specialists -
since 2009
Corporate Head Office
19, Skyline Crescent, NE
Calgary, AB
T2K 5X2
West Coast Office
1109 VenablesStreet
Vancouver, BC
V6A 2E3
Gulf Region Office
11811 North Freeway
Houston, TX
77060
www.rac-int.com
Conduct all services safely, above SPRAT and IRATA guidelines
Ensure a cost effective, competitive and successful completion of any
project, whatever the size and requirement.
We…