company pcompany p r o f i l er o f i l er o f i l e · pdf filecompany pcompany p r o f i l...
TRANSCRIPT
HI-TEC Engineering Works THE POWER OF MEP+CE
HI-TEC ENGINEERING WORKS
COMPANY PCOMPANY PCOMPANY PCOMPANY P R O F I L ER O F I L ER O F I L ER O F I L E
MECHANICAL & ELECTRICAL CONTRACTORS, ENGINEERS
NO. 109/11, GOTHAMI ROAD, COLOMBO 08, SRI LANKA.
Tel: +94 +94-11-438 7545, +94-11-438 7554,+94-77-787 0280
Fax: +94-11-454 5195 E mail: [email protected] Website : www.hitec.lk
The Power of MEP+CE
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 2 of 37
CONTENTS
Introduction Company Goal, Vision & Mission
3 4
Resume of the Organization 5
Leading Professionals Specialist Services Offered
6 7
Key Persons
8
Field Staff 10
Organizational Chart Project Images of the company
11
12
Appendix I: Projects Certificates 17
Appendix II: Major Projects 25
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 3 of 37
INTRODUCTION
History
Hi-Tec Engineering Works was founded as a specialist M & E engineering and contracting
company in 1990. The organization has successfully executed various mechanical and
electrical projects both in Sri Lanka and overseas, such as container terminals, laboratories,
hospitals, production facilities, offices and warehouses, dwelling units and residences, hotels
and restaurants, amusement arcades and night clubs, etc.
Strengths
The director of the company have within himself vast experience in the handling of large
projects, accumulated over several years and through the handling of diverse projects in the
past.
The projects handled include:
High & Low Tension Electrical Installations
Air-conditioning installations
Fire & burglar detection & protection systems
Civil and structural projects& Network projects
Fresh water supply and drainage systems
Interior design and decoration
(See Appendix I: Reference Project List)
The activities of the company are also broad based and diversified into allied electrical areas
such as the manufacture of ‘Hi-Tec’ Switchboards, a complete range of ‘Hi-Tec’ Luminaries
suitable for industrial, commercial and residential applications, ‘Hi-Tec’ LT Trunking and
Cable Ladder Systems and ‘Hi-Tec’ Power Factor Correction Banks.
Other areas into which our activities extend include the erection of pre-fabricated roofs and
structures, and the fabrication and installation of aluminum doors and windows.
We are well organized and equipped, with modern offices (our designs, project costing and
accounting are fully computerized), long-serving, experienced and dedicated personnel, a
range of modern tools and equipment, a sub-contracting capability extending to 050–200
skilled technical personnel, in addition to our own staff and prudent banking support.
We have worked successfully with leading architects and consultants on both local & foreign
different projects and we enjoy a cordial relationship with them. We have also worked
alongside and as sub-contractors to many leading international companies such as Mitsui
Construction Co Ltd, Penta-Ocean Wakachiku JV, Sumitomo Densetsu Co Ltd, etc.
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 4 of 37
COMPANY GOAL, VISION & MISSION
Goal
“To satisfy our customers by
supplying products and services
that consistently conforms to their
requirements, and exceeds their
expectations by continuous quality
improvement”
Vision
“To strive towards perfection in every
task undertaken, through the
harnessing of diverse skills and
resources”
Mission
“To complete every task
undertaken, to the highest level of
professional standards, through
qualified experienced and well
trained staff”
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 5 of 37
RESUME OF THE ORGANIZATION
Name of the Company
Hi-Tec Engineering Works
Business Registration Number
W/A 20621
ICTAD Registration Number & Grade
EM – 0157, Grade EM2
Registered Office
109/11, Gothami Road, Colombo 08
Operating Office & Workshop
88A, Sapumal Place, Rajagiriya
Telephone
General : +94-11-438 7545
General : +94-11-438 7554
Mr.Samarakoon (MD) : +94-77-787 0280
Facsimile : +94-11-454 5195
General : [email protected]
General : [email protected]
Web Site : www.hitec.lk
Proprietor : Mr. S.M.D. Samarakoon
Mechanical Engineer
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 6 of 37
LEADING PROFESSIONALS
Consulting Engineer
Gihan Badiriyagodage
Chartered Electrical Engineer, B.Sc. Eng., C. Eng., MIE (SL), MIEEE (USA)
Electrical Engineer
R. A. Thilina Prabath
Mechanical Engineer
Jayawikum Suraweera
R.P.N. Senivirathne
IT Engineer
D K Wimalarathne
Quantity Surveyor
M.M.N. Mufas
Electrical Engineer (Projects)
B. Fazir Bangsajayah
Mechanical Engineers (Projects)
L. Kasun Darshana
Civil Engineer (Projects)
T. Sathish
AutoCAD Draughtsman
K.V.Chathurani
S.P.P.P. Premadasa
Safety Officer (Projects)
Samson Warnakulasuriya
Bankers
Seylan Bank Ltd, Boralla
Accountant
Kelum Perera
Auditors
R & J Association (Pvt) Ltd
Consultants & Chartered Accountants
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 7 of 37
PRINCIPAL ACTIVITIES
• Mechanical & Electrical Projects
• Civil & Structural Projects
• Plumbing And Waterworks
SPECIALIST SERVICES OFFERED
• Auto-cad based design and implementation of M & E Systems.
• Design, supply, installation and maintenance of Air-conditioning Systems.
• Design, supply, installation and maintenance of Industrial, Commercial and Residential
Electrical Installations and Packages.
• “Hi-Tec” LT Switchboards, “Hi-Tec” Cable Trays and Truncking.
• Design and implementation of Industrial, Commercial and Residential Illumination.
• External Illumination Systems – Security & Street Lighting.
• “Hi-Tec” Interior Illumination Systems
• Supply and Installation of Flame Proof Wiring.
• Supply and Installation of Overhead Power Distribution Systems.
• Supply and Installation of Armored Underground Cabling.
• Supply and Installation of Lightning Protection Systems.
• Supply and Installation of Burglar Detection & Protection Systems.
• Supply and Installation of Fire Detection and Protection Systems.
• Supply and Installation of PC Networking Hardware and Software.
• Supply and Installation of Telephone Systems.
• Supply and Installation of Audio/Video Master Antenna Systems.
• Supply, installation and maintenance of Generators.
• Supply, Installation/Erection of Pre-fabricated Roofs & Structures.
• Supply, Installation and Commissioning of Fresh/Storm/Waste Water Distribution &
Drainage Systems, Supply, Fabrication and Installation Air Ducts
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 8 of 37
DETAILS OF KEY PROFESSIONALS
No. Name Designation
Qualified with
Experience
01 S.M.D.
Samarakoon
Managing
Director
National Diploma in Technology (Mechanical
Engineering)
Faculty of Engineering (University of
Moratuwa) Sri Lanka
25 years
02 Kelum Perera Accountant MAAT, LICA, CBA
15 years
03 Fazir
Bangsajayah
Engineer
(Projects)
National Diploma in Technology (Electrical
Engineering - Power) University of Moratuwa,
Sri Lanka.
22 years
04 R.A.Thilina
Prabath Engineer
BSc Eng (Electrical & Electronic) MIEE, MIESL
University of Peradeniya, Sri Lanka
05 years
05
L Kasun
Dharshana
Mechanical
Engineer
B.Sc. (Eng) Graduate in Mechanical and
Manufacturing.
Faculty of Engineering, University of Ruhuna
05 Years
06 R P N
Senivirathne Engineer
BSc.Eng (Mechanical)
University of Peradeniya, Sri Lanka
08 years
07
Sahan
Kapugamage
Mechanical
Engineer
HND-Mechanical Engineering (Production)
05 Years
08 Daminda
Wimalarathne IT Engineer
MBCS , MCP, CCNA
10 years
09
J.C.M.K. Gamage Electrical
Engineer B.Sc (Engineering), AMIE (SL)
02 year
10
T.Sathish
Civil Engineer
NCIT (Civil Engineering), Technical College, Ratmalana
08 Years
11
M.M. Noorul
Mufas
Quantity
Surveyor
HND (Quantity Surveying and Commercial
Management
03 Years
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 9 of 37
12
Chathurani
Koralevidana
Draughtsper
son
NCED, NCT (Civil), NCT (QS), AutoCAD
05 Years
13
DB
Chandrapala
Charge-
Hand
NAB Certificate in Electrical and
Electronic Engineering
05 years
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 10 of 37
FIELD STAFF
Payroll Personnel
Skilled Electricians 50
Semi-Skilled Electricians 20
Plumbers 24
Welders 10
Fabricators 08
A/C Technician 06
Helpers 20
Drivers 06 Purchasing / Storage Personnel 02
Multi duty helpers 10
Regular Subcontractors 02
Their Personnel:
Skilled Electricians 50
Skilled Mechanical 30
Helpers As required
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 11 of 37
ORGANIZATION CHART
Managing Director
Accountant Engineering Manager (Electrical & Mechanical & Civil)
Purchasing Manager
Man Power
Controller
Test Equipment
Controller
Material
Controller
Plant
Controller
Site
Engineers
Safety
Officer
Design
Engineer
Quantity
Surveyor
Surveyors
Draftspersons Purchasing
Officer
Administration / HR
Manager
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 12 of 37
COMPLETED PROJECT IMAGES
Shell Terminal Lanka Project
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 13 of 37
Base Line Road Project
Port of Colombo Expansion Project
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 15 of 37
The Monarch Tower Project
Hambantota Administrative Complex
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 25 of 37
Appendix II: Major Projects PROJECT
REF NO:
PROJECT/CLIENT MAIN
CONTRACTOR TYPE OF CONTRACT DURATION
PC-001
Medical
Research
Institute of Sri
Lanka, Colombo
08
Taisei Oncho
Co Ltd, Japan.
Air-conditioning Installation
Installation of multi-type package air-
conditioners,
Cu pipes, drain pipes, etc.
Fabrication and installation of G.I. and stainless
steel ducts
Insulation of ducts.
Power supply and automatic control systems
for the
Air-conditioning installation.
December,
1989 - April,
1990
PC-002
Plant Genetic
Research Centre,
Department of
Agriculture,
Kandy
Taisei Oncho
Co Ltd, Japan.
Maintenance Contract
Air-conditioning installation, cold rooms and allied
facilities.
Fresh water supply and drainage systems
December,
1989 - April,
1990
PC-003
Tropical Findings
(Pvt) Ltd, Ring
Road 1, EPZ,
Katunayake
Dinu
Construction
Co (Pvt) Ltd
Mechanical & Electrical Installation & Steel Roof
Compilation of electrical & mechanical design for
the project.
Supply and Installation main feeder cables, main
distribution.
board, sub-distributions boards, capacitor bank,
cable trays, etc.
Laying of conduits and cables, installation of
luminaries.
Supply and installation of water-cooled central
air-conditioning system and GI steel ducting.
Supply and installation fresh water supply and
drainage system.
Fabrication and installation of steel-structured
roof.
June, 1990 -
February,
1991.
PC-004
Italian
Restaurant,
Colombo Hilton,
Colombo 01.
Dinu
Construction
Co (Pvt) Ltd
Mechanical & Electrical Installation
Compilation of electrical & mechanical design.
Supply & installation of main distribution board
and
sub-distribution boards.
Laying of Conduits and cables and installation of
lighting fittings.
Providing and installing fresh water supply and
drainage systems.
Providing and installing LP gas supply for kitchen.
December,
1990 - April,
1991
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 26 of 37
Installation, wiring, testing and commissioning of
kitchen equipment
PC-005
Head Office
Project of The
Water Supply &
Drainage
Board, Male,
Republic of
Maldives.
Mitsui
Construction
Co Ltd / Dinu
Construction
Co (Pvt) Ltd
Mechanical & Electrical Installation
Fabrication & Installation of Aluminium Doors,
Windows and Steel-Structured Roof
Compilation of electrical and mechanical design
for the project
Fabrication, supply and installation of main and
sub distribution boards.
Laying of Conduits and cables, design, fabrication,
supply and
installation of luminaries; supply and installation
of power outlets.
Testing and commissioning fresh water supply and
drainage systems.
Installation of water pumps and sanitary fittings.
Fabrication and Installation of aluminium doors
and windows.
Fabrication and installation of steel-structured
roof.
February,
1991 -
October,
1991
PC-006
Port of Colombo
Expansion
Project, Sri
Lanka Ports
Authority
Penta Ocean
/ Wakachiku
JV, Japan.
Temporary Works
Laying of cables and installation of electrical
power panels.
Provision of electrical supply for site works
Laying of conduits and cables and installation of
office equipment.
November,
1991 -
January,
1992
PC-007
Port of Colombo
Expansion
Project (Stage
111)
Access Road
Project -
Colombo Port
Penta Ocean
/ Wakachiku
JV, Japan
Mechanical & Electrical Installation
1. Access Road (2 KM)
Installation of main feeder cables and power
distribution
Erecting lamp posts, connecting power cables and
fixing
lamps.
2. Building (Gate & Facility)
Laying of conduits, cables and installing light
fittings.
Installation of substation panels and distribution
board.
Installation of 25 kW generator and the automatic
control
panels.
Water supply and drainage systems comprising:
Cast iron pipes, steel pipes, PVC pipes, FRP water
tanks, septic tanks, and the sanitary fittings.
January,
1992 -
September,
1993
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 27 of 37
PC-008
Port of Colombo
Extension
Project (1)
Jaya Container
Terminal Stage
(111)
Pettah & Patent
Slip-way
Sumitomo
Densetsu Co
Ltd, Japan.
Electrical Works
Electrical works including laying of conduits and
cables.
fixing light fittings, installation of main and sub-
panels, main
feeder cables (up to 240 sq.mm 4 core).
Installation of Hi-Bay lamps on slip-way roof (at 20
m height)
Installation of power and control panels for
mechanical systems
and lighting systems.
Installation of electrical system for workshop and
chemical
proof conduit system for battery room.
January,
1992 - July,
1993
PC-009
Port of Colombo
Extension
Project (1)
Jaya Container
Terminal Stage
(111)
Sumitomo
Densetsu Co
Ltd, Japan.
Electrical Installation
(25 Acre Container Yard)
Laying of conduits and LT & HT cables (11kV and
3.3kV) and lighting
tower, reefer outlets, fire hydrant control system
and wharf lights
11kV main power supply and power supply for
3.3kV gantry crane.
Installation of outdoor power panels, fire hydrant
panels and
telephone distribution boards.
Installation of sub-stations, power control panels
and
11kV / 3.3kV and 3.3kV / 440V step-down
transformers and panels.
Panel connections and cable joints (LT & HT)
Erecting lighting tower at height of 30 m, laying of
cables and fixing
lights (20 Nos. 1000 W lamps per tower)
Erecting reefer structure and installation of reefer
outlets and cable
connections.
Installation of 2000kW diesel generator including
oil tanks, allied pipe works and water cooling
systems.
Providing electrical system for the Administration
Building and
and the Cargo Facility Building.
Assembly of automatic water sprinkler system and
fire hydrant
system, testing and commissioning.
January,
1993 - July,
1994.
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 28 of 37
PC-010
Head Office
Buildings,
Ministry of
Foreign Affairs,
Male, Republic
of Maldives.
Mitsui
Construction
Co Ltd/Dinu
Construction.
Mechanical & Electrical Installation
Aluminium Works.
Compilation of electrical and mechanical design
for the project.
Fabrication, supply and installation of main and
sub distribution
boards
Laying of Conduits and cables, design, fabrication
supply and
installation of luminaries; supply and installation
of power outlets.
Fresh water supply and drainage systems.
Installation of water pumps and sanitary fittings.
Fabrication, supply and Installation of aluminium
doors/windows.
November,
1993 -
May, 1994
PC-011
Sri Lanka Radio
Tower
(Greater
Colombo
Telecommunicat
ion Network
Project)
Transfield
Construction
Pty, Australia
/
Sumitomo
Densetsu Co
Ltd, Japan.
Radio Transmission System
Construction of concrete foundations, assembly
and erection
of self-supporting steel towers (05 nos. at
maximum height of 165 ft)
Installation OB light and earth systems.
July, 1994 -
December,
1995
PC-012
Port of Colombo
Expansion
Project
Jaya Container
Terminals Stage
(1V)
Sumitomo
Densetsu Co
Ltd, Japan.
Electrical Installation & Steel Structure
For Container Yard
Laying of conduits and cables for reefer outlet
power panels
reefer container outlets, lighting towers, wharf
lights,
fire hydrant control systems, telephone systems,
gantry cranes (3.3kV HT cables) and main power
supply.
Installation of outdoor reefer outlet power panels,
lighting
panels and fire hydrant control panels.
Installation of substation, HT & LT. panels,
11KV/3.3KV
3.3KV/440V step down transformers, UPS and
control panels.
LT & HT cable joints & connections.
January,
1995 - April,
1996
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 29 of 37
Erection reefer outlet steel structures & fixing
reefer outlets.
Installation of two numbers 2000kW Diesel
Generators.
Installation of water cooling system.
Electrical installation for buildings.
Installation, testing and commissioning of
equipment.
Comprehensive electrical system for pilot station
(rehabilitation work)
PC-013
Equipment
Training Centre,
Battaramulla
Maruma
Corporation,
Japan.
Installation of Heavy Equipment
Installation of heavy equipment in the workshop
January,
1996 -
March, 1996
PC-014
Port of Colombo
Extension
Project (111)
Oil Terminal &
Pipe Line Project
Sumitomo
Densetsu Co
Ltd, Japan.
Electrical Installation
Laying 3.3KV VCB Incoming switchgear,
11KV/3.3KV
Step down transformers.
Comprehensive electrical system for Break Water
Building.
Installation of lamp posts on break water.
Explosion - proof Conduit system for oil patch.
February,
1996 -
December,
1996
PC-015 Crescat
Development
Project
Shin Nippon
Air-
Technologies
Co Ltd.
Hot & Cold Fresh Water System
24-story high-rise apartment tower
Hot and Cold fresh water system and drainage
system for all
toilets
February,
1997 -
December,
1997
PC-016 Nurses Training
Centre - Sri
Jayawardanapur
a General
Hospital
Sumitomo
Densetsu Co
Ltd, Japan.
Electrical installation
Electrical Installation for the academy, hostel and
dining areas
March,
1988. - Dec.
1999.
PC-017 Jung Yoon
Textiles (Pvt) Ltd
- Biyagama
- None,
Direct Award
-
Electrical Installation for Textile Factory
Compilation of the electrical design for the
project.
Electrical installation and machinery wiring for the
factory comprising:
Supply and installation of main feeder cables,
1600 A main distribution
board, sub-distribution boards, cable trays,
overhead trunking, luminaries, power outlets,
fans, etc.
March,
1998. - Sep.
1998
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 30 of 37
supply and installation of parameter and exterior
illumination system.
PC-018 Oasis Trading
(Pvt) Ltd -
Ratmalana
- None,
Direct Award
-
Electrical Installation for Garments Factory
Electrical installation and machinery wiring for
factory extension
Supply and installation of main feeder cables, 400
A main distribution
board, sub distribution boards, luminaries,
trunking, power outlets, fans, etc
March, 1988
- June, 1998.
PC-019 Port of Colombo
Extension
Project (1)
Jaya Container
Terminal Stage
(VI)
NEW NORTH
PIER (URGENT
PLAN) PROJECT
Sumitomo
Densetsu Co
Ltd, Japan.
Electrical and Mechanical Installation
Laying of conduits and LT cables for lighting
tower, fire hydrant control system.
Installation of outdoor power panels, fire hydrant
panels and
telephone distribution boards.
Installation of sub-stations, power control panels
Panel connections and cable joints (LT )
Erecting lighting tower at height of 17 m, laying of
cables and fixing lights
July, 1998 -
December,
1998.
PC-020 Sigiriya Village Dinu
Construction
Co (Pvt) Ltd
Electrical & Air-conditioning Installation
20 Chalets at the Sigiriya Village
Supply and installation of main distribution
boards, sub distribution
boards, luminaries and power control and outlet
points of the chalets.
Air-conditioning installation., Hot and cold fresh
water system and drainage system for all chalets.
March,
1995. -
December,
1995
PC-021 Port of Colombo
Extension
Project (111)
Jaya Container
Terminal Stage
(1V)
EMPTY
CONTAINER
YARD PROJECT
Sumitomo
Densetsu Co
Ltd, Japan.
Electrical Installation
Laying of conduits and LT & HT cables (11kV and
3.3kV) and lighting
tower, fire hydrant control system.
11kV main power supply and power supply for
3.3kV gantry crane.
Installation of outdoor power panels, fire hydrant
panels and
telephone distribution boards.
Installation of sub-stations, power control panels
and
11kV / 3.3kV and 3.3kV / 440V step-down
transformers and panels.
Panel connections and cable joints (LT & HT)
Erecting lighting tower at height of 30 m, laying of
cables and fixing
lights (20 Nos. 1000 W lamps per tower)
Installation of 2000kW diesel generator 2 Nos
including
May, 1998 -
April, 1999.
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 31 of 37
oil tanks, allied pipe works and water cooling
systems.
PC-022 SRI LANKA LPG
TERMINAL
PROJECT
SHELL TERMINAL
LANKA (PVT.)
LIMITED.
Stork
Engineers &
Contractors
B.V. -
Netherlands
Electrical and Instrumentation Installation
Laying of conduits, Cable trey LT cables and
Parameter lighting system
fire hydrant control system.
Main power supply from Generator .
Installation & Commissioning LPG metering
package, LPG compress
package gas oil dispenser, containerise control
room, LPG loading
package and weigh bridge, telephone distribution
boards.
Installation of sub-stations, power control panels
and
Panel connections and cable joints (LT )
Installation of diesel generator 2 Nos
Calibration and install instrument
July, 1999 -
Dec, 1999.
PC-023 BASE LINE ROAD
IMPROVEMENT
& EXTENSION
PROJECT
SRI LANKA ROAD
DEVELOPMENT
AUTHORITY
Shin Nippon
Air
Technologies
Co, Ltd.
Electrical Installation - Street Lighting
Laying of Cables and Street lighting system
Main power supply from C.E.B.
Erection of lighting poles
Installation of sub power control panels
Feb. 1999 -
March 2000
PC-024 REDEVELOPMEN
T OF QUEEN
ELIZABETH
QUAY
COLOMBO PORT
- SOUTH ASIA
GATE WAY
TERMINALS
Hyundai
Engineering
and
Construction
Co.Ltd
Electrical Installation -
Laying of conduits and cables for reefer outlet
power panels
reefer container outlets, lighting towers(40M),
wharf lights,
fire hydrant control systems, telephone systems,
gantry cranes (3.3kV HT cables) and main power
supply(11kV).
Installation of outdoor reefer outlet power panels,
lighting
panels and fire hydrant control panels.
Installation of sub station, HT & LT. panels,
11KV/3.3KV
3.3KV/440V step down transformers, UPS and
control panels.
LT & HT cable joints & connections.
Erection reefer outlet steel structures & fixing
reefer outlets.
Jan. 2000 -
March 2002
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 32 of 37
Installation of three numbers 300kW Diesel
Generators.
Electrical installation for buildings.
Installation, testing and commissioning of
equipment.
Catodic protection system
PC-025 PROPOSED
OFFICE
DEVELOPMENT
FOR SITHMA
(PVT) LTD
479, T.B.JAYA
MAWATHA,
COLOMBO – 10
SHIN NIPPON
AIR
TECHNOLOGI
ES CO. LTD.
Electrical Installation -
Laying of conduits and cables for all power
systems and data
Floor trunking, Lighting and BMS ,bus bar systems
earthling lighting fixtures
Nev 2001 to
Dec 2002
PC-026 IMPROVEMENT
OF RATNAPURA
GENERAL
HOSPITAL
RATNAPURA
SUMITOMO
DENSETSU
CO. LTD
Electrical Installation -
Laying of conduits and cables for all power
systems and data
Floor trunking bus bar systems earthling lighting
fixtures
Emergence power supply system, telephone
system, fire control system
computer wiring system,
July 2001 to
Jan 2003
PC-027 FISHERIES
TRAINING
CENTRE
PROJECT -
TANGALLA
SANKEN
LANKA CO.
LTD.
Mechanical Works
Plumbing and Air condition works
Aug .2000 to
Match 2002
PC-028 Port of Colombo
Extension
Project (111)
NNP PROJECT
Sumitomo
Densetsu Co
Ltd, Japan.
Electrical Installation
Laying of conduits and LT & HT cables (11kV and
3.3kV) and lighting
tower, fire hydrant control system.
11kV main power supply and power supply for
3.3kV gantry crane.
Installation of outdoor power panels, fire hydrant
panels and telephone distribution boards.
Installation of sub-stations, power control panels
and
11kV / 3.3kV and 3.3kV / 440V step-down
transformers and panels.
Panel connections and cable joints (LT & HT)
Erecting lighting tower at height of 30 m, laying of
cables and fixing
lights (20 Nos. 1000 W lamps per tower)
Installation of 2000kW diesel generator including
oil tanks, allied pipe works and water cooling
FEB. 2001
TO DEC.
2002
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 33 of 37
systems.
PC-029 PROPOSED
BANDARANAYAK
E
INTERNATIONAL
AIRPORT
DEVELOPMENT
PROJECT
KATUNAYAKE
SHIN NIPPON
AIR
TECHNOLOGI
ES CO. LTD.
Electrical Installation
Laying of GI conduits and cables for all power
systems and data
Floor trunking, earthling, lighting fixtures
emergence power supply system, telephone
system, fire control system
computer wiring system, BMS System
JAN.2004 TO
NOV. 2005
PC-030 AUSTRALIAN
HIGH
COMMISSION
AND CHANCERY
BUILDING
PROJECT
SHIN NIPPON
AIR
TECHNOLOGI
ES CO. LTD.
Electrical Installation
Main Feeder and Power outlets, Lighting system,
Fire Alarm system,
CCTV system, EAC system, Communication & data
system, Lightning
Protection system, Generator system, BMS
system, Q-mastic system
computer wiring system,
SEP. 2004
TO MARCH
2006
PC-031 NATIONAL
BLOOD
TRANSFUSION
SERVICES
IMPROVEMENT
PROJECT
SHIN NIPPON
AIR
TECHNOLOGI
ES CO. LTD.
Electrical Installation
Main Feeder and Power outlets, Lighting system,
Fire Alarm system,
CCTV system, EAC system, Communication & data
system, Lightning
Protection system, Generator system, BMS
system, Q-mastic system
computer wiring system,
JUNE. 2005
TO MAY
2006
PC-032 PROPOSED
MONACH
TOWER PROJECT
- 30-Story
Apartment
Tower
COLOMBO 03
APP
ENGINEERIN
G (PVT) LTD
Electrical and Mechanical Installation -
Laying of conduits and cables for all power
systems and data
Trunking systems earthling lighting fixtures
1. CCTV System, 2. Audio Video Intercom system,
3. MATV system
4. Card Access System, 5. Fire Alarm system. 6.
Lightening Protection system
Hot & Cold Fresh Water System
30-story high-rise apartment tower
Hot and Cold fresh water system and drainage
system
Fire Protection System
Sprinkler system, Wet raiser, Hose real System
JAN. 2005
TO MARCH
2008
PC-033 PROPOSED
BRITISH HIGH
COMMISSION
PROJECT
COLOMBO -07
GIBS I
INTERNATIO
NAL - UK
Electrical Installation
Laying of conduits and cables for all power
systems and data
Trunking systems earthling lighting fixtures
1. CCTV System, 2. Audio Video Intercom system,
3. MATV system
MAY 2007
TO MAY
2008
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 34 of 37
4. Card Access System, 5. Fire Alarm system. 6.
Lightening Protection system
PC-034 PROPOSED
ADMINISTRATIV
E COMPLEX
PROJECT -
HAMBANTOTA
KEYANEAM
CONSTRUCTI
ON CO LTD -
KOREA
Electrical and Mechanical Installation –
Laying of conduits and cables for all power
systems and data
Trunking systems earthling lighting fixtures
1. CCTV System, 2. Audio Video Intercom system,
3. Fire Alarm system.
4. Lightening Protection system
Hot & Cold Fresh Water System
Hot and Cold fresh water system and drainage
system
Fire Protection System
Wet raiser, Hose real System
JUNE. 2007
TO MARCH
2010
PC-035 PROPOSED
CHAYA CORAL
HOTEL PROJECT
-
HIKKADUWA
DIMO LANKA
PVT. LTD.
Electrical Installation -
Laying of conduits and cables for all power
systems and data
Trunking systems earthling lighting fixtures
1. Fire Alarm system.
JANUARY.
2011 TO
SEPTEMBER
2011
PC-036 PROPOSED
CHAYA BAY
HOTEL PROJECT
-
BERUWELA
DIMO LANKA
PVT. LTD.
Electrical Installation -
Laying of conduits and cables for all power
systems and data
Trunking systems earthling lighting fixtures
1. Fire Alarm system.
Fire Protection System
Wet raiser, Hose real System
AUGUST
2011 TO
DATE
PC-037 Port of Colombo
Expansion
Project
(Southern Port)
Hyundai
Engineering
and
Construction
Co.Ltd
Electrical and Mechanical Installation
Laying of conduits and LT & HT cables (11kV and
3.3kV) and lighting
tower, fire hydrant control system.
11kV main power supply and power supply.
Installation of outdoor power panels, fire hydrant
panels and
telephone distribution boards.
Installation of sub-station equipment, power
control panels and
11kV / 440V step-down transformers and panels.
Panel connections and cable joints (LT & HT)
Erecting lighting tower at height of 30 m, laying of
cables and fixing
lights (20 Nos. 1000 W lamps per tower), Road
Lighting System
and Building Electricals installation
Mechanical Works
Installation of Main Water Supply system (Approx.
3 Kilometers)
Installation of Drainage System (Approx. 2
JANUARY
2011 TO
DATE
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 35 of 37
Kilometers) and Treatment Plant
Pump House & Pump Station
Building Plumbing installation
Fire Protection System
Main Fire Hydrant System for Container Yard &
Fire Pump House,
Building Fire Protection System
Central Air Conditioning System
Supply & Installation of Sea Water Cooled Chiller
A/C System
In Pilot Station & Crew Accommodation.
PC-038
Lavanga Resort
& Spa (Hotel
Project)
Anudan
Holdings Pvt.
Ltd.
Electrical and Mechanical Installation
Total Electrical System, Fire detection control
system,
MATV/CCTV/PABX System,
Mechanical Works
Installation of Main Water Supply system
Installation of Drainage System Pump House &
Pump Station
Building Plumbing installation
Swimming Pool Installation
AirConditioning Works
Fire Protection System
Main Fire Hydrant System & Fire Pump House,
Building Fire Protection System
MARCH
2012 TO
JUNE 2013
PC-039 UTMT Resort
Hotel Project
Dickwella
UTMT
Resorts Pvt.
Ltd.
Electrical and Mechanical Installation
Total Electrical System, Fire detection control
system,
MATV/CCTV/PABX System.
Mechanical Works
Installation of Main Water Supply system
Installation of Drainage System Pump House &
Pump Station
Building Plumbing installation
Fire Protection System
Fire Hydrant System & Fire Pump House,
Building Fire Protection System
NOVEMBER
2011- 2014
PC-040 Neelakudah
Hotel (Hotel
Project)
Salasi Lanka
Pvt. Ltd.
External Electrical Installation
Total External Electrical System
MARCH
2013 - 2014
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 36 of 37
PC-041
ANIE VILLA
Resort Hotel
Project
Dickwella
UTMT
Resorts Pvt.
Ltd.
Electrical and Mechanical Installation
Total Electrical System, Fire detection control
system,
MATV/CCTV/PABX System.
Mechanical Works
Installation of Main Water Supply system
Installation of Drainage System Pump House &
Pump Station
Building Plumbing installation
Fire Protection System
Fire Hydrant System & Fire Pump House,
Building Fire Protection System
NOVEMBER
2013 TO
NOVEMBER
2015
PC-042 SHANGRI LA
HOTEL PROJECT
Hotel Project
Hambantota
APP
Engineering
Pvt Ltd.
Electrical and Mechanical Installation
Total Electrical System, Fire detection control
system,
MATV/CCTV/PABX System.
Mechanical Works
Installation of Main Water Supply system
Installation of Drainage System Pump House &
Pump Station
Building Plumbing installation
Fire Protection System
Fire Hydrant System & Fire Pump House,
Building Fire Protection System
FEBRUARY
2014 to
JUNE 2016
PC-043 Construction of
Enginer’s Office
at Waterfront
Intergrated
Resort Project,
Slave Island,
Colombo - 02
Hyundai-
Keangnam-
Nawaloka JV
Construction of Two storied Pre-Fabricated Steel
Building including all relevant MEP works
(Electrical, FIRE, AC & Plumbing Etc.,)
OCT 2014 to
JUN 2015
PC-044 Port of Colombo
Container
Terminal (East
Port)
Hyundai
Engineering
and
Construction
Co
.Ltd
Building And MEP Works
Sub Station, Water Tank, and Pump House
Construction
Electrical and Communication Man holes,
Electrical and Communication Duct Line
Container Yard Earting System
Building Electricals installation
Mechanical Works
JULY 2014
JUNE 2016
HI-TEC Engineering Works THE POWER OF MEP+CE
Page 37 of 37
Pump House & Pump Station
Building Plumbing installation
Fire Protection System
Main Fire Hydrant System for Container Yard &
Fire Pump House,
Building Fire Protection System.
PC-045 Construction of
2 Nos. Workers
Dormittories at
Norochcholay
Plant.
Access
Engineering
PLC
Plumbing works for two nos. dormitories
including water supply, drainage, waste &
sewerage and Bio cell Anaerobic Treatment
system.
DEC 2015 to
MAY 2016
PC-046 Construction of
New South Wing
Office for
NWSDB Head
Office
Link
Engineering
Ltd.
Fire Detection & Fire Protection
All Plumbing Related Works including the design
All Electrical Related Works including the design
JAN 2016 to
DATE
PC-047 Construction of
Haritha Villa
Project t
Thiranagama,
Hikkaduwa
Salasi Lanka
Pvt. Ltd
Building And MEP Works
Sub Station, Water Tank, and Pump House
Construction
Electrical and Communication Man holes,
Electrical and Communication Duct Line
Container Yard Earting System
Building Electricals installation
Mechanical Works
Pump House & Pump Station
Building Plumbing installation
Fire Protection System
Main Fire Hydrant System for Container Yard &
Fire Pump House,
Building Fire Protection System.
JULY 2015 to
DATE
…End…