Background
9104/1 Ballot Failure
• The Dec 2009 ballot draft failed in Americas and Asia Pacific and stopped in Europe
• 9104/1 Sub Team and OPMT conducted extensive debate on “Show Stopper” issues but failed to reach any consensus.
– Site definition
– Audit day calculation for multiple sites
Go Forward – IAQG Council Direction
• OPMT was directed to charter a focused team to conduct a non advocate review of the show stopper issues. Team shall be comprised of technical experts
– Team launch - May 2010
– Recommend a solution (June 23, 2010)
3
9104/1 Special Team
Ian Folland & Tim Lee – Facilitators
Team Members:
• Roger Bennett - International Independent Organization for Certification (IIOC) – IAF MD 1 Convener and IAF MD 5 Co-convener
• Reg Blake - Certification Body (CB) representing the Independent Association of Accredited Registrars (IAAR)
• Norbert Borzek - German AB - DAkkS – Chair of the IAF Technical Committee .
• Patrick Boucheron – Turbomeca, France, OPMT Voting Member
• Buddy Cressionnie - IAQG 9100 International Document Representative (IDR)
• Randy Dougherty – USA AB - ANAB Director – Chair of the IAF
• Michel Jacquaniello – Zodiac Aerospace, France
• Kunihiro Tanabe - Japanese AB - JAB
• Norikazu Tsuchiya – KHI, Japan, OPMT Voting Member
4
Team Recommendations
• The team developed a detailed document containing the following concepts:
– Definitions and eligibility criteria for single site, multiple site, campus, several site and complex organizations;
– Audit day calculations methodology for all organizational types;
– Information in the form of a matrix and diagrams to help understand the different types or organizations
9104-1 Recommendations
9104-1 Certification Matrix
5
Definitions
• The team recommended that the ICOP process utilizes as much of IAF Mandatory Document language as possible
• Definition:– Site - A site is a permanent location where an
organization carries out work or a service• Rationale:
– Allows for dual certification (ISO and AQMS)– IAF language has been tested and currently in
use by CB’s
• Used to resolve the show stopper issue related to Site definition
6
Organizational Structure
• Team has developed detailed definitions and eligibility criteria for the following organizational structures
– Single Site
– Multiple Site
– Campus
– Several Sites
– Complex
• The above takes into consideration the unique organizational structures that exist in the Aviation, Space and Defense industry today
7
Example A - Campus
Must have a common quality management system
8
Example B - Several Sites
Must have a common quality management system
9
Audit Day Requirements
• Utilize audit day table contained in 9104-1 December 2009 draft.
• Audit Day Calculations
– Single Site – Number of employees – Reductions for ASRP and CAAT only
– Multiple Site – Number of employees at each site. Reductions for ASRP and CAAT only
– Campus – Total number of employees across all sites. No further reductions. 10% addition for auditing aspects of a campus and additional communication by audit team
– Several Sites - Number of employees at each site. Maximum of 30% reduction for reduced scope complexity at each site
– Complex – Combination of all the above. Audit time calculation will require approval by OPMT Sub Team
• Use of Advanced Surveillance Reassessment Procedures (ASRP) and Computer Aided Auditing Techniques (CAAT) should be allowed (maximum 30% reduction)
• ASRP shall not in itself be used to justify a reduction
10
Certification Matrix
• Detailed matrix was developed to provide clarification
11
Next Steps
• Deliver special team recommendations to 9104/1 team (July 1, 2010)
– Request incorporation of special teams recommendations into updated 9104/1 draft
• 9104/1 Sub team to continue with development process
– Disposition of all 9104/1 comments
– Ballot updated document
12
Summary
• The Team has delivered a recommendation that was on time and on target
• Recommendation addresses key 9104/1 ballot failure issues - “Show Stoppers”
• IAF representatives agreed to take lesson learned from this effort to drive IAF Mandatory Document changes (e.g. IAF MD 5 – Audit Day Calculations)
• This should be an acceptable go forward proposal that provides for sufficient on site audit time needed for an “Effective” ICOP assessment
13
9104-1 Special Team