1 Funded by the European Union CLIC Project Meeting - May 7, 2019 A. Latina XLS CompactLight (XLS) Report Andrea Latina On behalf of the CompactLight collaboration XLS [email protected] www.CompactLight.eu

Upload: others

Post on 25-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

1

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

CompactLight (XLS) Report

Andrea Latina

On behalf of the CompactLight collaboration

[email protected] www.CompactLight.eu

Page 2: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

2

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

The New Facility, compared with Current Facilities, will benefit from:

i. A lower electron beam energy, due to the enhanced undulator performance.

ii. Being significantly more compact due to lower energy and X-band high-

gradient structures.

iii. Having a much lower electrical power demand than current facilities.

iv. Having much lower construction and running costs.

This will facilitate the widespread development of X-ray FEL Facilities across

Europe and beyond, by making their construction and operation costs more

affordable through an optimum combination of emerging and innovative

accelerator technologies.

Aims and Objectives of XLS

Page 3: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

3

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

Preliminary parameters and layout of XLS hard X-ray FEL facility, compared with other existing facilities

CompactLight Layout & Perforamance

LCLS SACLASwissFEL

(ARAMIS)

LCLS II

(HXR)

PAL XFEL

(HXR)

EU-XFEL

(HXR)

XLS

(HXR)

Min Photon Energy KeV 0.27 5.0 1.8 1.03 2.06 3.1 0.25

Wavelenght nm 4.59 0.25 0.69 1.20 0.60 0.40 4.96

Max Photon Energy KeV 12.4 15.5 12.4 25 20.6 25 25

Wavelenght Å 1.0 0.8 1.0 0.5 0.6 0.5 0.5

Max Pulse Energy mJ 6000 250 150 1000

Pulse Duration fs 2 - 100 20 - 30 20 0.1 - 50

Pulse/sec. Hz 120 60 100 120 60 27000 100 - 1000

Beam Energy GeV 15 8.5 5.8 15 10 17.5 TBD

12 <100

4.7

500

Page 4: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

4

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

Anticipated XLS performance compared with other existing facilities

CompactLight Performance

Page 5: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

5

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

Bring together technology advances in key accelerator systems for XFEL

WP2 – FEL Science requirements and Facility Design

WPs Structure

Page 6: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

6

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

Time plan, Milestones and Deliverables

PublicWEB site

Kick-offMeeting

Mid-TermProj. Rew.

Users Req.

AnnualMeeting

Page 7: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

7

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

Frascati, 5/3/2019

FEL Parameter Discussions

Two operating modes:1. 100 Hz Hard X-rays

2. 1 kHz Soft X-rays

UNIQUE PARAMETERS

COMPACT LOW COST

Face-2-Face Meeting at LNF-INFN

Page 8: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

8

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

Face-2-Face Meeting at LNF-INFN

Parameters for Hard Xray

Parameter Value Unit

Injector Energy 300 MeV

Bunch charge 75 pC

rms Emittance(projected) 0.2 mm.mrad

rms Bunch length 0.35 ps

peak current 60 A

BC1 energy 300 MeV

compression factor 10

Relative energy spread 0.50 %

final bunch length 35 fs

final peak current 600 A

Linac 1 Energy 1.5 GeV

BC2 Energy 1.5 GeV

compression factor 8.3

Peak current 5 kA

Linac2 Beam Energy 5.5 GeV

Final Energy spread 0.01 %

Emittance 0.25 mm.mrad

peak current 5 kA

Soft X-ray to be calculated for given gradients

Page 9: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

9

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

S-Band Acc3 GHz, N? Cell

15 MV/m

X-Band Lnz12 GHz, N? Cell

G MV/m

Undulatorlu ,K,

N? section

1S-Band gun

3 GHz, 1.6? Cell 100 MV?

BC1Chicane

X-Band Acc12 GHz, N? Cell

G MV/m

BC2Chicane

X-Band Acc12 GHz, N? Cell

G MV/m

2C-Band gun

6 GHz, 3.6? Cell 200 MV?

C-Band Acc6 GHz, N? Cell

G MV/m

X-Band Lnz12 GHz, N? Cell

G MV/m

BC1Chicane

X-Band Acc12 GHz, N? Cell

G MV/m

Undulatorlu ,K,

N? section

BC2Chicane

X-Band Acc12 GHz, N? Cell

G MV/m

3X-Band gun12 GHz, 5.6? Cell

300 MV?

BC1Dogleg

X-Band Acc12 GHz, N? Cell

G MV/m

Undulatorlu ,K,

N? section

BC2Chicane

X-Band Acc12 GHz, N? Cell

G MV/m

X-Band Acc12 GHz, N? Cell

G MV/m

4X-Band gun12 GHz, 5.6? Cell

300 MV?

BC1Chicane

X-Band Acc12 GHz, N? Cell

G MV/m

Undulatorlu ,K,

N? section

BC2Chicane

X-Band Acc12 GHz, N? Cell

G MV/m

X-Band Acc12 GHz, N? Cell

G MV/m

K-Band lnz36 GHz, N? Cell

G MV/m

WP3: Injectors

Report on comparative performance

studies of the different injector options

The CERN Hybrid S-band + X-band velocity

bunching, also included (M. Kelisani, S.

Doebert)

Page 10: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

10

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

WP4: RF Systems

Rep rate increase is limited by klystron inefficiency outside working point. Repetition rate can be increase

based on dedicated tubes, in substitution of or in addition to high peak power ones.

Powering schemes

Page 11: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

11

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

WP7: Global Integration

XLS on PBS & EDMS

Detailed cost model started

Page 12: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

12

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

WP1: Project Management

Incoming meeting in Helsinki

July 1-4

CompactLight Mid-term ReviewWith participation of Industrial partners:

• Klystron

• CPI, Toshiba (accepted) - Thales (invited)

• Modulators:

• Scandinova, Ampegon (accepted) - JEMA (invited)

• Industry session on Wednesday

An article about CompactLight will appear on “Platinum”, an international

magazine on European Entrepreneurship, Research & Innovation, Industry.

Page 13: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

13

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS

CompactLight Midterm Review

Page 14: CompactLight (XLS) Report · XLS CLIC Project Meeting - May 7, 2019 A. Latina The New Facility, compared with Current Facilities, will benefit from: i. A lower electron beam energy,

14

Funded by theEuropean Union

CLIC Project Meeting - May 7, 2019 A. LatinaXLS