compañía minera maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfmine...

117
Kinross Gold Corporation Kinross Gold Corporation January 10, 2006 January 10, 2006 Compañía Minera Maricunga Compañía Minera Maricunga

Upload: others

Post on 26-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Kinross Gold CorporationKinross Gold CorporationJanuary 10, 2006January 10, 2006

Compañía MineraMaricunga

Compañía MineraMaricunga

Page 2: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

UbicaciónUbicación

Page 3: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary
Page 4: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

• Up to-date we have 134 days, 822,000 accumulated hours, without lost time accidents.

• Safety training program is being completed with Corporate personnel

• Status and future training plan was reviewed with NOSA personnel.

• Mine Rescue training is in progress with “Bomberos de Chile”.

• Personnel training courses are progressing well; fire control, lock out, crusher operations

Safety UpdateSafety Update

Page 5: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Mine Reopening ProjectMine Reopening Project

• Electric Power Line US$20,500K

• Primary Screen US$9,000K

• Conveyors US$10,000K

• Operating Costs US$26,500K

• ADR Plant upgrade US$2,300K

• EPCM US$6,500K

• Indirect and Others US$6,100K

• Total US$134,000K

Page 6: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Production Update

• Commissioning started at the end of June, 2005

• Commercial Production started on October 1st, 2005

• 40,000 TPD were reached during November and December 2005

Page 7: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Operations Forecast (1)Operations Forecast (1)

2006f

Tonnes Crushed (millions tonnes) 14Au Grade (grams/tonne) 0.94Au Recovery 59%

Total Au Production '000 240-250

Mining Cost/tonne $0.96Milling Cost/Tonne $2.25

Capex (millions) $10-12

(1) Estimates and Forecasts from Kinross Corporate Life of Mine model

Page 8: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Pancho Project Proposal, BackgroundPancho Project Proposal, Background

• On December 2004 and January 2005 a condemnation drill hole program was performed and the results gave good indications that the ore body could be expanded.

• The 2003 drill program did not provide complete information on the metallurgical and geoemechanical parameters.

• When a $500 cone was floated on the ore body, it demonstrated that many areas are limited due to lack of information

Page 9: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

• Selective check holes to confirm model (manto vs vein?). • Exploration:

• NE Pancho target, follow up Yr 2004 hit• S. Verde (below waste dump) target, follow up Yr 2004

mineralization, (surface laminated veinlets look good) (this is near the Bema property boundary)

• Geotechnical drilling to confirm wall stability• Met. sample drilling with hydro cell testing to prove up

recoveries

2006 Pancho Progam2006 Pancho Progam

Page 10: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

DumpDumpDumpDumpDumpDumpDumpDumpDump

Verde PitVerde PitVerde PitVerde PitVerde PitVerde PitVerde PitVerde PitVerde Pit

Pancho PitPancho PitPancho PitPancho PitPancho PitPancho PitPancho PitPancho PitPancho Pit

Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco

New areaNew areaNew areaNew areaNew areaNew areaNew areaNew areaNew areaLeach PadLeach PadLeach PadLeach PadLeach PadLeach PadLeach PadLeach PadLeach Pad

6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N

468.

000

E46

8.00

0 E

468.

000

E46

8.00

0 E

468.

000

E46

8.00

0 E

468.

000

E46

8.00

0 E

468.

000

E

474.

000

E47

4.00

0 E

474.

000

E47

4.00

0 E

474.

000

E47

4.00

0 E

474.

000

E47

4.00

0 E

474.

000

E

6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N

kilometers10.50

REF04-6

REF04-7

REF04-9

REF04-8

REF04-8A

REF04-5

REF04-4

REF04-1

REF04-2

REF04-3

COMMDENATION DRILL HOLES REALIZED 2005

DumpDumpDumpDumpDumpDumpDumpDumpDump

Verde PitVerde PitVerde PitVerde PitVerde PitVerde PitVerde PitVerde PitVerde Pit

Pancho PitPancho PitPancho PitPancho PitPancho PitPancho PitPancho PitPancho PitPancho Pit

Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco Area Guanaco

New areaNew areaNew areaNew areaNew areaNew areaNew areaNew areaNew areaLeach PadLeach PadLeach PadLeach PadLeach PadLeach PadLeach PadLeach PadLeach Pad

6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N6.950.500 N

468.

000

E46

8.00

0 E

468.

000

E46

8.00

0 E

468.

000

E46

8.00

0 E

468.

000

E46

8.00

0 E

468.

000

E

474.

000

E47

4.00

0 E

474.

000

E47

4.00

0 E

474.

000

E47

4.00

0 E

474.

000

E47

4.00

0 E

474.

000

E

6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N6.955.000 N

kilometers10.50

REF04-6

REF04-7

REF04-9

REF04-8

REF04-8A

REF04-5

REF04-4

REF04-1

REF04-2

REF04-3

COMMDENATION DRILL HOLES REALIZED 2005

Page 11: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Refugio - LocationRefugio - Location

CMM Claims

Buffer Zone

Leach Pad

Process Plant

Verde West and East Mines

Pancho Deposit

Guanaco

Verde Volcanic andIntrusive Complex

Laguna Tuff

Refugio Volcanics(undivided)

MesozoicRocks

PanchoDiorite &Volcanics

1.02/1162

7

Guanaco TargetWest Field ReconnaissanceGrade (g/t Au) / Core Length (metres)

27

1.02/116

0 1 2kilometres

Page 12: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

PANCHO DEPOSIT PANCHO DEPOSIT ((ViewView toto NE NE usingusingwidthwidth eithereither sideside

equalequal toto 50 50 metersmeters))

PLAN VIEW

U$400 pitU$500 pit

Grade shell with gold > 0.9 g/t

Grade shell with gold > 1.5 g/t

Drill Holes

Missing drill holes zones

PANCHO DEPOSIT PANCHO DEPOSIT ((ViewView toto NE NE usingusingwidthwidth eithereither sideside

equalequal toto 50 50 metersmeters))

PLAN VIEW

U$400 pitU$500 pit

Grade shell with gold > 0.9 g/t

Grade shell with gold > 1.5 g/t

Drill Holes

Missing drill holes zones

U$350

Footprint

Diameterincrease

Grade shells only for displaying better grades inside the various pits, they are not cut off grades.

Page 13: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Section 6953900 N

Pit U$350

Pit U$500

Grade Shell with gold > 1.5 g/tGrade Shell with gold > 0.9 g/t

Missing drill holes zones

Pancho DepositPancho Deposit

Grade shells only for displaying better grades inside the various pits, they are not cut off grades.

Page 14: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Grade Shell with gold > 0.9 g/tGrade Shell with gold > 1.5 g/t

Pit U$350

Pit U$500

Drill Holes

Section 469500 E

Grade shells only for displaying better grades inside the various pits, they are not cut off grades.

Pancho DepositPancho Deposit

Page 15: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Pancho Pit U$350 Pancho Pit U$500Zone Class Kton G/T Oz Zone Class Kton G/T OzPancho - Oxide (0.33) Measured 19,744 0.75 476,821 Pancho - Oxide (0.33) Measured 22,492 0.73 527,894

Indicated 7,563 0.60 145,901 Indicated 13,540 0.57 248,140

Measured and indicated 27,338 0.71 622,722 Measured and indicated 36,033 0.67 776,034 Pancho - Mixed (0.36) Measured 17,828 0.82 470,019 Pancho - Mixed (0.36) Measured 22,375 0.79 568,295

Indicated 3,199 0.70 71,988 Indicated 8,164 0.64 167,990

Measured and indicated 21,027 0.80 542,006 Measured and indicated 30,539 0.75 736,285 Pancho - Sulphide (0.38) Measured 18,131 0.82 477,996 Pancho - Sulphide (0.38) Measured 49,388 0.72 1,143,257

Indicated 6,357 0.76 155,339 Indicated 53,360 0.65 1,115,122

Measured and indicated 24,488 0.80 633,336 Measured and indicated 102,748 0.68 2,258,379 Subtotal Measured 55,734 0.80 1,424,836 Subtotal Measured 94,255 0.74 2,239,446

Indicated 17,119 0.68 373,228 Indicated 75,065 0.63 1,531,253

Measured and indicated 72,853 0.77 1,798,064 Measured and indicated 169,320 0.69 3,770,698

Pancho – Increase of ResourcesPancho – Increase of Resources

Please note, these tables contain resources only, they are not reserves. The original slide given in the presentation was incorrectly labeledas proven and probable reserves (attached in the addendum).

Page 16: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary
Page 17: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary
Page 18: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary
Page 19: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary
Page 20: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary
Page 21: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Kinross Gold Corporation40 King Street West, 52nd Floor

Scotia PlazaToronto, ON M5H 3Y2

416-365-5123416-363-6622866-561-3636

[email protected]

KGC: NYSE (Common shares)K: TSX (Common shares)K.U: TSX (US dollar trading symbol)K.WT: TSX (Warrants expiring 05/12/07)

21

Page 22: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

MDO OVERVIEW

Page 23: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Manpower by Areas – Dec. 2005

Within the 440 workers there are 10 temporary workersAverage Age: 43 years – Average Seniority: 9.5 years

La Coipa, General Information

Work Areas Supervisors Staff Employees Total

Management 12 5 17

Human Resources 7 3 10

Adm. and Finance 18 2 20

Mine 31 12 148 191

Plant 30 10 162 202

Total 98 32 310 440

Page 24: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Location of Main Orebodies

Page 25: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Mine Layout • Operating Parámeters• Mining method : Openpit• Slope angle : 43° -50 • Bench height : 10 meter• Ramp width : 24 meter• Ramp slope : 10 %

LADERA FARELLON

FARELLON BAJO

COIPA NORTE

BRECHA NORTE

Can Can

Page 26: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Flow Sheet. La Coipa Plant

Page 27: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

TAILING DISPOSAL

Page 28: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Metal ProductionGold Equivalent Ounces

233

159

282

127

242

179

210

154

102

349

81

385

152

197

117

195

192

107

199

110

167

135

168

83

100

200

300

400

500

600

Au

Eq

. O

z (0

00

's)

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005

Au Oz Ag (Au Eq. Oz)

391 409421

364

451 466

350

298 309312302

252

233

159

282

127

242

179

210

154

102

349

81

385

152

197

117

195

192

107

199

110

167

135

168

83

100

200

300

400

500

600

Au

Eq

. O

z (0

00

's)

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005

Au Oz Ag (Au Eq. Oz)

391 409421

364

451 466

350

298 309

391 409421

364

451 466

350

298 309312302

312302

252

Page 29: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Cash and Total Unit Cost

161

240

163

238

197

272

216

281

166

255

168

251

208

273

204

289

224

298

209

284

231

291

312

379

150

200

250

300

350

400

US$

/ A

u Eq

Oun

ce

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005

Unit Cash Cost Unit Total Cost

Page 30: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Budget 2006Production Statistics

Tonnes Mined (000) 16.376 Tonnes Milled (000) * 5.799 Grade Au (g/t) 0,98 Grade Ag (g/t) 94,0 Recovery Au (%) 75,5 Recovery Ag (%) 69,0 Oz Au * 138.352 Oz Ag * 12.092.608 Oz Au Equivalent * 335.208 * 100% Production (Include Puren)

Page 31: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Budget 2006Cost Statistics

Property Cost (US$ 000) 72.622 Unit Cash Cost (US$/Oz) 288,45Unit Total Cost (US$/Oz) 365,22

Page 32: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

MDO Reserves-Resources 12/2004

RESERVES Tn MINERALOz.Au.Eq.

ORIGINAL RESERVES 3.72 65.58

MILLED MINERAL 4.18 61.7

REMAIN RESERVES 1.94 26.5

TOTAL RESERVES 6.12 88.2RESOURCES 3.25 54.71

Page 33: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

• Opportunities for improving and extending MDO’sbusiness is based on four pillars of the strategic plan:

Focus on operational excellence.

Exploration in MDO mine properties

Develop business with neighbors

Proactive environmental management and stakeholder involvement

SBP 2005 - Strategic Frame

Page 34: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Potential ResourcesExisting Orebodies Koz. Au equiv.

– Ladera Farellón 65– Chimberos 20– Puren Phase II 220– Puren Phase III 100– Ladera Farellón Sulphides (Au/Ag) 1.500

Total (Au – Ag) 1.905Copper Potential Resources

– Ladera Farellón Suphides Kt 320 (705MLb)

MDO Growth Potential

Page 35: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

DISTRICT EXPLORATION POTENTIAL

Page 36: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Mining Claims

Page 37: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Esperanza Map

TETERITA

Work doneGeological loggingSurface sampling: 145 Drilling 68 drill holes RC (8,888 m).

ResultadosSilver mineralization Silisified tuffs.

Geo-physics Exploration 4 CSAMT lines with 3,7 Km.

Page 38: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Teterita orebody

Please note: the information for Cuerpo Superior and Cuerpo Inferior is reversed.

Page 39: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

La Coipa Au Sulfide Ore

• Initial exploration of The Coipa ended when sulfides were reached

• During y-1995-96 • 5 deep Drilling (1,922 m, up to 488 m depth).

• In y-1997-98• 7 new DDH (3,232 m, up to 550 m of depth)

• Today a full program has been defined

Page 40: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

La Coipa Au Sulfide Ore

Page 41: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

La Coipa Au Sulfide Ore

Page 42: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

La Coipa Au Sulfide Ore

Page 43: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Budget is US$ 5.0 M for a 2.5 year program

Au Sulfide Ore Proposal

Geo-chemistry 20.000Geo- physics 400.000Drilling campaign 2.700.000Assays 270.000Measurement of deviations 200.000Metallurgical studies 260.000G & A 1.000.000Contingency 150.000

TOTAL 5.000.000

Page 44: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

Exploration Budget y-2006

3,4504,0007,450

3,4501,5505,000Sulphides Ladera Farellon

750750Torito

150150Esmeralda

100100Carachapampa

1,1001,100Esperanza

350350G & A

Cost KUS$Cost KUS$Cost KUS$

20072006TOTALPROJECT

3,4504,0007,450

3,4501,5505,000Sulphides Ladera Farellon

750750Torito

150150Esmeralda

100100Carachapampa

1,1001,100Esperanza

350350G & A

Cost KUS$Cost KUS$Cost KUS$

20072006TOTALPROJECT

Page 45: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

January 2006

• MDO has an experienced team to operate in this working environment

• District has potential for new resource findings• Puren & Ladera-Farellon may add value to our

business for a number of years• MDO operating facility is a key asset to process

satellite deposits from neighbor concessions

Summary

Page 46: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Kinross Gold CorporationKinross Gold CorporationJanuary 12, 2006January 12, 2006

Resources and Reserves Geology and Mine Planning Department

Rio Paracatu Mineração S/A

Resources and Reserves Geology and Mine Planning Department

Rio Paracatu Mineração S/A

Page 47: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

LocationLocation

Page 48: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Regional geologyRegional geology

Town ofParacatu

$400 Scoping Pit Crest

ParacatuProperty

295,000E 300,000E

8,100,000N

0 1 2kilometres

road

8,105,000N

8,095,000N

Post mineralization faulting

Vazante Formation

Finely laminated carbonaceous pelites and quartzites

Paracatu Formation

Morro do Ouro Sequence

FazendaLavras Metasiltstones and quartzites

TailingsPond

TailingsDam

river

Geological Legend

Serra do Landim Sequence,

Foliated pelites 1%py, rare quartz boudins

Arkose and laminated metasiltstones

Serra da Anta Sequence

Serra da Lapa Sequence

Meta-arenites and argillaceous siltstonesRecifal Sequence

Reef dolomites

Thrust Fault

Carbonaceous pelites and arenites - foliated, quartz boudins,sulfides, and Au

Calcareous phyllites

Page 49: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Local geologyLocal geology

C Horizon

T Horizon

High Strain Zone

B1 Horizon

B2 Horizon

Page 50: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Local geologyLocal geology

KTS $400 Pit Limit

open west

Saprolite

Paracatu Formation

Trace Aspy 0.10 to 0.20 g/tB2 ( 0.2 to 0.4 g/t )B2 ( > 0.4 g/t )

600m Elev.

400m Elev. 0 100 200

metres

Surface800m Elev. 0.48g/t Au / 141m

K-605 K-405 K-205K-805 K105

WCR-1.54.5

Rico Creek

Sulfide leached

0.41g/t Au / 147m

0.58g/t Au / 70m

0.67g/t Au / 85m0.67g/t Au / 75m

0.52g/t Au / 127m

0.53g/t Au / 128m

0.71g/t Au / 88m

0.57g/t Au / 152m

0.55g/t Au /124m

Page 51: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Local geologyLocal geology

Page 52: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Local geologyLocal geology

B1

B2

Page 53: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Data up 2004Data up 2004

• up to 2003• 1,029 holes (different kinds of geological research)• 30,000 m of data

• drilling campaign 2004• 63 holes• 2,539 m of mineralized zone

Page 54: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

• Total meters• 267 drill holes 48,660.27 m

• Total drilling on the mineralized zone• Approximately 30,000

• Total drilling on the waste• Approximately 18,600

Exploration 2005Exploration 2005

Page 55: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Exploration 2005Exploration 2005

Geological samples

3,435 4,223 5,2367,762 8,190 8,898 9,575 10,320

13,402

16,90319,068 20,170

22,791 22,791

29,767 29,76732,297

46,248

62,297

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

1985 1986 1988 1990 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005(1) 2005(2)

Year

Num

ber

of s

ampl

es

Page 56: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Exploration 2005Exploration 2005

Page 57: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Expansion areaExpansion area

Highway

Rico Creek

Pond C

Page 58: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Exploration 2005Exploration 2005K-410

0-8 m 35-43 m 111-117 m 242-250 m

Page 59: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Exploration 2005Exploration 2005Inpit drilling

West Rico Creek

Rico Creek

West Rico Creek

Page 60: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Exploration 2005Exploration 2005

Pads reclamation

Beside the highwayWest Rico Creek

24h shifts

Page 61: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Geological interpretationGeological interpretation• Hard boundaries (weathering domains)

• B1• B2

• Gold / Deformation / Boudins / ASPY• High deformation and boudin• Presence of ASPY

• Waste domains (weathering degrees)• A soil• A saprolite• A oxide• A rock

Page 62: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Reserves StatementReserves Statement

Page 63: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Grade modelingGrade modeling

• Gold• Arsenic• Sulphur• Work Index• Density

8500 9000 9500 10000 10500 11000 11500

10000

10500

11000

11500

12000

0

0.3

0.4

0.45

0.5

0.55

0.9

Page 64: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Ultimate pit designUltimate pit design

• Geotechnical criteria• Design criteria (bench height, ramps)

Page 65: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Ultimate pit designUltimate pit design

Page 66: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Geological modelGeological model

Page 67: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Reserves StatementReserves StatementGrade x Tonnage curve (Ultimate Pit US$400/oz)

0

100

200

300

400

500

600

700

800

900

1,000

1,100

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10

Cut off grade (g/t)

Tonn

age

(t 0

00,0

00)

0

0.2

0.4

0.6

0.8

1

1.2

1.4

Ave

rage

gra

de (g

/t)

946 Mt

0.44 g/t

Page 68: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Reserves statementReserves statement

Classification Price tonnes Grade Gold(US$/oz) (x 1,000) (Au g/t) (ounces)

Proven 400$ 807,341 0.44 11,212,000 Probable 400$ 139,633 0.46 2,068,000 Proven & Probable 400$ 946,974 0.44 13,280,000

Measured 450$ 110,837 0.43 1,530,000 Indicated 450$ 11,069 0.41 147,000 Measured and Indicated 450$ 121,906 0.43 1,677,000

Inferred 450$ 122,981 0.43

Page 69: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Reserves StatementReserves Statement

0.32 0.81 1.01 1.20 1.41 1.63 1.84 2.06 2.32 2.59 2.88 3.11 3.37 3.62 3.741.84 2.68 3.20

3.73 3.32 3.02 2.723.52 3.39 3.38 3.49 3.48

3.864.11

5.08 5.07

8.45

13.28

0.001.002.003.004.005.006.007.008.009.00

10.0011.0012.0013.0014.0015.0016.0017.0018.00

1985

1986

1988

1990

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005(1)

Years

Mill

ion

Onc

es o

f Gol

d

Cumulative Mined (M onces) Reserve Remaining (M onces)

Page 70: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Further developmentsFurther developments

• Block model dimensions (50m x 50m x 12 m)• Fleet size and mining method

• Cable shovel 35 m3 bucket/ 240 st trucks• Open pit drilling and blast design

Page 71: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Kinross Gold Corporation40 King Street West, 52nd Floor

Scotia PlazaToronto, ON M5H 3Y2

416-365-5123416-363-6622866-561-3636

[email protected]

KGC: NYSE (Common shares)K: TSX (Common shares)K.U: TSX (US dollar trading symbol)K.WT: TSX (Warrants expiring 05/12/07)

26

Thanks for your attention.

Thanks for your attention.

Page 72: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

RIO PARACATU MINERAÇÃO S.A.MORRO DO OURO

GOLD MINE

RIO PARACATU MINERARIO PARACATU MINERAÇÇÃO S.A.ÃO S.A.MORRO DO OUROMORRO DO OURO

GOLD MINEGOLD MINE

Page 73: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

LEGAL NOTICE

Certain statements set forth in this presentation constitute"forward looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995. Such statements involve risks, uncertainties andother factors that may cause the actual results, performance or achievements to differ from those expressed or implied by such forward looking statements. Such risks and uncertainties are described in periodic filings made by Kinross Gold Corporation with the U.S. Securities and Exchange Commission and Canadian provincial securities regulatory authorities.

All dollar amounts used throughout this presentation are expressed in US dollars, unless otherwise noted.

2

Page 74: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

SIMPLIFIED FLOWSHEET

Existing Plant 18 Mtpa

Water to Tailings Dam

Sulphide Tailingspond

Open Pit Mine18 Mtpa @ 0.44g/t

Blending Silos

Milling (JIGs in CL)

Flotation

Crushing Plant

Classification

Tailings Dam

HYD

RO

MET

ALL

UR

GY

Concentrate +/- 30,0 g/t

C.I.L.

Grinding

Dessorption

Electrowinning

200,000 oz Au/Year

Smelter

Cyanide Recovery

Cyanide

BEN

EFIC

IATI

ON

Page 75: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

MORRO DO OURO OPEN PIT MINE

Page 76: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

BENEFICIATION AND HYDROMETALLURGICAL PLANT

Page 77: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

TAILINGS DAM

Page 78: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

RESOURCES AND RESERVES as at October 31, 2005

Classification Price tonnes Grade Gold(US$/oz) (x 1,000) (Au g/t) (ounces)

Proven 400$ 807,341 0.44 11,212,000 Probable 400$ 139,633 0.46 2,068,000 Proven & Probable 400$ 946,974 0.44 13,280,000

Measured 450$ 110,837 0.43 1,530,000 Indicated 450$ 11,069 0.41 147,000 Measured and Indicated 450$ 121,906 0.43 1,677,000

Inferred 450$ 122,981 0.43

Resources reported exclusive of reserves

FEX 2.65 Brazilian R per US$

Page 79: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

ENVIRONMENT

Page 80: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

ENVIRONMENTAL POLICY

PolicyTo establish plans, programs and measures to eliminate or minimise such impact and to take proactive measures to protect the environment.

Instruments:

• Environmental Impact Evaluation• Environmental Control Plan

Monitoring• Internal Environmental Audit

Page 81: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

INDUSTRIAL SAFETY SYSTEMS

Page 82: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

RPM - Adopt the NOSA MBO SystemNOSA MBO System– Objectives : To Educate

To Train Management and workforceTo Motivate

– To Prevent Accidents and Occupational Diseases

Chapters– Premises and housekeeping– Mechanical, Electrical and Personal Safeguarding– Fire Prevention and Protection– Incident (accident) recording and investigation– Safety Organisation– Environment

DuPont auditing system

RPM Health and Safety Standards

INDUSTRIAL SAFETY SYSTEMS

Page 83: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

LOST TIME INJURY FREQUENCY RATE

6.09

2.59

0.81

0.33

0.34

0

0.22 0.

75

0.52

0.22 0.

21

0.43 0.62 0.54 0.

91

0.55

0.29

0.21

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

87 88 89 90 91 92 93 94 95 96 97 98 99 '00 '01 '02 '03 '04per 1,000,000 hours worked

Page 84: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

COMMUNITY RELATIONS

Page 85: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

COMMUNITY RELATIONS

Policy

RPM is committed to responsible participation in the affairs of the local community and maintains a good relationship with its neighbourhood, looking for mutual respect, active partnership and long term commitment.

• Actions / programmes• Permanent contacts with:

- City hall, city court, union, chamber of commerce,Religious institutions, environmental organisations, communities associations

• Press conferences• Visits and meetings with neighbours• Tree planting programme, seedlings donations • Visits - open doors programme• Community consultation programme – survey - meetings

Page 86: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

KEY COMMUNITY INVOLVEMENT

Income and Job Generation Programme

Economic and Social Development Agency

Further Education

My First Job

Partnership Seminar

Environmental Education

Page 87: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

PRODUCTION AND PRODUCTIVITY

Page 88: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Budget and Forecast Assumptions

2006 2007 2008 LOM

Exchange Rate - Reais/$US 2.3 2.65 2.65 2.65

Oil Prices $US/bbl 60 60 45 45

FORECAST ASSUMPTIONS

Page 89: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

2005E 2006F 2007F 2008F

Tonnes Milled (millions tonnes) 17 17 17 24Au Grade (grams/tonne) 0.4 0.4 0.4 0.4Au Recovery 78% 78% 78% 78%

Total Au Production '000 175 170 - 180 185 - 190 250 - 260

Mining Cost/tonne $0.75 $0.75 $0.65 $0.60Milling Cost/tonne $2.70 $1.75 $1.40 $1.30

Capex (millions) $26 $120-130 $170-180 $60-70

OPERATING FORECAST (1)

(1) Estimates and forecasts from Kinross Corporate Life of Mine model.

(2) Estimated milling costs per tonne for 2005 includes G&A, forecast for 2006, 2007, and 2008 do not. For 2006, 2007 and 2008 estimated G&A and taxes costs add approx. $1.00/tonne. Average life of mine cost (include all operating costs) is $2.94/tonne.

Page 90: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

APPENDIXAPPENDIXAPPENDIX

Page 91: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

AWARDS AND CERTIFICATESAWARDS AND CERTIFICATES

Company to win the first Minas Ecologia Award – 1995.

First Brazilian Gold Mine to achieve ISO 14001 - in 2000.

Member of Environmental NGO “Amda” – since 1992.

Achieved Child Friendly certificate by NGO ABRINQ - since 2002.

Rated as a “Great Place to Work” – Exame Magazine 2003 and 2004.

First Brazilian Gold Mine to achieve SA 8000 - in 2004.

Classified as one of the best companies for people management by ValorCarreira Magazine - in 2004.

4th Place – Valor Carreira Magazine: Ranking in the best companies for people management - 2005

2nd Place – ABRH with the Open Arms Project (RPM Project for people with special necessities

Classified as one of the best companies for people management by ValorCarreira Magazine - in 2005.

Page 92: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

GEOGRAPHICAL POSITIONGEOGRAPHICAL POSITION

SOUTH AMERICA

BRAZIL

MINAS GERAIS STATE

BRASÍLIA

PARACATU

Page 93: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

PARACATU REGION

Population

Total 75,200Urban Zone 63,000

Hospitals 2Colleges 4Elementary and High Schools 52Technical School 2

Economy

Minerals: Gold, Limestone, Zinc and Lead Agricultural products: Soy Bean, Corn, Beans, Fruits,Cotton Cattle Raising: Milk and Meat

MINAS GERAIS STATE

São M

arco

s Rive

r

Pobre Creek

São Pedro River

São Domingos River

PARACATU

Rico Creek

Para

catu

Rive

r

Page 94: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

MINE DEVELOPMENT HIGHLIGHTS

1980 - RTZ Mineração begins exploration for gold

1985 - RPM is registered as a gold mining company

1986 - RPM is granted the mining licence

1987 - Start up of operations - First bullion produced (December)

1992 - Start up of the Optimisation project

1996 - February - Start up of the mine fleet

1997 - June - Start up of the expansion project II

1997 - October - Start up of the B2 ore mining

1999 - September - Start up of the 5th Mill – Expansion Project II

2002 – SAG Mill Pilot Plant Testwork – Start up of Expansion Project III studies

Page 95: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Kinross Gold CorporationKinross Gold CorporationJanuary 12, 2006January 12, 2006

RPM EXPANSION PROJECT IIIRPM EXPANSION PROJECT III

Page 96: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

PROJECT IMPLEMENTATIONPROJECT IMPLEMENTATION

• FOLLOWING PMI® (Project Management Institute) GUIDELINES

• ONWER’S TEAM FULLY MOBILIZED

• EpCM CONTRACT ESTABLISHED WITH SNCL/MINERCONSULT CONSORTIUM

• CURRENTLY UNDERTAKING BASIC ENGINEERING

Page 97: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project ObjectivesProject Objectives

• Plant Capacity Increase from 18 to 32 Mtpa in 2008

• Plant Capacity Increase from 32 to 50 Mtpa from 2009 onwards

Page 98: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project ObjectivesProject Objectives

Life Of Mine Figures

Yearly Averages LOMTonnes processed x 000 18 > 32 > 50Au Production ozs 370,000

Operating Costs US$/tonne 2.94Total Cash Costs US$/oz 260

Page 99: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project ScopeProject Scope

• First Phase: • Comprises the installation of:

• New Mine Fleet

• In Pit Crusher

• Overland Conveyor

• Stockpile and Reclaiming Facility

• New Grinding Plant (one 38 x 22 ft SAG mill and one 40 x 24 ft ball mill)

• Flotation Capacity for Handling extra tonnage

• Hydromet Capacity for Handling extra tonnage

Page 100: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project ScopeProject Scope

• Second Phase: • Comprises the installation of:

• Another 40 x 24 ft ball mill

• Flotation Capacity for Handling extra tonnage

• Hydromet Capacity for Handling extra tonnage

• New Tailings Dam

Page 101: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project Scope (Process Flowsheet)Project Scope (Process Flowsheet)

Page 102: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project ScopeProject Scope

• Other On going Studies: • Alternative Methods for tailings disposal

• Ex.: Tailings cycloning

• Sulphuric Acid Plant• Treatment of Hydromet Tailings for generating acid• Reduction of Specific Pond Volumes

Page 103: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project Scope ManagementProject Scope Management

• Scope Control• Procedure defined in the Project Plan• Establishment of a Document Room for

document revision and approval by EpCM and Owner’s Team

• Management of Scope Change• Formal Procedure defined in the Project Plan• Existence of a Scope Change Committee for

approving any proposed change in scope

Page 104: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project ScheduleProject Schedule

• Main Milestones Phase 1: • Basic Engineering: 09/2005 to 03/2006• Feasibility Study Preparation and Approval: up

to 05/2006• Initiate Construction: 04/2006• Full Project Release: 06/2005• Detailed Engineering Complete: 12/2006• Practical Construction: 02/2008• Start Grinding Commissioning: 03/2008• Plant Start up: 04/2008

Page 105: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project ScheduleProject Schedule

• Main Milestones Phase 2: • Second Ball Mill Order: 10/2007• Second Ball Mill Manufacturing: up to 02/2008• Second Ball Mill Installation and

Commissioning: 12/2008• Plant Start up: 01/2009• New Tailings Dam Construction: from 04/2007

to 09/2008• New 500 kV Transmission Line Construction

(by Federal Government): 2007 and 2008

Page 106: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project Schedule ManagementProject Schedule Management

• Project is Schedule Driven

• S curves by disciplines are reviewed on weekly meetings with EpCM company

• Deviations (delays) are pointed out and discussed

• Action Plan for retrieving lost time are put forward

Page 107: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project CostProject Cost

• Total Capital Costs estimated to be $326 million*

• CAPEX Figures were estimated in the Plant Capacity Study (+/- 35 %) – July 2005

• Figures will be confirmed at the end of Basic Engineering – March 2006

• Feasibility Study will be re-run to confirm and recommend Expansion Level

* Total capital costs of $326 million relate to the two phase expansion from 18 to 32 to 50 million tpa. The breakdown is approx. 70% for Phase I and approx. 30% for Phase 2.

Page 108: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project Cost ManagementProject Cost Management

• EpCM systems are being set up (PM+)• RPM systems are being set up (Modcap and

SEC)• Cost will be tracked by Cost Centers • Cost Centers will be established for main Items

and Sub Items, following the Project WBS• Purchase Orders will be issued in accordance to

the budget amount in each Cost Centre• Extra budget items should be formally justified

prior to approval

Page 109: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project QA/QC ManagementProject QA/QC Management

• Quality Procedures embedded into the Project Plan

• Main Activities• Stakeholder Mapping and Needs Assessment• Quality Planning• Quality Control Procedures• Quality Guarantee Procedures

• Performance Testing

Page 110: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project Human ResourcesProject Human ResourcesOwner’s Team Organization Chart

OPCO EXCOKinross Americas

RPM Kinross Legal

Kinross Tech Services Kinross HSE

Kinross Finance Community Relations

COO CFO

Others Project Director

Frank Murray

Project Manager

Luis Albano Tondo

Engineering

Armando Onodera

Procurement

Hilario Centurion

Services (Planning/Cost

Control/Contract Adm)Leonardo Pereira

Construction Jose Mauro

Administration/HR Lilian Lima

HSEDurval Nogueira

Process/OpAnatalia Lara

Licensing CommitteeMining and Tailings

DamAntonio Landi

Page 111: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project Human ResourcesProject Human ResourcesAutonomy and Responsibility

• Authorization and Responsibility Matrix defined in the Project Plan, for each Owner’s team member

• Formal Procedures for Approval in place, following RPM standards tailored for the Project

Page 112: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project Communication PlanProject Communication Plan• Regular Meetings:

• Epcm/Owner’s Meeting – weekly• Owner’s Team – weekly• OPCO – fortnightly• TECHCO – every 3 months• RPM Management: monthly• Community: part of RPM Community Affairs Plan

• Reports:• Weekly Report to COO• Monthly Report from EpCM• Meeting Minutes

• Conference Call• Weekly with COO

Page 113: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project Risk ManagementProject Risk Management

• Methodology considered in the Project Plan• Activities involve:

• Risk Identification• Qualitative Analyses

• Probability and Severity Matrix• Risk Ranking

• Quantitative Analyses• Estimate Risk Impact on Project• Sensitivity Analysis and Monte Carlo Simulations

• Action Plan for responding to identified risks• Monitoring and Control of Identified Risks

• Identification of Opportunities

Page 114: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project AcquisitionsProject Acquisitions

• Following RPM formal standards, tailored for the Project.

• Bids with at least three Suppliers• EpCM company responsible for technical

specification development, bid technical analysis and recommendation and item expediting

• Owner’s team responsible for commercial analysis and final decision on the best technical-commercial option (cost-benefit analysis)

• Payments made by Owner’s team

Page 115: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project AcquisitionsProject Acquisitions

• So far, three main contracts are in place:

• EpCM contract

• SAG and Ball Mill from METSO

• SAG Gearless Drive from SIEMENS

• Total Committed to date: US$ 68.8 million

Page 116: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Project IntegrationProject Integration

• Project Plan incorporating all management areas previously described, following the PMI guidelines

• Plan is dynamic and will be adapted as the project evolves

• Provides a formal description of Project Procedures

• Will become a standard within the Kinross Gold Corporation

Page 117: Compañía Minera Maricungas2.q4cdn.com/496390694/files/doc_presentations/2006/binder1.pdfMine Reopening ProjectMine Reopening Project • Electric Power Line US$20,500K • Primary

Kinross Gold Corporation40 King Street West, 52nd Floor

Scotia PlazaToronto, ON M5H 3Y2

416-365-5123416-363-6622866-561-3636

[email protected]

KGC: NYSE (Common shares)K: TSX (Common shares)K.U: TSX (US dollar trading symbol)K.WT: TSX (Warrants expiring 05/12/07)

23

THANK YOU