community wind pt#2 market niche

31
Hudson Valley Community Wind Share etothefourth.com 09/16/2009 1 Greening the Grid with Wind Part 2 Where is the community wind niche? 1 1 Wednesday, September 16, 2009

Upload: leo-wiegman

Post on 18-Nov-2014

1.128 views

Category:

Documents


0 download

DESCRIPTION

What does community wind need to ramp up big time? Too small for big utilities and too big for individuals, the community wind niche has enormous potential for generating electricity close to where we need it at lower costs per kilowatt-hour produced and transmitted.

TRANSCRIPT

Page 1: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009 1

Greening the Grid with Wind

Part 2 Where is the community wind niche?

1

1Wednesday, September 16, 2009

Page 2: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

US Wind Power is in its infancy. We can make it grow! Here is how.

2

2Wednesday, September 16, 2009

Page 3: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

What are the wind market niches?

3

3Wednesday, September 16, 2009

Page 4: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Different scales of turbines

20 m (66 ft)

50 m (164 ft)

80 m (262 ft)

typical cell tower

3 story home

Small scale wind

Community scale wind

Utility scale wind

1 to 20kW 50 to 500kW 500kW to 1+MW

~ $30,000

turbine cost ranges

~ $1 million

10 m (33 ft)

45 m (147 ft)

10 m (33 ft)

Hu

b H

eig

ht

of

Tu

rbin

e (

to s

cale

)

Familiar heights

<20kW

<500kW

>1MW

uses 880kWh/month

4

4Wednesday, September 16, 2009

Page 5: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

20 m (66 ft)

50 m (164 ft)

80 m (262 ft)

typical cell tower

3 story home

Small scale wind

Community scale wind

Utility scale wind

1 to 20kW 50 to 500kW 500kW to 1+MW

~ $30,000

turbine cost ranges

~ $1 million

10 m (33 ft)

45 m (147 ft)

10 m (33 ft)

Hu

b H

eig

ht

of

Tu

rbin

e (

to s

cale

)

Familiar heights

Turbines cost ranges

~$30,000+ 1 to 20kW

$300-400,000 50 to 500 kW

~$1 million+ 500kW to 1+MW

5

5Wednesday, September 16, 2009

Page 6: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Is there a community wind market niche?

6

6Wednesday, September 16, 2009

Page 7: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Micro-to-small scale niche

20 m (66 ft)

50 m (164 ft)

80 m (262 ft)

typical cell tower

3 story home

Small scale wind

Community scale wind

Utility scale wind

1 to 20kW 50 to 500kW 500kW to 1+MW

~ $30,000

turbine cost ranges

~ $1 million

10 m (33 ft)

45 m (147 ft)

10 m (33 ft)

Hu

b H

eig

ht

of

Tu

rbin

e (

to s

cale

)

Familiar heights

Individuals can build small scale wind power.

~$30,000+ 1 to 20kW

$300-400,000 50 to 500 kW

~$1 million+ 500kW to 1+MW

7

7Wednesday, September 16, 2009

Page 8: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

20 m (66 ft)

50 m (164 ft)

80 m (262 ft)

typical cell tower

3 story home

Small scale wind

Community scale wind

Utility scale wind

1 to 20kW 50 to 500kW 500kW to 1+MW

~ $30,000

turbine cost ranges

~ $1 million

10 m (33 ft)

45 m (147 ft)

10 m (33 ft)

Hu

b H

eig

ht

of

Tu

rbin

e (

to s

cale

)

Familiar heights

Utility scale market

Utility scale companies are building large wind farms in the this end of the market.

~$30,000+ 1 to 20kW

$300-400,000 50 to 500 kW

~$1 million+500kW to 1+MW

8

8Wednesday, September 16, 2009

Page 9: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

To tie into grid or not

20 m

(66 ft)

50 m (164 ft)

80 m (262 ft)

Small wind may or may not tie into the grid.

Small scale wind

Utility scale wind

1 to 20kW 50 to 500kW

~ $30,000

turbine cost ranges

~ $1 million

10 m (33 ft)

Hu

b H

eig

ht

of

Tu

rbin

e (

to s

cale

)

500kW to 1+MW

Utilty scale wind can afford to build power lines to reach its often remote sites

9

9Wednesday, September 16, 2009

Page 10: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Our community wind niche

20 m (66 ft)

50 m (164 ft)

80 m (262 ft)

typical cell tower

3 story home

Small scale wind

Community scale wind

Utility scale wind

1 to 20kW 50 to 500kW 500kW to 1+MW

~ $30,000

turbine cost ranges

~ $1 million

10 m (33 ft)

45 m (147 ft)

10 m (33 ft)

Hu

b H

eig

ht

of

Tu

rbin

e (

to s

cale

)

Familiar heights

In between, a viable market is opening for medium scale generators.

~$30,000+ 1 to 20kW

$300-400,000 50 to 500 kW

~$1 million+500kW to 1+MW

•Too small for big utilities,

•too big for individuals, the community wind niche has enormous potential for generating electricity•close to where we need it

•at lower costs per kWh produced.

10

10Wednesday, September 16, 2009

Page 11: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

So what does community wind need to ramp up big time?

11

11Wednesday, September 16, 2009

Page 12: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

What our wind niche needs 1. Wind!

150 m (500 feet) from nearest tall structure

10 m (30 feet) above highest structure

5.3+ m/s (12mph+) average wind speed at unobstructed hub height

12

12 mph (5.4 m/s) or better wind resource 30 feet above nearest disturbance and 500 feet from nearest tall structure.

12Wednesday, September 16, 2009

Page 13: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

What our wind niche needs:2. Grid tie-in connections

13

20 m

(66 ft)

50 m (164 ft)

80 m (262 ft)

1 to 20kW 50 to 500kW

~ $30,000

turbine cost ranges

~ $1 million

10 m (33 ft)

Hu

b H

eig

ht

of

Tu

rbin

e (

to s

cale

)

500kW to 1+MW

Community wind must tie into a local grid accessible without extensive new power line construction.

Community scale wind

Locations with affordable grid-tie connections

13Wednesday, September 16, 2009

Page 14: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

What our wind niche needs:3. Affordable sites!

14

Affordable land close to existing grid. 10 ALTERNATIVES TO THE INDIAN POINT ENERGY CENTER

gas-fired combined-cycle plants5 are much more efficientthan older or simple-cycle gas turbines.

NYISO has divided the NYCA into 11 zones, shown inFigure 1-3, to assist in pricing and monitoring load flows onthe transmission system. The key zones for this report arethese:

• H, which includes the northern portion of WestchesterCounty, where Indian Point is located;

• I, the rest of Westchester County;• J, New York City; and• K, Long Island outside of New York City.

In accordance with NYSRC standards, NYISO’s goal isfor the bulk power system to have sufficient capacity thatoutages will be less than 1 day in 10 years. This loss-of-loadexpectation (LOLE) is determined by using statistical de-scriptions of the historical availability of each generator andMonte Carlo calculation techniques to compute the expectednumber of days in a 10-year period when the load could notbe supplied. The LOLE is used in determining how muchadditional generation a given area will require for expectedload growth and is likely to continue to be used if IndianPoint is closed.

In addition to sufficient capacity, diversity of fuels pro-vides another element of system reliability. Excessive de-pendence on one fuel source threatens system reliability ifthat fuel supply encounters shortages. Figure 1-4 displaysthe varied contributions of different fuels to the installedcapacity (in megawatts) of the NYCA. Natural gas and oilrepresent 60 percent of the installed capacity, and coal,nuclear, and hydroelectric power account for 39 percent.New York’s new Renewable Portfolio Standard should im-prove fuel diversity. This standard requires 25 percent ofelectricity to be generated from renewable sources by 2013,compared with 19.5 percent now (mainly hydroelectricity,most notably from Niagara Falls).6

The electrical output (actual kilowatt-hours) generated byeach fuel is not proportional to the generating capacity thatuses that fuel. Gas and oil fuel about 38 percent of the total.Coal, nuclear, and hydro power represents most (61 percent)of the power generated in 2004.

Generator owners in the NYCA operate a diverse mix ofgeneration facilities. Figure 1-5 lists the power that can begenerated in each NYCA zone, by technology, during the

FIGURE 1-1 The New York Control Area high-voltage transmission network. SOURCE: New York Independent System Operator.

5These plants combine a gas turbine (similar to a jet engine) with a steamturbine that uses the waste heat from the gas turbine as its energy source.The latest combined-cycle plants can be up to 60 percent efficient, almosttwice as high as most coal or nuclear plants.

6Renewable resources include solar energy, wind, biofuels, and others.Renewables are appealing for a variety of reasons, especially environmen-tal, but most forms have been expensive relative to fossil and nuclear en-ergy. Some technologies (e.g., wind) are now proving to be competitive,and progress in research and development on others is encouraging, as dis-cussed in Chapters 2 and 3. Hydroelectricity is a form of renewable energy,and New York State already receives an abundant supply from NiagaraFalls and other sites, but it is questionable whether hydropower can be ex-panded significantly.

source: NYSDEC Interactive Maps page source: NYISO (high voltage transmission network)

14Wednesday, September 16, 2009

Page 15: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

What our wind niche needs:4. Wind-friendly policies

15

Wind-friendly state policies and local codes need to be encouraged.State policy drives utility regulation,

power pricing, and grid connectivity for renewables.

Local codes drive local permit thresholds site and approval process for renewables.

15Wednesday, September 16, 2009

Page 16: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Who is doing community wind already?

16

16Wednesday, September 16, 2009

Page 17: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Case example #1

wind resource: 5.4 to 7.4 m/s: 6.7 m/s (15 mph) average speed @50 m hub height).

turbine type: Endurance S-250 grid-tie wind turbine (with peak power rating of 5 kilowatts on a 126 foot monopole).

est. install. cost: $_to come_

est. production: 6,000 to 9,000 kwh per year (w/ ave. wind speed.)

site: public forest affiliated with SUNY-ESF nearby in Syracuse installed summer 2009

www.esf.edu/sustainability/action/windturbine.htm

wind resource data: http://firstlook.3tiergroup.com

ESF-Heiberg Memorial Forest, Tully NY

17

17Wednesday, September 16, 2009

Page 18: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Case example #2

wind resource: 5.6 to 7.9 m/s: 6.8 m/s (15.2 mph) average speed @50 m hub height.

turbine type: Northwind 100 grid-tie wind turbine on a 37 m (121 foot) monopole (with peak power rating of 100 kilowatts at 31 mph).

est. install. cost: $_to come_

est. production: _to come_ (kWh) per year (w/ ave. wind speed.)

site: Woods Hole Research Center, installed summer 2009http://www.whrc.org/pressroom/press_releases/pr-2009-7-07-turbine.htm

N.B.:Background image used on these slides depicts this new WHOI turbine with roof of research center just visible at bottom.

wind resource data: http://firstlook.3tiergroup.com

Woods Hole Research Center, Falmouth MA

18

18Wednesday, September 16, 2009

Page 19: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Potential sites in our area...with wind and land and grid nearby

19

19Wednesday, September 16, 2009

Page 20: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Hypothetical site 1

wind resource: 4.4 to 5.9 m/s: 5.2 m/s (11.6 mph) average speed @50 m hub height.

turbine type: NA.

est. install. cost: $_to come_

est. production: _to come_ (kWh) per year (w/ ave. wind speed.)

site: Croton Landing Park, owned by Village of Croton-on-Hudson, NY

www.crotononhudson-ny.gov/

• Wind speeds are promising, if not ideal.

wind resource data: http://firstlook.3tiergroup.com

Croton Landing Park, Croton-on-Hudson

20

20Wednesday, September 16, 2009

Page 21: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Hypothetical site 2

wind resource: 4.7 to 6.2 m/s: 5.5 m/s (12.3 mph) average speed @50 m hub height.

turbine type: NA.

est. install. cost: $_to come_

est. production: _to come_ (kWh) per year (w/ ave. wind speed.)

site: State Park Land, owned by New York State

www.dec.ny.gov/outdoor/7804.html

• Wind speeds are better than site 1, even though inland due to higher elevation.

wind resource data: http://firstlook.3tiergroup.com

FDR State Park, Westchester County NY

21

21Wednesday, September 16, 2009

Page 22: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Hypothetical sites

wind resource: 5.1 to 6.7 m/s: 5.9 m/s (13.2 mph) average speed @50 m hub height.

turbine type: NA.

est. install. cost: $_to come_

est. production: _to come_ (kWh) per year (w/ ave. wind speed.)

site: State Park Land, owned by New York State

www.dec.ny.gov/outdoor/7804.html

• Wind speeds are better than site 1 & 2, due to higher inland elevation.

wind resource data: http://firstlook.3tiergroup.com

Fahnestock State Park, Putnam County NY

22

22Wednesday, September 16, 2009

Page 23: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Hypothetical site 4

wind resource: 5.9 to 7.6 m/s: 6.8 m/s (15.2 mph) average speed @50 m hub height.

turbine type: NA.

est. install. cost: $_to come_

est. production: _to come_ (kWh) per year (w/ ave. wind speed.)

site: State State Natural Resource

Management Area, owned by New York State

www.dec.ny.gov/outdoor/7780.html#Rockypoint

• Wind speeds are better than sites 1, 2, & 3, due to LI Sound.

wind resource data: http://firstlook.3tiergroup.com

Rocky Point SNRMA, Brookhaven LI

23

23Wednesday, September 16, 2009

Page 24: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Wrap up & Resources

24

24Wednesday, September 16, 2009

Page 25: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Some thoughts

A good view can indicate a good site for wind. State, county and municipal parks have good views...and happen to have some of the best local wind resources.Is there a partnership we can create?

25

25Wednesday, September 16, 2009

Page 26: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

some more thoughts...Wind is faster higher above ground. speed @ 20m < 50m < 80m Wind resource software usually projects wind speed ranges for: 20 meters (small scale individual), 50 meters (community wind), & 80 meters (utility scale). We’re focussing on 50 meter range (c 150 foot “cell tower height”).

26

26Wednesday, September 16, 2009

Page 27: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Policy Changes NeededRegulation: Any business or homeowner should be able to

generate electricity, i.e. become a “mini-utility.” Price: Utilities should have to buy that electricity at a good

price for a predictable period.

Connectivity: Utilities should have to connect us to the grid.

These 3 policies work great in Europe.

27

27Wednesday, September 16, 2009

Page 28: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Private-Public-Partnerships

A Community Wind Power Cooperative needs locations for turbines in order to supply green electricity.A joint effort of the local governments, businesses, non-profits, & residents can work together to help identify good turbine locations.

28

28Wednesday, September 16, 2009

Page 29: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

The Team...so far...Leo Wiegman, mayor of Croton-on-Hudson; author of forthcoming book, “Climate Solutions” and “Build Your Own Wind Power”; Croton residentJohn Whelan, president of Switch Electrical Contractors; Croton residentEdward A. Robin, director, Alliance America (non-profit); engineer; retired IBM and KPMG Peat Marwick Executive; Croton resident;and growing....

To learn more or sign up for updates, visit the Hudson Valley Community Wind Share site:Click on “Community Wind” at http://etothefourth.com

29

29Wednesday, September 16, 2009

Page 31: Community Wind Pt#2 Market Niche

Hudson Valley Community Wind Share  etothefourth.com 09/16/2009

Wind Resources (alphabetically)

31

2008 Wind Technologies Market Report http://eetd.lbl.gov/EA/EMP/re-pubs.html

American Wind Energy Assoc. Small Wind site www.awea.org/smallwind/

Community Wind 101: A Primer for Policymakers www.ef.org/docs/CommWind_web.pdf

Database of State Incentives for Renewables & Efficiency www.dsireusa.org

New York state wind incentives www.powernaturally.org/Programs/Wind/incentives.asp

National Wind Technology Center www.nrel.gov/wind/nwtc.html

Small Wind discussion group http://tech.groups.yahoo.com/group/small-wind-home/

Smart Grid 101 www.americanprogress.org/issues/2009/02/clean_energy_pipeline.html

Toronto’s Windshare Coop www.windustry.org

USDOE’s Wind Powering America www.windpoweringamerica.gov

USDOE’s Small Wind for Homeowners, Ranchers, and Small Businesses www.windpoweringamerica.gov/small_wind.asp

Wind-Works blog www.wind-works.org/articles/community.htm

31Wednesday, September 16, 2009