community meeting title · 2020. 8. 17. · cars and buses student and faculty parking (+/-850...
TRANSCRIPT
-
40% Construction Community Meeting
Welcome! This meeting will begin shortly.
August 17, 2020
12:00PM
2
Site 113-H-W-4
-
Site 113-H-W-4Meeting AgendaAugust 17, 2020, 12:00PM
• Welcome – School Board Member Pam Gould
• Introductions – Lauren Roth, Facilities Communications
• School Update – Laura Beusse, Principal
• Project Update – David Torbert, AIA, NCARB
Larry Sease, Project Executive
• Questions and Answers
• Adjournment
3
-
Welcome Message from District 4 Board Member
Pam Gould
Site 113-H-W-4 4
-
Introductions by Senior manager, Facilities Communications
Lauren Roth
5Site 113-H-W-4
-
Rezoning ProcessSchool Board Policy JC
Step 1 - Superintendent commences rezoning
Step 2 - Calendar (Timeline) developed
Step 3 - Calendar shared
Step 4 - Research, data collection and meetings with internal stakeholders
Step 5 - Community Meeting(s) September 2020
Step 6 - Rule Development Workshop September 2020
Step 7 - Public Hearing October 2020
Step 8 - Storage of materials6
6 6Site 113-H-W-4
-
School NamingPrincipal Laura Beusse
• Introduction
• Site 113-H-W-4 web site: https://www.ocps.net/cms/One.aspx?portalId=54703&pageId=1468939
• Site 113-H-W-4 naming survey: https://forms.gle/4MjWCasuFM2CE637A
• Mascot, Colors
7Site 113-H-W-4
https://www.ocps.net/cms/One.aspx?portalId=54703&pageId=1468939https://forms.gle/4MjWCasuFM2CE637A
-
Site Location 113-H-W-4
8
DISNEY WORLD
HickorynutLake
Reedy Lake
Lake Tibet
north
ORANGE COUNTY
NATIONAL GOLF COURSE
DR. PHILLIPS HS
NEW HS SITE 80
SITE 113-H-W-4
WIN
TER
GA
RD
EN V
INEL
AN
D R
OA
D
FIC
QU
ETTE
RD
.
WINDERMERE HS
Huckleberry Lake
Lake Hancock
Lake MabelLake Sheen
Lake Butler
INTE
RST
ATE
4
S.R
. 4
29
LAK
E C
OU
NTY
OR
AN
GE
CO
UN
TY
-
Site Aerial 113- H-W-4
9
Site113-H-W-4
(+/-68 Acres)
north
SEIDEL ROAD
HickorynutLake
Reedy Lake
Tub Lake
Lakeshore
-
Site Plan 113-H-W 4
10
SEIDEL ROAD
Staff Parking
(200 Spaces)
Parking(480 Spaces)
Parking(170
Spaces)
Bus Parking
(75 buses & 75 cars)
Stadium Track &
Field (lighted)
Baseball(lighted)
Softball(lighted)
Practice
Tennis & Basketball
Courts
FRO
NTA
GE
RO
AD
Wetland
FRONT DOOR
Retention
north
0’ 200’
3-Story HS Campus
Access Easement for Reedy Creek
Improvement District
Student Stations = 2,776
Parking = 850 spacesCar Stacking = up to 300 carsBus Driver parking= 75 spaces
On-site Bus Stacking = 40+ buses
Service
Retention
Practice
Parent Drop
Future Bus Fueling and Driver Lounge
Location
Retention
-
Project Basis – OCPS Prototype Site 113-H-W-4
11
OCPS PROTOTYPE HIGH SCHOOLSWindermere High SchoolOak Ridge High SchoolEvans High SchoolApopka High SchoolWest Orange High SchoolWekiva High SchoolOcoee High SchoolLake Nona High SchoolEast River High SchoolFreedom High SchoolTimber Creek High SchoolOlympia High School
Oak Ridge High School
-
Project Basis – OCPS Prototype Site 113-H-W-4
12
UPGRADES INCLUDED PROTOTYPEEducational• 21st Century Collaborative Learning Hubs
Technology• Interactive Touchscreen Smart TV’s• WiFi access points throughout
Energy Efficiency• LED lighting campus wide (interior, exterior,
site and athletic fields)• High efficiency chillers and variable
pumping scheme• Low flow plumbing fixtures• Commissioning of MEP systems• ASHRAE 90.1 compliance for lighting and
power metering
Security• Full security access control and cameras for
the school• 2-way emergency radio system• Voice evacuation fire alarm system• Permanent generator and life safety lighting
Windermere High School
-
Renderings 113-H-W-4
13
north
-
Renderings 113-H-W-4
14
north
-
Renderings 113-H-W-4
15
north
-
Renderings 113-H-W-4
16
north
-
Campus Plan 113-H-W-4
17
north
GYM
CLASSROOMS & LABS
3-STORIES
SECURE COURTYARD
CAFETERIA
MEDIA
ADMIN
MUSICAUDITORIUM
LOCKER ROOMS
PARENT DROP OFF
BU
S D
RO
P O
FF
PA
RE
NT
DR
OP
OF
F
-
Building Program
18
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings•Classrooms•Science Labs•Computer Labs•CTE Labs
Auditorium & Music Spaces•Band•Vocal•Orchestra•Piano Lab
Gymnasium • Locker Rooms •Weight Room•Gymnastics/Dance•Wrestling
113-H-W-4Student Capacity: 2,776Buildings: 340,000 Square Feet
CAFETERIA
MEDIA CENTER
-
Building Program
19
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings•Classrooms•Science Labs•Computer Labs•CTE Labs
Auditorium & Music Spaces•Band•Vocal•Orchestra•Piano Lab
Gymnasium • Locker Rooms •Weight Room•Gymnastics/Dance•Wrestling
113-H-W-4Student Capacity: 2,776Buildings: 340,000 Square Feet
SCIENCE LAB
COMPUTER LAB
-
Building Program
20
GYMNASIUM
AUDITORIUM
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings•Classrooms•Science Labs•Computer Labs•CTE Labs
Auditorium & Music Spaces•Band•Vocal•Orchestra•Piano Lab
Gymnasium • Locker Rooms •Weight Room•Gymnastics/Dance•Wrestling
113-H-W-4Student Capacity: 2,776Buildings: 340,000 Square Feet
-
Site Program
21
Cars and BusesStudent and Faculty parking
(+/-850 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)Bus parking (up to 75 buses)
113-H-W-4Site: +/-68 Acres
STADIUM/TRACK & FIELD
GREENHOUSE
Site AmenitiesGreenhouse and Shade houseAthletics•Field House at Stadium/Track
•Locker Rooms•Weight Room•Concessions
•Practice Fields•Baseball Field•Softball Field•Baseball & Softball Concessions•Tennis Courts•Outdoor Basketball Courts
-
Site Program
22
Site AmenitiesGreenhouse and Shade houseAthletics•Field House at Stadium/Track
•Locker Rooms•Weight Room•Concessions
•Practice Fields•Baseball Field•Softball Field•Baseball & Softball Concessions•Tennis Courts•Outdoor Basketball Courts
Cars and BusesStudent and Faculty parking
(+/-850 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)Bus Parking (up to 75 buses)
113-H-W-4Site: +/-68 Acres
SOFTBALL
BASEBALL
-
Site Program
23
Site AmenitiesGreenhouse and Shade houseAthletics•Field House at Stadium/Track
•Locker Rooms•Weight Room•Concessions
•Practice Fields•Baseball Field•Softball Field•Baseball & Softball Concessions•Tennis Courts•Outdoor Basketball Courts
Cars and BusesStudent and Faculty parking
(+/-850 Spaces)Parent Drop off / pick upBus Loop (up to 50 buses)Bus Driver parking = 75 spacesBus Parking (up to 75 buses)
113-H-W-4Site: +/-68 Acres
OUTDOOR BASKETBALL
TENNIS
-
Additional Features 113-H-W-4
24
Safety & Security• Secure Courtyard Design• Single Secure Entry Point• Security System & Cameras• Card Reader Entrance Controls
Educational Technology• 70” Touch Screen “Smart” Monitors• Audio Enhancement• WiFi Connectivity
CLASSROOM TECHNOLOGY
SECURE ENTRY POINT
Audio Enhancement
System
70” Touchscreen
Wireless Access Point
-
Sustainability 113-H-W-4
25
Building• 10% more energy efficient than ASHRAE
90.1 standard• High Efficiency Chillers (15% energy
reduction)• Light colored roof to reduce heat gain and
improves energy performance• Energy Efficient LED Lighting• Energy Star rated equipment• Water saving toilets, faucets, and fixtures• All classrooms have daylighting• Over 75% of ALL spaces have daylighting• Thermal efficient windows/glazing
Site• Native/low water plants – reduce water
consumption• Low Impact Design (LID) stormwater design
Sustainable Design Criteria
-
What to Expect 113-H-W-4
Work Hours*Monday – Saturday 6:00am –6:00pm
* Early morning concrete pours will be necessary and will be
in strict accordance with the Orange County noise ordinance
DeliveriesMonday – Friday 6:00am – 6:00pm
All construction deliveries to enter the jobsite from Frontage Rd.
Road Closures
Frontage Rd. will be closed except to construction related traffic and for access to the adjacent solar field.
Limited single lane closure will be required along Seidel Rd. at times throughout the project to complete work located immediately adjacent to traffic lanes.
Summerlake Groves St. at Seidel Rd. will be closed to reconfigure the entrance for school bus traffic.
26
-
Site 113-H-W-4Site Map
27
Building 100 – AdministrationBuilding 200 – MediaBuilding 300 – GymnasiumBuilding 400 – ClassroomsBuilding 500 – ClassroomsBuilding 600 – ClassroomsBuilding 700 – Cafeteria/KitchenBuilding 800 – AuditoriumBuilding 900 – Field HouseBuilding 1000 - Concessions
-
Site 113-H-W-4Project Schedule
28
Main Building Package
Structural
Summer 2021
April2019
November2019
Move-In
August2021
Design, Permitting,
and Bidding
Early
Site
Package
February2020
August2020
Main Building Package
Finishes
-
Site 113-H-W-4November 2019
29
- Mobilization- Clearing/grubbing- Earthwork
-
Site 113-H-W-4December 2019
30
- Clearing/grubbing- Earthwork- Underground Utilities
-
Site 113-H-W-4January 2020
31
- Earthwork- Underground utilities- Temporary roads- Reedy Creek access- Pond excavation- Building pads- Bus parking base
-
Site 113-H-W-4February 2020
32
- Earthwork- Foundations- Underground MEPF
-
Site 113-H-W-4March 2020
33
-
Site 113-H-W-4April 2020
34
- Earthwork- Slabs on grade- Casting beds- Tilt wall panel fabrication
-
Site 113-H-W-4May 2020
35
-
Site 113-H-W-4June 2020
36
- Tilt wall erection- Structural steel installation- Roofing
-
Site 113-H-W-4July 2020
37
- Structural steel installation- Roofing- Interior buildout- Asphalt paving
-
Site 113-H-W-4August 2020
38
-
Site 113-H-W-4Upcoming Milestones
39
- Permanent power complete in September 2020- Campus wide roofing dry in complete in September 2020- HVAC chiller startup in November 2020- Traffic signalization/roadway improvements complete in March 2021- Substantial completion Summer 2021- School opening in August 2021
-
Questions & Answers
40