Community Liaison Group
West & North Joint Meeting
6 December 2018
![Page 2: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/2.jpg)
JIM WILLIAMSON
Introduction
![Page 3: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/3.jpg)
Time Item Topic
5:30pm 1 Welcome and actions from previous meeting
5:40pm 2 Year in review – West Gate Tunnel Authority
5:50pm 3 Landscaping and Open Space
6:10pm 4 Year in review – Construction
6:20pm 5 Construction Update (East, West & Tunnels)
6:50pm 6 Tea break
7.05pm 7 Year ahead
7.15pm 8 Feedback on CLG from members
7.30pm 9 Questions from members
![Page 4: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/4.jpg)
PETER SAMMUT
WEST GATE TUNNEL AUTHORITY
Year in review
![Page 5: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/5.jpg)
West Gate Tunnel Project - parties
Manages project on behalf
of State
Project Co.
Design and Construction Operation and Management
Independent Reviewer and
Environmental Auditor
![Page 6: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/6.jpg)
Major Transport Infrastructure Projects
A vital alternative to the West
Gate Bridge to free up traffic
and remove thousands of
trucks from residential streets
in Melbourne’s west.
Victoria's biggest road project -
connecting the missing link in
Melbourne's freeway network.
Removing 75 level crossings
across metropolitan
Melbourne
Untangling the City Loop so
more trains can run more often
across Melbourne
Planning and delivering major
road projects for Victoria.
Coordinating an unprecedented
number of transport projects across
Victoria.
The proposed Suburban Rail
Loop is a new underground
rail network connecting
Melbourne’s suburbs.
![Page 7: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/7.jpg)
Mismatch between population & job growth
![Page 8: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/8.jpg)
Why we are building the project
• Managing a growing Melbourne
• 24/7 truck bans on key inner-west streets
• 9,000 trucks taken off local roads
• Reliable travel times
• Better quality of living
• Improved connectivity & better accessibility
• Safer roads
• Less traffic noise 70 kilometres of new traffic lanes over 17 kilometres – from Kororoit
Creek Road to Wurundjeri Way
Up to 20 minutes in travel time savings between the city and
Melbourne’s west
A 16 per cent reduction in serious crashes
Improved incident response systems
Up to 13 minute faster trips to the Port of Melbourne
![Page 9: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/9.jpg)
Environment Effects Statement Initiatives
• Hobsons Bay Transport Study
• Corridor Study
• North and West Melbourne and Docklands Transport
• Moonee Ponds Master Plan
• Inner West Air Quality Community Reference Group
• Community Involvement and Participation Plan
• Noise mitigation for properties fronting Millers Road
• Significant funding to councils
![Page 10: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/10.jpg)
Hobsons Bay Transport
Strategy
Corridor Study North and West
Melbourne and
Docklands
Transport
Moonee Ponds Master
Plan
Inner West Air
Quality Community
Reference Group
Community
Involvement and
Participation Plan
Noise mitigation for
properties fronting
Millers Rd (WGF to
Geelong Rd)
First steering committee
meeting 31 Oct
Membership and
Terms of Reference
agreed
Central City
Transport Committee
established
Scope of work agreed
and steering committee
appointed
EOI process
complete
Draft plan issued to
HBCC and MCC
Residents contacted
through letters and
door knocks
Terms of Reference agreed Meetings held 20 Sept
& 25 Oct
Draft MOU under
discussion
First steering
committee meeting 26
Sept
Appointed members
and chair
Meetings held with
Councils
Noise monitoring
loggers installed in
Oct
MOU being agreed 3 groups brainstormed
60 issues at 2nd
meeting
Terms of Reference
agreed
First meeting
scheduled 10 Dec
Plan updated to
reflect feedback
Dec: follow-up letter
to property owners
Communication &
engagement plan being
developed with HBCC
Upcoming: 3rd meeting
early 2019 to focus on
solutions
Issues workshop for
government
depts/agencies 15 Nov
Upcoming: final
stages of
consultation with
HBCC and MCC
Commence
consultation
condition surveys
Meeting HBCC
communications and
engagement 22 Nov
Upcoming: update CoM
Moonee Ponds Creek
Strategic Opportunities
Plan
Upcoming: launch
and allocate first
round of grants H1
2019
Transport brief &
communication plans -
steering committee 3 Dec
Upcoming: alignment
with government
stakeholders
EES Initiatives - Engagement status
![Page 11: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/11.jpg)
Thank you for your contributionKevin Redfern – Seabrook
Philip Auciello – Brooklyn
Michael Kwon Sin Koy – Point Cook
Marlon de Leon – Tarneit
James Cox – Avondale Heights
BayWest Bicycle User Group
Bicycle Network
Friends of Lower Kororoit Creek
Friends of Stony Creek
LeadWest
Maribyrnong Truck Action Group (MTAG)
RACV
Victorian Transport Association (VTA)
Brimbank City Council
Hobsons Bay City Council
Wyndham City Council
Matt Monger – Docklands
Victor Ng – Seddon
Tony Le-Nguyen – Footscray
Sarah Grace – Yarraville
Nathan Hang – Kensington
Con Frescos – Yarraville
Concerned Locals of Yarraville
North and West Melbourne Association
Kensington Association
Friends of Moonee Ponds Creek
City of Melbourne
Maribyrnong City Council
Jim Williamson – Independent Chair
We welcome your feedback.
![Page 12: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/12.jpg)
DIETER LIM
TRACT
Landscaping and open space
![Page 13: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/13.jpg)
To bring the Community Liaison Group up to
date with the design process and status of
project packages
Demonstrate that Urban Design is being
developed consistent with Urban Design
Framework
PURPOSE OF PRESENTATION
![Page 14: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/14.jpg)
Tract is a national planning and design
practice specialising in town planning, urban
design, landscape architecture and
associated digital media
As planners and designers our charter is to
deliver sustainable and memorable
solutions, shaping places for living, leisure
and work, and the infrastructure that supports
and connects these places. We do this by
harnessing the strength and diversity of our
collective expertise
Tract have extensive experience and
award winning infrastructure capabilities
having worked as both landscape architect
and as urban designer for a variety of
infrastructure projects
TRACT - WHO ARE WE
![Page 15: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/15.jpg)
WGTP TIMELINE
![Page 16: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/16.jpg)
Setting up construction compounds
Widening the freeway
Changes to high-voltage power lines
Upgrading the Federation Trail
Building new noise walls
Building the Hyde Street ramps
2018 2019 2020 2021 2022
CONSTRUCTION TIMELINE - WEST GATE FREEWAY
![Page 17: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/17.jpg)
Setting up construction compounds
North Yarra Main Sewer works
Tunnel portals
Tunnelling
Cycling and walking bridge
2018 2019 2020 2021 2022
CONSTRUCTION TIMELINE - TUNNELS
![Page 18: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/18.jpg)
Setting up construction compounds
Building the elevated road
Maribyrnong River bridges
Major cycling upgrades
2018 2019 2020 2021 2022
CONSTRUCTION TIMELINE - PORT TO CITY
![Page 19: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/19.jpg)
1. PRELIMINARY DESIGN (PINK ROOM REVIEW)
2. PRELIMINARY DESIGN (EXTERNAL REVIEW) - STAKEHOLDER LIAISON
3. DETAILED DESIGN (PINK ROOM REVIEW)
4. DETAILED DESIGN (EXTERNAL REVIEW) - STAKEHOLDER LIAISON
5. DRAFT CERTIFIED DESIGN - IREAREVIEW
6. CERTIFIED DESIGN
7. ISSUE FOR CONSTRUCTION
DESIGN PROCESS PER PACKAGE
![Page 20: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/20.jpg)
WEST GATE TUNNEL - PROJECT PRECINCT
![Page 21: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/21.jpg)
WesternDistributor
Improving Melbourne together
Urban Design Framework Report3b.4.1PackageOne
DESIGN NARRATIVE
![Page 22: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/22.jpg)
WEST GATE TUNNEL PROJECT ILLUSTRATIVE
![Page 23: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/23.jpg)
M 80 INTERCHANGE
ACTIVE PRELIMINARY
DESIGN
COMMENCE
2019WESTGATE FWY
ACTIVE DRAFT CERTIFIED
DESIGN
WURUNDJERI WAY
ACTIVE PRELIMINARY
DESIGN
KOROROIT CREEK
AC TIVE
DRAFT CERTIFIEDDESIGN
SOUTHERN PORTAL
ACTIVE DRAFT CERTIFIED
DESIGN
NORTHERN
PORTAL
ACTIVE DRAFT CERTIFIED
DESIGN
FOOTSCRAY RD & CITYLINK / CITY CONNECTIONS
ACTIVE DETAILED DESIGN
PACKAGE ACTIVITY STATUS
![Page 24: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/24.jpg)
KOROROIT CREEK - PART K ILLUSTRATION
![Page 25: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/25.jpg)
KOROROIT CREEK - PART K DESIGN
![Page 26: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/26.jpg)
SOUTHERN PORTAL - PART K ILLUSTRATION
![Page 27: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/27.jpg)
SOUTHERN PORTAL - PART K DESIGN
![Page 28: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/28.jpg)
NORTHERN PORTAL - PART K ILLUSTRATION
![Page 29: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/29.jpg)
NORTHERN PORTAL - PART K DESIGN
![Page 30: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/30.jpg)
FOOTSCRAY ROAD - PART K ILLUSTRATION
![Page 31: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/31.jpg)
CITYLINK CONNECTIONS - PART K ILLUSTRATION
![Page 32: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/32.jpg)
DAVID CLEMENTS
TRANSURBAN
Year in review
![Page 33: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/33.jpg)
January – March
![Page 34: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/34.jpg)
![Page 35: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/35.jpg)
April – June
![Page 36: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/36.jpg)
![Page 37: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/37.jpg)
July - September
![Page 38: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/38.jpg)
![Page 39: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/39.jpg)
![Page 40: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/40.jpg)
October – December
![Page 41: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/41.jpg)
![Page 42: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/42.jpg)
![Page 43: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/43.jpg)
Bella’s on her way to Melbourne!
![Page 44: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/44.jpg)
BRAD JACKSON
CPBJH JOINT VENTURE
Construction update
![Page 45: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/45.jpg)
West – Current and upcoming works Service relocations /
Rosala Avenue walking and cycling bridge
Freeway widening and temporary noise walls
Millers Road interchange
Service relocations
Fogarty Avenue /Newport Rail line
Williamstown Road interchange / West Gate Freeway
Temporary noise walls / Muir Street walking and cycling bridge
![Page 46: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/46.jpg)
Traffic changes
![Page 47: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/47.jpg)
Noise walls – temporary and permanent
Temporary Noise Walls Permanent Noise Walls
![Page 48: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/48.jpg)
Tunnels portal
![Page 49: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/49.jpg)
Tunnelling hub
![Page 50: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/50.jpg)
North Yarra Main Sewer
![Page 51: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/51.jpg)
Port to City precinct
Maribyrnong River crossings
Footscray Road preparations
City Connections (E-Gate and F-Gate)
Wurundjeri Way
![Page 52: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/52.jpg)
Maribyrnong River crossings
![Page 53: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/53.jpg)
Footscray Road update
![Page 54: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/54.jpg)
City Connections (E-Gate & F-Gate)
![Page 55: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/55.jpg)
BRAD JACKSON
CPBJH JOINT VENTURE
The year ahead
![Page 56: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/56.jpg)
The year ahead – East
River piling
Utility relocationsPiling for elevated road
MTM and Yarra Trams relocated Realignment of rail track
Removal of V/Line reversal loopRemoval of V/Line stabling
sidings and wagon yard
V/Line relocated to newfacilities at Melbourne Market
![Page 57: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/57.jpg)
The year ahead – East
![Page 58: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/58.jpg)
The year ahead – Tunnels
Spoil shed completion
TBM 1 and 2 arrival to siteTBM launch
Permanent power and sub station go live
![Page 59: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/59.jpg)
The year ahead – Tunnels
![Page 60: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/60.jpg)
The year ahead – West First noise walls
Rosala Street pedestrian bridge opens Muir Street pedestrian bridge opens HV relocation to monopoles
Excavation at Southern Portal
![Page 61: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/61.jpg)
The year ahead – West
![Page 62: Community Liaison Group - West Gate Tunnelwestgatetunnelproject.vic.gov.au/__data/assets/pdf_file/0011/345773… · Time Item Topic 5:30pm 1 Welcome and actions from previous meeting](https://reader031.vdocuments.mx/reader031/viewer/2022011822/5ec64ee1ae97b357ee5ad77b/html5/thumbnails/62.jpg)
Questions from members