community based water supply and management system case of secode project bridging the water...

9
Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala Obae; Kenya Organization for Environmental Organization (KOEE)

Upload: julian-hood

Post on 29-Mar-2015

225 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala

Community based water supply and management system case of

SECODE project

Bridging the water divides; a participatory urban development process

Ann Nabangala Obae; Kenya Organization for Environmental Organization (KOEE)

Page 2: Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala

Background Nyalenda slums

Approximately 50,000 inhabitants, 150 semi –permanent households units per hectare, compared with 25 households units per hectare in the middle-income areas and 15 household units per hectare in the high-income areas.

Page 3: Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala

Water divides bridged by SECODE project in Nyalenda slums

Economic dividesQuantity divides

Quality divides

Page 4: Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala

Water divides bridged by SECODE project in Nyalenda slums

Quantity; Distance to access water reduced from 1.5 Kilometers to about 500 meters. The girl child has time to study more and women can to get involved in more productive work.

Quality; Thirty (30) new plants servicing 30 house holds constructed with over 240 household members benefiting directly. The house holds are recording reduced medical bills on water related illnesses and well informed about sanitation.

Economic; reduction in prices from US$0.10 - 0.13 to US$ 0.02 (rated at Kshs 79 = 1US$). An average of 77.5% water tariffs reduction Families able to save for education and food which are major slum livelihood challenges.

Page 5: Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala

Stakeholder involvement

Nyalenda Sustainable Development Network

National Environment and Management Authority

SECODE regional partnerships in Uganda

AAgthuoni women group water kiosk

SECODE regional partnerships in Uganda

SECODE - government of Kenya partnerships

Page 6: Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala

Impact of the community based water supply model

Eco- san toilet

Water connection chamber

Water kiosk

Page 7: Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala

Sustainability and commitmenta) Increased budget allocation towards good practices and

policy influencing on pro-poor water management and regulation in Kisumu slums

b) Strengthening capacity of local institutions and networks in good projects monitoring and networking ; Nyalenda sustainable Development Network (NYASDEN)

c) SECODE aims at “Kisumu wide slum resident’s network” as a lobby instrument on issues affecting slums development from time to time in the entire Kisumu

d) SECODE phase two is keen to build capacity of water services stakeholders and slums communities in participatory development approaches.

e) Community ownership of approach leading to proactive service delivery level

Page 8: Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala

Originality and innovative ideas in bridging the Nyalenda water

divides

• Slum residents are able to influence effective service delivery with limited external support.

• Service segmentation • Capacity building based on Training Needs Assessments

done through Local Environmental Committees (LECs), public forums and stockholder's consultative workshops.

Page 9: Community based water supply and management system case of SECODE project Bridging the water divides; a participatory urban development process Ann Nabangala

Way forward

• Intended use of the funds is to support more community based organizations towards community based water supply approach in Kisumu slums and capacity building for more Kisumu stakeholders and communities on SECODE’s approach to environment and livelihood enhancement, based on Local Agenda 21