Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer. Highway Maintenance Work District 5. Signs Pothole Patching Lighting Mowing Guardrail Striping Drainage Signals - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/1.jpg)
Commonwealth of KentuckyTransportation Cabinet
Department of Highways - District 5
The Slow Uphill Climb
Matt Bullock, P.E.
Chief District Engineer
![Page 2: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/2.jpg)
![Page 3: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/3.jpg)
![Page 4: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/4.jpg)
![Page 5: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/5.jpg)
![Page 6: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/6.jpg)
Highway Maintenance Work District 5
•Signs
•Pothole Patching
•Lighting
•Mowing
•Guardrail
•Striping
•Drainage
•Signals
Agreements with Local Agencies (Non-Interstate)
![Page 7: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/7.jpg)
Panel SignInstallation
Mowing
Striping
Lighting
GuardrailRepair
StreetSweeping
PotholePatching
![Page 8: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/8.jpg)
Highway Construction Work District 5
2008 Recommended Highway Plan
Formally - “Six Year Plan” Programs the funds for the next two years
The “Biennium”
Approximately $70 million Federal Stimulus
-For Dist. 5 road projects
Approximately $23 million Federal Stimulus
- For projects in the KIPDA Planning area
![Page 9: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/9.jpg)
Westport Road / Westport Road / InterchangeInterchange
• Widen Westport between Hubbards Ln. and Watterson• Full Interchange at the Watterson
• Single Point Urban Interchange (Bardstown Rd.)• Hall Contracting• Fall 2008 to May 2010• $47 Million
![Page 10: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/10.jpg)
![Page 11: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/11.jpg)
![Page 12: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/12.jpg)
![Page 13: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/13.jpg)
![Page 14: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/14.jpg)
I-65 Major RehabI-65 Major Rehab
•Complete removal of Concrete Sections•Replace With Asphalt
•Traffic Control•Contractor?????•December 2009 Completion•Approx. $30 Million•Stimulus Funded
![Page 15: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/15.jpg)
![Page 16: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/16.jpg)
Cable Rail InstallationCable Rail Installation
•Installation on KY 841 from I-65 to Dixie Highway•I-65 in Bullitt, Hart, and Barren Counties
•Gibraltor System – (4 wires)•RMD Holdings•Fall 2009 Completion•$3.1 Million
![Page 17: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/17.jpg)
![Page 18: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/18.jpg)
I-65 Patching & I-65 Patching & Diamond GrindingDiamond Grinding
• Patch Bad Concrete Areas from MP 118.5 to 127.5• Grind Surface
• Faulkner Construction• Fall 2009 Completion• $5.7 Million• Stimulus Funded
![Page 19: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/19.jpg)
![Page 20: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/20.jpg)
I-64 WideningI-64 Widening
• Widen I-64 between I-265 and Shelby Co. Line• 3 Lanes in each direction – Barrier Median
• Gohmann Asphalt & Construction• Fall 2010 Completion• $34 Million
![Page 21: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/21.jpg)
![Page 22: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/22.jpg)
![Page 23: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/23.jpg)
Eastern ParkwayEastern Parkway
• “Road Diet” and Pedestrian Safety• Bridge over Floyd and Brook Streets Rehab• Warnock Ramp Reconfiguration• Over-Height Truck detection system
• MAC Construction (Low bid – not yet awarded)• January 2010 Completion• $7.1 Million
![Page 24: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/24.jpg)
![Page 25: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/25.jpg)
![Page 26: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/26.jpg)
![Page 27: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/27.jpg)
Preston Highway (KY61)Preston Highway (KY61)
• 4-Lane Widening• From Jefferson County Line to John Harper Highway• One of Four Sections• Stimulus Funded
• Flynn Brothers Contracting• January 2010 Completion• $6.2 Million
![Page 28: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/28.jpg)
![Page 29: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/29.jpg)
![Page 30: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5](https://reader033.vdocuments.mx/reader033/viewer/2022051516/5681449f550346895db15de3/html5/thumbnails/30.jpg)
Shawnee Expressway Shawnee Expressway BridgeBridge
• I-264 West to I-64 West Bridge• Mainly for Rehab• Lane Configuration stays the same
• Faulkner Construction• May 2010 Completion• $5.6 Million