QUALITY ASSURANCE | COST SAVINGS | REDUCED ENERGY | INCREASED COMFORT C ommissioning New Buildings Building Commissioning as desCriBed By the Building Commissioning assoCiation: “a quality Based proCess with doCumented Confirmation that Building systems are planned, designed, installed, tested, operated and maintained in ComplianCe with the owners projeCt requirements.” www.commissioningsolutions.com

Upload: elizabeth-armour

Post on 07-Mar-2016

219 views

Category:

Documents


1 download

DESCRIPTION

Commissioning Solutions’ new building commissioning is a quality assurance process. This means we verify and document that the building systems function as the designer intended and meets the operational needs of the building owner and its users.

TRANSCRIPT

Page 1: Commissioning Solutions - New Buildings

Q U A L I T Y A S S U R A N C E | C O S T S AV I N G S | R E D U C E D E N E R G Y | I N C R E A S E D C O M F O R T

Co m m i s s i o n i n g New Bu i ld ings

Building Commissioning as desCriBed By the

Building Commissioning assoCiation:

“a quality Based proCess with doCumented Confirmation that

Building systems are planned, designed, installed, tested,

operated and maintained in ComplianCe with the owner’s

projeCt requirements.”

www.commissioningsolutions.com

Page 2: Commissioning Solutions - New Buildings

w h a t i s B u i l d i n g C o m m i s s i o n i n g ?

w h y C o m m i s s i o n i n g ?New building systems should be commissioned for these reasons:

• Operational problems are avoided prior to occupancy

• Poorly performing buildings inherently have high costs

• There are many benefits to Owners, Operators and Occupants

• Smoother construction process

B u i l d i n g Q u a l i t y a s s u r a n c e

Commissioning Solutions’ new building commissioning is a quality

assurance process. This means we verify and document that the

building systems function as the designer intended and meets the

operational needs of the building owner and its users.

• Commissioning thoroughly documents system design intent, operating sequences and test procedures.

• Commissioning verifies system performance based on extensive functional testing and measurement.

• Commissioning accomplishes higher energy efficiency, environmental health and occupant safety and improves air quality.

a d d i t i o n a l B e n e f i t s

Save money.

Lower energy & maintenance costs.

Quick payback.

Safer, more reliable and comfortable buildings.

Fewer disputes between building owner and

contractor.

Fewer change orders.

Problems are discovered early when they are not

expensive to correct.

The end result of commissioning is to reduce operating costs whileincreasing comfort in the building. There are other added benefits to Owners, Operators and Occupants such as:

o w n e r s • 8 - 20% reduction in operating costs • Fewer change orders • Reduced construction costs • Reduced operating costs • Fewer construction delays • Assurance that they got what they paid for

o p e r a t o r s • Properly operating systems from the beginning • Fewer occupant complaints • Training on all systems • Proper O&M manuals • Fewer construction delays

o c c u p a n t s • Healthy indoor air quality • Comfortable environment for both work & play

B e n e f i t s o f C o m m i s s i o n i n g

Page 3: Commissioning Solutions - New Buildings

a d d i t i o n a l B e n e f i t s

Save money.

Lower energy & maintenance costs.

Quick payback.

Safer, more reliable and comfortable buildings.

Fewer disputes between building owner and

contractor.

Fewer change orders.

Problems are discovered early when they are not

expensive to correct.

Commissioning costs are recovered

many times over through operational

savings, improved staff performance

and avoidance of costly construction

problems.

Typically the average price of new

building commissioning is 50¢ to

$1.50 per square foot.

r e d u c e y o u r r i s kOwners often say they cannot afford to pay for building commissioning. It is important to recognize the potential risks of NOT commissioning. Some of the risks can include, but are not limited to:

• Schedule overruns • Change orders • Litigation costs • High vacancy levels • Uncomfortable occupants • Excessively long shakedown periods • Costly post occupancy corrections • Inability to perform adequate operation and maintenance • High operation costs • Energy inefficiency

Our Commissioning Agents are team builders. Our goal is effective and professional communication. Commissioning Solutions has sense of respect for the design and construc-tion team. This respect allows us to be embraced as part of the team. Our Agents have great people skills and we strive, in all interactions, for diplomacy and tact.

Our Commissioning Agents have great technical skills. Our depth of experience in system design and the knowledge on how systems should operate sets us apart from the competition. Our Agents have the abilities to supplement the Engineer’s design recommendations with our own examples and experiences.

Our firm is independent from Architects, Engineers and Contractors. We provide objective opinions and suggest the best solutions without any possible conflict of interest. Commissioning Solutions has the tools and resources for independent measurement of HVAC systems for use in troubleshooting for the TAB verification purposes.We have no vested interest in any of the service providers.

T E A M B U I L D E R S | T E C H N I C A L S K I L L S | I N D E P E N D E N T

An average up front cost for commissioning is typically dependent on a small percent of the construction cost of the systems being commissioned.

“Industry sourcesindicate that on average the operating

costs of commissioned buildingsrange on average of 8% to 20% below

that of non-commissioned buildings.”

w h y C h o o s e C o m m i s s i o n i n g s o l u t i o n s ?

C o s t o f C o m m i s s i o n i n g

Page 4: Commissioning Solutions - New Buildings

c o m m i s s i o n a n e w B u i l d i n g f r o m t h e s t a r t

Commissioning that starts at the design phase allows Commissioning Solutions to work with the design team

and become familiar with the project goals and the design intent as decisions are being made to ensure that

the project meets the owner’s requirements and expectations. Drawings can be made to effectively incorporate

commissioning into the development process. This will ensure success, avoid problems and additional work

later in the project. In past experiences, Commissioning Solutions has seen projects with very sound design

and less than 1% of change orders, but found that there were over 550 deficiency items throughout the com-

missioning process.

Commissioning can occur in the construction process or after construction is completed. This can make it more

difficult to document the design intent, identify designing problems, develop testing plans and conduct tests.

This can compromise the potential for success.

C o m m i s s i o n i n g s o l u t i o n s i s C e r t i f i e d

FARGO2201 12th St. N. Suite EFargo, ND 58102

t: 701.365.0681 f: 701.280.0522

t: 701.775.2594f: 701.775.0231

311 4th St. S. Suite 110 Grand Forks, ND 58201

GRAND FORKS

503 Hawthorne St. Suite 141Alexandria, MN 56308

t: 320.846.0300f: 701.280.0522

ALEXANDRIA

www.commissioningsolutions.com

Please contact Brent Wavra, Managing Principal at 701.371.8014 or [email protected] for more information on Commissioning Solutions and what our firm can do for your building.