commercial & residential price list flipchart · peg+ & patio enclosure - full glass sf pes...

64
ACC = Accessories—Mobile Home ACT = Acoustical Treatments APP = Appliances AWN = Awnings & Patio Covers CAB = Cabinetry CLN = Cleaning CNC = Concrete CON = Content Manipulation DMO = General Demolition DOR = Doors DRY = Drywall ELE = Electrical ELS = Electrical - Special Systems EQU = Equipment EXC = Excavation FCC = Floor Covering - Carpet FCR = Floor Covering - Resilient FCS = Floor Covering - Stone FCT = Floor Covering - Ceramic Tile FCV = Floor Covering - Vinyl FCW = Floor Covering - Wood FEE = Permits & Fees FEN = Fencing FNC = Finish Carpentry/Trimwork FNH = Finish Hardware FPL = Fireplaces FPS = Fire Protection System FRM = Framing & Rough Carpentry Commercial & Residential Price List Flipchart (For use with Xactimate 5.9 for DOS and Xactimate for Windows) GLS = Glass, Glazing, & Storefronts HVC = Heat, Vent, & Air Conditioning INM = Insulation - Mechanical INS = Insulation LAB = Labor Only LIT = Light Fixtures MAS = Masonry MBL = Marble—Cultured or Natural MPR = Moisture Protection MSD = Mirrors & Shower Doors MSK = Mobile Home Skirting & Setup MTL = Metal Structures & Components ORI = Ornamental Iron PLA = Interior Lath & Plaster PLM = Plumbing PNL = Paneling & Wood Wall Finishes PNT = Painting POL = Swimming Pools & Spas RFG = Roofing SCF = Scaffolding SDG = Siding SFG = Soffit, Fascia, & Gutter SPE = Specialty Items STJ = Steel Joist Components STL = Steel Components STR = Stairs STU = Stucco & Exterior Plaster TBA = Toilet & Bath Accessories TIL = Tile TMB = Timber Framing TMP = Temporary Repairs WDA = Windows - Aluminum WDP = Windows - Sliding Patio WDR = Window Reglazing & Repair WDS = Windows - Skylights WDT = Window Treatments WDV = Windows - Vinyl WDW = Windows - Wood WPR = Wallpaper WRH = Wrecking & Hauling WTR = Water Extraction Services XST = Exterior Structures Appendix A = Standard Variables Appendix B = Room Dimensioning Formulas Appendix C = Calculation Formulas Explanation of Flipchart Items 1/2 & 1/2" drywall - hung, taped, floated, ready for paintSF WC Selector Code works with the category code to call this item. The category code for this item is DRY so the complete Item Code is DRY 1/2. The item Description provides brief details about the item. Default Variable used by the computer to calculate an item’s quantity within a room (see Appendix A for more information). Type of Unit used for pricing this item. For example, this item is priced per square foot (SF). Activity Code. A “+” means replace or do the activity, the “&” means remove and replace the item, and “-” means remove and discard the item. The default activity is shown here. © 1995–2001 Xactware, Inc. All rights reserved. (05/01/01)

Upload: others

Post on 31-Aug-2019

75 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ACC = Accessories—Mobile HomeACT = Acoustical TreatmentsAPP = AppliancesAWN = Awnings & Patio CoversCAB = CabinetryCLN = CleaningCNC = ConcreteCON = Content ManipulationDMO = General DemolitionDOR = DoorsDRY = DrywallELE = ElectricalELS = Electrical - Special SystemsEQU = EquipmentEXC = ExcavationFCC = Floor Covering - CarpetFCR = Floor Covering - ResilientFCS = Floor Covering - StoneFCT = Floor Covering - Ceramic TileFCV = Floor Covering - VinylFCW = Floor Covering - WoodFEE = Permits & FeesFEN = FencingFNC = Finish Carpentry/TrimworkFNH = Finish HardwareFPL = FireplacesFPS = Fire Protection SystemFRM = Framing & Rough Carpentry

Commercial & ResidentialPrice List Flipchart

(For use with Xactimate 5.9 for DOS and Xactimate for Windows)

GLS = Glass, Glazing, & StorefrontsHVC = Heat, Vent, & Air ConditioningINM = Insulation - MechanicalINS = InsulationLAB = Labor OnlyLIT = Light FixturesMAS = MasonryMBL = Marble—Cultured or NaturalMPR = Moisture ProtectionMSD = Mirrors & Shower DoorsMSK = Mobile Home Skirting & SetupMTL = Metal Structures & ComponentsORI = Ornamental IronPLA = Interior Lath & PlasterPLM = PlumbingPNL = Paneling & Wood Wall FinishesPNT = PaintingPOL = Swimming Pools & SpasRFG = RoofingSCF = ScaffoldingSDG = SidingSFG = Soffit, Fascia, & GutterSPE = Specialty Items

STJ = Steel Joist ComponentsSTL = Steel ComponentsSTR = StairsSTU = Stucco & Exterior PlasterTBA = Toilet & Bath AccessoriesTIL = TileTMB = Timber FramingTMP = Temporary RepairsWDA = Windows - AluminumWDP = Windows - Sliding PatioWDR = Window Reglazing & RepairWDS = Windows - SkylightsWDT = Window TreatmentsWDV = Windows - VinylWDW = Windows - WoodWPR = WallpaperWRH = Wrecking & HaulingWTR = Water Extraction ServicesXST = Exterior Structures

Appendix A = Standard VariablesAppendix B = Room Dimensioning FormulasAppendix C = Calculation Formulas

Explanation of Flipchart Items

1/2 & 1/2" drywall - hung, taped, floated, ready for paintSF WC

Selector Code works with the category code to call this item. The category code for this item is DRY so the complete Item Code is DRY 1/2.

The item Description provides brief details about the item.

Default Variable used by the computer to calculate an item’s quantity within a room (see Appendix A for more information).

Type of Unit used for pricing this item. For example, this item is priced per square foot (SF).

Activity Code. A “+” means replace or do the activity, the “&” means remove and replace the item, and “-” means remove and discard the item. The default activity is shown here.

© 1995–2001 Xactware, Inc. All rights reserved. (05/01/01)

1 Flip 5_01.fm Page 1 Thursday, August 22, 2002 9:55 AM

Page 2: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

2

ACC—APP APP—CAB CAB—CLN CLN CLN—DOR DOR

ANCR & Anchor - twist in ground type EAANCR+ & Anchor - two crossed rods driven into the ground EABAXL & Axle - electric brake (with springs) EADAXL- & Axle hubs - brake type EADAXL & Axle - drag (with springs) - no brakes EAEQL & Equalizers EAHTCH & Hitch - "A" frame style with coupler EAHUBS & Axle hubs - drag type EAIBEAM + I beam repair EAMN + Mobile home accessory - minimum charge EAOTRG & Outrigger - up to 30" long EARIM & Rim - doughnut type with no center EASPNG & Spring - mono or single leaf only EATIRE & Tire - 7 x 14.5 or 8 x 14.5 mounted EATIRE+ & Tire and rim - 7 x 14.5 or 8 x 14.5 EATLIT & Tail light - for stop and turn EATNGJK & Tongue jack EA

AV & Acoustic ceiling tile SF CAV+ & Acoustic ceiling tile - High grade SF CAVM+ & Ceiling panel -High grade w/battens & staples- mobile homeSF CAVM++ & Ceiling panel -glued w/no battens & staples- mobile home SF CAV++ & Acoustic ceiling tile - Premium grade SF CAVM & Ceiling panel - w/battens & staples- mobile home SF CBTN & Batten for ceiling panel - mobile home LFFUR & Acoustic ceiling tile furring SF CLP & Light diffusing panel (i.e., cracked ice) SF CLP+ & Light diffusing panel - High grade (i.e., mist white) SF CLP++ & Light diffusing panel - Premium grade (i.e., egg crate) SF CMN + Acoustic ceiling repair - minimum charge EASG & Suspended ceiling grid SF CSG+ & Suspended ceiling grid - High grade (colored) SF CSG++ & Suspended ceiling grid - Premium grade (brass or chrome) SF CSGRS + Suspended ceiling grid - Reset/realign SF CST- & Suspended ceiling tile - Standard grade SF CST & Suspended ceiling tile SF CST+ & Suspended ceiling tile - High grade SF CST++ & Suspended ceiling tile - Premium grade SF CSTG- & Suspended ceiling tile & grid system - Standard grade SF CSTG & Suspended ceiling tile & grid system SF CSTG+ & Suspended ceiling tile & grid system - High grade SF CSTG++ & Suspended ceiling tile & grid system - Premium grade SF CSTRS + Suspended ceiling tile - Detach & reset SF CTINCC & Tin ceiling cornice - embossed - unpainted LF PCTINCC+ & Tin ceiling cornice - embossed - factory painted LF PCTINCC++ & Tin ceiling cornice - embossed - chrome/brass/copper LF PCTINCP & Tin ceiling panel - embossed - unpainted SF CTINCP+ & Tin ceiling panel - embossed - factory painted SF CTINCP++ & Tin ceiling panel - embossed - chrome/brass/copper SF CTINCPRS & Tin ceiling panel - embossed - Detach & reset SF C

CT & Cooktop EACT+ & Cooktop - High grade EACT++ & Cooktop - Premium grade EACTM & Cooktop - mobile home EACTRS + Cooktop - Remove & reset EADRYRS + Dryer - Remove & reset EADW- & Dishwasher - Standard grade EA

DW & Dishwasher EADW+ & Dishwasher - High grade EADW++ & Dishwasher - Premium grade EADW+++ & Dishwasher - Deluxe grade EADWRS + Dishwasher - Remove & reset EAFRZRS + Freezer - Remove & reset EAGD- & Garbage disposal - Standard grade EAGD & Garbage disposal EAGD+ & Garbage disposal - High grade EAGD++ & Garbage disposal - Premium grade EAGDRS + Garbage disposal - Remove & reset EAHD- & Range hood - Standard grade EAHD & Range hood EAHD+ & Range hood - High grade EAHD>- & Range hood - oversized - Standard grade EAHD> & Range hood - oversized EAHD>+ & Range hood - oversized - High grade EAHDM & Range hood - mobile home EAHDRS + Range hood - Remove & reset EAMWS & Microwave oven - over range w/built-in hood EA MWS+ & Microwave oven - over range w/built-in hood - High grade EAMWSRS + Microwave oven - over range type -Remove & reset EAOVBI- & Built-in oven - Standard grade EAOVBI & Built-in oven EAOVBI+ & Built-in oven - High grade EAOVBIRS + Built-in oven - Remove & reset EARF14 & Refrigerator - 14 cf EARF14+ & Refrigerator - 14 cf - High grade EARF18 & Refrigerator - 18 cf EARF18+ & Refrigerator - 18 cf - High grade EARF22 & Refrigerator - 22 cf EARF22+ & Refrigerator - 22 cf - High grade EARF22++ & Refrigerator - 22 cf - Premium grade EA RF25 & Refrigerator - 25 cf EARF25+ & Refrigerator - 25 cf - High grade EARF25++ & Refrigerator - 25 cf - Premium grade EA RFBI & Built-in refrigerator EARFSC & Refrigerator - Commercial - side by side EARFSCRS & Refrigerator - Commercial - side by side - Remove & reset EARFM & Refrigerator - mobile home EARFP + Refrigerator - paint / refinish EARFPG + Refrigerator - paint / refinish & replace gaskets EARFRS + Refrigerator - Remove & reset EARFS22 & Refrigerator/freezer side by side - 22 cf EARFS22+ & Refrigerator/freezer side by side - 22 cf - High Grade EARFS24 & Refrigerator/freezer side by side - 24 cf EARFS24+ & Refrigerator/freezer side by side - 24 cf - High grade EARFWLRS + Refrigerator water line - Disconnect and reconnect EARG- & Range - Standard grade EARG & Range EARG+ & Range - High grade EARG++ & Range - Premium grade EARG+++ & Range - Deluxe grade EARGDI- & Range - 30" drop in - Standard grade EA RGDI & Range - 30" drop in EARGDI+ & Range - 30" drop in - High grade EARGDIRS + Range - drop in - Remove & reset EARGG & Range - 30" - gas EARGG+ & Range - 30" - gas - High grade EARGG++ & Range - 30" - gas - Premium grade EARGGRS + Range - gas - Remove & reset EARGGC & Range - commercial - 30" - gas EA

ACT = Acoustical Treatments

ACC = Accessories—Mobile Home

APP = Appliances

1 Flip 5_01.fm Page 2 Thursday, August 22, 2002 9:55 AM

Page 3: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

3

ACC—APP APP—CAB CAB—CLN CLN CLN—DOR DOR

RGGC+ & Range - commercial - 36" - gas EARGGC++ & Range - commercial - 48" - gas EARGGCRS + Range - commercial - gas - Remove & reset EARGM & Range and oven combination - mobile home EARGRS + Range - electric - Remove & reset EA TC & Trash compactor EATC+ & Trash compactor - High grade EATCRS + Trash compactor - Remove & reset EAWSHRS + Washing machine - Remove & reset EA

CARPT & Carport - Freestanding metal - Moderate load SFCARPT- & Carport - Freestanding metal - Light load SFCARPT+ & Carport - Freestanding metal - Heavy load SFMN + Awning repair - Minimum charge EAPC & Patio cover - Attached - Aluminum - Moderate load SFPC- & Patio cover - Attached - Aluminum - Light load SFPC+ & Patio cover - Attached - Aluminum - Heavy load SFPCDK & Patio cover - Roof Decking only - Moderate load SFPCDK- & Patio cover - Roof Decking only - Light load SFPCDK+ & Patio cover - Roof Decking only - Heavy load SFPCDKRS & Patio cover - Roof Decking - Detach & reset SFPCFACG & Patio cover - Fascia end - Guttered LFPCFACN & Patio cover - Fascia end - Non-guttered LFPCFACRS& Patio cover - Fascia end - Detach & reset LFPCRS + Patio or walkway cover - Detach & reset SFPEG & Patio Enclosure - Half Glass SFPEG+ & Patio Enclosure - Full Glass SFPES & Patio Enclosure - Half Screen SFPES+ & Patio Enclosure - Full Screen SFPOSTA & Patio Post - Aluminum tube LFPOSTS & Patio Post - Steel tube LFPOSTSC & Patio Post - Scrolled LFWINA & Awning - Window/door - Aluminum or steel LFWINA>RS + Awning - Aluminum/steel (Oversized) - Detach & Reset LFWINA+ & Awning - Window/door - Alum./steel - High grade LFWINA> & Awning - Window/door - Alum./stl. (Oversized) LFWINA>+ & Awning - Window/door - Alum./stl. - High grade (Oversized) LFWINASP & Awning side panels - Alum./steel (per set) EAWINASP> & Awning side panels - Alum./steel (Oversized) (per set) EAWINA+ + Awning - Aluminum or steel - Add for each color stripe EAWINARS + Awning - Aluminum/steel - Detach & reset LFWINC & Awning - Window/door - Canvas (fixed) LFWINC+ & Awning - Window/door - Canvas (retractable) LFWINCM & Awning - Canvas (retractable) - Add to motorize EAWINCRS & Awning - Canvas - Detach & reset LFWINV & Awning - Window/door - Vinyl (backlit type) LFWINVRS & Awning - Vinyl - Detach & reset LF

BS & Backsplash - plastic laminate SFCROWN + Add for crown molding per LF LFCTBB & Countertop - wood - butcher block (hardrock maple) SFCTFBSRS + Backsplash - flat laid plastic laminate - Detach & reset LFCTFL- & Countertop - flat laid plastic laminate - Standard grade LFCTFL & Countertop - flat laid plastic laminate LFCTFL+ & Countertop - flat laid plastic laminate - High grade LFCTFL++ & Countertop - flat laid plastic laminate - Premium grade LFCTFL> & Countertop - flat laid plastic laminate - Oversized LFCTFL>+ & Countertop - flat laid plastic laminate - Oversized - high gr. LFCTFLRS + Countertop - flat laid plastic laminate - Detach & Reset LFCTFLSPL4 & 4" backsplash for flat laid countertop LF

CTFLSPL6 & 6" backsplash for flat laid countertop LFCTGM & Countertop - Granite or Marble - Average grade SFCTGM+ & Countertop - Granite or Marble - High grade SFCTPF- & Countertop - post formed plastic laminate - Standard grade LFCTPF & Countertop - post formed plastic laminate LFCTPF+ & Countertop - post formed plastic laminate - High grade LFCTPF++ & Countertop - post formed plastic laminate - Premium grade LFCTPF> & Countertop - post formed plastic laminate - oversized LFCTPFRS + Countertop - post formed plastic laminate - Detach & reset LFCTSBSRS+ Backsplash - solid surface - Unattached - Detach & reset LFCTMITER & Add-on for mitered corner EACTSNKB & Sink - Bar - solid surface material EACTSNKD & Sink - double- solid surface material EACTSNKS & Sink - single - solid surface material EACTSS & Countertop - solid surface - Average grade SFCTSS+ & Countertop - solid surface - High grade SFCTSS++ & Countertop - solid surface - Premium grade SFCTSSBS & Backsplash - solid surface - Unattached LFCTSSBS+ & Backsplash - solid surf. - Covered (seamless - perm.) LFCTSSGL & Countertop - solid surface - Add for gloss finish SFCTSSIN & Countertop - solid surface - Add for inlays LFCTSSRS + Countertop - solid surface/granite - Detach & reset SFCTST & Countertop - stainless steel LFCTTZ & Countertop - concrete (terrazzo) SFFFHC & Laminated plastic cabinets - full height unit - Comm grade LFFH- - & Cabinetry - full height units - utility (unfinished) LFFH- & Cabinetry - full height unit - Standard grade LFFH & Cabinetry - full height unit LFFH+ & Cabinetry - full height unit - High grade LFFH++ & Cabinetry - full height unit - Premium grade LFFHRS + Cabinetry - full height unit - Detach & reset LFFLOW- & Cabinetry - plastic laminate lower (base) units - Std grade LFFLOW & Cabinetry - plastic laminate lower (base) units LFFLOW+ & Cabinetry - plastic laminate lower (base) units - High grade LFFLOWC & Laminated plastic cabinets - lower unit - Comm grade LFFUP- & Cabinetry - plastic laminate upper (wall) units - Std grade LFFUP & Cabinetry - plastic laminate upper (wall) units LFFUP+ & Cabinetry - plastic laminate upper (wall) units - High grade LFFUPC & Laminated plastic cabinets - upper unit - Comm grade LFGALLEY + Add for galley rail per LF LFGL + Add for frosted/etched or beveled glass, per cabinet door EAGL+ + Add for leaded glass (standard design), per cabinet door EAKNPL- & Cabinet knob or pull - standard grade EAKNPL & Cabinet knob or pull - average grade EAKNPL+ & Cabinet knob or pull - high grade EAKNPLRS + Cabinet knob or pull - Detach & reset EALOW- - & Cabinetry - lower (base) units - utility (unfinished) LFLOW- & Cabinetry - lower (base) units - Standard grade LFLOW & Cabinetry - lower (base) units LFLOW+ & Cabinetry - lower (base) units - High grade LFLOW++ & Cabinetry - lower (base) units - Premium grade LFLOWM & Cabinetry - lower w/flush doors - mobile home LFLOWRS + Cabinetry - lower (base) units - Detach & reset LFLZS + Add for lazy susan EAMC- & Medicine cabinet - Standard grade EAMC & Medicine cabinet EAMC+ & Medicine cabinet - High grade EAMC++ & Medicine cabinet - Premium grade EAMCM & Medicine cabinet - mobile home EAMCRS + Medicine cabinet - Detach & reset EAMN + Cabinetry repair - Minimum charge EAPLY & Replace cabinet panels - end, side, or back SF

AWN = Awnings & Patio Covers

CAB = Cabinetry

1 Flip 5_01.fm Page 3 Thursday, August 22, 2002 9:55 AM

Page 4: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

4

ACC—APP APP—CAB CAB—CLN CLN CLN—DOR DOR

PLY+ & Replace cabinet panels - end, side, or back (high grade) SFPLYTK + Re-skin toe kick LFRLOUT + Add for role out shelves per LF LFUP- - & Cabinetry - upper (wall) units - utility (unfinished) LFUP- & Cabinetry - upper (wall) units - Standard grade LFUP & Cabinetry - upper (wall) units LFUP+ & Cabinetry - upper (wall) units - High grade LFUP++ & Cabinetry - upper (wall) units - Premium grade LFUPM & Cabinetry - upper w/flush doors - mobile home LFUPRS + Cabinetry - upper (wall) units - Detach & reset LFVAL & Cabinet valance LFVAN- & Vanity - Standard grade LFVAN & Vanity LFVAN+ & Vanity - High grade LFVAN++ & Vanity - Premium grade LFVANM & Vanity - mobile home LFVANRS + Vanity - Detach & reset LF

AC + Clean acoustic ceiling (popcorn) texture SF CACCND + Clean air conditioning condenser unit EA ACT + Clean acoustic ceiling tile SF CAV- + Clean {V} - Light SF WCAV + Clean {V} SF WCAV+ + Clean {V} - Heavy SF WCAVT + Clean hand textured ceiling SF CAW + Clean exterior masonry - acid wash SF WAWMN + Clean exterior masonry - acid wash - Minimum charge EAAWN + Clean aluminum awning - window or door EAB + Clean baseboard LF PFBAC + Clean bath accessory EABAL + Clean balustrade LFBAR< + Clean light bar - Small EABAR + Clean light bar EABAR> + Clean light bar - Large EABATH + Clean bathroom fixtures EABATH> + Clean bathroom fixtures - Large bathroom EABBH + Clean baseboard heater LFBF + Clean door - bifold set EABFAN + Clean bathroom fan EABID + Clean bidet EABK + Clean bookcase SFBLND- + Clean window blind - horizontal or vertical - Light SFBLND + Clean window blind - horizontal or vertical SF BLND+ + Clean window blind - horizontal or vertical - Heavy SFBLR + Clean boiler unit EABM + Clean beams - exposed LFBP + Clean door - bypass (sliding) set EABPNL + Clean electrical breaker panel EABPNL> + Clean electrical breaker panel - Large EA CA + Clean cold air return cover EACB + Clean cove base molding - rubber or vinyl LF PFCHAN + Clean chandelier EACHAN+ + Clean chandelier - above average detail EA CHAN++ + Clean chandelier - with crystal EACHIME + Clean door chime EACHR + Clean chair rail LF PFCLOS< + Clean closet package (shelf & rod) - Small EACLOS + Clean closet package (shelf & rod) EACLOS> + Clean closet package (shelf & rod) - Large EACLOSLF + Clean closet shelf and rod per lineal foot LFCNC + Clean concrete on {V} SF F

CNCSTP + Clean concrete step EACNR + Clean corner trim LFCOVE + Clean carpet cove (wall wrap) LF PFCT + Clean cooktop EACTF + Clean countertop SFCTTL + Clean countertop - tile SFCWN + Clean crown molding LF PCDCT + Clean ductwork system - Int. - vacuum/deodorize/seal EADCTLF + Clean ductwork - Exterior (per LF) LFDCTRM + Clean ductwork - Exterior (per room) EADCTV + Clean ductwork system - Interior - vacuum only EADODR + Clean and deodorize building - Hot thermal fog CFDODROZ + Clean and deodorize building - Ozone treatment CFDOR + Clean door (per side) EADOR+ + Clean door - with detail (per side) EADORH + Clean door hardware EADRAP + Clean drapery - per pleat (3'- 6' length) - unlined EADRAP+ + Clean drapery - per pleat (3'- 6' length) - lined EADRAP> + Clean drapery - per pleat (6'- 8' length) - unlined EADRAP>+ + Clean drapery - per pleat (6'- 8' length) - lined EADRAP>> + Clean drapery - per pleat (8'- 10' length) - unlined EADRAP>>+ + Clean drapery - per pleat (8'- 10' length) - lined EADRAPHW + Clean drapery hardware EADVENT + Clean dryer vent LFDW- + Clean dishwasher - Light EADW + Clean dishwasher EADW+ + Clean dishwasher - Heavy EAEC + Clean evaporative cooler EAECDIF + Clean evaporative cooler diffuser EAF- + Clean floor SF FF + Clean floor, strip & wax SF FF+ + Clean floor, strip & wax - several layers of wax SF FFAC + Clean fascia LFFAN + Clean exhaust fan EAFAU + Clean sink faucet EAFCC + Clean and deodorize carpet SF FFCCP + Re-apply protective coating on carpet SFFCCSTN + Clean and deodorize carpet - heavy staining SF FFCCSTP + Clean carpet - cleaning charge per step EAFCS + Clean floor - stone SF FFCT + Clean floor - tile SF FFCW + Clean floor and seal - wood SF FFH + Clean cabinetry - full height - inside and out LFFHF + Clean cabinetry - full height - faces only LF FL + Clean light fixture - fluorescent EAFLD + Clean folding door (per side) EAFN + Clean ceiling fan and light EAFNTN + Clean drinking fountain EAFOIL + Clean wallpaper - foil SF WFPL + Clean fireplace face & mantel SFFPS + Clean floor and prep for overlay of subfloor SF FFR + Clean door - French (per side) EAFR2 + Clean door - French double door set (per side) EAFRFA + Clean furnace - forced air EAFRFA> + Clean furnace - forced air - Large EAFRW + Clean furnace - wall type EAFW + Clean foundation wall SFGD + Clean garbage disposal EAGDOR + Clean fireplace glass doors EAGLS + Clean glazed store front - glass and aluminum SF WGN + General clean-up HRGRASS + Clean wallpaper - grass cloth SF W

CLN = Cleaning

1 Flip 5_01.fm Page 4 Thursday, August 22, 2002 9:55 AM

Page 5: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

5

ACC—APP APP—CAB CAB—CLN CLN CLN—DOR DOR

GRIL + Clean ornamental iron grill SFGUT + Clean gutter/downspout LFHD + Clean range hood EAHMF + Clean humidifier unit EAHR + Clean handrail - wall mounted LFHRTH + Clean fireplace hearth SFIC + Clean intercom station EAJST + Clean floor or roof joist system SF FLIT- + Clean light fixture - low detail EALIT + Clean light fixture EALIT+ + Clean light fixture - high detail EALOW + Clean cabinetry - lower - inside and out LF LOWF + Clean cabinetry - lower - faces only LFLP + Clean light diffusing panel SFLTUB + Clean laundry tub EALVR- + Clean door - half louvered unit (per side) EA LVR + Clean door - full louvered unit (per side) EA MAR + Clean Marlite (waterproof) paneling SFMAS + Clean masonry SF WMC + Clean medicine cabinet EAMC> + Clean medicine cabinet - Large EAMCH + Clean chimney - metal LFMIR + Clean mirror SFMN + Cleaning - Minimum charge EAMTIL + Clean mirror tile SFMTLR + Clean metal roofing SFMW + Clean microwave EAOH + Clean overhead door & hardware EAOH> + Clean overhead door & hardware - Large EAOHO + Clean overhead (garage) door opener EAOL + Clean phone, TV, or speaker outlet EAOP + Clean door / window opening EAOPLF + Clean door / window opening LFORI + Clean ornamental iron handrail LFOS + Clean outlet or switch EAOV- + Clean oven - Light EAOV + Clean oven EAOV+ + Clean oven - Heavy EAPATIO- + Clean aluminum patio cover - Light SFPATIO + Clean aluminum patio cover SFPATIO+ + Clean aluminum patio cover - Heavy SFPDOR< + Clean patio door (sliding glass) - Small (per side) EAPDOR + Clean patio door (sliding glass) (per side) EAPDOR> + Clean patio door (sliding glass) - Large (per side) EAPH + Clean panic hardware EAPNL- + Clean paneling - Light SF WPNL + Clean paneling SF WPNL+ + Clean paneling - Heavy SF WPWASH- + Clean with pressure/chemical spray - Light SFPWASH + Clean with pressure/chemical spray SFPWASH+ + Clean with pressure/chemical spray - Heavy SFPWASH++ + Clean with pressure/chemical spray - Very heavy SFPWASHMN+ Pressure/chemical wash - Minimum charge EARAD + Clean radiator unit EARADC + Clean radiator cover EARC + Clean recessed light fixture EAREG + Clean register - heat / AC EARF- + Clean refrigerator - Light EARF + Clean refrigerator EARF+ + Clean refrigerator - Heavy EARG- + Clean range - Light EARG + Clean range EA

RG+ + Clean range - Heavy EARISER + Clean stair riser - per side EARU + Clean window blind - roll up EARW + Clean roof window SFSB + Sandblasting SFSB+ + Sandblasting - Heavy SFSB++ + Sandblasting - Extra heavy SFSBMN + Sandblasting - Minimum charge EASCR + Clean fireplace screen EASCRN + Clean window screen EASDGM + Clean siding - metal or vinyl SF WSDGW + Clean siding - wood SF WSDOR + Clean shower door EASFTM + Clean soffit - metal or vinyl SFSFTW + Clean soffit - wood SFSG + Clean suspended ceiling grid SF CSH + Clean deck sheathing SF FSHOE + Clean base shoe LF PFSHTR + Clean shutter EASHW + Clean shelving - wood LFSHWI + Clean shelving - wire (vinyl coated) LFSILM + Clean sill - cultured marble LFSILT + Clean sill - tile LFSILW + Clean sill - wood LFSKY< + Clean roof window or skylight - Small EASKY + Clean roof window or skylight EASKY> + Clean roof window or skylight - Large EASKY>> + Clean roof window or skylight - Extra large EASMOKE + Clean smoke detector EASNK + Clean sink EASNKD + Clean sink - double EASNKDFAU + Clean sink - double and faucet EASNKFAU + Clean sink and faucet EASPD + Clean soap dispenser EASROD + Clean shower curtain rod EASSNK + Clean service sink EAST + Clean suspended ceiling tile SF CSTD + Clean stud wall SF WSTM + Clean {V} with pressure steam SFSTN + Clean stone veneer SF WSTOL + Clean window stool & apron LFSTP + Clean steps (per tread) EASTR + Clean stair stringer LFSTRMD + Clean storm door assembly EASTRMW + Clean storm window EASTU + Clean stucco SF WSWR- + Clean shower - Light EASWR + Clean shower EASWR+ + Clean shower - Heavy EAT + Clean floor - terrazzo SF FTBAR + Clean towel bar EATC- + Clean trash compactor - Light EATC + Clean trash compactor EATC+ + Clean trash compactor - Heavy EATIL + Clean ceramic tile SF WTILR + Clean tile roofing SFTLT + Clean toilet EATLTP + Clean toilet partition - per stall EATLTS + Clean toilet seat EATPD + Clean toilet paper dispenser EATRD + Clean stair tread - per side EATRIM + Clean trim - wood LF

1 Flip 5_01.fm Page 5 Thursday, August 22, 2002 9:55 AM

Page 6: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

6

ACC—APP APP—CAB CAB—CLN CLN CLN—DOR DOR

TS + Clean thermostat EATSFAU + Clean tub / shower faucet EATUB- + Clean tub - Light EATUB + Clean tub EATUB+ + Clean tub - Heavy EATUBDR + Clean bathtub enclosure - sliding glass doors EATUBSUR- + Clean tub and surround - Light EATUBSUR + Clean tub and surround EATUBSUR+ + Clean tub and surround - Heavy EAUL + Clean floor underlayment SF FUP + Clean cabinetry - upper - inside and out LF UPF + Clean cabinetry - upper - faces only LFUR + Clean urinal EAVAN + Clean vanity - inside and out LFVANF + Clean vanity - faces only LFVENT + Clean roof vent EAWD< + Clean window, 3 - 9 SF EAWD + Clean window, 10 - 20 SF EAWD> + Clean window, 21 - 40 SF EAWD>> + Clean window, 41 - 60 SF EAWH- + Clean water heater - Light EAWH + Clean water heater EAWH+ + Clean water heater - Heavy EAWHP + Clean whirlpool EAWPR- + Clean wallpaper - Light SF WWPR + Clean wallpaper SF WWPR+ + Clean wallpaper - Heavy SF WWS + Clean water softener EAX + Clean exterior door (per side) EAXLIT + Clean exterior light fixture EA

COR1 + Concrete core drilling - 1" dia. x 1'deep EA COR2 + Concrete core drilling - 2" dia. x 1'deep EA COR3 + Concrete core drilling - 3" dia. x 1'deep EA COR4 + Concrete core drilling - 4" dia. x 1'deep EA CORMN + Concrete core drilling - Minimum charge EACS + Concrete sealer - brush or spray applied SF CYMN + Concrete CY - Minimum charge EADYE + Concrete dye - additional charge SF FEPX + Epoxy injection - concrete repair (per LF of crack) LFEPXF + Epoxy finish - one coat over concrete floor SF FEPXF2 + Epoxy finish - two coats over concrete floor SF FEPXMN + Epoxy injection - concrete repair - Minimum charge EAFTG- & Footings - labor and materials CY FTG:FTG & Footings - labor & materials - reinforced CY FTG:FTGLF & Footings - 24" x 10" LFFW & Concrete wall - labor & materials CY FW:FWLF & Concrete wall - 8" x 8' - labor and material LF PFFWS + Foundation wall sawing - 8" wall LFFWSMN + Foundation wall sawing - Minimum charge EAGUN & Gunite - per inch of thickness - no wire mesh SFGUNM & Wire mesh for gunite - 6"x 6", #10 SFLWGYP & Light weight, gypsum concrete SFMN + Miscellaneous concrete - Minimum charge EANS + Non-slip aluminum oxide finish SF FPIER & Concrete pier or footing with post anchor EA PUMP + Concrete pump truck (per hour) HRRB3 + Steel rebar - # 3 (3/8") LFRB4 + Steel rebar - # 4 (1/2") LFRB5 + Steel rebar - # 5 (5/8") LFRB6 + Steel rebar - # 6 (3/4") LF

RB7 + Steel rebar - # 7 (7/8") LFRB8 + Steel rebar - # 8 (1") LFSAW4 + Concrete floor sawing - 4" slab LFSAW6 + Concrete floor sawing - 6" slab LFSAWMN + Concrete floor sawing - Minimum charge EASAWSL + Concrete cutting - slab (per LF inch) LF SAWW + Concrete cutting - wall (per LF inch) LFSL2 & Concrete slab on grade - 2" - finished in place SF FSL4 & Concrete slab on grade - 4" - finished in place SF FSL6 & Concrete slab on grade - 6" - finished in place SF FSLCY & Concrete slab on grade - finished in place CY SL:SLLW & Concrete slab - light weight concrete CYSLPTN + Add for color & stamped pattern (brick/stone) in slab SFSLRE3 & Concrete slab reinforcement - #3 (3/8") - steel rebar grid SF FSLRE4 & Concrete slab reinforcement - #4 (1/2") - steel rebar grid SF FSLREM & Concrete slab reinforcement - 6" x 6", #10 wire mesh SF FSTP & Concrete step - labor & material CY STP:TILT6 & Tilt-up concrete panel, 6" thick SFTILT8 & Tilt-up concrete panel, 8" thick SFTILT10 & Tilt-up concrete panel, 10" thick SFTILTLW + Add for lightweight concrete SFTILTPEB + Add for aggregate (pebble) finish SFTILTRIB + Add for ribbed or ornamental finish SF TILTRUB + Add for rubbed finish SFTILTRUS + Add for rustication - feature/chamfer strips LFTILTSB + Add for sandblasted finish SFTILTSCB + Add for sand casting bed (forming tilt-up on ground) SF

ROOM< + Contents - move out then reset - Small room EAROOM + Contents - move out then reset EAROOM> + Contents - move out then reset - Large room EAROOM>> + Contents - move out then reset - Extra large room EA

ACT - Remove wet ceiling tile and bag for disposal SF CAR - Dump and landfill fees - (per ton) EADRY - Remove wet drywall - includes cleanup of residue SFDTRUCK - Single axle dump truck - per load - including dump fee EADUMP< - Dumpster load - Small EADUMP - Dumpster load EADUMP> - Dumpster load - Large EADUMP>> - Dumpster load - Extra large EAFCC - Remove wet, non-salvageable carpet, cut & bag for disp. SFFCCGD - Remove wet, non-salv. glue down carpet - cut/bag for disp. SFPU - Haul debris - per pickup truck load EA

A + Door astragal LFAV- & Interior door unit - Standard grade EAAV & Interior door unit EAAV+ & Interior door unit - High grade EAAV++ & Interior door unit - Premium grade EAAVM- & Interior door unit - Standard grade - mobile home EAAVM & Interior door unit - mobile home EAAVM+ & Interior door unit - High grade - mobile home EAAVM++ & Interior door unit - Premium grade - mobile home EABF- & Bifold door set - lauan - mahogany EABF & Bifold door set - colonist EABF+ & Bifold door set - Birch veneer EABF++ & Bifold door set - solid core - half-louvered EABF< & Bifold door set - Colonist - Single EA

CNC = Concrete

CON = Content Manipulation

DMO = General Demolition

DOR = Doors

1 Flip 5_01.fm Page 6 Thursday, August 22, 2002 9:55 AM

Page 7: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

7

ACC—APP APP—CAB CAB—CLN CLN CLN—DOR DOR

BF<- & Bifold door set - Lauan/mahogany - Single EABF<+ & Bifold door set - Birch veneer - Single EABF<++ & Bifold door set - solid core - half louvered - Single EABF<RS + Bifold door set (single) - Slab only - Detach & reset EABFLVR & Bifold door set - full louvered EABFLVR< & Bifold door set - full louvered - Single EABFMIR & Bifold mirrored door set EABFMIR< & Bifold mirrored door set - Single EABFMIR+ & Bifold mirrored door set - High grade EA BFMIR<+ & Bifold mirrored door set - High grade - Single EABFPNL & Bifold doorset - solid fir 4 or 6 panel EABFPNL< & Bifold doorset - solid fir 4 or 6 panel - Single EABFRS + Bifold door sets - slabs only - Detach & reset EABIRCH- & Interior door - birch - slab only EABIRCH & Interior door - birch - pre-hung unit EABIRCH+ & Interior door - birch - stain grade jamb and casing EABP- & Bypass (sliding) door set - lauan/mahogany EA BP & Bypass (sliding) door set - Colunist EABP+ & Bypass (sliding) door set - Birch EABP++ & Bypass (sliding) door set - Panel EA BPMIR & Bypass mirrored door set EABPMIR+ & Bypass mirrored door set - High grade EA BPRS + Bypass (sliding) door set - slabs only - Detach & reset EACOL- & Interior door - colonist - slab only EACOL & Interior door - colonist EACOL+ & Interior door - colonist - stain grade jamb & casing EADORRS + Interior door - Detach & reset EADOR-RS + Interior door - Detach & reset - slab only EADUT-RS + Dutch door - Detach & reset - slab only EADUTCH- & Exterior door - Dutch - slabs only EADUTCH & Exterior door - Dutch - pre-hung unit EAFLD & Folding door EAFR- & French door - wood - slab only EAFR & French door - pre-hung unit EAFR+ & French door - stain grade jamb and casing EA FR2 & French double door set EAFR2+ & French double door set - stain grade jamb & casing EAFR2RS + French double door set - Detach & reset EAFRM- & French door - metal - insulated - slab only EA FRM & French door - metal - insulated - pre-hung unit EAFRM2 & French double door set - metal - insulated - pre-hung unit EA FRRS + French door - Detach & reset EALV & Add for louvered insert, up to 18" x 12" EALVR- & Interior door - half louvered - pre-hung unit EALVR & Interior door - full louvered - pre-hung unit EAMAH- & Interior door - lauan / mahogany - slab only EA MAH & Interior door - lauan / mahogany - pre-hung unit EAMAH+ & Interior door - lauan / mahogany - stain grade jamb & case EAMAH++ & Interior door - lauan / mahogany - mahogany jamb & casing EAMN + Door repair - Minimum charge EAOAK- & Interior door - oak veneer - slab only EAOAK & Interior door - oak veneer - pre-hung unit EAOAK+ & Interior door - oak veneer - oak veneer jamb & casing EAOAK++ & Interior door - oak veneer - solid oak jamb & casing EAOH8- & Overhead door & hardware - 8' x 7'- Standard grade EAOH8 & Overhead door & hardware - 8' x 7' EAOH8+ & Overhead door & hardware - 8' x 7'- High grade EAOH8++ & Overhead door & hardware - 8' x 7'- Premium grade EAOH9- & Overhead door & hardware - 9' x 7'- Standard grade EAOH9 & Overhead door & hardware - 9' x 7' EAOH9+ & Overhead door & hardware - 9' x 7'- High grade EAOH9++ & Overhead door & hardware - 9' x 7'- Premium grade EA

OH10- & Overhead door & hardware - 10' x 7'- Standard grade EAOH10 & Overhead door & hardware - 10' x 7' EAOH10+ & Overhead door & hardware - 10' x 7'- High grade EAOH10++ & Overhead door & hardware - 10' x 7'- Premium grade EAOH12- & Overhead door & hardware - 12' x 7'- Standard grade EAOH12 & Overhead door & hardware - 12' x 7' EAOH12+ & Overhead door & hardware - 12' x 7'- High grade EAOH12++ & Overhead door & hardware - 12' x 7'- Premium grade EAOH16- & Overhead door & hardware - 16' x 7'- Standard grade EAOH16 & Overhead door & hardware - 16' x 7' EAOH16+ & Overhead door & hardware - 16' x 7'- High grade EAOH16++ & Overhead door & hardware - 16' x 7'- Premium grade EAOH18- & Overhead door & hardware - 18' x 7'- Standard grade EAOH18 & Overhead door & hardware - 18' x 7' EAOH18+ & Overhead door & hardware - 18' x 7'- High grade EAOH18++ & Overhead door & hardware - 18' x 7'- Premium grade EAOHDORMN+ Overhead door repair - Minimum charge EAOHO- & Overhead (garage) door opener - Standard grade EAOHO & Overhead (garage) door opener EAOHO+ & Overhead (garage) door opener - High grade EA OHO++ & Overhead (garage) door opener - Premium grade EAOHORM + Remote unit for overhead door opener EA OHORS + Overhead (garage) door opener - Detach & reset EAOHPB & Overhead door panel - bottom section EAOHPM & Overhead door panel - middle section EAOHPT & Overhead door panel - top section EAOHRS + Overhead door - Detach & reset EAOHRS> + Overhead door - Detach & reset - Large EAOHTRAK & Overhead door track LFOHWD + Add for square window - overhead door per window EAOHWD+ + Add for decorative window - overhead door - per window EAPKT- & Pocket door unit - lauan/mahogany EAPKT & Pocket door unit - Colunist EAPKT+ & Pocket door unit - Birch EAPKT++ & Pocket door unit - Panel EAPLN + Plane and refit door EAPNL- & Interior door - panel - slab only EAPNL & Interior door - panel - pre-hung unit EAPNL+ & Interior door - panel - stain grade jamb & casing EAPNL++ & Interior door - panel - stain grade, hardwd jamb & casing EA REV + Reverse angle track - O.H. door installation on masonry EAS10-10 & Sectional overhead door, 10' x 10' EAS10-10I & Sectional overhead door, 10' x 10' - insulated EAS10-12 & Sectional overhead door, 10' x 12' EAS10-12I & Sectional overhead door, 10' x 12' - insulated EAS12-10 & Sectional overhead door, 12' x 10' EAS12-10I & Sectional overhead door, 12' x 10' - insulated EAS12-12 & Sectional overhead door, 12' x 12' EAS12-12I & Sectional overhead door, 12' x 12' - insulated EAS12-14 & Sectional overhead door, 12' x 14' EAS12-14I & Sectional overhead door, 12' x 14' - insulated EAS14-10 & Sectional overhead door, 14' x 10' EAS14-10I & Sectional overhead door, 14' x 10' - insulated EAS14-12 & Sectional overhead door, 14' x 12' EAS14-12I & Sectional overhead door, 14' x 12' - insulated EAS14-14 & Sectional overhead door, 14' x 14' EAS14-14I & Sectional overhead door, 14' x 14' - insulated EAS16-10 & Sectional overhead door, 16' x 10' EAS16-10I & Sectional overhead door, 16' x 10' - insulated EAS16-12 & Sectional overhead door, 16' x 12' EAS16-12I & Sectional overhead door, 16' x 12' - insulated EASD3 & Steel door, 3' x 7' EA

1 Flip 5_01.fm Page 7 Thursday, August 22, 2002 9:55 AM

Page 8: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

DOR—ELE ELE ELE—FCC FCC—FCW FCW—FNC FNC—FNH

8

SD3FR & Steel door, 3' x 7' - fire rated EASD4 & Steel door, 4' x 7' EASD4FR & Steel door, 4' x 7' - fire rated EASDF3 & Steel door frame - 3' opening EASDF4 & Steel door frame - 4' opening EASDF6 & Steel door frame - 6' opening EASDF8 & Steel door frame - 8' opening EASDFEM + Steel door frame - Add to install in existing masonry EASDFNM + Steel door frame - Add to install in new masonry EASTRMD- & Storm door assembly - Standard grade EA STRMD & Storm door assembly EASTRMD+ & Storm door assembly - High grade EASTRMD++& Storm door assembly - Premium grade EA STRMDRS+ Storm door assembly - Detach & reset EAWD4 + Wood door - Add for 4' door width EAWD4FR + Wood door - Add for 4' door width, fire rated EAWD7 + Wood door - Add for 7' door height EAWDB & Wood door - Birch face, 5 or 7 ply hollow core EAWDBFR & Wood door - Birch face, fire rated (mineral fiber core) EAWDBSC & Wood door - Birch face, solid core EAWDL & Wood door - Lauan face, 5 or 7 ply hollow core EAWDLFR & Wood door - Lauan face, fire rated (mineral fiber core) EAWDLSC & Wood door - Lauan face, solid core EAWDO & Wood door - Oak face, 5 or 7 ply hollow core EA WDOFR & Wood door - Oak face, fire rated (mineral fiber core) EAWDOSC & Wood door - Oak face, solid core EAWDPNL & Wood door - panel - solid pine EAWF & Wood door frame & trim (for a 2" x 4" wall) LF WF6 & Wood door frame & trim (for a 2" x 6" wall) LF WFH & Wood door frame & trim - hardwood (for a 2" x 4" wall) LFWFH6 & Wood door frame & trim - hardwood (for a 2" x 6" wall) LFWFHX & Wood door frame & trim - exterior - hardwood LF WFHX7 & Wood door frame & trim - exterior - hardwood, 7 1/4" wide LFWFX & Wood door frame & trim - exterior - softwood LF WFX7 & Wood door frame & trim - exterior - softwood, 7 1/4" wide LFWN + Add for glass light, up to 24" x 20" EAX- & Exterior door - solid core lauan/mahogany or birch flush EAX & Exterior door - metal - insulated - flush or panel style EAX+ & Exterior door - metal - insulated/wood - High grade EAX++ & Exterior door - Fiberglass/wood w/detail - Premium grade EAXRS + Exterior door - Detach & reset EAXSL & Exterior door sidelite (window) - 12"- 14" width EAXSLRS + Exterior door sidelite (window) - Detach & reset EAXSM & Exterior door with storm door - mobile home EA XSM+ & Exterior door with storm door - High grade - mobile home EA

1/2- & 1/2" drywall - hung, taped, ready for texture SF WC1/2 & 1/2" drywall - hung, taped, floated, ready for paint SF WC1/2+ & 1/2" drywall - hung, taped, heavy texture, ready for paint SF WC1/2++ & 1/2" drywall - hung, taped, with smooth wall finish SF WC1/2FT & 1/2" drywall - hung & fire taped only SF WC1/2H & 1/2" drywall - hung only (no tape or finish) SF WC1/2OP & 1/2" drywall over plaster with light texture SF WC1/2WR & 1/2" water rock (greenboard) hung, taped ready for texture SF1/4WM & 1/4" drywall - vinyl coated w/seam battens - mobile home SF5/8- & 5/8" drywall - hung, taped, ready for texture SF WC5/8 & 5/8" drywall - hung, taped, floated, ready for paint SF WC5/8+ & 5/8" drywall - hung, taped, heavy texture, ready for paint SF WC5/8++ & 5/8" drywall - hung, taped, with smooth wall finish SF WC5/8C & 5/8" drywall - type C - hung, taped, light texture SF WC5/8FT & 5/8" drywall - hung & fire taped only SF WC

5/8H & 5/8" drywall - hung only (no tape or finish) SF WCAC- & Acoustic ceiling (popcorn) texture - light SF CAC & Acoustic ceiling (popcorn) texture SF CAC+ & Acoustic ceiling (popcorn) texture - heavy SF CACMN + Acoustic ceiling (popcorn) texture - Minimum charge EAADD12 + Additional cost for high wall or ceiling, 12'- 15' high SF CADD16 + Additional cost for high wall or ceiling, 16'- 19' high SF CGLIT + Glitter application to acoustic ceiling SF CHC & Hat channel, 16" OC SF WHC> & Hat channel, 24" OC SF WMASK + Mask room (40 - 70 lf) & prep for drywall or plaster work EAMASKLF + Mask wall (per LF) LF PCMN + Drywall repair - Minimum charge EAMST2 & Metal studding, 2 1/2" wide, 16" OC, 25 Ga. SF WMST2+ & Metal studding, 2 1/2" wide, 16" OC, 20 Ga. SF WMST4 & Metal studding, 3 5/8" wide, 16" OC, 25 Ga. SF WMST4+ & Metal studding, 3 5/8" wide, 16" OC, 20 Ga. SF WMST6 & Metal studding, 6" wide, 16" OC, 25 Ga. SF WMST6+ & Metal studding, 6" wide, 16" OC, 20 Ga. SF WPATCH + Drywall patch, ready for paint EARADIANT & Radiant heat - 1/2" double layer drywall (wire not incl.) SF CRC & Resilient channel (for sound) - 16" oc SF WCRC> & Resilient channel (for sound) - 24" oc SF WCRND + Add for bullnose (rounded) corners SF WCRNDLF + Add for bullnose (rounded) corners - per LF LFSG & Suspended grid system for drywall SF CTEX- + Texture drywall - machine SF WCTEX + Texture drywall - light hand texture SF WCTEX+ + Texture drywall - heavy hand texture SF WCTEX++ + Texture drywall - smooth / skim coat SF WCZC & Z channel, 16" OC SF WZC> & Z channel, 24" OC SF W

110 & 110 volt wiring run, box and plug or switch EA 220 & 220 volt wiring run, box and receptacle EABBH< & Baseboard electric heater - 4' EABBH & Baseboard electric heater - 6' EABBH> & Baseboard electric heater - 8' EABBH>> & Baseboard electric heater - 10' EABBHRS + Baseboard electric heater - 4' to 6' - Detach & reset EABBHRS> + Baseboard electric heater - 8' to 10' - Detach & reset EABFAN< & Bathroom fan, light, and heater - Small EA BFAN & Bathroom fan, light, and heater EABFAN> & Bathroom fan, light, and heater - Large EA BFANRS + Bathroom fan, light, and heater - Detach & reset EABPNL70 & Breaker panel - 70 amp EABPNL100 & Breaker panel - 100 amp EABPNL125 & Breaker panel - 125 amp EABPNL200 & Breaker panel - 200 amp EABPNL300 & Breaker panel - 300 amp EABPNLRS + Breaker panel - Detach & reset EABPNLRS< + Electrical breaker panel - 70 to 125 amp - Detach & rest EABRK & Circuit breaker - 110 volt - single pole EA BRK220 & Circuit breaker - 220 volt - double pole EABRKGFI & Circuit breaker - ground-fault circuit-interrupter (GFI) EABRKMD & Circuit breaker - main disconnect EACB< & Circuit breaker - bolt-on - 1 pole, 15 to 50 amp EACB2< & Circuit breaker - bolt-on - 2 pole, 15 to 50 amp EACB2 & Circuit breaker - bolt-on - 2 pole, 60 to 100 amp EACB3< & Circuit breaker - bolt-on - 3 pole, 15 to 50 amp EACB3 & Circuit breaker - bolt-on - 3 pole, 60 to 100 amp EA

DRY = Drywall

ELE = Electrical

1 Flip 5_01.fm Page 8 Thursday, August 22, 2002 9:55 AM

Page 9: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

DOR—ELE ELE ELE—FCC FCC—FCW FCW—FNC FNC—FNH

9

CB3> & Circuit breaker - bolt-on - 3 pole, 225 amp EA CB3>> & Circuit breaker - bolt-on - 3 pole, 400 amp EACB3>>> & Circuit breaker - bolt-on - 3 pole, 600 amp EACB400 & Main circuit breaker - 3 pole, 400 amp EA CB600 & Main circuit breaker - 3 pole, 600 amp EA CB800 & Main circuit breaker - 3 pole, 800 amp EA CB1200 & Main circuit breaker - 3 pole, 1200 amp EA CB2000 & Main circuit breaker - 3 pole, 2,000 amp EACBGFI & Circuit breaker - bolt-on - ground-fault interrupter (GFI) EACBUTTON & Door chime button (button only) EACHIME- & Door chime - Standard grade EACHIME & Door chime EACHIME+ & Door chime - High grade EACHIME++ & Door chime - Premium grade EACHIMERS + Door chime - Detach & reset EACO & Carbon monoxide detector EACO- & Carbon monoxide detector - Standard grade EACO+ & Carbon monoxide detector - High grade EACORS + Carbon monoxide detector - Detach & reset EACSF & Commercial electrical (SF of bldg) - Average load SF FCSF+ & Commercial electrical (SF of bldg) - Heavy load SF FCSF++ & Commercial electrical (SF of bldg) - Extra heavy load SF FDB400 & Distribution board - 400 amp, without breakers EADB600 & Distribution board - 600 amp, without breakers EADB800 & Distribution board - 800 amp, without breakers EADB1200 & Distribution board - 1200 amp, without breakers EADB2000 & Distribution board - 2000 amp, without breakers EAEMT1/2 & Electrical metallic tubing, (conduit) 1/2" LFEMT3/4 & Electrical metallic tubing, (conduit) 3/4" LFEMT1 & Electrical metallic tubing, (conduit) 1" LF EMT2 & Electrical metallic tubing, 2" LFEMT3 & Electrical metallic tubing, 3" LFEMT4 & Electrical metallic tubing, 4" LFENT1/2 & Electrical nonmetallic tubing, 1/2" LF ENT3/4 & Electrical nonmetallic tubing, 3/4" LF FLEX & Flexible metal conduit, 1/2" to 1" LFFAN- & Exhaust fan - Standard grade EAFAN & Exhaust fan EAFAN+ & Exhaust fan - High grade EAFAN++ & Exhaust fan - Premium grade EAFANRS + Exhaust fan - Detach & reset EAGFI & Ground-fault circuit-interrupter (GFI) outlet EAGROD & Grounding rod - copper clad with clamp, 8' EA HTAPE & Electrical heat tape - for exposed water lines - mobile home LFHTAPERS + Electrical heat tape - detach & reset - mobile home LFHNGR & Conduit hanger or support for 1/2"- 1 1/2" conduit EAHNGR> & Conduit hanger or support for 2"- 4" conduit EAICM- & Intercom - Master station - Standard grade EA ICM & Intercom - Master station EAICM+ & Intercom - Master station - High grade EAICM++ & Intercom - Master station - Premium grade EAICMRS + Master intercom station - Detach & reset EAICR & Intercom - Remote station EAICR+ & Intercom - Remote station - High grade EAICRS + Intercom station - Detach & reset EAJBOX & Junction box EALV & Phone / low voltage copper wiring LFLV> & Phone / low voltage copper wiring - Heavy gauge LF MEG + Megameter check electrical circuits - average residence EAMETR< & Meter base and main disconnect - 100 - 125 amp EAMETR & Meter base and main disconnect - 200 amp EA METR> & Meter base and main disconnect - 300 amp EA

METR>> & Meter base - 400 to 2000 amp EAMETRRS + Meter base and main disconnect - Detach & reset EAMN + Electrical repair - Minimum charge EAOL & Phone, TV, or speaker outlet EAOL220 & 220 volt outlet EAOL220+ & 220 volt outlet - Heavy duty EAOL220RS + 220 volt outlet - Detach & reset EAOLRS + Phone, TV, or speaker outlet - Detach & reset EAOS & Outlet or switch EAOS+ & Outlet or switch - High grade EAOSBOX & Outlet box - includes 4 connectors and plaster ring EAOSRS + Outlet or switch - Detach & reset EAPB100 & Panelboard - 120/240, 100 amp, single phase (per circuit) EAPB100+ & Panelboard - 120/208, 100 amp, three phase (per circuit) EAPB100++ & Panelboard - 277/480, 100 amp, three phase (per circuit) EAPB225 & Panelboard - 120/240, 225 amp, single phase (per circuit) EAPB225+ & Panelboard - 120/208, 225 amp, three phase (per circuit) EAPB225++ & Panelboard - 277/480, 225 amp, three phase (per circuit) EAPB400 & Panelboard - 120/240, 400 amp, single phase (per circuit) EAPB400+ & Panelboard - 120/208, 400 amp, three phase (per circuit) EAPB400++ & Panelboard - 277/480, 400 amp, three phase (per circuit) EAPB600+ & Panelboard - 120/208, 600 amp, three phase (per circuit) EAPB600++ & Panelboard - 277/480, 600 amp, three phase (per circuit) EAPBRS + Panelboard - detach and reset EAPLBOX & Pull box for 3/4"-2" conduit - with 2 connectors and plate EAPLBOX> & Pull box for 2"- 4" conduit - with 2 connectors and plate EAPVC1/2 & PVC schedule 40 conduit, 1/2" LFPVC3/4 & PVC schedule 40 conduit, 3/4" LFPVC1 & PVC schedule 40 conduit, 1" LFPVC2 & PVC schedule 40 conduit, 2" LFPVC3 & PVC schedule 40 conduit, 3" LFPVC4 & PVC schedule 40 conduit, 4" LFRADIANT + Radiant heat - wiring only SF CRC1/2 & Rigid conduit, 1/2" LFRC3/4 & Rigid conduit, 3/4" LFRC1 & Rigid conduit, 1" LFRC1-1/2 & Rigid conduit, 1 1/2" LFRC2 & Rigid conduit, 2" LFRC2-1/2 & Rigid conduit, 2 1/2" LFREWIRE + Rewire - average residence - copper wiring SF FSB400 & Switchboard (main disconnect) - 400 amp, up to 600 volt EASB600 & Switchboard (main disconnect) - 600 amp, up to 600 volt EASB800 & Switchboard (main disconnect) - 800 amp, up to 600 volt EASB1200 & Switchboard (main disconnect) - 1200 amp, up to 600 volt EASB2000 & Switchboard (main disconnect) - 2000 amp, up to 600 volt EASBRS + Switchboard - Detach and reset EASECC + Security system - contact w/wire (per opening) EASECC+ + Security system - contact w/wire (per opening)- High grade EASECK + Security system - key pad EASECK+ + Security system - key pad - High grade EA SECM + Security system - pressure mat SFSECMD + Security system - motion detector EASECP + Security system - control panel EASECP+ + Security system - control panel - High grade EASECPH + Security system - photo-electric beam EA SFLX1/2 & Sealtite flexible conduit, 1/2" LFSFLX3/4 & Sealtite flexible conduit, 3/4" LFSFLX1 & Sealtite flexible conduit, 1" LFSFLX2 & Sealtite flexible conduit, 2" LFSMOKE- & Smoke detector - Standard grade EASMOKE & Smoke detector EASMOKE+ & Smoke detector - High grade EA

1 Flip 5_01.fm Page 9 Thursday, August 22, 2002 9:55 AM

Page 10: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

DOR—ELE ELE ELE—FCC FCC—FCW FCW—FNC FNC—FNH

10

SMOKE++ & Smoke detector - Premium grade EASMOKERS+ Smoke detector -Detach & reset EASS100 & Safety switch (disconnect) - 100 amp EA SS200 & Safety switch (disconnect) - 200 amp EA SS400 & Safety switch (disconnect) - 400 amp EA SS800 & Safety switch (disconnect) - 800 amp EA TRUNK- & Trunk cable - Light gauge copper LFTRUNK & Trunk cable - copper conductors LFTRUNK+ & Trunk cable - Heavy gauge copper LFTRUNK++ & Trunk cable - Extra heavy gauge copper conductors LFTS & Thermostat - electric heat EATS+ & Thermostat - electric heat - High grade EATSB & Thermostat - electric heat - baseboard mounted EATV- & Television antenna - Standard grade EATV & Television antenna EATV+ & Television antenna - High grade EATV++ & Television antenna - Premium grade EATVRS + Television antenna - Detach & reset EAW110 & 110 volt wiring (12/2 copper conductor with ground) LFW220 & 220 volt wiring (8/3 copper conductor with ground) LFW12 & #12 to #16 gauge copper wire - stranded or solid LFW8 & #8 to #10 gauge copper wire - stranded or solid LFW4 & #4 to #6 gauge copper wire - stranded or solid LFW2 & #2 gauge copper wire - stranded or solid LF W1/0 & 1/0 to #1 gauge copper cable LFW4/0 & 4/0 to 2/0 gauge copper cable LFW250MCM & 250 MCM copper cable LFW500MCM & 500 MCM copper cable LFWALL & Wall heater EAWALL+ & Wall heater - High grade EAWALL++ & Wall heater - Premium grade EAXOS & Exterior outlet or switch EAXOSRS + Exterior outlet or switch - Detach & reset EA

BITV & Built-in large screen television EACVAC & Central vacuum - cleaning system EACVAC+ & Central vacuum - cleaning system - large EADISH & Digital satellite system with one receiver EADISH+ & Digital satellite system with dual receiver capabilities EADISH++ & 7’ 6" Digital satellite dish with controller and receiver EADISHR & Receiver for digital satellite system EAFA & Fire alarm system (per detector) EAIC & Intercom system (per station) EAICM & Intercom - Master station EAICM+ & Intercom - Master station - High grade EAICM++ & Intercom - Master station - Premium grade EAICR & Intercom - Remote station EAICR+ & Intercom - Remote station - High grade EAICRS + Intercom station - Detach & reset EALPS & Lightning protection system EAPLITE & Programmable lighting system EASD & Smoke detector EASD+ & Smoke detector - High grade EASD++ & Smoke detector - Premium grade EASDRS + Smoke detector - Detach & reset EASECC & Security system - contact w/wire (per opening) EASECC+ & Security system - contact w/wire (per opening) High grade EASECK & Security system - key pad EASECK+ & Security system - key pad - High grade EA SECM & Security system - pressure mat SFSECMD & Security system - motion detector EA

SECP & Security system - control panel EASECP+ & Security system - control panel - High grade EASECPH & Security system - photo electric beam EA SHOME & Home management system (Smart home) EASOLARP & Solar electric panel EASOLARRS + Solar electric panel - detach & reset EASURVC & Surveillance camera - color EASURVM & Surveillance monitor - 14" color EASURVS & Surveillance system - cameras, monitors, etc EASND & Sound system (per outlet) EA

BHOE + Backhoe and operator HRCOMP + Walk behind drum compactor and operator HRCOMP< + Walk behind plate compactor and operator HRCOMP> + Riding drum compactor and operator HRCRANE + Crane and operator - 17 ton capacity - 65 extension boom HRDOZER + Dozer/crawler and operator HRDTRUK + Dump truck and operator - 10 ton HRDTRUK< + Single axle dump truck and operator HRLOADER + Front end wheel loader and operator HRSKID + Skid steer loader and operator HRTRHOE + Trackhoe/excavator and operator HR

GRAV + Gravel (per CY) CYTSOIL + Topsoil (per CY) CY

AV- & Carpet - (material and labor) - Standard grade SF FAV & Carpet - (material and labor) SF FAV+ & Carpet - (material and labor) - High grade SF FAV++ & Carpet - (material and labor) - Premium grade SF FAVB + Additional labor cost for Berber or patterned carpets SF FAVRS + Carpet - Detach & relay SF FCOVE & Carpet cove (wall wrap) LF PFCOVE> & Carpet cove (wall wrap) - High LF PFCOVE>> & Carpet cove (wall wrap) - Extra high LF PFCP- & Cut pile carpet - 24 oz. SF FCP & Cut pile carpet - 36 oz. SF FCP+ & Cut pile carpet - 46 oz. SF FCP++ & Cut pile carpet - 54 oz. SF FEDGE & Carpet - metal transition strip LFFP + Floor prep (scrape rubber back residue) SF FGD- & Glue down carpet - Standard grade SF FGD & Glue down carpet SF FGD+ & Glue down carpet - High grade SF FGD++ & Glue down carpet - Premium grade SF FGDC & Glue down carpet - Commercial grade SF FI/O- & Indoor / outdoor carpet - Standard grade SF FI/O & Indoor / outdoor carpet SF FI/O+ & Indoor / outdoor carpet - High grade SF FI/O++ & Indoor / outdoor carpet - Premium grade SF FLAY + Lay carpet - labor only SF FLP- & Loop pile carpet - 20 oz. SF FLP & Loop pile carpet - 26 oz. SF FLP+ & Loop pile carpet - 36 oz. SF FMN + Carpet - Minimum charge EAPAD- & Carpet pad - Standard grade SF FPAD & Carpet pad SF FPAD+ & Carpet pad - High grade SF FPAD++ & Carpet pad - Premium grade SF F

ELS = Electrical - Special Systems

EXC = Excavation

FCC = Floor Covering - Carpet

EQU = Equipment

1 Flip 5_01.fm Page 10 Thursday, August 22, 2002 9:55 AM

Page 11: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

DOR—ELE ELE ELE—FCC FCC—FCW FCW—FNC FNC—FNH

11

PFE & Pad - felt, 5/16" SF FPRE3/8 & Pad - rebond, 3/8", 7 lb. SF FSEAMS + Seam carpet LFSTP + Step charge for carpet installation EASTP+ + High grade step wrap charge EAWOOL & Carpet - wool - looped SF FWOOL+ & Carpet - wool - cut SF F

RSR & Stair riser - resilient - 7" high, 1/8" thick LFSNO & Stair nosing safety tread - 1 1/2"x 3" LFSTR & Stair tread - 12" wide, 5/16" thick LFTA & Tile - asphalt SF FTA+ & Tile - asphalt, High grade SF FTFU & Tile - Futuras (tufted rubber), 12"x 12" SF FTRU & Tile - rubber, 1/8" thick SF FTV & Tile - vinyl SF FTV+ & Tile - vinyl - High grade SF FTV++ & Tile - vinyl - Premium grade SF FTVC & Tile - vinyl composition SF FTVC+ & Tile - vinyl composition - High grade SF FTVC++ & Tile - vinyl composition - Premium grade SF F

AV & Stone floor covering SF FAV+ & Stone floor covering - High grade SF FAVRS + Stone floor covering - Detach & reset SF FGROUT + Regrout stone floor SF FMBL & Marble or Granite floor tile 12" x 12" SF FMBL+ & Marble or Granite floor tile 12" x 12" - High grade SF FMN + Stone floor covering - Minimum charge EASLATE & Slate floor covering SF FSLATE+ & Slate floor covering - High grade SF FSLATERS + Slate floor covering - Detach & reset SF FTZ2 & Terrazzo - bonded to substrate, 2" thick SF FTZ3 & Terrazzo - over sand cushion, 3" thick SF FTZB & Terrazzo cove base, 4" to 6" high LF PFTZBRASS + Terrazzo - Add for brass strips SF FTZCLR + Terrazzo - Add for 2 colors of terrazzo SF FTZEPX + Terrazzo - Epoxy system, 1/4" thick SF FTZR + Terrazzo resurfacing - grind and re-seal SF F

AV- & Tile floor covering - Standard grade - glued to sub-floor SF FAV & Tile floor covering SF FAV+ & Tile floor covering - High grade SF FAV++ & Tile floor covering - Premium grade SF FB & Tile base LF PFGROUT + Regrout tile floor SF FMN + Tile floor covering - Minimum charge EAMORTAR + Mortar bed for tile floors SF FQT & Quarry tile floor SF FQT+ & Quarry tile floor - High grade SF FQT++ & Quarry tile floor - Premium grade SF FTRAV & Travertine tile SF F

AV- & Vinyl floor covering (sheet goods) - Standard grade SF FAV & Vinyl floor covering (sheet goods) SF FAV+ & Vinyl floor covering (sheet goods) - High grade SF FAV++ & Vinyl floor covering (sheet goods) - Premium grade SF FCB2 & Cove base molding - rubber or vinyl, 2" high LF PF

CB3 & Cove base molding - rubber or vinyl, 3" high LF PFCB4 & Cove base molding - rubber or vinyl, 4" high LF PFCOVE & Vinyl cove LF PFCOVE> & Vinyl cove - High wrap LF PFCOVE>> & Vinyl cove - Very high wrap LF PFMN + Vinyl floor covering - Minimum charge EAPREP + Floor preparation for sheet goods SF FPREP+ + Floor preparation for sheet goods - Heavy SF FRT- & Resilient (v/a type) tile flooring - Standard grade SF FRT & Resilient (v/a type) tile flooring SF FRT+ & Resilient (v/a type) tile flooring - High grade SF FRT++ & Resilient (v/a type) tile flooring - Premium grade SF FUL1/4 & Underlayment - 1/4" lauan/mahogany plywood SF FUL1/4M & Underlayment - 1/4" Masonite SF FUL1/4P & Underlayment - 1/4" BC plywood SF FUL1/4W & Underlayment - 1/4" waterproof waferboard SF FUL1/2 & Underlayment - 1/2" particle board SF FUL1/2P & Underlayment - 1/2" plywood SF FUL3/8 & Underlayment - 3/8" particle board SF FUL3/8P & Underlayment - 3/8" plywood SF FUL5/8 & Underlayment - 5/8" particle board SF FUL3/4 & Underlayment - 3/4" particle board SF FV- & Vinyl tile - Standard grade SF FV & Vinyl tile SF FV+ & Vinyl tile - High grade SF FV++ & Vinyl tile - Premium grade SF F

AV- & Hardwood floor covering - Standard grade SF FAV & Hardwood floor covering SF FAV+ & Hardwood floor covering - High grade SF FAV++ & Hardwood floor covering - Premium grade SF FAVPF & Pre-finished solid wood flooring SF FAVPF+ & Pre-finished solid wood flooring (High grade) SF FAVPF++ & Pre-finished solid wood flooring (Premium grade) SF FFIN- + Sand and seal wood floor SF FFIN + Sand & finish wood floor (natural finish) SF FFIN+ + Sand, stain, and finish wood floor SF FFINMN + Finish wood floor - Minimum charge EAFINSC + Screen and coat wood floor SF FFIR- & Fir subfloor - no finish SF FFIR & Fir floor - stain grade SF FFS & Felt and sleepers/underlay - wood floor over concrete SF FLAM- & Laminated wood flooring - Standard grade SF FLAM & Laminated wood flooring SF FLAM+ & Laminated wood flooring - High grade SF FLAMB & Baseboard - for laminate flooring LF PFLAME & End molding - for laminate flooring LFLAMQ & Quarter round - for laminate flooring LF PFLAMR & Reducer strip - for laminate flooring LFLAMS & Stair nosing - for laminate flooring LFLAMT & T-molding - for laminate flooring LFLAMTD & Engineered wood flooring - Oak plank SF FLAMTD+ & Engineered wood flooring - Ash or Maple SF FLAMTD++ & Engineered wood flooring - Brazillian Cherry or Walnut SF FM & Maple floor (gymnasium style) SF FM+ & Maple floor (gymnasium style) - High grade SF FM++ & Maple floor (gymnasium style) - Premium grade SF FMN + Wood floor covering - Minimum charge EAOPL & Oak floor planked w/plugs (i.e., Bruce) SF FPQ- & Parquet flooring - Standard grade SF FPQ & Parquet flooring SF F

FCR = Floor Covering - Resilient

FCS = Floor Covering - Stone

FCV = Floor Covering - Vinyl

FCW = Floor Covering - Wood

FCT = Floor Covering - Ceramic Tile

1 Flip 5_01.fm Page 11 Thursday, August 22, 2002 9:55 AM

Page 12: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

DOR—ELE ELE ELE—FCC FCC—FCW FCW—FNC FNC—FNH

12

PQ+ & Parquet flooring - High grade SF FPQ++ & Parquet flooring - Premium grade SF FSOFT- & Softwood flooring - Standard grade SF FSOFT & Softwood flooring SF FSOFT+ & Softwood flooring - High grade SF FSOFT++ & Softwood flooring - Premium grade SF FWPQ & Walnut parquet floor SF FWPQ+ & Walnut parquet floor - High grade SF FWPQ++ & Walnut parquet floor - Premium grade SF F

ASBT + Asbestos test fee EAASBTS + Asbestos test fee (per sample) EAPLAN + Architectural/Drafting fees (Bid item) EARADON + Radon test fee - full service radon survey EARADONS + Radon test fee (per sample) EATIPF + Taxes, insurance, permits & fees (Bid item) EA

BARB & Barbed wire - 3 strands mounted on wire arm LF BW & Basket weave fence - 2' to 4' high LFBW> & Basket weave fence - 4' to 6' high LFBWGT & Basket weave fence gate - 2' to 4' high LFBWGT> & Basket weave fence gate - 4' to 6' high LF CL3 & Chain link fence - 3' LFCL4 & Chain link fence - 4' LFCL5 & Chain link fence - 5' LFCL6 & Chain link fence - 6' LFCL7 & Chain link fence, 7' high LFCLFRS + Chain link fence fabric - Detach & reset SFCLGT3 & Chain link fence gate - 3' high - rolling LFCLGT4 & Chain link fence gate - 4' high - rolling LFCLGT5 & Chain link fence gate - 5' high - rolling LFCLGT6 & Chain link fence gate - 6' high - rolling LFCLGTRS + Chain link fence gate - rolling - Detach & reset LFCLGTS3 & Chain link fence gate - 3' high - swinging LFCLGTS4 & Chain link fence gate - 4' high - swinging LFCLGTS5 & Chain link fence gate - 5' high - swinging LFCLGTS6 & Chain link fence gate - 6' high - swinging LFCLGTSRS+ Chain link fence gate - swinging - Detach & reset LFCLGTV3 & Chain link fence gate - vinyl coated - 3' high - rolling LFCLGTV4 & Chain link fence gate - vinyl coated - 4' high - rolling LFCLGTV5 & Chain link fence gate - vinyl coated - 5' high - rolling LFCLGTV6 & Chain link fence gate - vinyl coated - 6' high - rolling LFCLGTVS3 & Chain link fence gate - vinyl coated - 3' high - swinging LFCLGTVS4 & Chain link fence gate - vinyl coated - 4' high - swinging LFCLGTVS5 & Chain link fence gate - vinyl coated - 5' high - swinging LFCLGTVS6 & Chain link fence gate - vinyl coated - 6' high - swinging LFCLPS + Chain link fence - vinyl privacy slats SFCLTOPR & Chain-link fence - top rail LFCLV3 & Chain link fence - vinyl coated - 3' LFCLV4 & Chain link fence - vinyl coated - 4' LFCLV5 & Chain link fence - vinyl coated - 5' LFCLV6 & Chain link fence - vinyl coated - 6' LFMN + Fencing repair - Minimum charge EAOPEN- & Electric gate opener - Standard grade EA OPEN & Electric gate opener EAOPEN+ & Electric gate opener - High grade EAP & Picket fence, 3' to 4' high LFP> & Picket fence, 5' to 6' high LFPGT & Picket fence gate - 3' to 4' high LFPGT> & Picket fence gate - 5' to 6' high LF

POST4 & Post - 4' fence EAPOST5 & Post - 5' fence EAPOST6 & Post - 6' fence EARAIL & Wood fence rail - 2" x 4" x 8' EARAILT & Wood fence rail - 2" x 4" x 8' - treated EARAZOR & Razor wire installed on top of a chain link fence LFSCTN4RS + Wood fence 3'- 4' high - Remove & reset - per 8' section EASCTN6RS + Wood fence 5'- 6' high - Remove & reset - per 8' section EASLAT4 & Wood fence slat 3'-4' high EASLAT4T & Wood fence slat 3'-4' high - treated EASLAT6 & Wood fence slat 5'-6' high EASLAT6T & Wood fence slat 5'-6' high - treated EASLATRS & Wood fence slat - Detach & reset EATRMTL & Post - terminal - metal EATRWD & Post - terminal - wood EATRWDT & Post - terminal - treated wood EAVMN + Vinyl fence repair - Minimum charge EAVNL4 & Vinyl (PVC) fence, 3'- 4' high - installed LF VNL6 & Vinyl (PVC) fence, 5'- 6' high - installed LF VNLGT4 & Vinyl (PVC) fence gate, 3'- 4' high - installed LFVNLGT6 & Vinyl (PVC) fence gate, 5'- 6' high - installed LFWDF4 & Wood fence 3'- 4' high LFWDF4T & Wood fence 3'- 4' high - treated LFWDF6 & Wood fence 5'- 6' high LFWDF6T & Wood fence 5'- 6' high - treated LFWDGT4 & Wood gate 3'- 4' high LFWDGT4 & Wood gate 3'- 4' high - treated LFWDGT6 & Wood gate 5'- 6' high LFWDGT6 & Wood gate 5'- 6' high - treated LFWDGTRS + Wood gate - Detach & reset LF

1X2 & Trim board - 1" x 2" - installed LF1X2C & Trim board - 1" x 2" - installed (cedar) LF1X2R & Trim board - 1" x 2" - installed (redwood) LF1X4 & Trim board - 1" x 4" - installed LF1X4C & Trim board - 1" x 4" - installed (cedar) LF1X4R & Trim board - 1" x 4" - installed (redwood) LF1X6 & Trim board - 1" x 6" - installed LF1X6C & Trim board - 1" x 6" - installed (cedar) LF1X6R & Trim board - 1" x 6" - installed (redwood) LF1X8 & Trim board - 1" x 8" - installed LF1X8C & Trim board - 1" x 8" - installed (cedar) LF1X8R & Trim board - 1" x 8" - installed (redwood) LF1X10 & Trim board - 1" x 10" - installed LF1X10C & Trim board - 1" x 10" - installed (cedar) LF1X10R & Trim board - 1" x 10" - installed (redwood) LF1X12 & Trim board - 1" x 12" - installed LF1X12C & Trim board - 1" x 12" - installed (cedar) LF1X12R & Trim board - 1" x 12" - installed (redwood) LF1XRS + Trim board - 1" x 2" to 1" x 6" - Detach & reset LF1XRS> + Trim board - 1" x 8" to 1" x 12" - Detach & reset LFATTIC & Attic entrance cover and trim EAB & Baseboard - 2 1/4" LF PFB+ & Baseboard - 2 1/4" stain grade LF PFB2M & Baseboard - 2 1/4" MDF LFB2M+ & Baseboard - 2 1/4" MDF w/detail LFB3 & Baseboard - 3 1/4" LF PFB3+ & Baseboard - 3 1/4" stain grade LF PFB3H & Baseboard - 3 1/4" hardwood LF PFB3H+ & Baseboard - 3 1/4" hardwood - molded w/detail LF PFB3H++ & Baseboard - 3 1/4" hardwood - molded w/intricate detail LF PF

FEE = Permits & Fees

FEN = Fencing

FNC = Finish Carpentry/Trimwork

1 Flip 5_01.fm Page 12 Thursday, August 22, 2002 9:55 AM

Page 13: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

DOR—ELE ELE ELE—FCC FCC—FCW FCW—FNC FNC—FNH

13

B3M & Baseboard - 3 1/4" MDF LF PFB3M+ & Baseboard - 3 1/4" MDF w/detail LF PFB6 & Baseboard - 6" fir LF PFB6S & Baseboard - 6" fir with base shoe LF PFB6H & Baseboard - 6" hardwood LF PFB6H+ & Baseboard - 6" hardwood - molded w/detail LF PFB6H++ & Baseboard - 6" hardwood - molded w/intricate detail LF PFB6M & Baseboard - 6" MDF LF PFB6M+ & Baseboard - 6" MDF w/detail LF PFBAL- & Balustrade - Standard grade LFBAL & Balustrade LFBAL+ & Balustrade - High grade LFBAL++ & Balustrade - Premium grade LFBALRS + Balustrade - Detach & reset LFBCS & Baseboard - w/ cap and shoe LF PFBCS+ & Baseboard - w/ cap and shoe - stain grade LF PFBH & Baseboard - 2 1/4" hardwood LF PFBH+ & Baseboard - 2 1/4" hardwood - molded w/detail LF PFBH++ & Baseboard - 2 1/4" hardwood - molded w/intricate detail LF PFBK10 & Bookcase - built in - 10" - (SF of face area) SFBK12 & Bookcase - built in - 12" - (SF of face area) SFBPL & Baseboard - plastic (simulated wood) LF PFBPL+ & Baseboard - plastic (simulated wood) - High grade LF PFBRS + Baseboard - Detach and reset LFBRS> + Baseboard - Detach and reset - oversized or multimember LFC & Casing LFC+ & Casing - stain grade LFC> & Casing - oversized LFC>+ & Casing - oversized - stain grade LFCAM & Casing - MDF LFCAM+ & Casing - MDF w/detail LFCAM> & Casing - MDF - oversized LFCAM>+ & Casing - MDF - oversized w/detail LFCH & Casing - hardwood LFCH+ & Casing - hardwood - molded w/detail LFCH++ & Casing - hardwood - molded w/intricate detail LFCH> & Casing - hardwood - oversized LFCH>+ & Casing - hardwood - oversized - molded w/detail LFCHR & Chair rail LF PFCHR+ & Chair rail - stain grade LF PFCHR> & Chair rail - oversized LF PFCHR>+ & Chair rail - oversized - stain grade LF PFCHR>++ & Chair rail - oversized - stain grade - molded w/detail LF PFCHRH & Chair rail - hardwood LF PFCHRH+ & Chair rail - hardwood - molded w/detail LF PFCHRH++ & Chair rail - hardwood - molded w/intricate detail LF PFCHRH>+ & Chair rail - hardwood - oversized - molded w/detail LF PFCHRH>++ & Chair rail - hardwood - oversized - w/intricate detail LF PFCHRM & Chair rail - MDF LF PFCHRM+ & Chair rail - MDF w/detail LF PFCHRM> & Chair rail - MDF - oversized LF PFCHRM>+ & Chair rail - MDF - oversized w/detail LF PFCHRRS + Chair rail - Detach & reset LFCLOS & Closet shelf and rod package LF CLOSL & Closet package - hall/linen (4 shelves 3' wide) EACLOSL> & Closet package - hall/linen (4 shelves 5'- 6' wide) EACLOSM & Closet Organizer - Melamine - Average LFCLOSM+ & Closet Organizer - Melamine - High grade LFCLOSM++ & Closet Organizer - Melamine - Premium grade LFCLOSW & Closet Organizer - Wire shelves - Average LFCLOSW+ & Closet Organizer - Wire shelves - High grade LFCLOSW++ & Closet Organizer - Wire shelves - Premium grade LF

CLROD & Closet rod LFCLROD+ & Closet rod - High grade LFCLRODRS + Closet rod - Detach & reset LFCM & Cove molding - 3/4" LFCM+ & Cove molding - 3/4" - stain-grade fir LFCMH & Cove molding - 3/4" - hardwood LFCNR & Corner trim LFCNR+ & Corner trim - stain grade LFCNRH & Corner trim - hardwood LFCNRPL & Corner trim - plastic LFCRS + Casing - Detach & reset LFCWN & Crown molding LF PCCWN+ & Crown molding - stain grade LF PCCWN> & Crown molding - oversized LF PCCWN>+ & Crown molding - oversized - stain grade LF PCCWNH & Crown molding - hardwood LF PCCWNH> & Crown molding - hardwood - oversized LF PCCWNM & Crown molding - MDF LF PCCWNM+ & Crown molding - MDF w/detail LF PCCWNM> & Crown molding - MDF - oversized LF PCCWNM>+ & Crown molding - MDF - oversized w/detail LF PCCWNRS + Crown molding - Detach & reset LFDOP< & Door opening trim (jamb & casing) - Small opening EADOP & Door opening trim (jamb & casing) EADOP> & Door opening trim (jamb & casing) - Large opening EADOP>> & Door opening trim (jamb & casing) - Extra large opening EADOPRS + Door opening trim - Detach & reset EAHR & Handrail - wall mounted LFHR+ & Handrail - wall mounted - stain grade LFHRH & Handrail - wall mounted - hardwood LFHRRS + Handrail - wall mounted - Detach & reset LFLATTICE & Lattice work SFMN + Finish carpentry - Minimum charge EAOHJ & Jamb and trim for overhead door unit LFQR & Quarter round - 3/4" LFQR+ & Quarter round - 3/4" - stain grade LFQRH & Quarter round - 3/4" - hardwood LFSH12 & Shelving - 12" - in place LFSH12+ & Shelving - 12" - in place - stain grade LF SH16 & Shelving - 16" - in place LFSH16+ & Shelving - 16" - in place - stain grade LF SH24 & Shelving - 24" - in place LFSH24+ & Shelving - 24" - in place - stain grade LF SHOE & Base shoe LF PFSHOE+ & Base shoe - stain grade LF PFSHOEH & Base shoe - hardwood LF PFSHRS + Shelving - Detach & reset LFSILL & Window sill LFSILL+ & Window sill - stain grade LFSILLH & Window sill - hardwood LFSTOL & Window stool & apron LFWOP & Window trim (casing & stop) LFWOP+ & Window trim - stain grade (casing & stop) LF WOPH & Window trim - hardwood (casing & stop) LF

BAC- & Bath accessory - Standard grade EABAC & Bath accessory EABAC+ & Bath accessory - High grade EABAC++ & Bath accessory - Premium grade EABFT & Bifold door track & hardware EABFTRS + Bifold door track & hardware - Detach & reset EA

FNH = Finish Hardware

1 Flip 5_01.fm Page 13 Thursday, August 22, 2002 9:55 AM

Page 14: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

FNH—FPL FPL—FRM FRM FRM—HVC HVC—INM INM—LIT

14

BMP & Bumper for loading dock EABRUSH & Brush and cup holder EABRUSHRS+ Brush and cup holder - Detach & reset EACHK & Ceiling hook EACHKRS + Ceiling hook - Detach & reset EADB- & Deadbolt - Standard grade EADB & Deadbolt EADB+ & Deadbolt - High grade EADB++ & Deadbolt - Premium grade EADBRS + Deadbolt - Detach & reset EACDB & Deadbolt - Commercial grade EACDB+ & Deadbolt - Heavy duty - Commercial grade EA CDBRS + Deadbolt - Commercial grade - Detach & reset EADBX & Door lockset & deadbolt - exterior EADBX+ & Door lockset & deadbolt - exterior - High grade EADBX++ & Door lockset & deadbolt - exterior - Premium grade EADC & Door closer EADC+ & Door closer - High grade EADC++ & Door closer - Premium grade EACDC & Door closer - Commercial grade EACDC+ & Door closer - Heavy duty - Commercial grade EA CDCRS + Door closer - Commercial grade - Detach & reset EADCH & Door security chain set EADCRS + Door closer - Detach & reset EADORH- & Door lockset - interior - Standard grade EADORH & Door lockset - interior EADORH+ & Door lockset - interior - High grade EA DORH++ & Door lockset - interior - Premium grade EA DORHRS + Door lockset - Detach & reset EADORHX- & Door lockset - exterior - Standard grade EADORHX & Door lockset - exterior EADORHX+ & Door lockset - exterior - High grade EA DORHX++ & Door lockset - exterior - Premium grade EA FB & Flush bolts (set of 2) EAHANG & Clothes hanger - door mounted EAHING4 & Door hinge, 4" ball bearing (set of 3) EA HING4+ & Door hinge, 4" ball bearing w/non-removable pin (set of 3) EAHINGE- & Door hinges - Standard grade (per set) EA HINGE & Door hinges (per set) EAHINGE+ & Door hinges - High grade (per set) EAHINGERS + Door hinges - per set - Detach & reset EAHOLD + Door hold open EAHOLDRS + Door hold open - Detach & reset EAKICK & Door kick plate - 16 gauge, 8" x 34" EAKNOCK & Door knocker EAKNOCKRS + Door knocker - Detach & reset EALKR & Locker - 12" wide x 60" high x 15" deep EALKRD & Double locker - 12" wide x 60" high x 15" deep EALOKK & Lockset - keyed - Medium duty - Commercial grade EALOKK+ & Lockset - keyed - Heavy duty - Commercial grade EALOKP & Lockset - passage - Medium duty - Commercial grade EALOKRS + Lockset - Commercial grade - Detach & reset EAMN + Finish hardware repair - Minimum charge EAPEEP & Door peep hole EAPEEPRS + Door peep hole - Detach & reset EAPH & Panic hardware - rim series (bar and latch, no rods) EAPHCR & Panic hardware with concealed vertical rods EA PHXR & Panic hardware with external vertical rods EA PKT & Pocket door hardware EAPKTL & Pocket door latch EAPKTLRS + Pocket door latch - Detach & reset EAPULL & Door pull plate, 4" x 16" EA

PUSH & Door push plate, 4" x 16" EAROBE & Robe hook EAROBERS + Robe hook - Detach & reset EASDISH & Soap dish EASDISHRS + Soap dish - Detach & reset EASDISP & Soap dispenser EASDISPRS + Soap dispenser - Detach & reset EASHLDR & Soap holder - recessed EASHLDRRS + Soap holder - recessed - Detach & reset EASHWI & Shelving - wire (vinyl coated) LFSHWIRS + Shelving - wire (vinyl coated) - Detach & reset LFSROD & Shower curtain rod EASRODRS + Shower curtain rod - Detach & reset EASS + Smoke seal LFSW & Door sweep EATBAR- & Towel bar - Standard grade EATBAR & Towel bar EATBAR+ & Towel bar - High grade EATBAR++ & Towel bar - Premium grade EATBARRS + Towel bar - Detach & reset EATHR & Door threshold EATHRA & Door threshold, aluminum LFTHRR & Door threshold, rubber LFTHRW & Door threshold, wood LFTP- & Toilet paper holder - Standard grade EATP & Toilet paper holder EATP+ & Toilet paper holder - High grade EATP++ & Toilet paper holder - Premium grade EATPRS + Toilet paper holder - Detach & reset EATR- & Towel ring - Standard grade EATR & Towel ring EATR+ & Towel ring - High grade EATR++ & Towel ring - Premium grade EATRRS + Towel ring - Detach & reset EATW & Towel warmer - Free standing portable electric EATW+ & Towel warmer - Electric floor mounted - Brass or Chrome EAWCH- & Wash cloth holder - Standard grade EAWCH & Wash cloth holder EAWCH+ & Wash cloth holder - High grade EAWCH++ & Wash cloth holder - Premium grade EAWCHRS + Wash cloth holder - Detach & reset EAWS & Door weather stripping EA

AV & Masonry fireplace & chimney - single story home EAAV+ & Masonry fireplace & chimney - single story home - High grd EAAV> & Masonry fireplace & chimney - two story home EA AV>+ & Masonry fireplace & chimney - two story home - High grd EAAVCHLF & Add for tall masonry chimney over 15' (per vertical LF) LFAVTRIM + Upgraded zero clnce fireplace trim - add on EAAVTRIM+ + Upgraded for high grade zero clnce fireplace trim EAAVZCHLF & Add for zero clearance chimney over 15' (per vertical LF) LFAVZDV & Fireplace, zero clnce, direct vent, w/venting EAAVZDV+ & Fireplace, zero clnce, direct vent, w/venting - high grade EAAVZG & Fireplace, zero clnce, gas burning, w/venting EAAVZG+ & Fireplace, zero clnce, gas burning, w/venting - high grade EAAVZW & Fireplace, zero clnce, wood burning w/venting EAAVZW+ & Fireplace, zero clnce, wood burning w/venting - high grade EABLWR & Direct vent fireplace blower - add on EABVENT & Fireplace B-vent per LF EADMP & Fireplace damper EAFACB & Fireplace face, brick SF

FPL = Fireplaces

1 Flip 5_01.fm Page 14 Thursday, August 22, 2002 9:55 AM

Page 15: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

FNH—FPL FPL—FRM FRM FRM—HVC HVC—INM INM—LIT

15

FACST & Fireplace face, cultured stone SFFACST+ & Fireplace face, natural stone SFFLCP & Flue cap EAFLUE & Flue tile liner LFGDOR- & Glass fireplace door - Standard grade EA GDOR & Glass fireplace door EAGDOR+ & Glass fireplace door - High grade EAGDOR++ & Glass fireplace door - Premium grade EA GCORRS + Glass fireplace door - Detach & reset EAGLOG & Fireplace gas log set - 18" to 24" EAGLOG> & Fireplace gas log set - 30" EAGLOGRS + Fireplace gas log set - Detach & reset EAGRATE & Fireplace grate EAHRTH- & Fireplace hearth - tile SFHRTH & Fireplace hearth - brick SFHRTH+ & Fireplace hearth - marble SFHRTHRS + Fireplace hearth - Detach & reset SFMBOX36 & Metal firebox unit - 36"- zero clearance EAMBOX42 & Metal firebox unit - 42"- zero clearance EAMN + Fireplace repair - Minimum charge EAMNTL- & Fireplace mantel - wood beam or shelf only (per LF) LFMNTL & Fireplace mantel - paint grade - prefab. EA MNTL+ & Fireplace mantel - stain grade or hardwood - prefab. EARF + Refurbish wood stove - no trim EARF+ + Refurbish wood stove - with trim EARF++ + Refurbish wood stove - with highly decorative trim EASCR- & Fireplace screen - Standard grade EASCR & Fireplace screen EASCR+ & Fireplace screen - High grade EASCR++ & Fireplace screen - Premium grade EASCRRS + Fireplace screen - Detach & reset EASTOVE & Wood stove - Small size EASTOVE> & Wood stove - Medium size EASTOVE>> & Wood stove - Large size EASTOVEB + Blower - upgrade charge for a wood stove EASTOVEBD + Brass door - upgrade charge for a wood stove EASTOVEBL + Brass legs - upgrade charge for a wood stove EASTOVECL + Black cast legs - upgrade charge for a wood stove EASTOVEEG + Etched glass - upgrade charge for a wood stove EASTOVEP + Pedestal base - upgrade charge for a wood stove EASTOVERS + Wood stove - Detach & reset EASW6 & Single wall flue - black, 6" LFSW8 & Single wall flue - black, 8" LFTRI & Triple wall or insulated high temperature flue LFTRIRF & Triple wall flue roof installation kit EA

ANSUL & Ansul fire extinguisher system above cooking area EAAVR4 & Alarm and valve riser, 4" EAAVR6 & Alarm and valve riser, 6" EABFP2 & Backflow preventer, 2 1/2" EABFP4 & Backflow preventer, 4" EABFP6 & Backflow preventer, 6" EABFP8 & Backflow preventer, 8" EABFP10 & Backflow preventer, 10" EAFRP + Freeze-proof system - additional charge SF FFRX & 5 lb. ABC fire extinguisher EAFRX10 & 10 lb. ABC fire extinguisher EAFRX20 & 20 lb. ABC fire extinguisher EAFXCAB & Fire extinguisher and cabinet, 14" x 27" x 8" EAGASH & Gas fire suppression system - whole house SF FHSCAB & 1 1/2" fire hose and cabinet - 50' long EA

HSCAB+ & 2 1/2" fire hose and cabinet - 50' long EA SF & Exposed fire protection system (SF of bldg) SF FSF+ & Concealed fire protection system (SF of bldg) SF F

1X2 & 1" x 2" lumber (.167 BF per LF) LF1X4 & 1" x 4" lumber (.333 BF per LF) LF1X6 & 1" x 6" lumber (.5 BF per LF) LF1X6WP & 1" x 6" lumber - wood polymer (.5 BF per LF) LF1X8 & 1" x 8" lumber (.667 BF per LF) LF1X10 & 1" x 10" lumber (.83 BF per LF) LF1X12 & 1" x 12" lumber (1 BF per LF) LF2X2R & 2" x 2" lumber - redwood (.33 BF per LF) LF 2X4 & 2" x 4" lumber (.667 BF per LF) LF2X4R & 2" x 4" lumber - redwood (.667 BF per LF) LF 2X4R+ & 2" x 4" lumber - redwood - High grade (.667 BF per LF) LF2X4T & 2" x 4" lumber - treated (.667 BF per LF) LF 2X4WP & 2" x 4" lumber - wood polymer (.667 BF per LF) LF2X6 & 2" x 6" lumber (1 BF per LF) LF2X6R & 2" x 6" lumber - redwood (1 BF per LF) LF2X6R+ & 2" x 6" lumber - redwood - High grade (1 BF per LF) LF2X6T & 2" x 6" lumber - treated (1 BF per LF) LF2X6WP & 2" x 6" lumber - wood polymer (1 BF per LF) LF2X8 & 2" x 8" lumber (1.33 BF per LF) LF2X8T & 2" x 8" lumber - treated (1.33 BF per LF) LF 2X8WP & 2" x 8" lumber - wood polymer (1.33 BF per LF) LF2X10 & 2" x 10" lumber (1.67 BF per LF) LF2X10T & 2" x 10" lumber - treated (1.67 BF per LF) LF2X10WP & 2" x 10" lumber - wood polymer (1.67 BF per LF) LF2X12 & 2" x 12" lumber (2 BF per LF) LF2X12T & 2" x 12" lumber - treated (2 BF per LF) LF 2X2M & 2" x 2" interior wall framing - mobile home SF 4SKTM & 2 x 4 skirting framework - mobile home SF 4LF< & Stud wall - 2" x 4" x 8' - 12" oc LF PF4LF & Stud wall - 2" x 4" x 8' - 16" oc LF PF4LF> & Stud wall - 2" x 4" x 8' - 24" oc LF PF4SF< & Stud wall - 2" x 4" - 12" oc SF W4SF & Stud wall - 2" x 4" - 16" oc SF W4SF> & Stud wall - 2" x 4" - 24" oc SF W6LF< & Stud wall - 2" x 6" x 8' - 12" oc LF PF6LF & Stud wall - 2" x 6" x 8' - 16" oc LF PF6LF> & Stud wall - 2" x 6" x 8' - 24" oc LF PF6SF< & Stud wall - 2" x 6" - 12" oc SF W6SF & Stud wall - 2" x 6" - 16" oc SF W6SF> & Stud wall - 2" x 6" - 24" oc SF WST & Stud wall (per BF) BF STB:STT & Stud wall - treated (per BF) BF STB:4X4 & 4" x 4" square wood post (1.33 BF per LF) LF 4X4R & 4" x 4" wood post - redwood or treated (1.33 BF per LF) LF4X4T & 4" x 4" wood post - treated (1.33 BF per LF) LF 4X4TU8 & 4" x 4" x 8’ wood post - turned EA4X4TU10 & 4" x 4" x 10’ wood post - turned EA4X4TU36 & 4" x 4" x 36" exterior newel post - turned EA4X4TU42 & 4" x 4" x 42" exterior newel post - turned EA4X4TU60 & 4" x 4" x 60" exterior newel post - turned EA4X4WP & 4" x 4" post - wood polymer lumber (1.33 BF per LF) LF 5X5TU8 & 5" x 5" x 8’ wood post - turned EA5X5TU10 & 5" x 5" x 10’ wood post - turned EA6X6 & 6" x 6" square wood post (3 BF per LF) LF6X6TU8 & 6" x 6" x 8’ wood post - turned EA6X6TU10 & 6" x 6" x 10’ wood post - turned EA8X8 & 8" x 8" square wood post (5.33 BF per LF) LF

FRM = Framing & Rough Carpentry

FPS = Fire Protection System

1 Flip 5_01.fm Page 15 Thursday, August 22, 2002 9:55 AM

Page 16: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

FNH—FPL FPL—FRM FRM FRM—HVC HVC—INM INM—LIT

16

AC1/4 & AC plywood - 1/4" SFAC1/2 & AC plywood - 1/2" SFBB & Builder board - 1/2" (composition or fiberboard sheathing) SF WBB1 & Builder board - 1" (composition or fiberboard sheathing) SF WBELLYM & Bellyboard repair (underbelly material) - mobile home SF FBJ10 & Bar joist - 2" x 9 1/2" (measure LF) LFBJ12 & Bar joist - 2" x 11 7/8" (measure LF) LFBJ14 & Bar joist - 2" x 14" (measure LF) LFBJ16 & Bar joist - 2" x 16" (measure LF) LFBMGBF & Beam - glu-lam (per BF) BF BF:BMM2X10 & Beam - microlam - 1 3/4" x 9 1/2" LFBMM2X12 & Beam - microlam - 1 3/4" x 11 7/8" LFBMR & Beam - rough sawn BF BF:DBP4 & Drilled bottom plate - 2" x 4" treated lumber LFDBP6 & Drilled bottom plate - 2" x 6" treated lumber LFDKR- & Deck planking - redwood - standard grade (per BF) BF DK:DKR & Deck planking - redwood (per BF) BF DK:DKR+ & Deck planking - redwood - High grade (per BF) BF DK:DKRLR & Deck handrail - redwood - standard grade LFDKRLR & Deck handrail - redwood LFDKRLR+ & Deck handrail - redwood - High grade LF DKRLT & Deck handrail - treated lumber LFDKRLV & Deck handrail - Vinyl LFDKRLV+ & Deck handrail - Vinyl - High grade LFDKRLWP & Deck handrail - wood polymer lumber LFDKRSF- & Deck planking - redwood - Standard grade (per SF) SF FDKRSF+ & Deck planking - redwood - High grade (per SF) SF FDKT & Deck planking - treated lumber (per BF) BF DK:DKTSF & Deck planking - treated lumber (per SF) SF FDKWP & Deck planking - 5/4" x 6" wood polymer lumber (per BF) BF DK:DKWP+ & Deck planking - 2 x 4" or 2 x 6 wood polymer lumber (per BF) BF DK:DKWPSF & Deck planking - 5/4" x 6" wood polymer lumber (per SF) SF FDKWPSF+ & Deck planking - 2 x 4" or 2 x 6 wood polymer lumber (per SF) SF FFLTR< & Floor trusses - up to 16" deep LF JSTLF:FLTR & Floor trusses - up to 22" deep LF JSTLF:FUR1 & Furring strip - 1" x 2" SFFUR2 & Furring strip - 2" x 2" SFFURC1 & Furring strip - 1" x 2" - applied to concrete SF WFURC2 & Furring strip - 2" x 2" - applied to concrete SF WH4 & Hip or roof intersection 4/12 slope (hip/valley length) LFH6 & Hip or roof intersection 6/12 slope (hip/valley length) LFH8 & Hip or roof intersection 8/12 slope (hip/valley length) LFH12 & Hip or roof intersection 12/12 slope (hip/valley length) LFHDR6 & Header - double 2" x 6" LFHDR8 & Header - double 2" x 8" LFHDR10 & Header - double 2" x 10" LFHDR12 & Header - double 2" x 12" LFIJ & "I" joist (TJI) - up to 12" deep LF JSTLF:IJ> & "I" joist (TJI) - 13" to 16" deep LF JSTLF:J4LF & Joist - floor or ceiling - 2 x 4 - w/blocking LF JSTLF:J4SF< & Joist - floor or ceiling - 2 x 4 - w/blocking - 12" oc SF FJ4SF & Joist - floor or ceiling - 2 x 4 - w/blocking - 16" oc SF FJ4SF> & Joist - floor or ceiling - 2 x 4 - w/blocking - 24" oc SF FJ6LF & Joist - floor or ceiling - 2 x 6 - w/blocking LF JSTLF:J6SF< & Joist - floor or ceiling - 2 x 6 - w/blocking - 12" oc SF FJ6SF & Joist - floor or ceiling - 2 x 6 - w/blocking - 16" oc SF FJ6SF> & Joist - floor or ceiling - 2 x 6 - w/blocking - 24" oc SF FJ8LF & Joist - floor or ceiling - 2 x 8 - w/blocking LF JSTLF:J8SF< & Joist - floor or ceiling - 2 x 8 - w/blocking - 12" oc SF FJ8SF & Joist - floor or ceiling - 2 x 8 - w/blocking - 16" oc SF FJ8SF> & Joist - floor or ceiling - 2 x 8 - w/blocking - 24" oc SF FJ10LF & Joist - floor or ceiling - 2 x 10 - w/blocking LF JSTLF:

J10SF< & Joist - floor or ceiling - 2 x 10 - w/blocking - 12" oc SF FJ10SF & Joist - floor or ceiling - 2 x 10 - w/blocking - 16" oc SF FJ10SF> & Joist - floor or ceiling - 2 x 10 - w/blocking - 24" oc SF FJ12LF & Joist - floor or ceiling - 2 x 12 - w/blocking LF JSTLF:J12SF< & Joist - floor or ceiling - 2 x 12 - w/blocking - 12" oc SF FJ12SF & Joist - floor or ceiling - 2 x 12 - w/blocking - 16" oc SF FJ12SF> & Joist - floor or ceiling - 2 x 12 - w/blocking - 24" oc SF FJST & Joist - floor or ceiling system BF JSTBF:JSTT & Joist - floor or ceiling system - treated BF JSTBF:MN + Framing repair - Minimum charge EAMST2 & Metal studding, 2 1/2" wide, 16" OC, 25 Ga SFMST2+ & Metal studding, 2 1/2" wide, 16" OC, 20 Ga SFMST4 & Metal studding, 3 5/8" wide, 16" OC, 25 Ga SFMST4+ & Metal studding, 3 5/8" wide, 16" OC, 20 Ga SFMST6 & Metal studding, 6" wide, 16" OC, 25 Ga SFMST6+ & Metal studding, 6" wide, 16" OC, 20 Ga SFPIER & Precast concrete or block pier EARAILTU & Porch or deck handrail w/turned balusters LFRF4LF & Rafters - 2 x 4 - stick frame roof (using rafter length) LFRF4SF< & Rafters - 2 x 4 - 12" OC (3-5/12 Gable, per SF of floor) SF FRF4SF & Rafters - 2 x 4 - 16" OC (3-5/12 Gable, per SF of floor) SF FRF4SF> & Rafters - 2 x 4 - 24" OC (3-5/12 Gable, per SF of floor) SF FRF6LF & Rafters - 2 x 6 - stick frame roof (using rafter length) LFRF6SF< & Rafters - 2 x 6 - 12" OC (3-5/12 Gable, per SF of floor) SF FRF6SF & Rafters - 2 x 6 - 16" OC (3-5/12 Gable, per SF of floor) SF FRF6SF> & Rafters - 2 x 6 - 24" OC (3-5/12 Gable, per SF of floor) SF FRF8LF & Rafters - 2 x 8 - stick frame roof (using rafter length) LFRF8SF< & Rafters - 2 x 8 - 12" OC (3-5/12 Gable, per SF of floor) SF FRF8SF & Rafters - 2 x 8 - 16" OC (3-5/12 Gable, per SF of floor) SF FRF8SF> & Rafters - 2 x 8 - 24" OC (3-5/12 Gable, per SF of floor) SF FRF10LF & Rafters - 2 x 10 - stick frame roof (using rafter length) LFRF10SF< & Rafters - 2 x 10 - 12" OC (3-5/12 Gable, per SF of floor) SF FRF10SF & Rafters - 2 x 10 - 16" OC (3-5/12 Gable, per SF of floor) SF FRF10SF> & Rafters - 2 x 10 - 24" OC (3-5/12 Gable, per SF of floor) SF FRF12LF & Rafters - 2 x 12 - stick frame roof (using rafter length) LFRF12SF< & Rafters - 2 x 12 - 12" OC (3-5/12 Gable, per SF of floor) SF FRF12SF & Rafters - 2 x 12 - 16" OC (3-5/12 Gable, per SF of floor) SF FRF12SF> & Rafters - 2 x 12 - 24" OC (3-5/12 Gable, per SF of floor) SF FRFMN + Roof framing - Minimum charge EARFA4L & Additional labor - 2 x 4 - 2 x 6 - 5/12 to 9/12 slope LFRFA4L> & Additional labor - 2 x 4 - 2 x 6 - 9/12 to 12/12 slope LFRFA4S< & Additional labor - 2 x 4 - 2 x 6 - 5/12 to 9/12 slope - 12" OC SF FRFA4S & Additional labor - 2 x 4 - 2 x 6 - 5/12 to 9/12 slope - 16" OC SF FRFA4S> & Additional labor - 2 x 4 - 2 x 6 - 5/12 to 9/12 slope - 24" OC SF FRFA4SS< & Additional labor - 2 x 4 - 2 x 6 - 9/12 to 12/12 slope - 12" OC SF FRFA4SS & Additional labor - 2 x 4 - 2 x 6 - 9/12 to 12/12 slope - 16" OC SF FRFA4SS> & Additional labor - 2 x 4 - 2 x 6 - 9/12 to 12/12 slope - 24" OC SF FRFA8L & Additional labor - 2 x 8 - 2 x 12 - 5/12 to 9/12 slope LFRFA8L> & Additional labor - 2 x 8 - 2 x 12 - 9/12 to 12/12 slope LFRFA8S< & Additional labor - 2 x 8 - 2 x 12 - 5/12 to 9/12 slope - 12" OC SF FRFA8S & Additional labor - 2 x 8 - 2 x 12 - 5/12 to 9/12 slope - 16" OC SF FRFA8S> & Additional labor - 2 x 8 - 2 x 12 - 5/12 to 9/12 slope - 24" OC SF FRFA8SS< & Additional labor - 2 x 8 - 2 x 12 - 9/12 to 12/12 slope - 12" OC SF FRFA8SS & Additional labor - 2 x 8 - 2 x 12 - 9/12 to 12/12 slope - 16" OC SF FRFA8SS> & Additional labor - 2 x 8 - 2 x 12 - 9/12 to 12/12 slope - 24" OC SF FRFTRA & Additional labor for stick frame roof, 5/12 to 9/12 slope BFHFRT:RFTRA> & Additional labor for stick frame roof, 9/12 to 12/12 slope BFHFRT:RFTR & Rafters - stick frame roof BF HFRT:RFTRT & Rafters - stick frame roof - treated BF HFRT:RR & Railroad ties LFSH1/2 & Sheathing - plywood - 1/2" CDX SF WSH1/2T & Sheathing - plywood - 1/2" - treated SF W

1 Flip 5_01.fm Page 16 Thursday, August 22, 2002 9:55 AM

Page 17: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

FNH—FPL FPL—FRM FRM FRM—HVC HVC—INM INM—LIT

17

SH1TG & Sheathing - 1 1/8" - tongue and groove SF FSH1X6 & Sheathing - 1" x 6" SF FSH1X6TG & Sheathing - 1" x 6" - tongue and groove SF FSH2X6TG & Sheathing - 2" x 6" - tongue and groove SF FSH3/8 & Sheathing - plywood - 3/8" SF WSH3/8RS & Sheathing - plywood - 3/8" - rough sawn fir SF WSH5/8 & Sheathing - plywood - 5/8" CDX SF WSH5/8T & Sheathing - plywood - 5/8" - treated SF WSH5/8TG & Sheathing - plywood - 5/8" - tongue and groove SF FSHF1/2 & Sheathing - foil faced foam - 1/2" SF WSHF3/4 & Sheathing - foil faced foam - 3/4" SF WSHF1 & Sheathing - foil faced foam - 1" SF WSHW1/2 & Sheathing - waferboard - 1/2" SF WSHW5/8 & Sheathing - waferboard - 5/8" SF WSHW3/4T & Sheathing - waferboard - 3/4 - tongue and groove SF FSJACK + Temporary Shoring Post - Screw Jack (per day) DASH3/4 & Sheathing - plywood - 3/4" CDX SF FSH3/4T & Sheathing - plywood - 3/4" - treated SF FSH3/4TG & Sheathing - plywood - 3/4" - tongue and groove SF FSTPM> & Steps (extruded aluminum) full landing - mobile home EASTPM & Steps (extruded aluminum) 1/2 landing - mobile home EASTPRM & Steps and landing - redwood - 6 x 8 or smaller - mobile home EATPL4 & Top plate - 2" x 4" LF PCTPL6 & Top plate - 2" x 6" LF PCTR3 & Truss - 3/12 slope LF TR:TR3T & Truss - 3/12 slope - treated LF TR:TR4 & Truss - 4/12 slope LF TR:TR4+ & Truss - 4/12 slope - heavy loading LF TR:TR4T & Truss - 4/12 slope - treated LF TR:TR6 & Truss - 6/12 slope LF TR:TR6+ & Truss - 6/12 slope - heavy loading LF TR:TR6T & Truss - 6/12 slope - treated LF TR:TR8 & Truss - 8/12 slope LF TR:TR8+ & Truss - 8/12 slope - heavy loading LF TR:TR8T & Truss - 8/12 slope - treated LF TR:TRFL & Truss - flat roof system LF TR:TRFL+ & Truss - flat roof system - heavy loading LF TR:TRG + Truss - gambrel roof - add for extra framing LF TRRS + Truss - Detach & reset LFTRVAULT + Add-on for scissor or vaulted truss LFUL1/4 & Underlayment - 1/4" lauan/mahogany plywood SF FUL1/4M & Underlayment - 1/4" Masonite SF FUL1/4P & Underlayment - 1/4" BC plywood SF FUL1/4W & Underlayment - 1/4" waterproof waferboard SF FUL3/8 & Underlayment - 3/8" particle board SF FUL3/8P & Underlayment - 3/8" plywood SF FUL1/2 & Underlayment - 1/2" particle board SF FUL1/2P & Underlayment - 1/2" plywood SF FUL5/8 & Underlayment - 5/8" particle board SF FUL3/4 & Underlayment - 3/4" particle board SFULMN + Underlayment - Minimum charge EAX4 & Stud wall 2 x 4 x 8 ext. w/shear panels & 1/2" bldr bd LF PFX6 & Stud wall 2 x 6 x 8 ext. w/shear panels & 1/2" bldr bd LF PF

CW & Curtain wall - single glazed SFCW2 & Curtain wall - double glazed SFLOWE + Add for "low E" glass SFSFA & Storefront - natural aluminum anodized frame SF SFB & Storefront - bronze anodized frame SFSFDA & Storefront door - natural aluminum anodized frame, 3'x 7' EA

SFDB & Storefront door - bronze anodized frame, 3'x 7' EATINT + Add for bronze or gray tinted glass SF

AC< & Central air conditioning system - 2 ton EAAC & Central air conditioning system - 3 ton EAAC> & Central air conditioning system - 4 ton EAAC>> & Central air conditioning system - 5 ton EAACM & Air conditioning unit - average grade - mobile home EAWACM & Window AC unit - mobile home EAAC2 & Air conditioning unit, 2 ton EAAC5 & Air conditioning unit, 5 ton EAAC8 & Air conditioning unit, 8 ton EAAC10 & Air conditioning unit, 10 ton EAAC15 & Air conditioning unit, 15 ton EAAC20 & Air conditioning unit, 20 ton EAACCND< & Central air - condenser unit - 2 ton EA ACCND & Central air - condenser unit - 3 ton EA ACCND> & Central air - condenser unit - 4 ton EA ACCND>>& Central air - condenser unit - 5 ton EA ACCNDRS+ Central air - condenser unit - Detach & reset EAACM & Air conditioning unit - average grade - mobile home EAACRC< + Central air conditioning system - recharge - 5 lb freon EAACRC + Central air conditioning system - recharge - 10 lb freon EAACRC> + Central air conditioning system - recharge - 13 lb freon EAACRC>> + Central air conditioning system - recharge - 17lb freon EAACTW< & AC unit w/sleeve - through wall - 5,000 BTU EAACTW & AC unit w/sleeve - through-wall - 8,000 BTU EA ACTW> & AC unit w/sleeve - through-wall - 12,000 BTU EAACTW>> & AC unit w/sleeve - through-wall - 18,000 BTU EAACTWRS + AC unit w/sleeve - through-wall - Detach & reset EAAFAN & Attic fan - whole house - installed EAAFAN> & Attic fan - 36" diameter, 6,500 CFM EA AFAN>> & Attic fan - 48" diameter, 12,000 CFM EA BBHST & Baseboard heat - steam or hot water LF BBHSTRS & Baseboard heat - steam or hot water - Detach & reset LF BLR< & Boiler - 62,000 BTU EABLR & Boiler - 130,000 BTU EABLR> & Boiler - 165,000 BTU EABLR>> & Boiler - 200,000 BTU EABLRE< & Boiler - 55 MBH, electric, steam or hot water EABLRE & Boiler - 109 MBH - electric - steam or hot water EABLRE> & Boiler - 218 MBH, electric, steam or hot water EABLRE>> & Boiler - 328 MBH, electric, steam or hot water EABLRG< & Boiler - 320 MBH, natural gas EABLRG & Boiler - 554 MBH, natural gas EABLRG> & Boiler - 801 MBH, natural gas EABLRG>> & Boiler - 1047 MBH, natural gas EABLRRS + Boiler unit - Detach & reset EABVENT- & Bathroom ventilation fan - Standard grade EABVENT & Bathroom ventilation fan EABVENT++ & Bathroom ventilation fan - Premium grade EABVENTRS & Bathroom ventilation fan - Detach & reset EABVLIT- & Bathroom ventilation fan w/light - Standard grade EABVLIT & Bathroom ventilation fan w/light EABVLIT+ & Bathroom ventilation fan w/light - High grade EABVLIT++ & Bathroom ventilation fan w/light - Premium grade EACA< & Cold air return cover - Small EACA & Cold air return cover EACA> & Cold air return cover - Large EACA>> & Cold air return cover - Extra large EACARS + Cold air return cover - Detach & reset EA

HVC = Heat, Vent, & Air Conditioning

GLS = Glass, Glazing, & Storefronts

1 Flip 5_01.fm Page 17 Thursday, August 22, 2002 9:55 AM

Page 18: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

FNH—FPL FPL—FRM FRM FRM—HVC HVC—INM INM—LIT

18

DCT< & Ductwork system - hot or cold air - up to 1199 SF home EADCT & Ductwork system - hot or cold air - 1200 to 1599 SF home EADCT> & Ductwork system - hot or cold air - 1600 to 2199 SF home EADCT>> & Ductwork system - hot or cold air - 2200 to 2500 SF home EADCTG & Ductwork - galvanized (per pound) EADCTLF< & Ductwork - hot or cold air - Small size LF DCTLF & Ductwork - hot or cold air LFDCTLF> & Ductwork - hot or cold air - Large size LF DCTLF>> & Ductwork - hot or cold air - Extra large size LFDCTLFRS + Ductwork - hot or cold air - Detach & reset LFDCTLN & Duct liner - mineral fiber insulation SF DCTM & Ductwork - complete under floor system - mobile home EADCTRM & Ductwork - hot or cold air (per room) EA DCTRM+ & Ductwork in crawl space - hot or cold air (per room) EADVENT & Clothes dryer vent - installed EAEC< & Evaporative cooler - 4500 cfm EAEC & Evaporative cooler - 5200 cfm EAEC> & Evaporative cooler - 6600 cfm EAEC>> & Evaporative cooler - 7200 cfm EAECCON & Evaporative cooler controls EAECDCT & Evaporative cooler ductwork LFECDIF & Evaporative cooler diffuser EAECRS + Evaporative cooler - Detach & reset EAECSL & Evaporative cooler supply line LFFDVENT & Foundation vent - installed in wood framing EAFDVENT+ & Foundation vent - installed in masonry block/brick EAFLUSH + Boiler unit - flush and recharge EAFRCLN + Furnace - check, clean, replace filters and service EAFRFA< & Furnace - forced air - 60 - 75,000 BTU EA FRFA & Furnace - forced air - 100,000 BTU EAFRFA> & Furnace - forced air - 125,000 BTU EAFRFA>> & Furnace - forced air - 140,000 BTU EAFRFAH< & Furnace - forced air - high efficiency - 65,000 BTU EAFRFAH & Furnace - forced air - high efficiency - 75,000 BTU EAFRFAH> & Furnace - forced air - high efficiency - 100,000 BTU EAFRFAH>> & Furnace - forced air - high efficiency - 120,000 BTU EAFRFARS + Furnace - forced air - Detach & reset EAFRM & Furnace - mobile home EAFRM+ & Furnace - 47,000 BTU - AC ready - mobile home EAFRM> & Furnace - 56,000 BTU - mobile home EAFRM>+ & Furnace - 56,000 BTU - AC ready - mobile home EAFRW & Furnace - wall - single, 35,000 BTU EAHC2 & Heating and cooling unit - 2 ton, 80 MBH EA HC5 & Heating and cooling unit - 5 ton, 140 MBH EA HC10 & Heating and cooling unit - 10 ton, 260 MBH EA HC20 & Heating and cooling unit - 20 ton, 400 MBH EA HMF< & Humidifier unit - Small EAHMF & Humidifier unit EAHMF> & Humidifier unit - Large EAHMF>> & Humidifier unit - Extra large EAHMFRS + Humidifier unit - Detach & reset EAHPR8 & Heat pump, roof mounted - 8 ton, 90 MBH EAHPR10 & Heat pump, roof mounted - 10 ton, 120 MBH EAHPR15 & Heat pump, roof mounted - 15 ton, 180 MBH EAHPR20 & Heat pump, roof mounted - 20 ton, 240 MBH EAHPW2 & Heat pump, through wall unit - 2 ton, 26 MBH EA HPW3 & Heat pump, through wall unit - 3 ton, 37 MBH EA HPW4 & Heat pump, through wall unit - 4 ton, 52 MBH EA HPW5 & Heat pump, through wall unit - 5 ton, 61 MBH EA IDCT & Insulated duct - 3/4" wall SFIDCT4 & Insulated duct - 4" dia., 26 gauge LF IDCT8 & Insulated duct - 8" dia., 26 gauge LF

IDCT12 & Insulated duct - 12" dia., 24 gauge LF IDCT20 & Insulated duct - 20" dia., 24 gauge LF IDCT30 & Insulated duct - 30" dia., 22 gauge LF IDCT42 & Insulated duct - 42" dia., 20 gauge LF MN + Heave, vent, & air conditioning repair - Minimum charge EARAD< & Radiator unit - Small EARAD & Radiator unit EARAD> & Radiator unit - Large EARAD>> & Radiator unit - Extra large EARADC< & Radiator cover - Small EARADC & Radiator cover EARADC> & Radiator cover - Large EARADC>> & Radiator cover - Extra large EARADCRS + Radiator cover - Detach & reset EARADRS + Radiator unit - Detach & reset EAREG & Heat/AC register EAREGRS + Heat/AC register - Detach & reset EATS- & Thermostat - Standard grade EATS & Thermostat EATS+ & Thermostat - High grade EATS++ & Thermostat - Premium grade (programmable) EA TSRS + Thermostat - Detach & reset EATSZ & Thermostat - zone control EAVENT3 & Furnace vent - aluminum, 3" LFVENT4 & Furnace vent - aluminum, 4" LFVENT5+ & Furnace vent - double wall, 5" LFVENT6+ & Furnace vent - double wall, 6" LFVENT8+ & Furnace vent - double wall, 8" LFVENTCP5 & Furnace vent - rain cap and storm collar, 5" EAVENTCP6 & Furnace vent - rain cap and storm collar, 6" EAVENTCP8 & Furnace vent - rain cap and storm collar, 8" EAVENTPVC & Furnace vent - P.V.C. (90% efficient furnaces) LFWACM & Window AC unit - mobile home EAWINE & Cooling unit for wine room - Small EAWINE> & Cooling unit for wine room - Large EAWINERS + Cooling unit for wine room - Detach & reset EA

CS1< & Calsil pipe insulation - 1" wall for 1/2" to 1" pipe LFCS1 & Calsil pipe insulation - 1" wall for 1 1/2" to 2" pipe LFCS1> & Calsil pipe insulation - 1" wall for 2 1/2" to 4" pipe LFCS1>> & Calsil pipe insulation - 1" wall for 4 1/2" to 6" pipe LFCS2< & Calsil pipe insulation - 2" wall for 1/2" to 1" pipe LFCS2 & Calsil pipe insulation - 2" wall for 1 1/2" to 2" pipe LFCS2> & Calsil pipe insulation - 2" wall for 2 1/2" to 4" pipe LFCS2>> & Calsil pipe insulation - 2" wall for 4 1/2" to 6" pipe LFCS3< & Calsil pipe insulation - 3" wall for 1/2" to 1" pipe LFCS3 & Calsil pipe insulation - 3" wall for 1 1/2" to 2" pipe LFCS3> & Calsil pipe insulation - 3" wall for 2 1/2" to 4" pipe LFCS3>> & Calsil pipe insulation - 3" wall for 4 1/2" to 6" pipe LFF1/2< & Foam pipe insulation - 1/2" wall for 1/8" to 3/4" pipe LFF1/2 & Foam pipe insulation - 1/2" wall for 1" to 1 1/2" pipe LFF1/2> & Foam pipe insulation - 1/2" wall for 2" to 3" pipe LFF3/4< & Foam pipe insulation - 3/4" wall for 1/8" to 3/4" pipe LFF3/4 & Foam pipe insulation - 3/4" wall for 1" to 1 1/2" pipe LFF3/4> & Foam pipe insulation - 3/4" wall for 2" to 3" pipe LFF1< & Foam pipe insulation - 1" wall for 1/8" to 3/4" pipe LFF1 & Foam pipe insulation - 1" wall for 1" to 1 1/2" pipe LFF1> & Foam pipe insulation - 1" wall for 2" to 3" pipe LFFG1< & Fiberglass pipe insulation - 1" wall for 1/2" to 1" pipe LFFG1 & Fiberglass pipe insulation - 1" wall for 1 1/2" to 2" pipe LFFG1> & Fiberglass pipe insulation - 1" wall for 2 1/2" to 4" pipe LF

INM = Insulation - Mechanical

1 Flip 5_01.fm Page 18 Thursday, August 22, 2002 9:55 AM

Page 19: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

FNH—FPL FPL—FRM FRM FRM—HVC HVC—INM INM—LIT

19

FG1>> & Fiberglass pipe insulation - 1" wall for 4 1/2" to 6" pipe LFFG2< & Fiberglass pipe insulation - 2" wall for 1/2" to 1" pipe LFFG2 & Fiberglass pipe insulation - 2" wall for 1 1/2" to 2" pipe LFFG2> & Fiberglass pipe insulation - 2" wall for 2 1/2" to 4" pipe LFFG2>> & Fiberglass pipe insulation - 2" wall for 4 1/2" to 6" pipe LFFGDCT1 & Fiberglass duct wrap, 1 1/2" thick SFFGDCT2 & Fiberglass duct wrap, 2" thick SFRFGD & Rigid fiberglass duct insulation board - foil faced SF

BI6 & Blown-in insulation - 6" depth - R19 SF CBI10 & Blown-in insulation - 10" depth - R30 SF CBI12 & Blown-in insulation - 12" depth - R38 SF CBI16 & Blown-in insulation - 16" depth - R50 SF CBI24 & Blown-in insulation - 24" depth - R72 SF CBIM - Blown-in insulation - Machine removal SFBT2 & Batt insulation - 2" - R6 (split R11 batt) SF WBT4 & Batt insulation - 4" - R11 SF WBT4+ & Batt insulation - 4" - R13 SF WBT6 & Batt insulation - 6" - R19 SF WBT10 & Batt insulation - 10" - R30 SF CBT12 & Batt insulation - 12" - R38 SF CBVNT & Baffle vent LFFOAM + Urethane foam sealant LFHWRAP & House wrap (air/moisture barrier) Du Pont Tyvek or equal SF WLAM & Laminated 2" insulation used with metal buildings SF WCMN + Insulation - Minimum charge EARBD1/2 & Rigid foam insulation board - 1/2" SF WRBD3/4 & Rigid foam insulation board - 3/4" SF WRBD1 & Rigid foam insulation board - 1" SF WSB8 & String & blow insulation in 8" joists w/Visqueen SF CSB10 & String & blow insulation in 10" joists w/Visqueen SF CSB12 & String & blow insulation in 12" joists w/Visqueen SF CVIS + Visqueen vapor barrier SF

ADMIN + Administrative labor charge (Bid item) HRCARPFNC + Carpenter - Finish, Trim/Cabinet - per hour HRCARPFRM + Carpenter - General Framer - per hour HRCARPMEC+ Carpenter - mechanic - per hour HRCLN + Cleaning Technician - per hour HRCLN-F + Floor cleaning technician - per hour HRCNC + Concrete mason - per hour HRDRY + Drywall Installer/Finisher - per hour HRELE + Electrician - per hour HREQU + Equipment Operator - per hour HRFLR + Flooring Installer - per hour HRHVC + Heating/A.C. Mechanic - per hour HRINS + Insulation Installer - per hour HRLBR + General Laborer - per hour HRMAS + Mason - Brick/Stone - per hour HRPLA + Plasterer - per hour HRPLM + Plumber - per hour HRPNT + Painter/Wallpaperer - per hour HRRFG + Roofer - per hour HRTIL + Tile/Cultured Marble Installer - per hour HR

AV- & Light fixture - Standard grade EAAV & Light fixture EAAV+ & Light fixture - High grade EAAV++ & Light fixture - Premium grade EA

BAR2 & Light bar - 2 lights EABAR2+ & Light bar - 2 lights - High grade EABAR3 & Light bar - 3 lights EABAR3+ & Light bar - 3 lights - High grade EABAR4 & Light bar - 4 lights EABAR4+ & Light bar - 4 lights - High grade EABAR5 & Light bar - 5 lights EABAR5+ & Light bar - 5 lights - High grade EABAR6 & Light bar - 6 lights EABAR6+ & Light bar - 6 lights - High grade EABAR8 & Light bar - 8 lights EABAR8+ & Light bar - 8 lights - High grade EACHAN- & Chandelier - Standard grade EACHAN & Chandelier EACHAN+ & Chandelier - High grade EACHAN++ & Chandelier - Premium grade EACHAN>++ & Chandelier - oversized - Premium grade EACHANC+ & Chandelier - Crystal - High grade EACHANC++ & Chandelier - Crystal - Premium grade EACHANCRS + Chandelier - Crystal or oversized - Detach & reset EACHANRS + Chandelier - Detach & reset EAEXIT & Exit sign - wired in EAEXIT+ & Exit sign - internal power EAFL- & Fluorescent light fixture - Standard grade EA FL & Fluorescent light fixture EAFL+ & Fluorescent light fixture - High grade EAFL++ & Fluorescent light fixture - Premium grade EA FL1-2 & Fluorescent - one tube - 2' - strip light EAFL1-2+ & Fluorescent - one tube - 2' - fixture w/lens EAFL1-4 & Fluorescent - one tube - 4' - strip light EAFL1-4+ & Fluorescent - one tube - 4' - fixture w/lens EAFL1-4RS + Fluorescent light fixture- 1 tube 2’ & 4' - Detach & reset EAFL1-6 & Fluorescent - one tube - 6' - strip light EAFL1-6+ & Fluorescent - one tube - 6' - fixture w/lens EAFL1-8 & Fluorescent - one tube - 8' - strip light EAFL1-8+ & Fluorescent - one tube - 8' - fixture w/lens EAFL2-4 & Fluorescent - two tube - 4' - strip light EAFL2-4+ & Fluorescent - two tube - 4' - fixture w/lens EAFL2-6 & Fluorescent - two tube - 6' - strip light EAFL2-6+ & Fluorescent - two tube - 6' - fixture w/lens EAFL2-8 & Fluorescent - two tube - 8' - strip light EAFL2-8+ & Fluorescent - two tube - 8' - fixture w/lens EAFL4-4 & Fluorescent - four tube - 4' - strip light EAFL4-4+ & Fluorescent - four tube - 4' - fixture w/lens EAFL4-6 & Fluorescent - four tube - 6' - strip light EAFL4-6+ & Fluorescent - four tube - 6' - fixture w/lens EAFL4-8 & Fluorescent - four tube - 8' - strip light EAFL4-8+ & Fluorescent - four tube - 8' - fixture w/lens EAFLACT & Fluorescent - acoustic grid fixture, 2' x 2' EAFLACT2 & Fluorescent - acoustic grid fixture - two tube, 2' x 4' EAFLACT4 & Fluorescent - acoustic grid fixture - four tube, 2' x 4' EAFLC & Fluorescent - circular fixture EAFLLN & Fluorescent light fixture lens - wrap around (lens only) EAFLRS + Fluorescent light fixture - Detach & reset EAFN- - & Ceiling fan without light EAFN- & Ceiling fan without light - High grade EAFN & Ceiling fan & light EAFN+ & Ceiling fan & light - High grade EAFN++ & Ceiling fan & light - Premium grade EAFNRS + Ceiling fan & light - Detach & reset EAHG & Hanging globe light fixture EAHG+ & Hanging globe light fixture - High grade EA

LIT = Light Fixtures

INS = Insulation

LAB = Labor Only

1 Flip 5_01.fm Page 19 Thursday, August 22, 2002 9:55 AM

Page 20: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

LIT—MSD MSD—PLM PLM—PNL PNL—PNT PNT—POL POL—RFG

20

HG++ & Hanging globe light fixture - Premium grade EA HG2 & Hanging double globe light fixture EAHG2+ & Hanging double globe light fixture - High grade EAHG2++ & Hanging double globe light fixture - Premium grade EAMER & Mercury vapor security light EAMN + Light fixture repair - Minimum charge EAPOR & Porcelain light fixture EAPORRS + Porcelain light fixture - Detach & reset EARC- & Recessed light fixture - Standard grade EARC & Recessed light fixture EARC+ & Recessed light fixture - High grade EARC++ & Recessed light fixture - Premium grade EARCRS + Recessed light fixture - Detach & reset entire unit EARS + Light fixture - Detach & reset EARS> + Light fixture - Detach & reset - Large EARS>> + Light fixture - Detach & reset - Extra large EASPOT1 & Spot light fixture - single EASPOT2 & Spot light fixture - double EASPOT2M & Spot light fixture - double - w/motion sensor EASPOT3 & Spot light fixture - triple EATRK & Track Lighting - track only LFTRKCN & Fixture (can) for track lighting EATRKCN+ & Fixture (can) for track lighting - High grade EATRKCNRS + Fixture (can) for track lighting - Detach & reset EATRKRS + Track for track lighting - Detach & reset LFX- & Exterior light fixture - Standard grade EAX & Exterior light fixture EAX+ & Exterior light fixture - High grade EAX++ & Exterior light fixture - Premium grade EAXPOST & Exterior post light fixture EAXPOST+ & Exterior post light fixture - High grade EAXPOST++ & Exterior post light fixture - Premium grade EAXRS + Exterior light fixture - Detach & reset EA

AW + Masonry acid wash SFBL4 & Block - 4" x 8" x 16" - in place SF WBL6 & Block - 6" x 8" x 16" - in place SF WBL6+ & Block - 6" x 8" x 16" - in place - reinforced SF WBL8 & Block - 8" x 8" x 16" - in place SF WBL8+ & Block - 8" x 8" x 16" - in place - reinforced SF WBL10 & Block - 10" x 8" x 16" - in place SF WBL10+ & Block - 10" x 8" x 16" - in place - reinforced SF WBL12 & Block - 12" x 8" x 16" - in place SF WBL12+ & Block - 12" x 8" x 16" - in place - reinforced SF WBLGL & Block - glass - 4"x 8"x 8" SFBLGL< & Block - glass - 3"x 8"x 8" SFBLGLR & Block - glass - Add for reinforcements SFBLP + Block - Add for pilaster SFBLS + Block - Add for scored or split faced block SF WBLSC4 & Block - 4" x 8" x 16" - sculpture/decorative screen SFBLSC8 & Block - 8" x 8" x 16" - sculpture/decorative screen SFBLVRE24 + Block - Add if vertical reinforcement is 24" OC SF WBM8 & Block - bond beam - 8" x 8" x 16" - reinforced LF PFBM10 & Block - bond beam - 10" x 8" x 16" - reinforced LF PFBM12 & Block - bond beam - 12" x 8" x 16" - reinforced LF PFBRK- & Brick veneer - Standard grade (i.e., concrete) SF WBRK & Brick veneer SF WBRK+ & Brick veneer - High grade SF WBRK++ & Brick veneer - Premium grade SF WBRKS6 & Brick - structural (Atlas), 6" SF WBRKS8 & Brick - structural (Atlas), 8" SF W

BRKBW + Brick - Add for basketweave pattern SF WBRKHB + Brick - Add for herringbone pattern SF WBRKRS + Brick veneer - Detach & reset SF WBRKSB + Brick - Add for stacked bond SF WBRKSO + Brick - Add for soldier or sailor course LFINS + Masonry insulation - Vermiculite or Perlite SF WMN + Masonry - Minimum charge EAPAV- & Paver brick - Standard grade SF FPAV & Paver brick SF FPAV+ & Paver brick - High grade SF FPOINT + Re-point masonry SFQUOIN & Quoin - 8" - 8" x 12" EASLUM4 & Slumpstone block - 4" width SF WSLUM6 & Slumpstone block - 6" width SF WSLUM8 & Slumpstone block - 8" width SF WSLUM10 & Slumpstone block - 10" width SF WSLUM12 & Slumpstone block - 12" width SF WSTN & Stone veneer SF WSTN+ & Stone veneer - High grade SF WSTNRS + Stone veneer - Detach & reset SF WWR6 + Add for wire reinforcing (Dur-o-wal), 6" LF WR8 + Add for wire reinforcing (Dur-o-wal), 8" LF WR10 + Add for wire reinforcing (Dur-o-wal), 10" LF WR12 + Add for wire reinforcing (Dur-o-wal), 12" LF

B & Baseboard - cultured (simulated) marble LF PFCT & Countertop - cultured (simulated) marble SF CTONX & Countertop - onyx SFSILM4 & Sill - cultured marble on 2 x 4 wall LF SILM6 & Sill - cultured marble on 2 x 6 wall LF SNKN + Add for sink opening in natural marble (self-rimming sink) EASNKN+ + Add for sink opening in natural marble (bottom-mount sink) EATHR & Threshold - natural marble LFVTSNK & Vanity top with sink (one piece) - cultured marble LFVTSNK+ & Vanity top - one sink - cultured marble - high grade LFVTSNK> & Vanity top - two sinks - cultured marble LFVTSNK>+ & Vanity top - two sinks - cultured marble - high grade LFVTSNKO & Vanity top with sink (one piece) - onyx LF VTSNKO+ & Vanity top - one sink - onyx - high grade LFVTSNKO> & Vanity top - two sinks - onyx LFVTSNKRS + Vanity top - Detach & reset LFVTSNO>+ & Vanity top - two sinks - onyx - high grade LFW & Wall veneer panels - cultured marble SF WWN & Wall veneer panels - natural marble SF W

BR + Open cell backing rod, 1/2" LFCLKA + Caulking - acrylic LFCLKB + Caulking - butyl rubber LFCLKS + Caulking - silicone LFDMPR + Dampproofing SFDMPR+ + Dampproofing - asphalt emulsion SFWPRF + Waterproofing - two coats of emulsion over a glass fabric SF

AV & Mirror - 1/4" plate glass SFAV+ & Mirror - 1/4" plate glass - gold veined or smoked SFOHC + Outlet hole - cut into mirror EAAVRS + Mirror - plate glass - Detach & reset EAMN + Mirror, shower door - Minimum charge EASDOR- & Shower door - Standard grade EA

MAS = Masonry

MSD = Mirrors & Shower Doors

MBL = Marble—Cultured or Natural

MPR = Moisture Protection

MSD = Mirrors & Shower Doors

1 Flip 5_01.fm Page 20 Thursday, August 22, 2002 9:55 AM

Page 21: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

LIT—MSD MSD—PLM PLM—PNL PNL—PNT PNT—POL POL—RFG

21

SDOR & Shower door EASDOR+ & Shower door - High grade EASDOR++ & Shower door - Premium grade EASDORC & Shower door - corner unit EASDORC+ & Shower door - corner unit - High grade EA SDORC++ & Shower door - corner unit - Premium grade EASDORCRS& Shower door - corner unit - Detach & reset EASDOR-RS + Remove and reset shower door - slab only EATIL & Mirror tile SFTIL+ & Mirror tile - High grade SFTIL++ & Mirror tile - Premium grade SFTILMN + Mirror tile - Minimum charge EATUBDR- & Bathtub enclosure - sliding glass doors - Standard grade EATUBDR & Bathtub enclosure - sliding glass doors EA TUBDR+ & Bathtub enclosure - sliding glass doors - High grade EATUBDR++ & Bathtub enclosure - sliding glass doors - Premium grade EATUBDRRS + Bathtub enclosure - sliding glass doors - Detach & reset EA

BLK & 4" x 8" x 16" hollow block used to level - installed EABLK+ & 4" x 8" x 16" solid block used to level - installed EABRKDW + Break down prior to move EABRKSET + Break down prior to and set up after move EALEV + Block and level - single wide EALEV> + Block and level - double wide EALEV>> + Block and level - triple wide EAMN + Mobile home skirting - Minimum charge EAMOVE + Moving - bid per job EARELEV + Relevel - single wide EARELEV> + Relevel - double wide EARELEV>> + Relevel - triple wide EASKRTDOR & Access door - in mobile home skirting EASKRTF & Skirting - fiberboard or Masonite SFSKRTM & Skirting - metal SFSKRTRS + Skirting - Detach & reset SFSKRTV & Skirting - vinyl or plastic SFSTAND & Park stand or pier with screw adjuster EA

MN + Metal structure repair - Minimum charge EAPNLC & Wall or roof panel - corrugated SFPNLR & Wall or roof panel - 7/8" rib SFPNLS & Wall or roof panel - S-36 style SFPP & Post and pole framed steel building SF FSSRFG & Standing seam metal roofing SFXBRAC & X-bracing - 5/16" galvanized cable LF

DORS & Ornamental iron - Security door EADORS & Ornamental iron - Security door - High grade EAGRIL- & Ornamental iron - security grill - window - Standard grade SFGRIL & Ornamental iron - security grill - window SF MN + Ornamental Iron - Minimum charge EAORGT & Ornamental iron gate - plain - 4' wide x 3' high EAORRS + Ornamental iron handrail - Detach & reset LFORSP & Ornamental iron handrail w/ straight pickets, 3' high LFORTP & Ornamental iron handrail w/ twisted pickets, 3' high LF

2 & Two coat plaster (no lath) SF WCAPG & Acoustic plaster over 1/2" gypsum lath SF WCAPM & Acoustic plaster over metal lath SF WC

G2 & Two coat plaster over 1/2" gypsum lath SF WCM2 & Two coat plaster over metal lath SF WCM3 & Three coat plaster over metal lath SF WCMED & Ceiling medallion - molded polymer EAMN + Interior plaster repair - Minimum charge EATHIN + Thin coat plaster (no lath) SF WCTHING & Thin coat plaster over 1/2" gypsum lath SF WC

BFAU & Bidet - faucet w/fittings EABFAU+ & Bidet - faucet w/fittings - High grade EA BFAU++ & Bidet - faucet w/fittings - Premium grade EABID & Bidet EABID+ & Bidet - High grade EABIDRS + Bidet - Detach & reset EABP1/2 & Black pipe with fitting and hanger, 1/2" LFBP3/4 & Black pipe with fitting and hanger, 3/4" LFBP1 & Black pipe with fitting and hanger, 1" LFBP2 & Black pipe with fitting and hanger, 2" LFBP3 & Black pipe with fitting and hanger, 3" LFBP4 & Black pipe with fitting and hanger, 4" LFCI1-1/2 & Cast iron pipe (no-hub), 1 1/2" with 1 fitting per 10' LFCI2 & Cast iron pipe (no-hub), 2" with 1 fitting per 10' LFCI3 & Cast iron pipe (no-hub), 3" with 1 fitting per 10' LFCI4 & Cast iron pipe (no-hub), 4" with 1 fitting per 10' LFCI6 & Cast iron pipe (no-hub), 6" with 1 fitting per 10' LFCI8 & Cast iron pipe (no-hub), 8" with 1 fitting per 10' LFDRN1 & Drain line - ABS pipe with fitting and hanger, 1 1/2" LFDRN2 & Drain line - ABS pipe with fitting and hanger, 2" LFDRN3 & Drain line - ABS pipe with fitting and hanger, 3" LFDRN4 & Drain line - ABS pipe with fitting and hanger, 4" LFDRN6 & Drain line - ABS pipe with fitting and hanger, 6" LFDRNRS + Drain line - ABS pipe - Detach & reset LFFAU- & Sink faucet - Standard grade EAFAU & Sink faucet EAFAU+ & Sink faucet - High grade EAFAU++ & Sink faucet - Premium grade EAFAUB & Sink faucet - Brass EAFAUBA- & Sink faucet - Bathroom - Standard grade EAFAUBA & Sink faucet - Bathroom EAFAUBA+ & Sink faucet - Bathroom - High grade EAFAUBA++ & Sink faucet - Bathroom - Premium grade EAFAUGOLD & Sink faucet - Gold plated EAFAUKDM & Faucet for double kitchen sink - mobile home EAFAUKSM & Faucet for single kitchen sink - mobile home EAFAURS + Sink faucet - Detach & reset EAFNTN & Drinking fountain EAFNTN+ & Drinking fountain with cooler EAGP1/2 & Galvanized pipe with fitting and hanger, 1/2" LFGP3/4 & Galvanized pipe with fitting and hanger, 3/4" LFGP1 & Galvanized pipe with fitting and hanger, 1" LF GP1-1/2 & Galvanized pipe with fitting and hanger, 1 1/2" LFGP2 & Galvanized pipe with fitting and hanger, 2" LF JT & Jetted tub - Acrylic - Average grade EAJT+ & Jetted tub - Acrylic - High grade EAJTCNR & Jetted tub - Acrylic, corner unit - Chrome or brass trim EAJTFAU & Jetted tub faucet EAJTFAU+ & Jetted tub faucet - High grade EAJTRS + Jetted tub - Acrylic - Detach and reset EALEAK + Fee to locate under slab leak EALTUB- & Laundry tub - Standard grade EALTUB & Laundry tub EA

MTL = Metal Structures & Components

ORI = Ornamental Iron

PLM = Plumbing

PLA = Interior Lath & Plaster

MSK = Mobile Home Skirting & Setup

1 Flip 5_01.fm Page 21 Thursday, August 22, 2002 9:55 AM

Page 22: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

LIT—MSD MSD—PLM PLM—PNL PNL—PNT PNT—POL POL—RFG

22

LTUB+ & Laundry tub - High grade EALTUB++ & Laundry tub - Premium grade EALTUBRS + Laundry tub - Detach & reset EAMN + Plumbing repair - Minimum charge EAPSNK- & Pedestal sink - Standard grade EAPSNK & Pedestal sink EAPSNK+ & Pedestal sink - High grade EAPSNK++ & Pedestal sink - Premium grade EAPSNKRS + Pedestal sink - Detach & reset EAPTRAP & P-trap assembly - ABS (plastic) EASL3/8 & Water supply line - copper with fitting and hangar, 3/8" LFSL1/2 & Water supply line - copper with fitting and hangar, 1/2" LFSL3/4 & Water supply line - copper with fitting and hangar, 3/4" LFSL1 & Water supply line - copper with fitting and hangar, 1" LFSL1-1/2 & Water supply line - copper with fitting and hangar, 1-1/2" LFSL2 & Water supply line - copper with fitting and hangar, 2" LFSLABOC + Open and close slab for plumbing work EASLRS + Water supply line - copper - Detach & reset LFROUGH + Rough in plumbing - includes supply and waste lines SF FSNK- & Sink - single - Standard grade EASNK & Sink - single EASNK+ & Sink - single - High grade EASNK++ & Sink - single - Premium grade EASNKD- & Sink - double - Standard grade EASNKD & Sink - double EASNKD+ & Sink - double - High grade EASNKD++ & Sink - double - Premium grade EASNKDRS + Sink - double - Detach & reset EASNKM & Single basin sink - mobile home EASNKRS + Sink - single - Detach & reset EASSNK & Service sink - 22" x 20" - wall hung EASSNK+ & Service sink - corner - floor mounted EA STOP & Angle stop and supply line EASUMP & Sump pump - 1 1/2" discharge EASUMPRS + Sump pump - Detach & reset EASUP & Plumbing fixture supply line EASWFAU- & Shower faucet - Standard grade EASWFAU & Shower faucet EASWFAU+ & Shower faucet - High grade EASWFAU++ & Shower faucet - Premium grade EASWR- & Fiberglass shower unit - Standard grade EASWR & Fiberglass shower unit EASWR+ & Fiberglass shower unit - High grade EASWR++ & Fiberglass shower unit - Premium grade EA SWRB & Shower Base (fiberglass) EASWRB+ & Shower Base (cultured marble) EASWRPAN + Shower pan EASWRPAN>+ Shower pan - Large EASWRRS + Fiberglass shower unit - Detach & reset EASWRST & Steam shower EASWRSTB & Steam shower/bath EATLT- & Toilet - Standard grade EATLT & Toilet EATLT+ & Toilet - High grade EATLT++ & Toilet - Premium grade EATLTRS + Toilet - Detach & reset EATLTS- & Toilet seat - Standard grade EATLTS & Toilet seat EATLTS+ & Toilet seat - High grade EATLTS++ & Toilet seat - Premium grade EATLTSRS + Toilet seat - Detach & reset EATSFAU- & Tub/shower faucet - Standard grade EA

TSFAU & Tub/shower faucet EATSFAU+ & Tub/shower faucet - High grade EATSFAU++ & Tub/shower faucet - Premium grade EATSFAURS + Tub/shower faucet - Detach & reset EATUBFAU & Bathtub faucet (no shower) EATUBFAU+ & Bathtub faucet (no shower) - High grade EA TUB- & Bathtub - Standard grade EATUB & Bathtub EATUB+ & Bathtub - High grade EATUB++ & Bathtub - Premium grade EATUBM & Bathtub, 4.5 ft. long - mobile home EATUBRS + Bathtub - Detach & reset EATUB/S- & Fiberglass tub & shower combination - Standard grade EATUB/S & Fiberglass tub & shower combination EA TUB/S+ & Fiberglass tub & shower combination - High grade EATUB/S++ & Fiberglass tub & shower combination - Premium grade EATUB/SRS + Fiberglass tub & shower combination - Detach & reset EATUBGM & Garden bathtub - 4.5 ft. long - mobile home EAUR & Urinal - wall hung EAUR+ & Urinal - stall type EAWBOX & Washing machine outlet box with valves EAWC & Water closet EAWCE & Water closet - elongated EAWCHA & Water closet - handicapped EAWCRS + Water closet - Detach & reset EAWCWH & Water closet - wall hung EAWCS & Water closet seat EAWCS+ & Water closet seat - High grade EAWCSE & Water closet seat - elongated EAWCSRS + Water closet seat - Detach & reset EAWH6 & Water heater - 6 gallon EAWH7.5M & Water heater - 7.5 gal. electric - mobile home EAWH20 & Water heater - 20 gallon - Electric EAWH30 & Water heater - 30 gallon - Gas EAWH30E & Water heater - 30 gallon - Electric EAWH30M & Water heater - 30 gal. (direct vent) - Gas - mobile home EAWH40 & Water heater - 40 gallon - Gas EAWH40E & Water heater - 40 gallon - Electric EAWH40M & Water heater - 40 gal. (direct vent) - Gas - mobile home EAWH50 & Water heater - 50 gallon - Gas EAWH50E & Water heater - 50 gallon - Electric EAWH75 & Water heater - 75 gallon - Gas EAWH80E & Water heater - 75 gallon - Electric EAWH100 & Water heater - 100 gallon residential grade - Gas EAWH100+ & Water heater - 100 gal - CA approved EA WH120E & Water heater - 120 gallon - Electric EAWH140 & Water heater - 140 gal - gas EAWH200 & Water heater - 200 gal - gas EAWHRJM & Water heater roof jack assembly - mobile home EAWHRS + Water heater - Detach & reset EAWS< & Water softener - Small EAWS & Water softener EAWS> & Water softener - Large EAWS>> & Water softener - Extra large EAWSRS + Water softener - Detach & reset EAXFAU & Exterior faucet EAXFAUF & Exterior faucet - frost free EAXFAURS + Exterior faucet - Detach & reset EA

AV- & Paneling - Standard grade SF WAV & Paneling SF W

PNL = Paneling & Wood Wall Finishes

1 Flip 5_01.fm Page 22 Thursday, August 22, 2002 9:55 AM

Page 23: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

LIT—MSD MSD—PLM PLM—PNL PNL—PNT PNT—POL POL—RFG

23

AV+ & Paneling - High grade SF WAV++ & Paneling - Premium grade SF WBAB & Board & batten style wall covering SF WBOB & Board on board style wall covering SF WCHEV + Add for chevron style install (1 angle joint in wall cntr) SF WCLOS & Cedar closet lining SF WCORK & Cork wall tile SF WCORK+ & Cork wall tile - High grade SF WCORKMN + Cork wall tile - Minimum charge EADIAG + Add for diagonal installation SF WFORM & Formica wall finish SF WFORM+ & Formica wall finish with metal trim SF WHBONE + Add for herringbone install-diagonal joints 4'-6' apart SF WMN + Paneling - Minimum charge EAPEG & Pegboard SFSWR & Marlite shower surround w/trim - up to 98 SF EA TGB & T & G paneling - butterfly (beaded vee with 1" cove) SF WTGBN & T & G paneling - bullnose (rounded joints) SF WTGBV & T & G paneling - double beaded vee SF WTGCD & T & G paneling - cedar paneling (unfinished) SF WTGKP & T & G paneling - knotty pine paneling (unfinished) SF WTGRW & T & G paneling - redwood paneling (unfinished) SF WTGV & T & G paneling - v-joint paneling SF WTUB & Marlite tub surround w/trim - up to 65 SF EA WP & Waterproof paneling w/trim SF WWP+ & Waterproof paneling w/trim - High grade SF WWP++ & Waterproof paneling w/trim - Premium grade SF W

AC + Paint acoustic ceiling (popcorn) texture SF CACT + Paint acoustic ceiling tile SF CAGRIL + Paint air ventilation grill (per side) SF ATTIC + Seal attic framing for odor control SF ATTIC+ + Seal attic framing to matt white finish SF AWN + Paint aluminum awning SFB + Paint baseboard - one coat LF PFB> + Paint baseboard, oversized - one coat LF PFB2 + Paint baseboard - two coats LF PFB>2 + Paint baseboard, oversized - two coats LF PFBS + Stain & finish baseboard LF PFBS> + Stain & finish baseboard, oversized LF PFBCS + Paint baseboard, cap & shoe LF PFBCSS + Stain & finish baseboard, cap & shoe LF PFBAL + Paint balustrade LFBALS + Stain & finish balustrade LFBBH + Paint baseboard heater LFBF + Paint door - bifold set (per side) EABFS + Stain & finish door - bifold set (per side) EA BK + Paint/finish bookcase SFBKS + Stain/finish bookcase SFBLR + Paint boiler unit EABM + Paint wood beam SFBMS + Stain/finish wood beam SFBP + Paint door - bypass (sliding) set (per side) EA BPS + Stain & finish door - bypass (sliding) set (per side) EABPNL + Breaker panel cover - prep and repaint EABRK + Finish brick with masonry sealer SF WC + Paint casing - one coat LFC2 + Paint casing - two coats LFCS + Stain & finish casing LFCA + Paint cold air return (cover) EACHR + Paint chair rail - one coat LF PF

CHR2 + Paint chair rail - two coats LF PFCHRS + Stain & finish chair rail LF PFCLOS< + Paint - closet package (shelf, jamb & casing) - Small EACLOS + Paint - closet package (shelf, jamb & casing) EACLOS> + Paint - closet package (shelf, jamb & casing) - Large EACLOSL + Paint - closet package (hall or linen closet) EACNC + Paint concrete {V} SFCNR + Paint corner trim LFCNRS + Stain & finish corner trim LFCWN + Paint crown molding - one coat LF PCCWN> + Paint crown molding, oversized - one coat LF PCCWN2 + Paint crown molding - two coats LF PCCWN>2 + Paint crown molding, oversized - two coats LF PCCWNS + Stain & finish crown molding LF PCDCT + Paint ductwork system - hot or cold air EADCTLF + Paint ductwork - hot or cold air LFDCTRM + Paint ductwork - hot or cold air (per room) EADK + Stain/finish deck SFDKRL + Stain/finish deck handrail LFDOR + Paint door (per side) EADORS + Stain & finish door (per side) EADORST + Strip paint/finish from door, 3-0 or smaller (per side) EADORT + Paint door trim & jamb (per side) EADORTS + Stain & finish door/window trim & jamb (per side) EAEC + Paint evaporative cooler EAECDIF + Paint evaporative cooler diffuser EAFACM + Paint exterior fascia - metal, 4"- 6" wide LFFACW + Paint exterior fascia - wood, 4"- 6" wide LF FAUX + Painting - Faux (special effects) - 2 part SFFAUX+ + Painting - Faux (special effects) - 3 part SFFAUX++ + Painting - Faux (special effects) - Marbling SFFCS + Finish flooring - stone (per coat) SF FFEN + Paint/finish - wood fence SFFENGT + Paint/finish - wood gate SFFH + Paint full height cabinetry - inside and out LF FH< + Paint cabinetry - full height - inside and out LFFHF + Paint full height cabinetry - faces only LFFHF< + Paint cabinetry - full height - faces only LFFHFS + Stain & finish full height cabinetry - faces only LFFHS + Stain & finish full height cabinetry - inside and out LFFHST + Strip and refinish cabinetry - full height - inside and out LFFHFST + Strip and refinish cabinetry - full height - faces only LFFR + Paint door - French (per side) EAFR2 + Paint door - French double door set (per side) EAFRS + Stain & finish door - French (per side) EAFW + Seal foundation wall SF WGRIL + Paint ornamental iron grill SFGUTG + Paint gutter / downspout LFHR + Paint handrail - wall mounted LFHRS + Stain & finish handrail - wall mounted LFHRTH + Paint fireplace hearth SFJST + Seal floor or roof joist system SF FLOW + Seal and paint cabinetry - lower - inside and out LF LOW< + Paint cabinetry - lower - inside and out LF LOWF + Seal and paint cabinetry - lower - faces only LFLOWF< + Paint cabinetry - lower - faces out LF LOWS + Stain & finish cabinetry - lower - inside and out LFLOWFS + Stain & finish cabinetry - lower - faces only LFLOWST + Strip & refinish cabinetry - lower - inside and out LFLOWFST + Strip & refinish cabinetry - lower - faces only LFLVR- + Paint door - half louvered (per side) EALVR + Paint door - full louvered (per side) EA

PNT = Painting

1 Flip 5_01.fm Page 23 Thursday, August 22, 2002 9:55 AM

Page 24: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

LIT—MSD MSD—PLM PLM—PNL PNL—PNT PNT—POL POL—RFG

24

LVRS- + Stain & finish door - half louvered (per side) EALVRS + Stain & finish door - full louvered (per side) EAMAS + Paint/seal masonry SF WMASKL + Mask and cover large light fixture EAMASKL+ + Mask and cover large ornate light fixture EAMASKLF + Mask and prep for paint LF PCMASKSF + Mask {V} per square foot SF WMC + Paint medicine cabinet EAMCS + Stain & finish medicine cabinet EAMCST + Strip and refinish medicine cabinet EAMN + Painting - Minimum charge EAMTL + Paint metal siding SF WMTLR + Paint metal roofing SFOH + Paint/finish overhead door (per side) EAOH> + Paint/finish overhead door - Large (per side) EAOHDORT + Paint single garage door opening & trim EA OHDORT> + Paint double garage door opening & trim EA OP + Paint door or window opening (per side) EAORI + Paint ornamental iron handrail, 36" to 42" high LFP + Paint {V} - one coat SF WCP2 + Paint {V} - two coats SF WCPATIO + Paint aluminum patio cover SFPIPE< + Paint pipe, 1" to 3" diameter LFPIPE + Paint pipe, 4" to 6" diameter LFPNL + Paint paneling SF WPNLS + Stain & finish paneling SF WPOST + Paint/finish - fence post - wood EARAD + Paint radiator unit EARADC + Paint radiator cover EARISER + Paint stair riser EARISERS + Stain & finish stair riser EAS + Seal/prime {V} - one coat SF WCS2 + Seal/prime {V} - two coats SF WCS3 + Seal/prime {V} - three coats SF WCSAND + Sand wood SFSCRP + Scrape {V} & prep for paint SF WCSDG + Seal then paint/finish wood siding SF WSFTM + Paint exterior soffit - metal SFSFTR + Prime & paint exterior soffit - exposed rafter SFSFTW + Paint exterior soffit - wood SFSG + Paint suspended ceiling grid SF CSH + Paint plywood sheathing SFSHOE + Paint base shoe LF PFSHOES + Stain & finish base shoe LF PFSHTR + Paint/finish window shutters (set) EASHW + Paint wood shelving, 12"- 24" width LFSHWS + Stain & finish wood shelving, 12"- 24" width LF SILL + Paint/finish window sill LFSILLS + Stain & finish wood window sill LFSM2 + Paint sheet metal - two coats SFSP + Seal then paint {V} (2 coats) SF WCSP2 + Seal then paint {V} twice (3 coats) SF WCSP2+ + Seal then paint {V} twice (3 coats) - 2 colors SF WCSTR + Paint stair stringer LFSTRDIS + Paint disappearing (folding) stairway EASTRMD + Paint/finish storm door assembly EASTRMW + Paint/finish storm window EASTRS + Stain & finish stair stringer LFSTU + Paint stucco SF WSWALL + Seal stud wall for odor control SF WSWPS + Seal/;prime (V) - one coat (white pigmented shellac) SFTBAR + Paint towel bar EA

TEX + Texture paint {V} SF WCTR + Seal truss system SF CTRD + Paint stair tread EATRDS + Stain & finish stair tread EATRIM + Paint trim LFTRIMS + Stain & finish trim LFTRIMST + Strip paint/finish from trim, 1" - 4" wide LFTRIMST> + Strip paint/finish from trim, 4" - 8" wide LFUL + Seal underlayment for odor control SF FUP + Seal and paint cabinetry - upper - inside and out LF UP< + Paint cabinetry - upper - inside and out LF UPF + Seal and cabinetry - upper - faces only LFUPF< + Paint cabinetry - upper - faces only LFUPS + Stain & finish cabinetry - upper - inside and out LFUPFS + Stain & finish cabinetry - upper - faces only LFUPST + Strip & refinish cabinetry - upper - inside and out LFUPFST + Strip & refinish cabinetry - upper - faces only LFVAN + Seal and paint vanity - inside and out LFVAN< + Paint vanity - inside and out LFVANF + Seal and paint vanity - faces only LFVANF< + Paint vanity - faces only LFVANS + Stain & finish vanity - inside and out LFVANFS + Stain & finish vanity - faces only LFVANFST + Strip & refinish vanity - faces only LFVANST + Strip & refinish vanity - inside and out LFVENT + Paint roof vent EAWDW< + Paint/finish wood window (per side) - Small EA WDW + Paint/finish wood window (per side) EAWDW> + Paint/finish wood window (per side) - Large EA WDW>> + Paint/finish wood window (per side) - Extra large EAWPR + Paint wallpaper/Sanitex SF WWSH + Paint (stain) wood shingles SFX1 + Exterior - paint one coat SF WX2 + Exterior - paint two coats SF WXDOR + Paint door - exterior (per side) EAXDORS + Stain and finish door - exterior (per side) EAXS + Exterior - seal or prime and prep for paint SF WXSP + Exterior - seal or prime then paint with one finish coat SF WXSP2 + Exterior - seal or prime then paint with two finish coats SF WXSTN + Exterior - stain one coat SF WXSTN2 + Exterior - stain two coats SF W

AV & Swimming pool complete - gunite (white plaster finish) SFAV+ & Swimming pool complete - tile finish SFCAULK + Elastomeric joint caulking of pool deck LF CHLOR & Swimming pool chlorination system EACOV & Swimming pool cover - reinforced vinyl SFCOV+ & Swimming pool cover - automatic SFDKAGG + Pool decking - epoxy aggregate surface SF FIL & Swimming pool filtration system 6000 gal/hr EA GROUT + Regrout tile swimming pool SFHTRE & Swimming pool heater - electric EAHTRE> & Swimming pool heater - electric - Large EA HTRG & Swimming pool heater - gas EAHTRG> & Swimming pool heater - gas - Large EAHTRRS + Swimming pool heater - Detach & reset EALAD & Swimming pool ladder - 3 rung - Stainless steel EAMN + Swimming pool repair - Minimum charge EAPNT + Repaint pool with rubber base paint SFPNT+ + Paint pool with epoxy paint SFPUMP & Swimming pool pump, 3/4 hp EA

POL = Swimming Pools & Spas

1 Flip 5_01.fm Page 24 Thursday, August 22, 2002 9:55 AM

Page 25: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

LIT—MSD MSD—PLM PLM—PNL PNL—PNT PNT—POL POL—RFG

25

PUMP> & Swimming pool pump, 2 hp EASPA< & Spa - self contained above ground - 3 person EA SPA & Spa - self contained above ground - 5 person EA SPA> & Spa - self contained above ground - 8 person EA SPAG & Spa - complete in-ground unit - 6 person EA SPAG> & Spa - complete in ground unit - 8 person EASPAG>> & Spa - complete in-ground unit - 10 person EA

220 & 3-tab - 20 yr. - composition shingle roofing - incl. felt SQ GRFW:220E & 3-tab - 20 yr. composition shingle roofing (per shingle) EA220S & 3-tab - 20 yr. - comp. shingle roofing - shingles only SQ GRFW:240 & 3-tab - 25 yr. - composition shingle roofing - incl. felt SQ GRFW:240E & 3-tab - 25 yr. - composition shingle roofing (per shingle) EA240S & 3-tab - 25 yr. - comp. shingle roofing - shingles only SQ GRFW:250 & Laminated - 25 yr. - composition shingle rfg. - incl. felt SQ GRFW:250E & Laminated - 25 yr. - comp. shingle roofing (per shingle) EA250S & Laminated - 25 yr. - comp. shingle rfg - shingles only SQ GRFW:250TL & T-Lock - 25 yr. - comp. shingle roofing - incl. felt SQ GRFW:250TLE & T-Lock - 25 yr. - comp. shingle roofing (per shingle) SQ250TLS & T-Lock - 25 yr. - comp. shingle roofing - shingles only SQ GRFW:280 & 3-tab - 25 yr (hvy wt) composition shingle rfg. - incl. felt SQ GRFW:280E & 3-tab - 25 yr. - (hvy wt) comp. shingle rfg. (per shingle) EA280S & 3-tab - 25 yr. (hvy wt) comp. shingle rfg - shingles only SQ GRFW:300 & Laminated - 30 yr. - composition shingle rfg. - incl. felt SQ GRFW:300E & Laminated - 30 yr. - comp. shingle roofing (per shingle) EA300S & Laminated - 30 yr. - comp. shingle rfg - shingles only SQ GRFW:400 & Laminated - 40 yr. - comp. shingle roofing - incl felt SQ GRFW:400E & Laminated - 40 yr. - comp. shingle rfg.- (per shingle) EA400S & Laminated - 40 yr. - comp. shingle roofing - shingles only SQ GRFW:500 & Laminated - Lifetime - comp. shingle rfg. - incl felt SQ GRFW:500E & Laminated - Lifetime - comp. shingle rfg.- (per shingle) EA500S & Laminated - Lifetime - comp. shingle rfg. - shingles only SQ GRFW:500SL & Laminated - Lifetime - Slate look comp. shingle - incl felt SQ GRFW:500SLE & Laminated - Lifetime - Slate look comp. shingle (per shingle) SQ500SLS & Laminated - Lifetime - Slate look comp. shingle - shingles onlySQ GRFW:ADDRMV - Additional layer of comp. shingles (tear off per layer) SQ GRFW:ALPNT + Aluminum coating - without fiber SFALPNT+ + Aluminum coating - with fiber SFBI & Modified bitumen roof SQBU3 & Built-up 3 ply roofing - in place SQBU4 & Built-up 4 ply roofing - in place SQBU5 & Built-up 5 ply roofing - in place SQBUG & Built-up roofing - gravel ballast SQBUSFG + Built-up roofing - scratch, flood and re-gravel SQCFG & Corrugated fiberglass roofing (greenhouse type) SFCSH & Composite Roofing - Shake style - incl. felt SQCSHE & Composite Roofing - Shake style (per shingle) EACSL & Composite Roofing - Slate style - incl. felt SQCSLE & Composite Roofing - Slate style (per shingle) EADRIP & Drip edge LFDRIPC & Drip edge - copper LFELASTO + Elastomeric roof coating (rubberized) for mobile home SF CELASTO< + Elastomeric roof coating (rubberized) small patch EAFB1 & Fiberboard, 1" SF CFB2 & Fiberboard, 2" SF CFB3 & Fiberboard, 3" SFFELT15 + Roofing felt - 15 lb. SQFELT30 + Roofing felt - 30 lb. SQFL14 & Flashing, 14" wide LFFL14C & Flashing, 14" wide - copper LFFL20 & Flashing, 20" wide LF

FLCAP & Cap flashing (counterflashing) LFFLCAPC & Cap flashing (counterflashing) - copper LFFLP & Flash parapet wall only LFFLPIPE + Flashing - pipe jack EAFLPIPEC + Flashing - pipe jack - copper EAFLRIG & Ridge flashing LFFLRIGC & Ridge flashing - copper LFGLVM & Galvanized roofing - mobile home SF CGSTOP & Gravel stop LFGSTOPC & Gravel stop - copper LFHTMN + Roofing repair - hot material required - Min. charge EAIF3/4 & Insulation - fiberglass board, 3/4" SQ IF1 & Insulation - fiberglass board, 1" SQIF2 & Insulation - fiberglass board, 2" SQIP1 & Insulation - perlite board, 1" SQIP1-1/2 & Insulation - perlite board, 1-1/2" SQIP2 & Insulation - perlite board, 2" SQIP3 & Insulation - perlite board, 3" SQIPO1 & Insulation - polystyrene board, 1" SQIPO2 & Insulation - polystyrene board, 2" SQIU1 & Insulation - urethane board, 1" SQIU1-1/2 & Insulation - urethane board, 1-1/2" SQ IU2 & Insulation - urethane board, 2" SQIU3 & Insulation - urethane board, 3" SQIWS + Ice & water shield SFMN + Roofing repair - Minimum charge EAMTL- & Metal roofing - Standard grade SFMTL & Metal roofing SFMTL+ & Metal roofing - High grade SFMTL++ & Metal roofing - Premium grade SFMTLMN + Metal roofing - Minimum charge EAMTLRS + Metal roofing - Detach & reset SFPLSLM + Peel & Seal reroofing material - mobile home SF CRIDGC + Ridge cap - composition shingles LFRIDGC+ + Ridge cap - High profile - composition shingles LFRIDGM + Ridge cap - metal roofing LFRIDGT + Ridge cap - tile roofing LFRIDGW + Ridge cap - wood shingles LFRL & Roll roofing SQRL+ & Roll roofing - High grade SQRUB & Rubber roofing - Perimeter adhered system SQRUB+ & Rubber roofing - Full adhered system SQSLATE & Slate roofing - 12" to 18" tall SQSLATE+ & Slate roofing - High grade - 18" to 24" tall SQSLATE++ & Slate roofing - Premium grade - 12" to 24" tall - red SQSLE & Slate roofing - 12" to 18" tall (per slate) EASLE+ & Slate roofing - High grade - 12" to 18" tall (per slate) EASLE++ & Slate roofing - Premium grade - 12" to 18" tall (per slate) EASPLY & Single ply .060 PVC membrane - mechanically fastened SQSPLY+ & Single ply .045 PVC membrane - with gravel ballast SQSTEEP + Additional charge for steep or high roof SQSTEEP> + Additional charge for steep roof greater than 10/12 slope SQSTEP + Step flashing LFSTEPC + Step flashing - copper LFSTIL & Steel tile - granular coated SQSTIL+ & Steel tile - granular coated - High grade SQ .TIL- & Tile roofing - concrete - “S” or flat tile SQ GRFW:TIL & Tile roofing - clay - “S” or flat tile SQ GRFW:TIL+ & Tile roofing - tile roofing - clay - Barrel (mission) tile SQ GRFW:TIL++ & Tile roofing - Glazed - (Barrel or “S” tile) SQ GRFW:TILE- & Tile roofing - Concrete - ’S’ or flat (per tile) EATILE & Tile roofing - Clay - ’S’ or flat (per tile) EA

RFG = Roofing

1 Flip 5_01.fm Page 25 Thursday, August 22, 2002 9:55 AM

Page 26: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

RFG—SFG SFG—STL STL—TIL TMB—WDP WDP—WDV WDV—WDW

26

TILE+ & Tile roofing - Clay - Barrel (mission) (per tile) EATILE++ & Tile roofing - Glazed - Barrel or ’S’ (per tile) EATILMN + tile roofing repair - Minimum charge EATILRS + tile roofing - Detach & reset SQVENT + Apply mastic around vent pipes to repair leakage EAVENTB & Roof vent - turbine type EAVENTR & Continuous ridge vent - shingle-over style LFVENTRS + Roof vent - Detach & reset EAVENTT & Roof vent - turtle type EAVMTL & Valley metal LFVMTLC & Valley metal - copper LFWSHK & Wood shakes - medium hand split SQ GRFW:WSHK+ & Wood shakes - heavy hand split SQ GRFW:WSHKE & Wood shakes - medium hand split (per shake) EAWSHKE+ & Wood shakes - heavy hand split (per shake) EAWSHKE & Wood shakes - medium hand split - fire retard. (per shake) EAWSHKE+ & Wood shakes - heavy hand split - fire retard. (per shake) EAWSHKR & Wood shakes - medium hand split - fire resistant SQ GRFW:WSHKR+ & Wood shakes - heavy hand split - fire resistant SQ GRFW:WSTP & Wood shingles - taper sawn - #1 cedar SQ GRFW:WSTPE & Wood shingles - taper sawn - #1 cedar (per shingle) EAWSTPR & Wood shingles - taper sawn - fire resistant - #1 cedar SQ GRFW:WSTPRE & Wood shingles - taper sawn - fire resistant - (per shingle) EA

LJ + Two ladders with jacks and plank (per day) EA MN + Scaffold - Minimum charge EARENTD + Scaffold rental - per section (per day) DARENTW + Scaffold rental - per section (per week) WKSECT + Labor to set up and take down scaffold - per section EA

1X4 & Siding - cedar slat, 1" x 4" over plywood (excludes ply) SF WBAB & Siding - board & batten - pine or equal SF WBABC & Siding - board & batten - cedar SF WBABR & Siding - board & batten - redwood SF WBEV & Siding - beveled - pine or equal (clapboard) SF WBEVC & Siding - beveled - cedar (clapboard) SF WBEVFC & Siding - beveled - fiber-cement (clapboard) SF WBEVR & Siding - beveled - redwood (clapboard) SF WBOB & Siding - board on board - pine or equal SF WBOBC & Siding - board on board - cedar SF WBOBR & Siding - board on board - redwood SF WCSH & Siding - cedar shingle SF WCSH+ & Siding - cedar shingle - fancy cut SF WHB & Siding - hardboard - sheet SF WMLAP & Siding - hardboard - lap pattern SF WMN + Siding - Minimum charge EAMTL- & Siding - aluminum or steel (.019 thickness)- std grade SF WMTL & Siding - aluminum or steel (.021 thickness) SF WMTL+ & Siding - aluminum or steel (.024 thickness) - High grade SF WMTLC & Metal outside corner post LFMVRS + Metal & vinyl siding - Detach & reset SFPLY & Siding - plywood - fir face SF WPLYC & Siding - plywood - cedar face SF WPLYR & Siding - plywood - redwood face SF WSDRS + Siding - Detach & reset SF WSHIP & Siding - shiplap - pine or equal SF WSHIPC & Siding - shiplap - cedar SF WSHIPR & Siding - shiplap - redwood SF WSHTR< & Shutters - simulated wood (polystyrene) - Small EASHTR & Shutters - simulated wood (polystyrene) EA

SHTR> & Shutters - simulated wood (polystyrene) - Large EASHTRRS + Shutters - Detach & reset EASHUTA & Security shutter - accordion or folding type SFSHUTM & Motorization for security shutters SFSHUTR & Security shutter - roll-up type SFSTUC & Siding - hardboard - simulated stucco SF WT111 & Siding - T1-11 Masonite - paint grade SF WT111+ & Siding - T1-11 hardboard - stain grade SF WTG & Siding - tongue & groove - pine or equal SF WTGC & Siding - tongue & groove - cedar SF WTGR & Siding - tongue & groove - redwood SF WVENTG< & Attic vent - gable end - vinyl - small EAVENTG & Attic vent - gable end EAVENTG> & Attic vent - gable end - vinyl - large EAVENTGW & Attic vent - gable end - wood EAVINYL & Siding - vinyl SF WVINYL+ & Siding - vinyl - High grade SF WVINYL++ & Siding - vinyl - Premium grade SF WVINYLB & Light J-block - vinyl EAVINYLBV & Vinyl J-vent EAVINYLC & Vinyl outside corner post LFWDWRAP & Wrap wood window frame & trim with aluminum sheet EAWDWRAP<& Wrap wood window frame & trim with aluminum sheet - small EAWDWRAP>& Wrap wood window frame & trim with aluminum sheet - large EA

FACM4 & Fascia - metal, 4" LFFACM6 & Fascia - metal, 6" LFFACM8 & Fascia - metal, 8" LFFACMVRS + Fascia - metal/vinyl - Detach & reset LFFACV & Fascia - vinyl coated aluminum, 4"- 6" LFFACW4- & Fascia - 1" x 4" #2 pine LFFACW4 & Fascia - 1" x 4" #1 pine LFFACW4C & Fascia - 1" x 4" #3 cedar LFFACW6- & Fascia - 1" x 6" #2 pine LFFACW6 & Fascia - 1" x 6" #1 pine LFFACW6C & Fascia - 1" x 6" #3 cedar LFFACW8- & Fascia - 1" x 8" #2 pine LFFACW8 & Fascia - 1" x 8" #1 pine LFFACW8C & Fascia - 1" x 8" #3 cedar LFGRD & Gutter guard/screen LFGRD+ & Gutter guard/screen - High grade LFGRD+RS + Gutter guard/screen - High grade - Detach & reset LFGRDRS + Gutter guard/screen - Detach & reset LFGUTA & Gutter / downspout - aluminum LFGUTC & Gutter / downspout - copper LFGUTG & Gutter / downspout - galvanized LFGUTGS & Gutter / downspout - galvanized - soldered LFGUTP & Gutter / downspout - plastic LFGUTRS + Gutter / downspout - Detach & reset LFMN + Soffit, fascia & gutter - Minimum charge EAMTL1 & Soffit & fascia - metal - 1' overhang LFMTL2 & Soffit & fascia - metal - 2' overhang LFMTL3 & Soffit & fascia - metal - 3' overhang LFMTL4 & Soffit & fascia - metal - 4' overhang LFSFTM & Soffit - metal SFSFTV & Soffit - vinyl SFSFTMVRS+ Soffit - metal/vinyl - Detach & reset SFSFTW & Soffit - wood SFWFRM1 & Soffit - box framing - 1' overhang LFWFRM2 & Soffit - box framing - 2' overhang LFWFRM3 & Soffit - box framing - 3' overhang LF

SCF = Scaffolding

SDG = Siding

SFG = Soffit, Fascia, & Gutter

1 Flip 5_01.fm Page 26 Thursday, August 22, 2002 9:55 AM

Page 27: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

RFG—SFG SFG—STL STL—TIL TMB—WDP WDP—WDV WDV—WDW

27

WFRM4 & Soffit - box framing - 4' overhang LFWOOD1 & Soffit & fascia - wood - 1' overhang LF WOOD2 & Soffit & fascia - wood - 2' overhang LF WOOD3 & Soffit & fascia - wood - 3' overhang LF WOOD4 & Soffit & fascia - wood - 4' overhang LF

AQ & Aquarium - 72" x 24" x 24" - Built-in EABBALL & Indoor basketball standard w/wall padding EABOWL + Bowling alley - per lane EACLOSC & Closet carousel - motorized - Small EACLOSC> & Closet carousel - motorized - Large EACLOSCRS + Closet carousel - Detach & reset EADUMBW & Dumbwaiter - two story - motorized EAELEVR & Elevator - residential - 2 story (small) EAFNTN4 & Landscape fountain - Small (4’ diameter) EAFNTN8 & Landscape fountain - Large (8’ diameter) EAHABITAT & Environmental habitat - enclosure EARADON + Radon evacuation system - average home EASAFE & Safe - concealed wall EASAFE> & Safe - concealed floor EASAUNA & Sauna - interior - 4’ x 6’ EASCRN & Built-in projection screen - fixed EASCRN+ & Built-in projection screen - motorized with remote EASCRN++ & Built-in projection screen - concealed - motorized/remote EASHOOT & Indoor shooting range - per position EASTRLIFT & Stair Lift - 2 story - straight EATPROJ & Built-in theater projector - LCD EATSEAT & Built-in theater seating - per seat EATSPKR & Built-in theater speaker system EAWWELL & Window well - Metal - 40" Wide EAWWELL> & Window well - Metal - 64" Wide EA

08K1 & Steel joist - 8" K Series - under 60' span LF 10CS3 & Steel joist - 10" CS Series - under 60' span LF10K1 & Steel joist - 10" K Series - under 60' span LF 12CS3 & Steel joist - 12" CS Series - under 60' span LF12K1 & Steel joist - 12" K Series - under 60' span LF 12K3 & Steel joist - 12" K Series - under 60' span LF 14CS3 & Steel joist - 14" CS Series - under 60' span LF14K1 & Steel joist - 14" K Series - under 60' span LF 14K3 & Steel joist - 14" K Series - under 60' span LF 16CS5 & Steel joist - 16" CS Series - under 60' span LF16K2 & Steel joist - 16" K Series - under 60' span LF 16K3 & Steel joist - 16" K Series - under 60' span LF 18CS5 & Steel joist - 18" CS Series - under 60' span LF18K3 & Steel joist - 18" K Series - under 60' span LF 18K4 & Steel joist - 18" K Series - under 60' span LF 18K5 & Steel joist - 18" K Series - under 60' span LF 18LH09 & Steel joist - 18" LH Series - up to 144' span LF20CS5 & Steel joist - 20" CS Series - under 60' span LF20K7 & Steel joist - 20" K Series - under 60' span LF 20LH10 & Steel joist - 20" LH Series - up to 144' span LF22CS5 & Steel joist - 22" CS Series - under 60' span LF22K7 & Steel joist - 22" K Series - under 60' span LF 24CS5 & Steel joist - 24" CS Series - under 60' span LF24K09 & Steel joist - 24" K Series - under 60' span LF24K12 & Steel joist - 24" K Series - under 60' span LF24LH11 & Steel joist - 24" LH Series - up to 144' span LF26CS5 & Steel joist - 26" CS Series - under 60' span LF26K10 & Steel joist - 26" K Series - under 60' span LF

28CS5 & Steel joist - 28" CS Series - under 60' span LF28K10 & Steel joist - 28" K Series - under 60' span LF28LH13 & Steel joist - 28" LH Series - up to 144' span LF30CS5 & Steel joist - 30" CS Series - under 60' span LF30K11 & Steel joist - 30" K Series - under 60' span LF32LH15 & Steel joist - 32" LH Series - up to 144' span LF36LH15 & Steel joist - 36" LH Series - up to 144' span LF40LH16 & Steel joist - 40" LH Series - up to 144' span LF44LH17 & Steel joist - 44" LH Series - up to 144' span LF48LH17 & Steel joist - 48" LH Series - up to 144' span LF52DLH17 & Steel joist - 52" DLH Series - up to 144' span LF56DLH17 & Steel joist - 56" DLH Series - up to 144' span LF60DLH18 & Steel joist - 60" DLH Series - up to 144' span LF64DLH18 & Steel joist - 64" DLH Series - up to 144' span LF68DLH19 & Steel joist - 68" DLH Series - up to 144' span LF72DLH19 & Steel joist - 72" DLH Series - up to 144' span LFBRIDG & Steel joist bridging EA

C8X8.5 & Channel - 8" d. x 1 7/8" w. x 3/16" thick LF C10X22 & Channel - 10" d. x 3 1/2" w. x 5/16" thick LF C12X40 & Channel - 12" d. x 3 7/8" w. x 5/8" thick LF COL3P & Column - 3" pipe w/base pl./top bkt. LF COL4P & Column - 4" pipe w/base pl./top bkt. LF COL4ST & Column - 4" sq.tube w/base pl./top bkt. LF COL6P & Column - 6" pipe w/base pl./top bkt. LF COL6ST & Column - 6" sq.tube w/base pl./top bkt. LF COL8P & Column - 8" pipe w/base pl./top bkt. LF COL8ST & Column - 8" sq.tube w/base pl./top bkt. LF COLAB & Column anchor bolt - 5/8" x 12" x 2" w/2 nuts & washers EACOLAB> & Column anchor bolt - 3/4" x 12" x 2" w/2 nuts & washers EACOLAB>> & Column anchor bolt - 1" x 12" x 2" w/2 nuts & washers EACOLBP + Column base plate - 1" x 12" x 12" EACOLTB & Column top bracket - 3/4" bottom & 1/4" sides EADECK & Metal decking, 1 1/2" 16 gauge galvanized - 'B' SF CDECK+ & Metal decking, 3" 18 gauge - 'B' SF CGRF & Steel girder for a floor system (60G10N24K) LF GRR & Steel girder for a roof system (48G8N12K) LF L1.5 & Angle - L 1 1/2" x 1 1/2" x 1/8" thick LFL1.5> & Angle - L 1 1/2" x 1 1/2" x 1/4" thick LF L2 & Angle - L 2" x 2" x 3/16" thick LFL2> & Angle - L 2" x 2" x 1/4" thick LFL2.5 & Angle - L 2 1/2" x 2 1/2" x 1/4" thick LFL3 & Angle - L 3" x 3" x 3/16" thick LFL3> & Angle - L 3" x 3" x 1/4" thick LFL3>> & Angle - L 3" x 3" x 3/8" thick LFL3X2 & Angle - L 3" x 2 1/2" x 3/16" thick LFL3X2> & Angle - L 3" x 2 1/2" x 1/4" thick LFL3.5 & Angle - L 3 1/2" x 3 1/2" x 1/4" thick LFL4 & Angle - L 4" x 4" x 1/4" thick LFL5X3 & Angle - L 5" x 3 1/2" x 1/4" thick LFL5X3> & Angle - L 5" x 3 1/2" x 5/16" thick LF L5X3>> & Angle - L 5" x 3 1/2" x 3/8" thick LFL6X4 & Angle - L 6" x 4" x 5/16" thick LFL6X4> & Angle - L 6" x 4" x 3/8" thick LFMN + Structural steel repair - Minimum charge EAW6X9 & I-beam - 5 7/8" d. x 4" w.x 3/16" thick LFW8X10 & I-beam - 7 7/8" d. x 4" w. x 1/4" thick LF W10X9.9 & I-beam - 10" d. x 2 3/4" w. x 3/16" thick LF W10X22 & I-beam - 10 1/8" d. x 5 3/4" w. x 1/4" thick LFW12X14 & I-beam - 11 7/8" d. x 4" w. x 1/4" thick LF W12X16 & I-beam - 12" d. x 4" w. x 1/4" thick LF

SPE = Specialty Items

STJ = Steel Joist Components

STL = Steel Components

1 Flip 5_01.fm Page 27 Thursday, August 22, 2002 9:55 AM

Page 28: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

RFG—SFG SFG—STL STL—TIL TMB—WDP WDP—WDV WDV—WDW

28

W12X19 & I-beam - 12 1/8" d. x 4" w. x 1/4" thick LF W12X22 & I-beam - 12 5/16" d. x 4" w. x 1/4" thick LF W12X26 & I-beam - 12 1/4" d. x 6 1/2" w. x 1/4" thick LFW12X30 & I-beam - 12 3/8" d. x 6 1/2" w. x 1/4" thick LFW14X17 & I-beam - 14" d. x 4" w. x 3/16" thick LFW14X22 & I-beam - 13 3/4" d. x 5" w. x 1/4" thick LF W14X26 & I-beam - 14" d. x 5" w. x 1/4" thick LFW14X30 & I-beam - 13 7/8" d. x 6 3/4" w. x 1/4" thick LFW14X34 & I-beam - 14" d. x 6 3/4" w. x 1/4" thick LF W16X26 & I-beam - 15 3/4" d. x 5 1/2" w. x 1/4" thick LFW16X31 & I-beam - 15 7/8" d. x 5 1/2" w. x 1/4" thick LFW18X35 & I-beam - 17 3/4" d. x 6" w. x 5/16" thick LF W18X40 & I-beam - 17 7/8" d. x 6" w. x 5/16" thick LF W18X50 & I-beam - 18" d. x 7 1/2" w. x 3/8" thick LF W18X55 & I-beam - 18 1/8" d. x 7 1/2" w. x 3/8" thick LFW18X60 & I-beam - 18 1/4" d. x 7 1/2" w. x 7/16" thick LFW18X65 & I-beam - 18 3/8" d. x 7 5/8" w. x 7/16" thick LFW21X44 & I-beam - 20 5/8" d. x 6 1/2" w. x 3/8" thick LFW21X50 & I-beam - 20 7/8" d. x 6 1/2" w. x 3/8" thick LFW21X62 & I-beam - 21" d. x 8 1/4" w. x 3/8" thick LF W21X68 & I-beam - 21 1/8" d. x 8 1/4" w. x 7/16" thick LFW24X55 & I-beam - 23 1/2" d. x 7" w. x 3/8" thick LF W24X68 & I-beam - 23 3/4" d. x 9" w. x 7/16" thick LF W24X76 & I-beam - 23 7/8" d. x 9" w. x 7/16" thick LF W24X84 & I-beam - 24" d. x 9" w. x 1/2" thick LFW24X94 & I-beam - 24 3/8" d. x 9 1/16" w. x 1/2" thick LFW27X84 & I-beam - 26 3/4" d. x 10" w. x 1/2" thick LF W27X94 & I-beam - 27" d. x 10" w. x 1/2" thick LFW30X99 & I-beam - 29 5/8" d. x 10 7/16" w. x 1/2" thick LF

3 & Stairway - 3' wide (8' rise plus joist) EA3> & Stairway - 3' 6" wide (8' rise plus joist) EA 4 & Stairway - 4' wide (8' rise plus joist) EAAV & Stairway - stringers, treads & risers (per tread) EAAVR & Stairway - redwood stringers and treads (per tread) EAAVT & Stairway - treated stringers and treads (per tread) EADIS & Stairway - disappearing (folding) EALND & Stairway - midpoint landing - (enter SF of landing) SFMN + Stairway repair - Minimum charge EARISER & Stair riser EARISER+ & Stair riser - stain grade softwood EARISERH & Stair riser - hardwood EARISERRS + Stair riser - Detach & reset EASTR & Stair stringer LFSTRRS + Stair stringer - Detach & reset LFTRD & Stair tread EATRD+ & Stair tread - stain grade softwood EATRDH & Stair tread - hardwood EATRDR & Stair tread - redwood EATRDRS + Stair tread - Detach & reset EA

AV- & Metal lath & stucco - Standard grade SF WAV & Metal lath & stucco SF WCOLOR + Stucco color coat SFCOLORS + Stucco color coat - Synthetic SFMAS2 + Two coat stucco over masonry SF WMN + Stucco or exterior plaster repair - Minimum charge EANGS & Stucco - natural gray - sand float SYNGT & Stucco - natural gray - troweled SYPLAS + Plaster (parget) foundation SF

RP + Stucco repair around doors, windows, etc. - 1st floor LFRP2 + Stucco repair around doors, windows, etc. - 2nd floor LFSYN & Synthetic stucco on 1" polystyrene board SF WSYN+ & Synthetic stucco on 2" polystyrene board SF WSYNMAS + Synthetic stucco applied to masonry block SF WSYNW & Synthetic stucco on 1" poly. board - Water managed SF WSYNW+ & Synthetic stucco on 2" poly. board - Water managed SF WTRIM + Synthetic stucco - additional charge for raised trim LF

FND & Feminine napkin dispenser EAFNDD & Feminine napkin disposal EAGBAR< & Handicap grab bar - Stainless steel, 1 1/2" x 24" EAGBAR & Handicap grab bar - Stainless steel, 1 1/2" x 30" EAGBAR> & Handicap grab bar - Stainless steel, 1 1/2" x 36" EAGBAR>> & Handicap grab bar - Stainless steel, 1 1/2" x 48" EAHAND & Hot air hand dryer EAMIR & Bathroom mirror - with metal frame - surface mounted SFMIRS & Bathroom mirror shelf, 24" long EAMN + Toilet and bath accessory repair - Minimum charge EAPTD & Paper towel dispenser EAPTD+ & Paper towel dispenser with waste receptacle EA SPD- & Soap dish - chrome - surface mounted EASPD & Soap dispenser - liquid - surface mounted, 20 oz. EASPD> & Soap dispenser - liquid - surface mounted, 40 oz. EATLTP & Toilet partition (formica or baked enamel steel) EATLTP+ & Toilet partition - High grade (i.e., porcelain enamel) EATPD & Toilet paper dispenser - single roll EATPD2 & Toilet paper dispenser - double roll EATSCD & Toilet seat cover dispenser EAURS & Urinal screen (formica or baked enamel steel) EAURS+ & Urinal screen - High grade (i.e., porcelain enamel) EAWR & Waste receptacle - semi-recessed EA

AV- & Ceramic tile - Standard grade - without mortar bed SFAV & Ceramic tile SFAV+ & Ceramic tile - High grade SFAV++ & Ceramic tile - Premium grade SFB & Ceramic tile base LF PFBCEM1/2 & 1/2" Cement board SFBCEM1/4 & 1/4" Cement board SFBMUD & Mortar bed for ceramic tile (walls) SFCTTL- & Countertop - tile - Standard grade SFCTTL & Countertop - tile SFCTTL+ & Countertop - tile - High grade SFCTTL++ & Countertop - tile - Premium grade SFGROUT + Regrout tile SFJMB & Tile jamb - wrap around LFMN + Ceramic tile - Minimum charge EAPL & Plastic tile SFSIL4 & Window sill - tile on 2"x 4" wall LFSIL6 & Window sill - tile on 2"x 6" wall LFSILRE + Window sill - tile - regrout LFSWR< & Tile shower - up to 60 SF EASWR & Tile shower - 65 to 100 SF EASWR> & Tile shower - 105 to 120 SF EASWR>> & Tile shower - 125 to 150 SF EASWRRE + Tile shower - regrout EATUB & Tub surround - ceramic tile on mortar bed - up to 60 SF EATUB> & Tub surround - ceramic tile on mortar bed - 65 to 75 SF EA

STR = Stairs

STU = Stucco & Exterior Plaster

TBA = Toilet & Bath Accessories

TIL = Tile

1 Flip 5_01.fm Page 28 Thursday, August 22, 2002 9:55 AM

Page 29: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

RFG—SFG SFG—STL STL—TIL TMB—WDP WDP—WDV WDV—WDW

29

BM6X8 & Timber beam, 6 x 8 LFBM6X10 & Timber beam, 6 x 10 LFBM8X10 & Timber beam, 8 x 10 LFBM8X12 & Timber beam, 8 x 12 LFBM8X14 & Timber beam, 8 x 14 LFBM8X16 & Timber beam, 8 x 16 LFGD12X12 & Timber girder, 12 x 12 LFGD10X16 & Timber girder, 10 x 16 LFJ4X10 & Timber joist, 4 x 10 LFJ4X12 & Timber joist, 4 x 12 LFLOGH + Manufactured log home kit - 6" or 7" logs - per SF SFLOGH> + Manufactured log home kit - 8" or 9" logs - per SF SFLOGH>> + Manufactured log home kit - 10" or 12" logs - per SF SFMN + Timber framing repair - Minimum charge EAPRL2X6 & Purlin/girt, 2 x 6 LFPRL2X8 & Purlin/girt, 2 x 8 LFPRL4X6 & Purlin/girt, 4 x 6 LFPRL4X8 & Purlin/girt, 4 x 8 LFPST6 & Timber post, 6x6 LFPST8 & Timber post, 8x8 LFPST10 & Timber post, 10x10 LF

BWSU + Barricade and warning device - setup and takedown HRCT + Caution tape LFFB + Flasher barricade (per day) EAFBMN + Barricade/warning sign - Minimum rental charge EAFEN & Temporary fencing LFGENERTR + 10,000 watt generator (per month) EAMN + Temporary repair - Minimum charge EAPOW + Temporary power - weekly EAPOWHU & Temporary power - hookup EATC + Traffic cones (per unit, per day) EATCMN + Traffic cones - Minimum rental charge EATLT + Temporary toilet (per month) EATLTMN + Temporary toilet, Minimum rental charge EAWS + Warning sign, 4' x 4' on a 6' post (per day) EA WTHR + Temporary weatherproofing (Bid item) EA

ALRS + Aluminum window - Detach & reset EAAV< & Aluminum window, horiz. slider 3-11 sf EAAV<+ & Aluminum window, horiz. slider 3-11 sf (2 pane) EAAV<++ & Aluminum window, horiz. slider 3-11 sf (2 pane w/thermal) EAAV & Aluminum window, horiz. slider 12-23 sf EAAV+ & Aluminum window, horiz. slider 12-23 sf (2 pane) EAAV++ & Aluminum window, horiz. slider 12-23 sf (2 pane w/thermal)EAAV> & Aluminum window, horiz. slider 24-32 sf EAAV>+ & Aluminum window, horiz. slider 24-32 sf (2 pane) EAAV>++ & Aluminum window, horiz. slider 24-32 sf (2 pane w/thermal)EAAV>> & Aluminum window, horiz. slider 33-40 sf EAAV>>+ & Aluminum window, horiz. slider 33-40 sf (2 pane) EAAV>>++ & Aluminum window, horiz. slider 33-40 sf (2 pane w/thermal)EAAVM< & Aluminum window - mobile home, 3-11 sf EAAVM<+ & Aluminum window - mobile home, 3-11 sf, double pane EAAVM<++ & Aluminum window - mobile home, 3-11 sf, d.p. insulated EAAVM & Aluminum window - mobile home, 12-23 sf EAAVM+ & Aluminum window - mobile home, 12-23 sf, double pane EAAVM++ & Aluminum window - mobile home, 12-23 sf, d.p. insulated EAAVM> & Aluminum window - mobile home, 24-32 sf EA

AVM>+ & Aluminum window - mobile home, 24-32 sf, double pane EAAVM>++ & Aluminum window - mobile home, 24-32 sf, d.p. insulated EAAVM>> & Aluminum window - mobile home, 33-40 sf EA AVM>>+ & Aluminum window - mobile home, 33-40 sf, double pane EAAVM>>++ & Aluminum window - mobile home, 33-40 sf, d.p.insulated EACOLOR + Add for colored frame (i.e., bronze or white) SFGRID + Add for grid (double or triple glazed windows) SFLOWE + Add for “Low E” glass SFMN + Window repair - Minimum charge EAP< & Aluminum window, picture/fixed 3-11 sf EAP<+ & Aluminum window, picture/fixed 3-11 sf (2 pane) EAP<++ & Aluminum window, picture/fixed 3-11 sf (2 pane w/thermal) EAP & Aluminum window, picture/fixed 12-23 sf EAP+ & Aluminum window, picture/fixed 12-23 sf (2 pane) EAP++ & Aluminum window, picture/fixed 12-23 sf (2 pane w/thermal)EAP> & Aluminum window, picture/fixed 24-32 sf EAP>+ & Aluminum window, picture/fixed 24-32 sf (2 pane) EAP>++ & Aluminum window, picture/fixed 24-32 sf (2 pane w/thermal)EAP>> & Aluminum window, picture/fixed 33-40 sf EAP>>+ & Aluminum window, picture/fixed 33-40 sf (2 pane) EAP>>++ & Aluminum window, picture/fixed 33-40 sf (2 pane w/thermal)EAS< & Aluminum window, single hung 4-8 sf EAS<+ & Aluminum window, single hung 4-8 sf (2 pane) EA S<++ & Aluminum window, single hung 4-8 sf (2 pane w/thermal) EAS & Aluminum window, single hung 9-12 sf EAS+ & Aluminum window, single hung 9-12 sf (2 pane) EAS++ & Aluminum window, single hung 9-12 sf (2 pane w/thermal) EAS> & Aluminum window, single hung 13-19 sf EAS>+ & Aluminum window, single hung 13-19 sf (2 pane) EAS>++ & Aluminum window, single hung 13-19 sf (2 pane w/thermal)EAS>> & Aluminum window, single hung 20-28 sf EAS>>+ & Aluminum window, single hung 20-28 sf (2 pane) EAS>>++ & Aluminum window, single hung 20-28 sf (2 pane w/thermal)EASPAL< & Specialty aluminum window unit - Small EA SPAL & Specialty aluminum window unit EASPAL> & Specialty aluminum window unit - Large EA SPAL>> & Specialty aluminum window unit - Extra large EASPALRS + Specialty aluminum window unit - Detach & reset EASTRMM< & Storm window - mobile home, 3-11 sf EA STRMM & Storm window - mobile home, 12-23 sf EA STRMM> & Storm window - mobile home, 24-32 sf EA STRMM>> & Storm window - mobile home, 33-40 sf EA STRMW< & Storm window - aluminum, 3-11 sf EASTRMW & Storm window - aluminum, 12-24 sf EA STRMW> & Storm window - aluminum, 25-32 sf EA STRMW>> & Storm window - aluminum, 33-40 sf EA STRMWRS+ Storm window - Detach & reset EATINT + Add for tinted glass SF

5CM & 5-0 6-8 patio door - colored frame - mobile home EA5CM+ & 5-0 6-8 patio door - colored frm - d.p.insulated - mobile homeEA5MM & 5-0 6-8 patio door - mill finish - mobile home EA5MM+ & 5-0 6-8 patio door - mill finish - d.p insulated - mobile home EA6B & 6-0 6-8 bronze sliding patio door EA6B2 & 6-0 6-8 bronze sliding patio door insulated (2 panes) EA6M & 6-0 6-8 mill finish sliding patio door EA6M2 & 6-0 6-8 mill finish sliding patio door insulated (2 panes) EA6WD & 6-0 6-8 wood sliding patio door - w/exterior cladding EA6WD+ & 6-0 6-8 wood sliding patio door - w/ext. clad. - Premium EA8B & 8-0 6-8 bronze sliding patio door EA8B2 & 8-0 6-8 bronze sliding patio door insulated (2 panes) EA

TMB = Timber Framing

WDA = Windows - Aluminum

TMP = Temporary Repairs

WDP = Windows - Sliding Patio

1 Flip 5_01.fm Page 29 Thursday, August 22, 2002 9:55 AM

Page 30: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

RFG—SFG SFG—STL STL—TIL TMB—WDP WDP—WDV WDV—WDW

30

8M & 8-0 6-8 mill finish sliding patio door EA8M2 & 8-0 6-8 mill finish sliding patio door insulated (2 panes) EA8WD & 8-0 6-8 wood sliding patio door - w/exterior cladding EA8WD+ & 8-0 6-8 wood sliding patio door - w/ext. clad. - Premium EAAVRS + Sliding patio door - Detach & reset EAMN + Patio door repair - Minimum charge EASCRN36 & Patio door screen, 36" wide EASCRN48 & Patio door screen, 48" wide EASCRNM & Replacement patio screen door - mobile home EATINT + Add for tinted glass SF

1/8 + Reglaze 1/8" clear glass - 40 sf maximum SF 1/8T + Reglaze 1/8" tempered glass - 40 sf maximum SF 3/16 + Reglaze 3/16" clear glass - 40 sf maximum SF 3/16T + Reglaze 3/16" tempered glass - 40 sf maximum SF1/4 + Reglaze 1/4" clear glass - 40 sf maximum SF 1/4L + Reglaze 1/4" laminated glass - 40 sf maximum SF 1/4T + Reglaze 1/4" tempered glass - 40 sf maximum SF 1/4W + Reglaze 1/4" polished wire glass - 40 sf maximum SF3/8 + Reglaze 3/8" clear glass - 40 sf maximum SF GLAZ< + Reglaze window, 1 - 9 sf EAGLAZ + Reglaze window, 10 - 16 sf EAGLAZ> + Reglaze window, 17 - 24 sf EAGLAZ>> + Reglaze window, 25 - 30 sf EAGLAZ2< + Reglaze double-pane thermal window unit, 1 - 9 sf EAGLAZ2 + Reglaze double-pane thermal window unit, 10 - 16 sf EAGLAZ2> + Reglaze double-pane thermal window unit, 17 - 24 sf EAGLAZ2>> + Reglaze double-pane thermal window unit, 25 - 30 sf EAGRID + Add for grid (double or triple glazed windows) SFLOWE + Add for “Low E” glass SFMN + Window repair - Minimum charge EAOBS + Add for obscure glass SFRDOR + Lube/recondition sliding glass door EASCRN< & Window screen, 1 - 9 sf EASCRN & Window screen, 10 - 16 sf EASCRN> & Window screen, 17 - 25 sf EASCRN>> & Window screen, 26 - 32 sf EASCRNRS + Window screen - Detach & reset EASKY< + Reglaze skylight - up to 6 SF EASKY + Reglaze skylight - 6 to 10 SF EASKY> + Reglaze skylight - 10 to 15 SF EATINT + Add for tinted glass SF

DDF< & Skylight - double dome fixed, 4 - 6.5 sf EA DDF & Skylight - double dome fixed, 6.6 - 9 sf EA DDF> & Skylight - double dome fixed, 9.1 - 12.5 sf EA DDF>> & Skylight - double dome fixed, 12.6 - 15.5 sf EADDV< & Skylight - double dome venting, 4 - 6.5 sf EA DDV & Skylight - double dome venting, 6.5 - 9 sf EA DDV> & Skylight - double dome venting, 9.1 - 12.5 sf EADDV>> & Skylight - double dome venting, 12.6 - 15.5 sf EALOWE + Add for “Low E” glass SFMN + Skylight repair - Minimum charge EAREM & Remote electric opening system EARW<< & Roof window - double glazed, up to 6 sf EARW< & Roof window - double glazed, 6.1 - 9 sf EA RW & Roof window - double glazed, 9.1 - 10 sf EA RW> & Roof window - double glazed, 10.1 - 12 sf EA RW>> & Roof window - double glazed, 12.1 - 15 sf EA TINT + Add for tinted glass SF

BLND< & Window blind - horizontal or vertical - Small EABLND & Window blind - horizontal or vertical EABLND> & Window blind - horizontal or vertical - Large EABLND>> & Window blind - horizontal or vertical - Extra large EABLNDRS + Window blind - horizontal or vertical - Detach & reset EADRPM & Drapery rod - adaptable controller EADRPM+ & Drapery rod - motorized - single drape system EADRPM++ & Drapery rod - motorized - double drape system EAHW< & Window drapery - hardware - Small EAHW & Window drapery - hardware EAHW> & Window drapery - hardware - Large EAHW>> & Window drapery - hardware - Extra large EAHWRS + Window drapery - hardware - Detach & reset EAMN + Window treatment repair - Minimum charge EARU< & Window shade - roll up - Small EARU & Window shade - roll up EARU> & Window shade - roll up - Large EARU>> & Window shade - roll up - Extra large EARURS + Window shade - roll up - Detach & reset EASHTR< & Interior window shutters (set) - Small EASHTR & Interior window shutters (set) EASHTR> & Interior window shutters (set) - Large EA SHTR>> & Interior window shutters (set) - Extra large EASHTRRS + Interior window shutters (set) - Detach & reset EA

C< & Vinyl window - casement, 3-5 sf EAC<+ & Vinyl window - casement, 3-5 sf - High grade EAC<++ & Vinyl window - casement, 3-5 sf - Premium grade EAC & Vinyl window - casement, 6-8 sf EAC+ & Vinyl window - casement, 6-8 sf - High grade EA C++ & Vinyl window - casement, 6-8 sf - Premium grade EA C> & Vinyl window - casement, 9-13 sf EAC>+ & Vinyl window - casement, 9-13 sf - High Grade EAC>++ & Vinyl window - casement, 9-13 sf - High Grade EACOLOR + Vinyl window - Add for premium color frames SFD< & Vinyl window - double hung, 4-8 sf EAD<+ & Vinyl window - double hung, 4-8 sf - High Grade EAD<++ & Vinyl window - double hung, 4-8 sf - Premium Grade EAD & Vinyl window - double hung, 9-12 sf EAD+ & Vinyl window - double hung, 9-12 sf - High Grade EAD++ & Vinyl window - double hung, 9-12 sf - Premium Grade EAD> & Vinyl window - double hung, 13-19 sf EAD>+ & Vinyl window - double hung, 13-19 sf - High Grade EAD>++ & Vinyl window - double hung, 13-19 sf - Premium Grade EAD>> & Vinyl window - double hung, 20-28 sf EAD>>+ & Vinyl window - double hung, 20-28 sf - High Grade EAD>>++ & Vinyl window - double hung, 20-28 sf - Premium Grade EAGRID + Add for grid SFHR24 & Vinyl window - half round, 24" wide EAHR36 & Vinyl window - half round, 36" wide EAHR48 & Vinyl window - half round, 48" wide EAHR60 & Vinyl window - half round, 60" wide EAHR72 & Vinyl window - half round, 72" wide EAHRGRID + Add for grid in half round window - per window unit EAHS< & Vinyl window, horizontal sliding, 3-11 sf EA HS<+ & Vinyl window, horizontal sliding, 3-11 sf - High grade EAHS<++ & Vinyl window, horizontal sliding, 3-11 sf - Premium grade EAHS & Vinyl window, horizontal sliding, 12-23 sf EA HS+ & Vinyl window, horizontal sliding, 12-23 sf - High grade EA

WDR = Window Reglazing & Repair

WDS = Windows - Skylights

WDV = Windows - Vinyl

WDT = Window Treatments

1 Flip 5_01.fm Page 30 Thursday, August 22, 2002 9:55 AM

Page 31: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

RFG—SFG SFG—STL STL—TIL TMB—WDP WDP—WDV WDV—WDW

31

HS++ & Vinyl window, horizontal sliding, 12-23 sf - Premium grade EAHS> & Vinyl window, horizontal sliding, 24-32 sf EA HS>+ & Vinyl window, horizontal sliding, 24-32 sf - High grade EAHS>++ & Vinyl window, horizontal sliding, 24-32 sf - Premium grade EAHS>> & Vinyl window, horizontal sliding, 33-40 sf EA HS>>+ & Vinyl window, horizontal sliding, 33-40 sf - High grade EAHS>>++ & Vinyl window, horizontal sliding, 33-40 sf - Premium grade EALOWE + Add for “Low E” glass SFMN + Vinyl window repair - Minimum charge EAOV & Vinyl window - Oval, 36" x 60" EAOV< & Vinyl window - Oval, 24" x 36" EAOV> & Vinyl window - Oval, 48" x 72" EAP< & Vinyl window, picture/fixed, 3-11 sf EAP<+ & Vinyl window, picture/fixed, 3-11 sf - High grade EAP<++ & Vinyl window, picture/fixed, 3-11 sf - Premium grade EAP & Vinyl window, picture/fixed, 12-23 sf EAP+ & Vinyl window, picture/fixed, 12-23 sf - High grade EAP++ & Vinyl window, picture/fixed, 12-23 sf - Premium grade EAP> & Vinyl window, picture/fixed, 24-32 sf EAP>+ & Vinyl window, picture/fixed, 24-32 sf - High grade EAP>++ & Vinyl window, picture/fixed, 24-32 sf - Premium grade EAP>> & Vinyl window, picture/fixed, 33-40 sf EAP>>+ & Vinyl window, picture/fixed, 33-40 sf - High grade EAP>>++ & Vinyl window, picture/fixed, 33-40 sf - Premium grade EAR24 & Vinyl window - Round/Octagon, 24" EAR36 & Vinyl window - Round/Octagon, 36" EAR48 & Vinyl window - Round/Octagon, 48" EAS< & Vinyl window, single hung, 4-8 sf EAS<+ & Vinyl window, single hung, 4-8 sf - High grade EAS<++ & Vinyl window, single hung, 4-8 sf - Premium grade EAS & Vinyl window, single hung, 9-12 sf EAS+ & Vinyl window, single hung, 9-12 sf - High grade EAS++ & Vinyl window, single hung, 9-12 sf - Premium grade EAS> & Vinyl window, single hung, 13-19 sf EAS>+ & Vinyl window, single hung, 13-19 sf - High grade EAS>++ & Vinyl window, single hung, 13-19 sf - Premium grade EAS>> & Vinyl window, single hung, 20-28 sf EAS>>+ & Vinyl window, single hung, 20-28 sf - High grade EAS>>++ & Vinyl window, single hung, 20-28 sf - Premium grade EATINT + Add for tinted glass SFVNRS + Vinyl window - Detach & reset EA

C< & Wood window - casement, 3-11 sf EAC<+ & Wood window - casement, 3-11 sf, High grade EAC<++ & Wood window - casement, 3-11 sf, Premium grade EAC & Wood window - casement, 12-23 sf EAC+ & Wood window - casement, 12-23 sf, High grade EAC++ & Wood window - casement, 12-23 sf, Premium grade EAC> & Wood window - casement, 24-32 sf EAC>+ & Wood window - casement, 24-32 sf, High grade EAC>++ & Wood window - casement, 24-32 sf, Premium grade EAC>> & Wood window - casement, 33-40 sf EAC>>+ & Wood window - casement, 33-40 sf, High grade EAC>>++ & Wood window - casement, 33-40 sf, Premium grade EAD<- & Wood window - double hung, 4-9 sf, Standard grade EAD< & Wood window - double hung, 4-9 sf EAD<+ & Wood window - double hung, 4-9 sf, High grade EAD<++ & Wood window - double hung, 4-9 sf, Premium grade EAD- & Wood window - double hung, 10-15 sf, Standard grade EAD & Wood window - double hung, 10-15 sf EAD+ & Wood window - double hung, 10-15 sf, High grade EA

D++ & Wood window - double hung, 10-15 sf, Premium grade EAD>- & Wood window - double hung, 16-21 sf, Standard grade EAD> & Wood window - double hung, 16-21 sf EAD>+ & Wood window - double hung, 16-21 sf, High grade EAD>++ & Wood window - double hung, 16-21 sf, Premium grade EAD>>- & Wood window - double hung, 22-26 sf, Standard grade EAD>> & Wood window - double hung, 22-26 sf EAD>>+ & Wood window - double hung, 22-26 sf, High grade EAD>>++ & Wood window - double hung, 22-26 sf, Premium grade EAHS<- & Wood window - horizontal sliding, 3-11 sf, Std. grade EAHS< & Wood window - horizontal sliding, 3-11 sf EA HS<+ & Wood window - horizontal sliding, 3-11 sf, High grade EAHS- & Wood window - horizontal sliding, 12-24 sf, Std.grade EAHS & Wood window - horizontal sliding, 12-24 sf EA HS+ & Wood window - horizontal sliding, 12-24 sf, High grade EAHS>- & Wood window - horizontal sliding, 25-32 sf, Std. grade EAHS> & Wood window - horizontal sliding, 25-32 sf EA HS>+ & Wood window - horizontal sliding, 25-32 sf, High grade EAHS>>- & Wood window - horizontal sliding, 33-40 sf, Std. grade EAHS>> & Wood window - horizontal sliding, 33-40 sf EA HS>>+ & Wood window - horizontal sliding, 33-40 sf, High grade EAMN + Window repair - Minimum charge EAP<- & Wood window - picture (fixed), 12-22 sf, Standard grade EAP< & Wood window - picture (fixed), 12-22 sf EA P<+ & Wood window - picture (fixed), 12-22 sf, High grade EAP- & Wood window - picture (fixed), 23-33 sf, Standard grade EAP & Wood window - picture (fixed), 23-33 sf EA P+ & Wood window - picture (fixed), 23-33 sf, High grade EAP>- & Wood window - picture (fixed), 34-44 sf, Standard grade EAP> & Wood window - picture (fixed), 34-44 sf EA P>+ & Wood window - picture (fixed), 34-44 sf, High grade EAP>>- & Wood window - picture (fixed), 45-55 sf, Standard grade EAP>> & Wood window - picture (fixed), 45-55 sf EA P>>+ & Wood window - picture (fixed), 45-55 sf, High grade EAS<- & Wood window - single hung, 4-9 sf, Standard grade EAS< & Wood window - single hung, 4-9 sf EAS<+ & Wood window - single hung, 4-9 sf, High grade EAS<++ & Wood window - single hung, 4-9 sf, Premium grade EAS- & Wood window - single hung, 10-15 sf, Standard grade EAS & Wood window - single hung, 10-15 sf EAS+ & Wood window - single hung, 10-15 sf, High grade EAS++ & Wood window - single hung, 10-15 sf, Premium grade EAS>- & Wood window - single hung, 16-21 sf, Standard grade EAS> & Wood window - single hung, 16-21 sf EAS>+ & Wood window - single hung, 16-21 sf, High grade EAS>++ & Wood window - single hung, 16-21 sf, Premium grade EAS>>- & Wood window - single hung, 22-26 sf, Standard grade EAS>> & Wood window - single hung, 22-26 sf EAS>>+ & Wood window - single hung, 22-26 sf, High grade EAS>>++ & Wood window - single hung, 22-26 sf, Premium grade EASP< & Specialty wood window unit, 3-11 sf EASP & Specialty wood window unit, 12-23 sf EASP> & Specialty wood window unit, 24-32 sf EASP>> & Specialty wood window unit, 33-40 sf EASTRMW< & Storm window - wood, 3-11 sf EASTRMW & Storm window - wood, 12-24 sf EASTRMW> & Storm window - wood, 25-32 sf EASTRMW>> & Storm window - wood, 33-40 sf EASTRMWRS+ Storm window - Detach & reset EAWDRS + Wood window unit - Detach & reset EA

WDW = Windows - Wood

1 Flip 5_01.fm Page 31 Thursday, August 22, 2002 9:55 AM

Page 32: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

WPR—XST SFG—STL STL—TIL TMB—WDP WDP—WDV WDV—WDW

32

AV- & Wallpaper - Standard grade SF WAV & Wallpaper SF WAV+ & Wallpaper - High grade SF WAV++ & Wallpaper - Premium grade SF WAVRL & Wallpaper (per roll) RLBORDR- & Wallpaper border - Standard grade LF PCBORDR & Wallpaper border LF PCBORDR+ & Wallpaper border - High grade LF PCBORDR++ & Wallpaper border - Premium grade LF PCFABRIC & Wallcovering - fabric SF WFOIL & Wallpaper - foil SF WFOIL+ & Wallpaper - foil - High grade SF WFOIL++ & Wallpaper - foil - Premium grade SF WGRASS & Wallpaper - grass cloth SF WGRASS+ & Wallpaper - grass cloth - High grade SF WGRASS++ & Wallpaper - grass cloth - Premium grade SF WMN + Wallpaper - Minimum charge EAPREP + Prep wall for wallpaper SF WRMV - Additional charge to remove non-strippable wallpaper SF WV & Vinyl wallcovering SF WV+ & Vinyl wallcovering - High grade SF WV++ & Vinyl wallcovering - Premium grade SF W

WHR + Wrecking and hauling (per man hour) HR

BARR & Contamination Barrier SFBLK< + Block and pad furniture in room - Small amount EABLK + Block and pad furniture in room EABLK> + Block and pad furniture in room - Large amount EADHM + Dehumidifier unit (per day) - No monitoring) EA DHM> + Dehumidifier unit (per day) - Large - No monitoring) EADHM>> + Dehumidifier unit (per day) - XLarge - No monitoring EADHMD + Dehumidifier unit (per day) - Desiccant - No monitoring EADRY + Drying fan (per day) - No monitoring EAEQ + Equipment setup, take down, and monitoring (hourly charge) HREQD + Equipment decontamination charge (one time per job) EAESRV + Emergency service call - after business hours EAESRVD + Emergency service call - during business hours EAEXT + Water extraction from floor SF FEXT+ + Water extraction from floor - Heavy SF FEXTG + Water extraction from floor - Gray water SF FEXTS + Water extraction from floor - Black water SF FEXTWP + Pumping of standing water GLEXTWPC + 2" Submersible pump with hose DAGRM + Apply germicide, mildewcide, or combination solution SF FHDRY + Hang dry carpet in plant SFHDRY+ + Hang dry custom oriental rug in plant SF HEPAF + Add for HEPA filter (for negative air exhaust fan) EAHEPAFAC + HEPA Vacuuming DALIFT + Lift carpet for drying SF FMN + Service - minimum charge EANAFAN + Negative air exhaust fan (per day) DAPAD + Pad - remove wet carpet SF FPPE + Add for personal protective equipment (sewage cleanup) EAPPER + Respirator - Rubber mask w/dual cartridge - Disposable EATEST + Sewage contamination & clearance testing (per swab) EATRAN + Transport carpet for drying SF F

WALL + Wall cavity drying system - Injector type (per day) DAWALLD + Wall cavity drying system - Ducted type (per day) DA

CANCOL & 8" x 8" steel canopy column LFCANCOV & Canopy cover SFCANFTG + 5' x 5' x 5' canopy footing EACANMN + Steel canopy repair - Minimum charge EACANPNL & 36" wide steel canopy panel LFSHEDMB & Storage shed - Metal - Barn type (gambrel) - 10’ x 14’ EASHEDMB< & Storage shed - Metal - Barn type (gambrel) - 10’ x 8’ EASHEDMG & Storage shed - Metal - Gable type - 10’ x 8’ EASHEDMG<& Storage shed - Metal - Gable type - 8’ x 6’ EASHEDMV & Storage shed - Vinyl - Gable type - 10’ x 8’ EASHEDMV< & Storage shed - Vinyl - Gable type - 8’ x 6’ EASHEDRS + Storage shed - Vinyl - Detach & reset EA

WPR = Wallpaper

WRH = Wrecking & Hauling

WTR = Water Extraction Services

XST = Exterior Structures

1 Flip 5_01.fm Page 32 Thursday, August 22, 2002 9:55 AM

Page 33: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 33 Thursday, August 22, 2002 10:07 AM

Appendix AStandard Variables

C = Square feet of ceiling F = Square feet of floorHH= Height of the room LW = Square feet in one long wallLL = Lineal feet in one long wall PC = Lineal feet in perimeter of ceilingPF = Lineal feet in perimeter of floor SY = Square yards of floor + wasteSW= Square feet in one short wall W = Square feet of wallsWC=Square feet of walls and ceilingWW= Lineal feet in one short wall

The standard variables listed above always include the entire room, no matter what the shape. To designate a sub-variable, a variable which applies only to a specific subroom, follow the variable with the subroom number. For example, if the closet is subroom number one, the variable for all walls and ceilings in the closet is WC1. Equations like 1/2WC, meaning one half the walls and ceilings, are also allowed.

Variables Description

The description of a price-list item can be changed automatically to describe the surface area included in the item. This is done by inserting the symbol {V} into the description of a price-list item. The symbol will later be replaced by a phrase such as “the walls and ceiling,” “the ceiling,” “the floor,” etc., depending on the variable used in the calculation field. For example, if the

item is PNT SP and the variable is WC, the description will read “Seal then paint the walls and ceiling (2 coats).” If the variable C is used on the same item, the description will read “Seal then paint the ceiling (2 coats).”

Example:

PNT SP + Seal then paint {V} (2 coats) SF WC580 SF @ .35 203.00

becomes...

PNT SP + Seal then paint the walls and ceiling (2 coats)SF WC580 SF @ .35 203.00

Fractions of Variables

You may also calculate fractions of multiples of the variables by adding the fraction (or decimal) or multiple value before the variable. For example, you may use 1/2WC or .5WC to restrict the quantity to one half the walls and ceiling, and the variable 2WC designates twice the area of the walls and ceilings.

33

Appendix BRoom Dimensioning Formulas

The most common room shape, BOX, is the default at the Room Dimensioning screen. By entering height, length, and width measurements as prompted, Xactimate easily computes the dimensions of rectangular rooms.

It is simple to produce precise dimensions for other room shapes with the Room Dimensioning formulas included in Xactimate. These include interior-use formulas for circular, triangular, trapezoidal and intersecting-cube rooms; and for rooms with peaked, sloped and clerestory ceilings and bay windows. Other exterior-use formulas can be used for calculating elevation and gable-roof-and-box measurements. You can create other formulas as needed. (See more on creating formulas in the Xactimate User’s Guide.)

Where To Use Dimensioning Formulas

Dimensioning formula names are entered in the second field, the SHAPE field, of the Room Dimensioning screen. You can replace the BOX default entry by typing in the code for the room shape, or pressing <F5> to list all available formulas, highlighting the desired entry, and pressing <Enter>.

How to Enter Dimensioning Information

Once a room shape other than BOX has been placed in the SHAPE field, a new window appears at the bottom of the screen. This window presents a series of questions that prompt you to enter the measurements required to calculate the dimensions of the room. For example, dimensioning a circular room will generate questions that ask you for the room diameter and ceiling height.

Xactimate allows you to enter measurements for room dimensioning information in three ways; using a comma to separate feet and inches, tick marks (' and ") to identify feet and inches, and feet and inches in decimal format. For example, 3,6 and 3' 6" and 3.5 are valid representations of three feet six inches.

How to Use Variables in Formulas

Answers to the questions in the Room Dimensioning screen activate the standard variables for this room. Xactimate recognizes these standard variables when they are entered in the Line Item Entry screen, and it uses them to calculate the quantity of an item. (See more on Calculation Formulas in Appendix C.)

Appendix A & B Appendix B Appendix B & C Appendix C

Page 34: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 34 Thursday, August 22, 2002 10:07 AM

BAY Bay Window

QA Enter the length of the longest wall (usually missing).Enter the length of the longest wall (usually missing) between the bay and the adjoining room. If the wall is missing, be sure to indicate it at the Dimensioning screen.

QB Enter the length of the opposite wall.Enter the length of the wall parallel to the wall in QA (the face of the bay).

QC Enter the distance between the two walls above.Enter the distance between the walls entered in QA and QB. DO NOT ENTER THE LENGTH OF A SIDE WALL.

QDEnter the height of the walls.Enter the distance from the floor to the ceiling in the bay window.

BAY WINDOW QB

QD

QA

QC

34

BOX Rectangular Room

QA Enter the length of the room.Enter the length of the room’s longest wall.

QB Enter the width of the room.Enter the length of the wall that runs perpendicular to the longest wall in the room.

QC Enter the height of the room.Enter the distance from the floor to the ceiling.

QA QB

QC

Appendix A & B Appendix B Appendix B & C Appendix C

Page 35: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 35 Thursday, August 22, 2002 10:07 AM

BOXI Intersecting Cubes

QA Enter the length of the longest wall in the room.Enter the length of the room’s longest wall.

QB Enter the length of the wall opposite the long wall.Enter the length of the wall that runs parallel to the longest wall in the room.

QC Enter the length of the width wall.Enter the length of the longest of the two walls yet to be dimensioned.

QDEnter the length of the wall opposite the width wall.Enter the length of the last wall to be dimensioned.

QE Enter the height of the walls.Enter the distance from the floor to the ceiling.

QA

QC

QB

QD

35

CIR Circular Room

QA Enter the diameter of the room.Enter the distance from one side of the room to the other.

QB Enter the ceiling height.Enter the distance from the floor to the ceiling.

QA

QB

Appendix A & B Appendix B Appendix B & C Appendix C

Page 36: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 36 Thursday, August 22, 2002 10:07 AM

CS Clerestory Room

QA Enter the length of the walls with constant height.Enter the length of the walls with constant height.

QB Enter the length of the walls with irregular height.Enter the length of the walls which rise and fall with the shape of the ceiling.

QC Enter the height of the wall bearing the high roof.Enter the height of the tall wall bearing the high roof.

QDEnter the height of the wall bearing the low roof.Enter the height of the short wall bearing the low roof.

QE Enter the height of the high roof section.Enter the distance from the floor to the highest point of the ceiling.

QF Enter the distance from the peak to the high outside wall.Enter the horizontal distance from the wall supporting the high roof to a point directly below the peak.

QGEnter the height of the high/low roof transition wall.This wall connects the high and low roofs. Enter the vertical distance from the bottom to the top of this wall.

QAQB

QC

QE

QG

QF

QD

36

DRMR Gable Dormer - Exterior Dimensions

QA Enter the width of the dormer face.Enter the horizontal measurement across the front (face) of the dormer.

QB Enter the height of the dormer.Enter the vertical measurement of the front (face) of the dormer. This is the distance from the roof deck to the lowest point of the dormer’s roof.

QC Enter the length of the side fascia.Enter the horizontal measurement of the fascia on one side of the dormer.

QDEnter the width of the roof overhang.Enter the width of the overhang or eaves of the dormer. This measurement is usually consistent on every side.

QE Enter the rafter length.Enter the ridge-to-fascia length of the dormer.

QF Enter the length of the ridge.Enter the length of the dormer’s ridge.

QGEnter the number of dormers.Enter the number of dormers with these dimensions.

QF

QC

QA

QD

QE

QB

C = sq. feet of roof areaPC = lineal feet of fasciaPF = lineal feet of flashing

Appendix A & B Appendix B Appendix B & C Appendix C

Page 37: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 37 Thursday, August 22, 2002 10:07 AM

EL Exterior Elevation

QA Enter the length.Enter the length of this elevation.

QB Enter the height.Enter the measurement from the top of the foundation to the top of the wall before the gable starts.

QC Enter the height of the gable end. Enter the measurement from the top of the wall to the gable’s peak. Enter 0 if there is no gable.

ORTION

QA

QC

QB

37

GBL Gable Roof and Box

QA Enter the length of the side walls.Enter the length of the side walls. These walls parallel the ridge.

QB Enter the combined overhangs on the gable ends.Enter the combined overhangs at both gable ends. For example, for a roof with a 2 foot overhang at each end, enter 4.

QC Enter the height of the side walls.Enter the distance from the top of the foundation (or from the ground if working with the foundation area as well as the wall) to the highest point of the wall. Enter 8 for an eight-foot wall.

QDEnter the length of the gable walls.Enter the length of the walls running perpendicular to the ridge at the gable end of the structure.

QE Enter the combined overhangs on the side walls.Enter the combined roof overhangs above the side walls. For example, for a 2 foot soffit on each side, enter 4.

QF Enter the slope of the roof.For example, if the roof rises 4 feet for every 12 feet of horizontal measurement, enter 4.

12"

QF

QC

1/2(QB)

End View

QE12

QE12

QD

QA

C = sq. feet of roof areaPC = lineal feet of fasciaPF = lineal feet of flashing

Appendix A & B Appendix B Appendix B & C Appendix C

Page 38: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 38 Thursday, August 22, 2002 10:07 AM

GBLT Gable Roof and Box Tie-in

QA Enter the length of the side walls.Enter the length of the side walls measure parallel the ridge. This formula is designed to be used with the GBL formula. To make the variables correct, make the shared wall a missing wall.

QB Enter the overhang on the gable end.Enter the amount of roof overhang on the gable end.

QC Enter the height of the side walls.Enter the distance from the top of the foundation (or from the ground if working with the foundation area as well as the wall) to the highest point of the wall.

QDEnter the length of the gable wall.Enter the length of the wall running perpendicular to the ridge at the gable end of the structure. When using this formula, be sure to enter the gable end wall’s length as a missing wall at the Dimensioning screen.

QE Enter the combined overhangs on the side walls.Enter the combined roof overhangs above the side walls. For example, for a 2 foot overhang on each side, enter 4.

QF Enter the slope of the tie-in roof.This is the slope of the roof on the tie-in portion. For example, if the roof rises 4 feet for every 12 feet of horizontal measurement, enter 4.

QGEnter the slope of the roof being tied into.This is the slope of the roof being tied into by the roof being measured. For example, if the roof rises 4 feet for every 12 feet of horizontal measurement, enter 4.

QD

QC

QB

QG

12"

QF

12"

QE QE12

12

End View

QA

C = sq. feet of roof areaPC = lineal feet of fascia

Use this formula with the Gable Roof and Box (GBL) formula and note the shared wall as missing.

38

PK Peaked Room

QA Enter the length of the side walls.Enter the length of the walls whose height remains constant.

QB Enter the length of the peaked walls.Enter the length of the walls which rise and fall with the shape of the ceiling.

QC Enter the height for the short wall.Enter the height of the wall under the lowest part of the ceiling.

QDEnter the height for the tall wall.Enter the height of the wall under the highest part of the ceiling.

QE Enter the height of the peak.Enter the measurement from the floor to the peak.

QF Enter the distance from the short wall to the peak.Enter the horizontal measurement from the short wall to a point directly under the peak.

D CEILING

QC

QF

QB

QA

QDQE

Appendix A & B Appendix B Appendix B & C Appendix C

Page 39: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 39 Thursday, August 22, 2002 10:07 AM

SL Sloped Ceiling Room

QA Enter the length of the non-sloping walls.Enter the length of the walls whose height remains constant.

QB Enter the length of the sloping walls.Enter the length of the walls which rise and fall with the ceiling shape.

QC Enter the height of the short wall.Enter the height of the wall under the low edge of the sloped ceiling.

QDEnter the height of the tall wall.Enter the height of the wall under the high edge of the sloped ceiling.

QA

QB

QC

QD

39

TRI Triangular Room

QA Enter the length of the first or longest wall.Enter the length of the longest wall. If all the walls are the same length, enter their lengths in any order.

QB Enter the length of the second or next-to-longest wall.Enter the length of the next longest wall.

QC Enter the length of the third or shortest wall.Enter the length of the remaining wall. This wall can be equal to but not longer than the other two walls.

QDEnter the ceiling height.Enter the distance from the floor to the ceiling. The ceiling must be flat, not angled or sloped.

QA

QCQB

QD

Appendix A & B Appendix B Appendix B & C Appendix C

Page 40: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 40 Thursday, August 22, 2002 10:07 AM

TRP Trapezoidal Room

QA Enter the length of the longest wall.Enter the length of the longest wall in the room.

QB Enter the length of the opposite wall.Enter the length of the wall directly across from the longest wall.

QC Enter the distance between the two walls above.Enter the distance between the long wall and the opposite wall. DO NOT ENTER THE LENGTH OF A SIDE WALL.

QDEnter the ceiling height.Enter the distance from the floor to the ceiling.

QA

QCQD

QB

40

Appendix CCalculation Formulas

Generally, the quantity of an item is calculated automatically when you enter a standard variable for the room. Some items, such as concrete, lumber, and roofing materials, require more data than standard variables provide. For such items, Xactimate provides a variety of special calculation formulas to determine the quantity of the item within the room.

To use some calculation formulas, you must first determine special measurements, such as the depth of a footing for a concrete column, or the width of a joist. The formula asks you for this information and delivers the total yards of concrete, or squares of roofing material.

Other special formulas add waste, or convert existing dimensions into a proper format for ordering. For example, you may know the quantity of boards needed for an area, and need to convert that number into board feet; or you may need to convert square feet of wall space into number of rolls of wallpaper. The CONVERT formula does the mathematics for you.

Formula Operators

Xactimate formulas use these standard mathematical operations:

Symbol Character Usage Operation

+ plus A+B Addition- minus A-B Subtraction/ forward slash A/B Division* star A*B Multiplication^ caret A^B Raise A to the power of B() parentheses (A+B) Open/close parentheses may

enclose values, variables, or equations.

ABS ABS(A) Absolute value of AINT INT(A) Greatest integer of A (must be a

positive number)PI PI(A) 3.14159265359 * value of ARND RND(A) Round value in A to the nearest

whole numberRUP RUP(A) Round value in A up to the next

whole numberSQR SQR(A) Square root of the value in A

Appendix A & B Appendix B Appendix B & C Appendix C

Page 41: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 41 Thursday, August 22, 2002 10:07 AM

Each formula asks you a series of questions. These questions are in bold print and labeled with a letter: the first is Question A, the second is Question B, and so on. This letter designation is abbreviated QA, QB, etc. to the left of each question.

Note that the labels in the illustrations (QA, QB, etc.) correspond to the questions in the formula. These help identify the measurement requested in each question.

How to Enter Measurements

Unlike Room Dimensioning formulas, calculation formulas require that you enter measurements in a specific format. When necessary, the explanatory text following the question indicates the format you should use in your answer.

If the question requires the measurement to be entered in inches, type in the number of inches only. Do not use special symbols like quotation (“) marks in your answer. For example, you would enter four inches (4") by typing in a 4 and then pressing <Enter>.

If the question requires you to enter the measurement in feet (comma) inches, type in the number of feet, then a comma, and then the number of inches. Do not use special symbols like quotation (“) marks or apostrophes (') in your answer. For example, you would enter six feet four inches (6'4") by typing in 6,4 and then pressing <Enter>.

Lumber Measurements

Lineal feet is a standard measuring unit for many types of lumber. It refers to the total length of all the boards needed in an item if laid end-to-end. Board feet is a standard measuring unit for lumber that represents a piece of wood measuring one foot square with a one inch depth.

41

BF: Convert to Board Feet

QA Enter the thickness of the material.Enter in inches the smaller of the two dimensions at the end of the board. For example, enter 2 for a 2" x 4".

QB Enter the width of the material.Enter in inches the larger of the two dimensions at the end of the board. For example, enter 4 for a 2" x 4".

QC Enter the length of the material.Enter the length of the piece of wood in feet (comma) inches.

QDEnter the number of pieces.Enter the number of pieces of wood.

QC

QA

QB

RD FEET

Appendix A & B Appendix B Appendix B & C Appendix C

Page 42: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 42 Thursday, August 22, 2002 10:07 AM

CB: CY of Concrete in a Beam

QA Enter the length of the beam.Enter in feet (comma) inches the length of the concrete beam.

QB Enter the thickness of the beam.Enter in inches the thickness of the concrete beam.

QC Enter the height of the beam.Enter in inches the height of the concrete beam.

QDEnter the number of beams.Enter the number of concrete beams.

QA

QB

QC

42

CNVT: Convert to New Units of Measure

QA Enter the surface area to be converted.Enter the square feet of the material you wish converted to another unit of measure. You can use the Standard Variables F, C, W, WC, LW, and SW, or a formula in your answer.

QB Enter the total coverage per each new unit.Using the same unit of measure used in the previous field, enter the area covered by the new material. For example, to convert square feet to European rolls of wallpaper, enter 25; to 4' x 8' sheathing, enter 32; to square yards, enter 9, etc.

QC Enter the waste percentage.Enter the percentage of waste usually associated with the item you are converting. Do not use a decimal point or the % symbol. If there is no waste, enter 0. Xactimate rounds up to a full unit.

Appendix A & B Appendix B Appendix B & C Appendix C

Page 43: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 43 Thursday, August 22, 2002 10:07 AM

COL: CY of concrete in a Column with Footing

QA Enter the length of the footing.Enter in inches the longest dimension of the footing.

QB Enter the width of the footing.Enter in inches the width of the footing. This is the dimension perpendicular to the dimension entered in QA.

QC Enter the footing thickness.Enter in inches the distance from the top to the bottom of the footing.

QDEnter the diameter of the column.Enter in inches the distance from one side of the column directly through the middle of the column to the other side.

QE Enter the height of the column.Enter in feet (comma) inches the distance from the top of the footing to the top of the column.

QF Enter the number of column-footing assemblies.Enter the number of column-footing assemblies.

QA

QB

QD

QE

QC

43

DK: BF in a Deck

QA Enter the square feet of deck surface.Enter either the length times the width, i.e., 24*12; or, if this area has been entered at the Room Dimensioning screen, enter the Standard Variable F (SF of floor.)

QB Enter the thickness of the decking material.Enter in inches the smaller of the two dimensions at the end of the board. For example, enter 2 if you are using 2" x 6"s.

QC Enter the percent of waste.Enter 5 for a standard five percent waste, or the waste percentage you anticipate. Do not use a decimal point or the % symbol.

QB

QA

Appendix A & B Appendix B Appendix B & C Appendix C

Page 44: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 44 Thursday, August 22, 2002 10:07 AM

DRM: BF in a Hand Framed Gable Dormer

QA Enter the length of the dormer ridge.Enter in feet (comma) inches the dormer ridge length.

QB Enter the length of the dormer fascia.Enter in feet (comma) inches the length of the dormer fascia on one side.

QC Enter the length of the dormer rafters.Enter in feet (comma) inches the length of the dormer’s common rafters.

QDEnter the rafter centers of the dormer.Enter in inches the distance from the center of one rafter to the center of the next.

QE Enter the width of the dormer rafters.Enter the longest measurement at the end of the dormer rafters. Enter 6 if the rafters are 2" x 6".

QF Enter the width of the dormer face.Enter in inches the width of the dormer face.

QGEnter the height of the wall at the dormer face.Enter in inches the height of the wall forming the dormer face. This wall typically has a window in it.

QHEnter the width of the dormer studs.Enter in inches the longest measurement at the end of the studs used in the dormer walls. For example, enter 4 if a 2" x 4" is used.

QI Enter the dormer stud centers.Enter in inches the distance from the center of one stud in the dormer wall to the center of the next. For example, enter 16 for 16" centers.

QJ Enter the width of the header material, if any.A header is a horizontal structural member over the top of a wall opening that distributes the load to either side of the opening. Enter in inches the widest measurement at the end of the header board. For example, enter 10 for a 2" x 10".

QK Enter the lineal feet of the headered opening.Enter in feet (comma) inches the width of the headered opening. If an opening does not exist in the dormer face, enter 0 to this question and QJ.

QL Enter the number of dormers.Enter the number of gable dormers with these dimensions.

44

QAQD

QG

QF

QI

QC

QK

QB

Appendix A & B Appendix B Appendix B & C Appendix C

Page 45: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 45 Thursday, August 22, 2002 10:07 AM

FTG: CY of Concrete in a Footing

QA Enter the lineal feet of footings.Enter in feet (comma) inches the distance around the exterior footings plus the length of any interior footings.

QB Enter the width of the footings.Enter in inches the side-to-side measurement of the footings.

QC Enter the depth of the footings.Enter in inches the distance from the top to the bottom of the footings.

BIC YARDS OF CONCRETE INFOOTING

enter in feetomma) inches

QC - enternches

QB

QC

45

FW: CY of Concrete in a Foundation Wall

QA Enter the lineal feet of foundation wall.Enter in feet (comma) inches the distance around the exterior of the foundation wall plus the length of any interior walls.

QB Enter the height of the foundation wall.Enter in feet (comma) inches the measurement from the top to the bottom of the foundation wall.

QC Enter the thickness of the foundation wall.Enter in inches the thickness of the foundation wall.

footing

QC

QB

Appendix A & B Appendix B Appendix B & C Appendix C

Page 46: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 46 Thursday, August 22, 2002 10:07 AM

Gambrel: SQ in a Gambrel Roof

QA Enter the length of the roof.Enter in feet (comma) inches the ridge length of the roof.

QB Enter the width of lower slope of the roof.Enter in feet (comma) inches the width of the lower slope on one side of the gambrel roof.

QC Enter the width of the upper slope of the roof.Enter in feet (comma) inches the width of the upper slope on one side of the gambrel roof.

QDEnter the waste percent.Enter a waste percentage. Do not enter a decimal point or use the % symbol.

QE Enter the number of bundles per square or 1 to round up. The answer will be rounded up to the fraction that corresponds with the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles, enter 3 if this applies. Enter 1 to round up to the next higher whole square.

46

QB

QA

QC

LFF = lineal feet of fasciaSFL = sq. feet of lower roof slopesSFU = sq. feet of upper roof slopes SF = total sq. feet of roof areaSQL = squares of lower roof slopesSQU = squares of upper roof slopes

Appendix A & B Appendix B Appendix B & C Appendix C

Page 47: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 47 Thursday, August 22, 2002 10:07 AM

GRF: SQ in a Gable Roof (using Slope)

QA Enter the length of the main roof.Enter in feet (comma) inches the ridge length of the main roof.

QB Enter the width of the main roof.Enter in feet (comma) inches the width of the main roof. This is the distance from fascia to fascia (gable wall plus overhangs).

QC Enter the rise of the main roof.Enter in feet (comma) inches the vertical distance from the fascia level to the main roof’s peak.

QDEnter the length of the tie-in roof, if any.Enter in feet (comma) inches the fascia length on one side of the tie-in roof section. Enter 0 if a tie-in roof does not exist.

QE Enter the width of the tie-in roof, if any.Enter in feet (comma) inches the width of the tie-in roof. This is the distance from fascia to fascia (including overhangs). Enter 0 if a tie-in roof does not exist.

QF Enter the rise of the tie-in roof, if any.Enter in feet (comma) inches the vertical distance from the tie-in roof’s fascia level to its peak.

QGEnter the length of the second tie-in roof, if any.Enter in feet (comma) inches the fascia length on one side of the second tie-in roof section. Enter 0 if a second tie-in roof does not exist.

QHEnter the width of the second tie-in roof, if any.Enter in feet (comma) inches the width of the second tie-in roof. This is the distance from fascia to fascia (including overhangs). Enter 0 if a second tie-in roof does not exist.

QI Enter the rise of the second tie-in roof, if any.Enter in feet (comma) inches the vertical distance from the second tie-in roof’s fascia level to its peak. Enter 0 if a second tie in roof does not exist.

QJ Enter the number of bundles per square or 1 to round up.The answer will be rounded to the fraction that corresponds with the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles; enter 3 if this applies. Enter 1 to round up to the next higher whole square.

47

QA

QC

QBQD/QG QE/QH

QF/QI

Appendix A & B Appendix B Appendix B & C Appendix C

Page 48: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 48 Thursday, August 22, 2002 10:07 AM

GRF2: SQ in a Gable Roof

QA Enter the length of the roof.Enter in feet (comma) inches the ridge length of the main roof.

QB Enter the rafter length of the main roof.Enter in feet (comma) inches the distance from the main roof’s fascia to its ridge.

QC Enter the length of the tie-in roof, if any.Enter in feet (comma) inches the fascia length of the tie-in roof. Enter 0 if a tie-in roof does not exist.

QDEnter the rafter length of the tie-in roof, if any.Enter in feet (comma) inches the distance from the tie-in roof’s fascia to its ridge. Enter 0 if a tie-in roof does not exist.

QE Enter the width of the tie-in roof, if any.Enter in feet (comma) inches the distance from the tie-in roof’s fascia to fascia (gable end plus overhangs). Enter 0 if a tie-in roof does not exist.

QF Enter the length of the second tie-in roof, if any.Enter in feet (comma) inches the fascia length of the second tie-in roof. Enter 0 if a second tie-in roof does not exist.

QGEnter the rafter length of the second tie-in roof.Enter in feet (comma) inches the distance from the second tie-in roof’s fascia to its ridge. Enter 0 if a second tie-in roof does not exist.

QHEnter the width of the second tie-in roof, if any.Enter in feet (comma) inches the fascia-to-fascia distance of the second tie-in roof (gable end plus overhangs). Enter 0 if a second tie-in roof does not exist.

QI Enter the number of bundles per square or 1 to round up.The answer will be rounded to the fraction that corresponds to the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles, enter 3 if this applies. Enter 1 to round up to the next higher whole square.

48

QC/QF QE/QH

QD/QG

QA

QB

Appendix A & B Appendix B Appendix B & C Appendix C

Page 49: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 49 Thursday, August 22, 2002 10:07 AM

GRFW: SQ in a Gable Roof (User defined Waste)

QA Enter the length of the roof.Enter in feet (comma) inches the ridge length of the main roof.

QB Enter the rafter length of one side of the main roof.Enter in feet (comma) inches the distance from the main roof’s fascia to its ridge on one side.

QC Enter the rafter length of the main roof’s second side.Enter in feet (comma) inches the distance from the main roof’s fascia to its ridge on the other side of the roof.

QDEnter the length of the tie-in roof, in any.Enter in feet (comma) inches the fascia length of the tie-in roof. Enter 0 if a tie-in roof does not exist.

QE Enter the rafter length of the tie-in roof, if any.Enter in feet (comma) inches the distance from the tie-in roof’s fascia to its ridge. Enter 0 if a tie-in roof does not exist.

QF Enter the width of the tie-in roof, if any.Enter in feet (comma) inches the distance from the tie-in roof’s fascia to fascia (gable end plus overhangs). Enter 0 if a tie-in roof does not exist.

QGEnter the length of the second tie-in roof, if any.Enter in feet (comma) inches the fascia length of the second tie-in roof. Enter 0 if a second tie-in roof does not exist.

QHEnter the rafter length of the second tie-in roof, if any.Enter in feet (comma) inches the distance from the second tie-in roof’s fascia to its ridge. Enter 0 if a second tie-in roof does not exist.

QI Enter the width of the second tie-in roof, if any.Enter in feet (comma) inches the fascia-to-fascia distance of the second tie-in roof (gable end plus overhangs). Enter 0 if a second tie-in roof does not exist.

QJ Enter the percent of waste. Enter a waste percentage. Do not enter a decimal point or use the % symbol.

QK Enter the number of bundles per square or 1 to round up. The answer will be rounded up to the fraction that corresponds with the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles; enter 3 if this applies. Enter 1 to round up to the next higher whole square.

49

QF/QI

QE/QH

QA

QB

QC

QD/QG

Appendix A & B Appendix B Appendix B & C Appendix C

Page 50: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 50 Thursday, August 22, 2002 10:07 AM

HFR: BF in a Hand Framed Roof without Tie-in

QA Enter the length of the roof.Enter in feet (comma) inches the length of the roof measure parallel to its ridge.

QB Enter the width of the rafter material.Enter in inches the longest measurement at the end of the rafter. For example, enter 8 if you are using 2" x 8"s.

QC Enter the length of the rafter.Enter in feet (comma) inches the length of the rafter from the fascia to the roof’s ridge.

QDEnter the rafter centers.Enter in inches the distance from the center of one rafter to the center of the next.

QE Enter the number of doubled or extra rafters.Enter the number of doubled rafters. Doubled rafters are used where additional support is needed. For example, air conditioning units, dormers, or framing around chimneys may require extra rafters.

50

QB

QC

QDQA

This formula calculates one collar tie for every third set of rafters and one pair of web members for everyother rafter pair. Ceiling joists are not included.

Appendix A & B Appendix B Appendix B & C Appendix C

Page 51: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 51 Thursday, August 22, 2002 10:07 AM

HFRT: BF in a Hand Framed Roof with a Tie-in

QA Enter the length of the main roof.Enter in feet (comma) inches the length of the main roof measured parallel to its ridge.

QB Enter the width of the main roof’s rafter material.Enter in inches the longest measurement at the end of the rafter. For example, enter 6 for a 2" x 6".

QC Enter the main roof’s rafter length.Enter in feet (comma) inches the length of the rafter from the fascia to the main roof’s ridge.

QDEnter the main roof’s rafter centers.Enter in inches the distance from the center of one rafter to the center of the next.

QE Enter the number of extra rafters in the main roof.Enter the number of doubled rafters in the main roof. Doubled rafters are used where additional support is needed. For example, air conditioning units, dormers, or framing around a chimney may require extra rafters.

QF Enter the tie-in roof’s ridge length.Enter in feet (comma) inches the length of the tie-in roof’s ridge. Enter 0 if a second or tie-in roof does not exist.

QGEnter the tie-in roof’s fascia length.Enter in feet (comma) inches the tie-in roof’s fascia length. Enter 0 if a second or tie-in roof does not exist.

QHEnter the width of the tie-in roof’s rafter material.Enter in inches the longest measurement at the end of the tie-in roof’s rafters. For example, enter 6 for a 2" x 6".

QI Enter the tie-in roof’s rafter length.Enter in feet (comma) inches the length of the rafter from the tie-in roof’s fascia to its ridge. Enter 0 if a second or tie-in roof does not exist.

QJ Enter the tie-in roof’s rafter centers.Enter in inches the distance from one rafter of the tie-in roof to the next. Enter 0 if a second or tie-in roof does not exist.

QK Enter the number of extra rafters in the tie-in roof.Enter the number of doubled rafters in the second or tie-in roof. Doubled rafters are used where additional support is needed. For example, air conditioning units, dormers, or framing around chimneys may require extra rafters.

51

QD

QA

QF

QC

QGQJ

QI

Appendix A & B Appendix B Appendix B & C Appendix C

Page 52: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 52 Thursday, August 22, 2002 10:07 AM

HFTR: BF in a Hand Framed Tie-In Roof

QA Enter the length of the tie-in ridge.Enter in feet (comma) inches the ridge length of the tie-in or second roof.

QB Enter the length of the fascia.Enter in feet (comma) inches the tie-in roof’s fascia length from its front corner to the place it connects to the main roof.

QC Enter the width of the rafters.Enter in inches the longest measurement at the end of the board. For example, enter 8 if using 2" x 8"s.

QDEnter the length of the rafter.Enter in feet (comma) inches the rafter length from the fascia to the ridge of the roof.

QE Enter the rafter centers.Enter in inches the distance from the center of one rafter to the center of the next.

QF Enter the number of doubled or extra rafters.Double rafters are used where additional support is needed. For example, air conditioning units, dormers, or framing around chimneys may require extra rafters.

52

QB

QE

QA

QC

QD

This formula calculates one collar tie for every third set of rafters and one pair of web members for everyother rafter pair. Ceiling joistsare not included.

Appendix A & B Appendix B Appendix B & C Appendix C

Page 53: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 53 Thursday, August 22, 2002 10:07 AM

HRF: SQ in a Hip Roof (using slope)

QA Enter the length of the main roof.Enter in feet (comma) inches the length of the main roof measured parallel to its ridge.

QB Enter the width of the main roof.Enter in feet (comma) inches the distance from fascia to fascia (including overhang) of the main roof.

QC Enter the rise of the main roof.Enter in feet (comma) inches the vertical distance from fascia level to the roof’s main peak.

QDEnter the length of the tie-in roof, if any.Enter in feet (comma) inches the length of the tie-in roof’s ridge. Enter 0 if a tie-in roof does not exist.

QE Enter the width of the tie-in roof, if any.Enter in feet (comma) inches the distance from fascia to fascia (including overhang) of the tie-in roof. Enter 0 if a tie-in roof does not exist.

QF Enter the rise of the tie-in roof, if any.Enter in feet (comma) inches the vertical distance from the tie-in roof’s fascia level to its peak. Enter 0 if a tie-in roof does not exist.

QGEnter the length of the second tie-in roof, if any.Enter in feet (comma) inches the length of the second tie-in roof’s ridge. Enter 0 if a second tie-in roof does not exist.

QHEnter the width of the second tie-in roof, if any.Enter in feet (comma) inches the distance from fascia to fascia (including overhang) of the second tie-in roof. Enter 0 if a second tie-in roof does not exist.

QI Enter the rise of the second tie-in roof, if any.Enter in feet (comma) inches the vertical distance from the second tie-in roof’s fascia level to its peak. Enter 0 if a second tie-in roof does not exist.

QJ Enter the number of bundles per square or 1 to round up.The answer will be rounded to the fraction that corresponds with the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles; enter 3 if this applies. Enter 1 to round up to the next higher whole square.

53

QC

QB QA QD/QG QE/QH

QF/QI

Appendix A & B Appendix B Appendix B & C Appendix C

Page 54: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 54 Thursday, August 22, 2002 10:07 AM

HRF2: SQ in a Hip Roof

QA Enter the length of the roof.Enter in feet (comma) inches the fascia length of the roof measured parallel to the ridge.

QB Enter the width of the roof.Enter in feet (comma) inches the fascia length measured perpendicular to the ridge.

QC Enter the rafter length of the roof.Enter in feet (comma) inches the length of a common rafter of the roof (including overhang). This is the distance from the fascia to the ridge measured perpendicular to the ridge.

QDEnter the length of the tie-in roof, if any.Enter in feet (comma) inches the fascia length of the tie-in roof measured parallel to its ridge. Enter 0 if a tie-in roof does not exist.

QE Enter the rafter length of the tie-in roof, if any.Enter in feet (comma) inches the length of a common rafter of the tie-in roof (including overhang). This is the distance from the fascia to the ridge measured perpendicular to the ridge. Enter 0 if a tie-in roof does not exist.

QF Enter the length of the second tie-in roof, if any.Enter in feet (comma) inches the fascia length of the second tie-in roof measured parallel to its ridge. Enter 0 if a second tie-in roof does not exist.

QGEnter the rafter length of the second tie-in roof, if any.Enter in feet (comma) inches the length of a common rafter of the second tie-in roof (including overhang). This is the distance from the fascia to the ridge measured perpendicular to the ridge. Enter 0 if a second tie-in roof does not exist.

QHEnter the number of bundles per square or 1 to round up.The answer will be rounded to the fraction that corresponds with the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles; enter 3 if this applies. Enter 1 to round up to the next higher whole square.

54

QB QA QD/QF

QE/QGQC

Appendix A & B Appendix B Appendix B & C Appendix C

Page 55: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 55 Thursday, August 22, 2002 10:07 AM

HRFW: SQ in a Hip Roof (User defined Waste)

QA Enter the length of the roof.Enter in feet (comma) inches the fascia length of the roof measured parallel to the ridge.

QA Enter the width of the roof. Enter in feet (comma) inches the fascia length measured perpendicular to the ridge.

QC Enter the rafter length of the roof. Enter in feet (comma) inches the length of a common rafter of the roof (including overhang). This is the distance from the fascia to the ridge measured perpendicular to the ridge.

QDEnter the length of the tie-in roof, if any. Enter in feet (comma) inches the fascia length of the tie-in roof measured parallel to its ridge. Enter 0 if a tie-in roof does not exist.

QE Enter the rafter length of the tie-in roof, if any.Enter in feet (comma) inches the length of a common rafter of the tie-in roof (including overhang). This is the distance from the fascia to the ridge measured perpendicular to the ridge. Enter 0 if a tie-in roof does not exist.

QF Enter the length of the second tie-in roof, if any.Enter in feet (comma) inches the fascia length of the second tie-in roof measured parallel to its ridge. Enter 0 if a second tie-in roof does not exist.

QGEnter the rafter length of the second tie-in roof.Enter in feet (comma) inches the length of a common rafter of the second tie-in roof (including overhang). This is the distance from the fascia to the ridge measured perpendicular to the ridge. Enter 0 if a second tie-in roof does not exist.

QHEnter the percent of waste. Enter a waste percentage. Do not enter a decimal point or use the % symbol.

QI Enter the number of bundles per square or 1 to round up. The answer will be rounded to the fraction that corresponds with the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles; enter 3 if this applies. Enter 1 to round up to the next higher whole square.

55

QB QA QD/QF

QE/QGQC

Appendix A & B Appendix B Appendix B & C Appendix C

Page 56: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 56 Thursday, August 22, 2002 10:07 AM

JSTBF: BF in a Joist System

QA Enter the total joist system length.Enter in feet (comma) inches the joist system length. This measurement follows the direction of travel when stepping from joist to joist.

QB Enter the total joist system width.Enter in feet (comma) inches the distance spanned by the joist system.

QC How many spans are used to cover the system width?A span refers to the distance between the bearing points of a joist. Often, a joist system will require two or three spans to cover the entire width of the structure.

QD Enter the joist’s width.Enter in inches the widest measurement at the end of the joist.

QE Enter the joist centers.Enter in inches the distance from the center of one joist to the center of the next.

The number ofspans in thissystem is two.

QB

QA

QC

QD

QE

56

JSTLF: LF in a Joist System

QA Enter the total joist system length.Enter in feet (comma) inches the joist system length. This measurement follows the direction of travel when stepping from joist to joist.

QB Enter the total joist system width.Enter in feet (comma) inches the distance spanned by the joist system—generally the width of the structure.

QC How many spans are used to cover total system width?A span refers to the distance between the bearing points of a joist. Often, a joist system will require two or three spans to cover the entire width of the structure.

QDEnter the joist centers.Enter in inches the distance from the center of one joist to the center of the next.

FEET IN AYSTEM

QB

QA

QC

QD

Appendix A & B Appendix B Appendix B & C Appendix C

Page 57: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 57 Thursday, August 22, 2002 10:07 AM

MANSARD: SQ in a Mansard Roof

QA Enter the length of the lower roof.Enter in feet (comma) inches the fascia length on the long side of the lower roof.

QB Enter the width of the lower roof. Enter in feet (comma) inches the fascia length of the short side of the lower roof.

QC Enter the rafter length of the lower roof. Enter in feet (comma) inches the length of a common rafter of the lower roof section (including overhang). This is the distance from the fascia to the ridge separating the upper and lower roof sections.

QDEnter the width of the upper roof section.Enter in feet (comma) inches the width of the upper section of the roof. This is the shortest side of the upper roof.

QE Enter the waste percent. Enter a waste percentage. Do not enter a decimal point or use the % symbol.

QF Enter the number of bundles per square or 1 to round up. The answer will be rounded to the fraction that corresponds with the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles; enter 3 if this applies. Enter 1 to round up to the next higher whole square.

57

QC

QD

QBQA

LFF = lineal feet of fasciaSFL = sq. feet of lower roof slopesSFU = sq. feet of flat upper roof SF = total sq. feet of roof areaSQL = squares of lower roof slopesSQU = squares of flat upper roof

Appendix A & B Appendix B Appendix B & C Appendix C

Page 58: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 58 Thursday, August 22, 2002 10:07 AM

MONO: CY of Concrete in a Monolithic Slab

QA Enter the length of the slab.Enter in feet (comma) inches one of the slab’s dimensions.

QB Enter the width of the slab.Enter in feet (comma) inches the dimension of the slab not entered in QA.

QC Enter the thickness of the slab.Enter in inches the distance from the top to the bottom of the slab.

QDEnter the lineal feet of the perimeter footings.Enter in feet (comma) inches the distance around the outside of the monolithic slab.

QE Enter the width of the perimeter footings.Enter in inches the average width of the perimeter footings.

QF Enter the depth of the perimeter footings.Enter in inches the average depth of the perimeter footings.

QGEnter the total lineal feet of interior footing.Enter in feet (comma) inches the lineal feet of interior footing.

QH Enter the width of the interior footing.Enter in inches the average width of the interior footings.

QI Enter the depth of the interior footings.Enter in inches the average depth of the interior footings.

perimeter shovel footing interior shovel footing

QC

QA

QH

QB

QE

QF QI

58

RCIR: SQ in a Circular Roof

QA Enter the diameter of the area.Enter in feet (comma) inches the distance from one side of the roof to the other.

QB Enter the percent of waste. Enter a waste percentage. Do not enter a decimal point or use the % symbol.

QC Enter the number of bundles per square or 1 to round up. The answer will be rounded to the fraction that corresponds with the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles; enter 3 if this applies. Enter 1 to round up to the next higher whole square.

QA

LFF = lineal feet of fascia SF = sq. feet of roof area

Appendix A & B Appendix B Appendix B & C Appendix C

Page 59: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 59 Thursday, August 22, 2002 10:07 AM

RCON: SQ in a Conical Roof

QA Enter the diameter of the cone base.Enter in feet (comma) inches the distance from one side of the cone base to the other.

QB Enter the rafter length. Enter in feet (comma) inches the distance from the roof’s fascia to the peak.

QC Enter the percent of waste. Enter a waste percentage. Do not enter a decimal point or use the % symbol.

QDEnter the number of bundles per square or 1 to round up. The answer will be rounded to the fraction that corresponds with the number of bundles of shingles per square. Most composition shingles come in 1/3 square bundles; enter 3 if this applies. Enter 1 to round up to the next higher whole square.

QA

QB

LFF = lineal feet of fascia SF = sq. feet of roof area

59

SL: CY of Concrete in a Slab

QA Enter the length of the slab.Enter one of the dimensions of the slab in feet (comma) inches.

QB Enter the width of the slab.Enter in feet (comma) inches the dimension of the slab not entered in QA.

QC Enter the thickness of the concrete.Enter in inches the distance from the top to the bottom of the concrete slab.

QB

QC

QA

Appendix A & B Appendix B Appendix B & C Appendix C

Page 60: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 60 Thursday, August 22, 2002 10:07 AM

STB: BF in a Load Bearing Stud Wall

QA Enter the lineal feet of wall.Enter the length of the wall in feet (comma) inches. If you have more than one wall, enter the combined lineal feet. You may use appropriate Standard Variables and mathematical formulas.

QB Enter the number of corners, openings, and intersections.This includes all windows, doors, corners, and wall intersections. The formula adds 2.5 studs for each opening, corner, and intersection.

QC Enter the stud width.Enter in inches the widest measurement at the end of the stud. For example, enter 6 for a 2" x 6".

QDEnter the length of the stud.Enter in feet (comma) inches the longest measurement (length) of the studs. Pre-cuts (92 5/8") should be rounded to 8 feet.

QE Enter the measurement from stud center to center.Enter in inches the distance from the center of one stud to the center of the next. For example, enter 16 for sixteen inch centers.

QF Enter the number of top plates.A top plate is the horizontal board or boards running across the top of the studs. The formulas automatically adds the sole (bottom) plate.

QGEnter the width of the header material.A header is a horizontal structural member over the top of wall openings that distributes the load to either side of the opening. Enter in inches the widest measurement at the end of the board. For example, enter 10 if you are using 2" x 10"s.

QHEnter the thickness of the header material.Enter in inches the smaller measurement at the end of the board. For any 2X material enter 2, for 4X material enter 4.

QI Enter the number of boards used per header.For example, enter 2 if you are using two boards nailed together.

QJ Enter the lineal feet of headered openings.Measure the width of each opening and add the measurements together. Enter in feet (comma) inches.

60QA

QD

QC

QF

QE

QG

Appendix A & B Appendix B Appendix B & C Appendix C

Page 61: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 61 Thursday, August 22, 2002 10:07 AM

STN: BF in a Non-Bearing Stud Wall

QA Enter the lineal feet of wall.Enter the length of the wall in feet (comma) inches. If you have more than one wall, enter the combined lineal feet. You may use appropriate Standard Variables and mathematical formulas.

QB Enter the number of corners, openings, and intersections.This includes all windows, doors, corners, and wall intersections. The formula adds 2.5 studs for each opening, corner, and intersection.

QC Enter the stud width.Enter in inches the widest measurement at the end of the stud.

QDEnter the length of the stud.Enter in feet (comma) inches the longest measurement (length) of the studs. Pre-cuts (92 5/8") should be rounded to 8 feet.

QE Enter the measurement from stud center to center.Enter in inches the distance from the center of one stud to the center of the next. For example, enter 16 for sixteen inch centers.

QF Enter the number of top plates.A top plate is the horizontal board or boards running across the top of the studs. The formula automatically adds the sole (bottom) plate.

QA

QFQD

QC

QE

61

STP: CY of Concrete in a Step

QA Enter the rise of each step.Enter in inches the average height (rise) of each step.

QB Enter the run of each step.Enter in inches the horizontal measurement from the front edge (nose) of one step to its back edge (where it rises to the next step).

QC Enter the length of each step.Enter in inches the side-to-side measurement of the step.

QDEnter the number of steps (not including the landing).Enter the number of steps. Do not include the landing in this number.

QE Enter the length of the landing.Enter in inches the side-to-side measurement of the landing. This is the measurement parallel to the steps.

QF Enter the width of the landing.Enter in inches the front-to-back measurement of the landing. This is the measurement perpendicular to the steps.

QE

QA

QB

QF

QC QD

There are threesteps in this drawing

Formula calculates step areaas solid. Landing area is calculated as having 6" thickwalls on three sides. Top is calculated at the same thickness as therisers.

Appendix A & B Appendix B Appendix B & C Appendix C

Page 62: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 62 Thursday, August 22, 2002 10:07 AM

TR: LF of Truss

QA Enter the total truss system length.Enter in feet (comma) inches the building dimension perpendicular to the span of the trusses.

QB Enter the width (span) of the truss.This is the width of a typical truss not including overhang. Enter in feet (comma) inches the measurement from bearing point to bearing point of the truss.

QC Enter the truss centers.Enter in inches the distance from the center of one truss to the center of the next.

NOTE: A span refers to the distance between the bearing points of a truss.QB

QC

QA

62

VRF: BF in a Roof for a Vaulted Ceiling

QA Enter the length of the roof.Enter in feet (comma) inches the length of the roof over the vaulted ceiling area. This measurement might be most easily obtained by measuring the length of the room with the vaulted ceiling.

QB Enter the width of the roof.Enter in feet (comma) inches the width of the roof over the vaulted ceiling. This is the distance from fascia to fascia.

QC Enter the rise of the roof.Enter in feet (comma) inches the vertical distance from the fascia level to the peak of the roof.

QDEnter the width of the rafter material.Enter in inches the largest measurement at the end of the rafter. For example, enter 8 for a 2" x 8".

QE Enter the rafter centers.Enter in inches the distance from the center of one rafter to the center of the next.

QF Enter the number of doubled or extra rafters.Enter the number of doubled rafters. Doubled rafters are used where additional support is needed. For example, air conditioning units or framing around chimneys may require extra rafters.

QE

QC

QB

QD

QA

Appendix A & B Appendix B Appendix B & C Appendix C

Page 63: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 63 Thursday, August 22, 2002 10:07 AM

VRFT: BF in a Roof for Vaulted Ceiling with Tie-in

QA Enter the tie-in roof’s fascia length.Enter in feet (comma) inches the fascia length of the tie-in roof with the vaulted ceiling.

QB Enter the width of the roof.Enter in feet (comma) inches the fascia to fascia distance of this tie-in roof.

QC Enter the rise of this roof.Enter, in feet (comma) inches the vertical distance from fascia level to this roof’s peak.

QDEnter the width of the rafter material.Enter in inches the largest measurement at the end of the rafter. For example, enter 8 for a 2" x 8".

QE Enter the rafter centers.Enter in inches the distance from the center of one rafter to the center of the next.

QF Enter the number of doubled or extra rafters.Doubled rafters are used where additional support is needed. For example, air conditioning units or framing around chimneys may require extra rafters.

QGEnter the slope of the roof this roof ties into.Enter the slope of the roof this roof ties into in the following format: enter 4 for 4/12.

63

QE

QC

QB

QAQA, QB, & QC - enter in feet (comma) inchesQD & QE - enter in inchesQF & QG - enter a whole number

QD

Appendix A & B Appendix B Appendix B & C Appendix C

Page 64: Commercial & Residential Price List Flipchart · PEG+ & Patio Enclosure - Full Glass SF PES & Patio Enclosure - Half Screen SF PES+ & Patio Enclosure - Full Screen SF POSTA & Patio

ABC Flip 5_01.fm Page 64 Thursday, August 22, 2002 10:07 AM

WASTE: Add a Waste Factor

QA Enter the number of units.You may use an appropriate Standard Variable or a formula to calculate your answer.

QB Enter the percent of waste.Enter the waste percentage. Do no use the decimal point or the % symbol. For example, enter 10 to calculate 10% waste.

64

Appendix A & B Appendix B Appendix B & C Appendix C