comments on fy08 budget implications for npp and personal safety

7
Comments on FY08 Budget Comments on FY08 Budget Implications for NPP and Implications for NPP and Personal Safety Personal Safety Steve Vigdor Physics All-Hands Meeting January 24, 2008

Upload: swaantje-grevink

Post on 31-Dec-2015

31 views

Category:

Documents


1 download

DESCRIPTION

Comments on FY08 Budget Implications for NPP and Personal Safety. Steve Vigdor Physics All-Hands Meeting January 24, 2008. FY08 ONP Budget News. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Comments on FY08 Budget Implications for NPP and Personal Safety

Comments on FY08 Budget Comments on FY08 Budget Implications for NPP and Implications for NPP and

Personal SafetyPersonal Safety

Steve Vigdor

Physics All-Hands Meeting

January 24, 2008

Page 2: Comments on FY08 Budget Implications for NPP and Personal Safety

FY08 ONP Budget NewsFY08 ONP Budget News DOE ONP budget +2.3% with respect to FY07, but protection of

construction + research budgets facility operations ~flat-flat at FY07 levels across the program

RHIC accelerator + exp’t support operations reduced by $10.5M with respect to President’s FY08 request

IMPACT: 30 cryoweeks 19 cryoweeks short p+p run; 2nd straight year with no new data relevant to gluon polarization + possibility of very long (~9-month) shutdown if CR in early FY09

Plans for future relatively protected: stochastic cooling development proceeds as planned; detector R&D reduced from $1.5M to $1.2M; experiment capital equipment reduced from $3.2M to $3.0M; PHENIX FVTX and NCC upgrades start.

Planning for how to incorporate budget reductions and prioritize RHIC running needs was done with experiment input to extent possible, given rapid time scales and holidays.

Page 3: Comments on FY08 Budget Implications for NPP and Personal Safety

Plan for Rest of RHIC Run 8Plan for Rest of RHIC Run 8

Run8 RHIC dAu Integrated Luminosity for Physics (singles corrected)

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

200.0

26

-No

v-0

7

3-D

ec

-07

10

-De

c-0

7

17

-De

c-0

7

24

-De

c-0

7

31

-De

c-0

7

7-J

an

-08

14

-Ja

n-0

8

21

-Ja

n-0

8

28

-Ja

n-0

8

Since beginning of Physics

inte

gra

ted

lu

min

os

ity

(n

b-1

)STAR

PHENIX

Lmax

Lmin

Very good machine performance & reliability PHENIX, STAR should complete d+Au goals earlier than planned

Switch from d+Au to 200 GeV pp on 1/28/08, run for 6 weeks ( 4 physics weeks, into mid-March)

Emphasize fwd. hadron correla-tions, as pp reference for d+Au gluon saturation tests & transverse spin asymmetries in region where inclusive spin effects sizable.

Allow 2-day test at end for Au+Au below Einjection

Page 4: Comments on FY08 Budget Implications for NPP and Personal Safety

RHIC Budget Impact Statement Provided RHIC Budget Impact Statement Provided to Marge Lynch at CEGPAto Marge Lynch at CEGPA

Overall, we have lost 30 weeks of RHIC operations during FY06-08, and we did this well only because of the FY06 grant from Jim Simons. This is stretching out the RHIC physics program, placing us at a competitive disadvantage with respect to new facilities being commissioned (LHC) or planned (FAIR at GSI in Germany). It is making RHIC operation fall far below optimal efficiency, and is gradually demoralizing the user base and delaying the production of Ph.D. scientists. It is making heavily invested foreign partners (especially the RIKEN Institute in Japan) doubt U.S. reliability as a scientific partner. RHIC has absolutely world-leading capabilities, but continuing budgeting problems limit their exploitation.

Working to optimize the impact of RHIC physics even under challenging budgets. Accelerated upgrade plans help to ensure future impact.

Page 5: Comments on FY08 Budget Implications for NPP and Personal Safety

OHEP Budget Impacts at BNLOHEP Budget Impacts at BNL

National disaster feeds through to BNL mostly via ILC stop-work impact on SMD ($800K, mostly on labor)

Other HEP core funding protected at initial program guidance levels, except for -0.9% across-the-board rescission.

Daya Bay project gets increase of $1.0M, US ATLAS kept ~at initial guidance level, as DOE tries to protect programs that will produce high-impact data over coming ~5 years.

While things will be tight in HEP at BNL, overall problem far less severe than at FNAL, SLAC

Extra $1.7M requested for expanded RACF infrastructure not available in FY08 – DOE will try for FY09 increment.

Page 6: Comments on FY08 Budget Implications for NPP and Personal Safety

Collateral DamageCollateral Damage

Squeezing out a minimally useful pp RHIC run under the omnibus bill requires belt-tightening elsewhere in NPP.

Reduced GPP and GPE funds from ONP require some descoping of RACF expansion and of Instrumentation Division capital equipment upgrades.

Page 7: Comments on FY08 Budget Implications for NPP and Personal Safety

Where Does Personal Safety Come In?Where Does Personal Safety Come In? Optimizing science impact minimizing lost time and lost

credibility with DOE from staff accidents site-wide BNL work planning is very effective in reducing accidents

in professional activities, but ‘lifestyle’ accidents have increased -- nobody really understands why!

A little extra common-sense attention paid by each of us to ‘second-nature’ activities can’t hurt, and is likely to help reduce reportable incidents.

E.g.: Place safety above multi-tasking!

Be alert to crumbling infrastructure!