coming in 2010
DESCRIPTION
COMING IN 2010. Library remodeling project: A Learning Commons for ASU Third Floor Concerns Dr . Maurice G. Fortin 5 November 2009. THE ASU LIBRARY IN FALL 2010. Refocusing the Library to become the heart of learning on campus. A LEARNING COMMONS. What is a Learning Commons?. - PowerPoint PPT PresentationTRANSCRIPT
COMING IN 2010
Library remodeling project: A Learning Commons for ASU
Third Floor Concerns
Dr. Maurice G. Fortin
5 November 2009
THE ASU LIBRARY IN FALL 2010
Refocusing the Library to become
the heart of learning on campus
A LEARNING COMMONS
What is a Learning Commons?
COPING WITH CONSTRUCTION
Goal: to minimize the impacts Closing Library’s First Floor Work begins 14 December 2009 Expected completion is
end of July 2010
COPING WITH CONSTRUCTION
Access Front Porch Elevator: 2nd Floor Landing Between Floors (2nd & Basement)
Internal ElevatorCentral Stairwell
Third Floor – same as now
COPING WITH CONSTRUCTION
Relocation of Services: Circulation Reference ILL Library Instruction
COPING WITH CONSTRUCTION: 2nd Floor
COPING WITH CONSTRUCTION: Basement
COPING WITH CONSTRUCTION
Noisy: M-F (7 am to 6 pm?) Temporary “Outages” Lack of study space Fewer PCs & other equipment Frayed nerves?
COPING WITH CONSTRUCTION
Hours of Operation: 2010 Spring Semester 2010 Summer Terms M-Th: 7:30 am to midnight 7:30 am to 11:00 pm F: 7:30 am to 6:00 pm 7:30 am to 6:00 pm Sa: 9:00 am to 6:00 pm 9:00 am to 6:00 pm Su: 1:00 pm to 10:00 pm 1:00 pm to 10:00 pm
UNEXPECTED/EXPECTED CLOSURES
THE ASU LIBRARY IN FALL 2010
THE ASU LIBRARY IN FALL 2010
THE ASU LIBRARY IN FALL 2010
THE ASU LIBRARY
THANKS!!
Any Questions?