combined application for construction permit on the basis

5
Combined Application for Construction Permit on the basis of Uttarakhand Uniform Building Bye Laws, 2016 through UK-SWS: www.investuttarakhand.com Building Plan Approval: Pre-construction and Post-construction- prior to plinth and pre-occupancy

Upload: others

Post on 16-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Combined Application for Construction Permit on the basis of Uttarakhand UniformBuilding Bye Laws, 2016 through UK-SWS: www.investuttarakhand.com

Building Plan Approval: Pre-construction and Post-construction- prior to plinth and pre-occupancy

Inspection Procedure for Obtaining Occupancy Certificate

After availing the construction permit, construction should be completed and stage wise intimation to be givento Authority (DDA/SIDA). From date of sanctioning of project (Building Plan Approval) under the variouscategories (Industrial/Commercial) the proposed construction of development work with completion within fiveyears of period from competent authority or supervising authority as the case may an occupancy certificateobtain necessarily through intimating the completion of the construction and providing completion certificate.

Flow Chart-New Submission of Building Plan Approval

Apply for the service throughselecting SIDA/ConcernedDDA in the user Dashboard

On the SIDA/DDA Portal-click on apply for Consent

to Operate