![Page 1: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/1.jpg)
MonthYear
Columbus AvenueBicycle Path and Mobility Enhancements
Community Board 7
Commissioner Janette Sadik-Khan, New York City Department of TransportationDecember 11, 2012
![Page 2: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/2.jpg)
Background
2
− 2010: Protected bicycle path installed on Columbus Avenue− W 96th St to W 77th St− Worked with the Columbus
Avenue Working Group
− 2012: Protected bicycle path installed on 9th Avenue − W 59th St to W 31st St
![Page 3: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/3.jpg)
Columbus Avenue Issues
3
− Lack of continuity in the bicycle network− Resulting in lower bicycle volumes on existing Columbus Avenue bike path
− Long pedestrian crossings− 60 foot wide roadway
− Desire for beautification of commercial corridor− Street trees and plantings
− Corridor with variable traffic conditions− Motor vehicle congestion approaching Broadway intersection− Water main construction near Lincoln Center
![Page 4: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/4.jpg)
Project Proposal
4
− Extend design on Columbus Avenue− W 110 to W 96 Streets− W 77 to W 59th Streets
− Provide connections to existing bicycle facilities− 106th St− 9th Avenue− Columbus Avenue
− Tailor design to improve traffic flow in congested areas
− Provide loading zones for businesses with need
![Page 5: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/5.jpg)
5
Existing Conditions
Columbus Avenue at W 70th St
![Page 6: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/6.jpg)
6
Existing Conditions
Wide Parking Lanes
Wide Parking Lanes
Wide Roadway, Long Pedestrian Crossing Distances
Wide Roadway, Long Pedestrian Crossing Distances
3 Travel Lanes + 1 Curbside Rush Hour Travel Lane2 Parking Lanes, No Dedicated Cycling Space
3 Travel Lanes + 1 Curbside Rush Hour Travel Lane2 Parking Lanes, No Dedicated Cycling Space
60 Feet60 Feet
Rush Hour Travel LaneRush Hour Travel Lane
![Page 7: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/7.jpg)
Proposal Summary
7
Bicycle Path Enhanced Shared Lane
Existing Bicycle Facilities
ConstructionColumbus Av
![Page 8: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/8.jpg)
Design Treatments
Mixing Zone
Pedestrian Island
8
Enhanced Shared Lane
Shortens pedestrian crossings
Shortens pedestrian crossings
Safely accommodates
vehicle/bike turning conflict
Safely accommodates
vehicle/bike turning conflict
Additional bike symbols, over head
no passing sign, solid lane line
Additional bike symbols, over head
no passing sign, solid lane line
![Page 9: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/9.jpg)
Proposal Summary
9
Bicycle Path
Existing Bicycle Facilities
ConstructionColumbus Av
![Page 10: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/10.jpg)
10
Segment Planned # of Travel Lanes Volume**
W. 110th to W. 96th 3+ 868(8:00a – 9:00a)
Peak Hour Volume Compared to Proposed Number of Travel Lanes
Peak Hour Vehicle Volumes: Average of three consecutive weekdays (Monday-Thursday) taken the week of 10/1/12
Proposed Roadway Configuration110th St to 96th St & 77th St to 70th St
![Page 11: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/11.jpg)
Proposed Roadway Configuration
11Columbus Avenue, Manhattan
![Page 12: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/12.jpg)
Parking Impact
12
East Side Repurposed Parking Space (west side not affected by islands & turn lanes)
Parking Space Equivalents (Approx.)
110th to 96th
77th to 65th
Total
Turn Lanes/ Mixing Zones 23 22 45
Pedestrian Islands 9 7 16
Total Spaces Repurposed 32 29 61
Total Existing Parking Spaces 149 108 257
Percent of Spaces Repurposed 21% 27% 24%
Mixing Zone Pedestrian Island
Note: Upper Section, 17 islands, 4 mixing zones, 1 turn lane; Lower 12 islands, 3 mixing zone, 1 turn lane
![Page 13: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/13.jpg)
13
Existing Conditions: Lincoln Center
Columbus Avenue at Broadway
![Page 14: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/14.jpg)
1414
Short Curbside Turn Lane
Short Curbside Turn Lane
Complex Intersection, Wide Roadway,
Long Pedestrian Crossing Distances
Complex Intersection, Wide Roadway,
Long Pedestrian Crossing Distances
3 Travel Lanes1 Turn Lane
1 Bus Stop Lane
3 Travel Lanes1 Turn Lane
1 Bus Stop Lane
60 Feet60 Feet
Existing Conditions: Lincoln Center
![Page 15: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/15.jpg)
15
Existing Conditions: Columbus Ave
Columbus Avenue at W 68th St Facing South
![Page 16: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/16.jpg)
Proposal Summary
16
Shared Lane
Existing Bicycle Facilities
ConstructionColumbus Av
![Page 17: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/17.jpg)
17
Segment Planned # of Travel Lanes Volume**
W. 66th to W. 65th 4 1,255(8:00p – 9:00p)
Peak Hour Volume Compared to Proposed Number of Travel Lanes
Peak Hour Vehicle Volumes: Average of three consecutive weekdays (Monday-Thursday) taken the week of 10/1/12
Proposed Roadway Configuration
• Add 1 travel lane
![Page 18: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/18.jpg)
Proposed Roadway Configuration
18Second Avenue, Manhattan
![Page 19: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/19.jpg)
Intersection Treatment/Transition
19• Transition from bicycle path to shared lane through intersection
![Page 20: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/20.jpg)
Proposal Summary
20
Bicycle Path Shared Lane
Existing Bicycle Facilities
ConstructionColumbus Av
![Page 21: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/21.jpg)
Turn Treatments
21Existing Bicycle Facilities
Construction
Location of Split Phase Location of Mixing Zone
Potential Bike PathPotential Shared Lane
Columbus Av W 1
08 S
T
W 1
04 S
T
W 7
6 S
T
W 7
4 S
T
W 7
2 S
T
W 7
0 S
T
W 1
00 S
T
![Page 22: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/22.jpg)
Construction
22
• DEP water main project: Late 2013 Completion• Columbus Ave: Broadway to W 60th St• W 60th St: West End Ave to Columbus Ave• W 63rd St: Broadway to Columbus• W 62nd St: Amsterdam and Columbus
• Fordham University Construction• Columbus Ave: W 62nd to W 60th Streets
• Install bicycle path upon completion of construction on Columbus Ave• Columbus Ave: W 63rd to W 59th St
![Page 23: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/23.jpg)
Bike Path Construction Detour
23Ninth Avenue, Manhattan: Water Main Construction Temporary Design (52-48)
• Install temporary path through work zone
![Page 24: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/24.jpg)
Business Outreach
24
• Working with businesses to review their needs for potential loading regulations
− 107-108: WS Movers− 106-105: NY Plumbing Supply− 105-104: Klausner Plumbing− 100-99: PETCO, Home Goods− 99-98: Modell’s− 98-97: Duane Reade− 97-96: Rite Aid, Sleepy’s− 76-75: Duane Reade− 74-73: Pioneer Supermarket− 67-68: 67th St Wine and Spirit− 67-68: Reebok Sports Club− 67-66: ABC Studio
• Business outreach completed between W 110 St and W 96 St
Location of major business
![Page 25: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/25.jpg)
Proposal Benefits
25
• Increased safety for all roadway users• Better continuity of the Bicycle Network,
promotes healthy activity• Reduces traffic congestion approaching
Broadway by adding a travel lane• Shorter Pedestrian Crossings – Helps seniors
and children• Greener Streets – Planting beds on pedestrian
islands provide more green space• Convenient delivery zones for businesses
![Page 26: Columbus Avenue Month Bicycle Path and Mobility ......Commissioner Janette Sadik-Khan, New Yo rk City Department of Transportation December 11, 2012 Background 2 −2010: Protected](https://reader034.vdocuments.mx/reader034/viewer/2022050309/5f710e27091e5a4fde73e7a4/html5/thumbnails/26.jpg)
26
nyc.gov/dot ThankYou