Collingswood Public Schools Board of Education - 200 Lees Avenue, Collingswood, NJ 08108 - Tel: 856-962-5700 YES, YOUR VOTE COUNTS Please Remember to Vote What A special referendum question to authorize the School District to raise funds through the sale of bonds to finance the Collingswood Com- munity Outdoor Enrichmentfacili- ties program is planned for Tuesday, March 13, 2018. The scope of the work is the culmi- nation of the district wide long range facilities plan and public participation which enhances our school facilities and provides much improved out- door recreation opportunities throughout the community. The Referendum includes the follow- ing projects: Extensive Construction at the Mid- dle/High School to remove a deteri- orating high-school stadium structure and construct a new multi-purpose turf field using cork infill and a 6- lane track; to re-orient existing fields outside the stadium, adding a sec- ond, multi-sport turf field using cork infill; to reconfigure the existing soft- ball and practice fields to maximize use of our current space; to address ADA concerns throughout the facili- ty; to improve basketball courts, lighting, and fencing, drainage, utili- ties, paving and curbing. The play- grounds at all 5 elementary schools will be improved with new Safety System surfaces. Building Improvements at Stadi- um Field include new grandstands & press box, a 1-story building with team rooms, rest rooms and conces- sions, and a new special education life skills classroom with attached storage. The local share cost of Building Im- provements is $13,044,327. Complete descriptions of these pro- jects are found in documents on the Districts Referendum webpage. More Information For detailed information, visit our web site at http://www.collsk12.org and look for the Referendum page. Email questions or comments to [email protected] How Much?...Aid? The approximate, all-inclusive cost estimates for the Referendum are: Now is the Time The Board of Education took consid- erable time studying the need for this project, soliciting community input, and adjusting the project scope based on community input. The positives in this economic cli- mate are that interest rates are near historic lows and we can take ad- vantage of that now by supporting the Collingswood Community Outdoor Enrichment program. Tuesday March 13, 2018 COMMUNITY PRESENTATIONS Feb. 1, 2018 4:00 PM Garfield ES Feb. 8, 2018 6:30 PM Newbie ES Feb. 6, 2018 3:30 PM Sharp ES Feb. 7, 2018 6:00 PM Tatem ES Feb. 6, 2018 7:00 PM Zane ES Impact on Your Taxes The Districts financial advisors have made a preliminary analysis of the costs of the $13.7 M bonds, minus the debt service aid, over 20 years. The tax impact on the local average assessed home of $229,150 is $194 per year; or $84.66 per $100.000 of assessed value (not sales value). Special Election on March 13, 2018 Site Work $ 9.4 M Buildings $ 4.2 M TOTAL COSTS $ 13.7 M Collingswood Community Outdoor Enrichment *** State Share *** Eligible Projects 5¢ for every dollar The Referendum amount on which we will vote, is the total cost of $13.7 million. We have made applications for debt service aid and anticipate that the State of New Jersey will pay up to 5% of the cost of all eligible projects approved as part of the aid program. That is $664,600. These payments are made in annual installments. There is a Tax Impact Calculator in the Ref- erendum section of the District website with which you can input your specific propertys assessed Value and obtain the specific esti- mated annual tax impact there is no need to calcu- late from averages. DISTRICTS VOTING PLACE 1, 4, 8 Community Center 30 W. Collings Ave 2, 12 Collingswood Library 771 Haddon Ave 3, 9, 10, 11 Scottish Rite Ballroom 315 White Horse Pike 5 Heights Park Club 700 West Browning Road 6, 7 McLaughlin Hall 744 South Atlantic

Upload: others

Post on 27-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Collingswood Community Outdoor Enrichment · referendum@collsk12.org The approximate, all-inclusive cost estimates for the Referendum are: Now is the Time The Board of Education took

Collingswood Public Schools Board of Education - 200 Lees Avenue, Collingswood, NJ 08108 - Tel: 856-962-5700

YES, YOUR VOTE COUNTS Please Remember to Vote

What A special referendum question to

authorize the School District to raise

funds through the sale of bonds to

finance the “Collingswood Com-

munity Outdoor Enrichment” facili-

ties program is planned for Tuesday,

March 13, 2018.

The scope of the work is the culmi-

nation of the district wide long range

facilities plan and public participation

which enhances our school facilities

and provides much improved out-

door recreation opportunities

throughout the community.

The Referendum includes the follow-

ing projects:

Extensive Construction at the Mid-

dle/High School to remove a deteri-

orating high-school stadium structure

and construct a new multi-purpose

turf field using cork infill and a 6-

lane track; to re-orient existing fields

outside the stadium, adding a sec-

ond, multi-sport turf field using cork

infill; to reconfigure the existing soft-

ball and practice fields to maximize

use of our current space; to address

ADA concerns throughout the facili-

ty; to improve basketball courts,

lighting, and fencing, drainage, utili-

ties, paving and curbing. The play-

grounds at all 5 elementary

schools will be improved with new

Safety System surfaces.

Building Improvements at Stadi-

um Field include new grandstands

& press box, a 1-story building with

team rooms, rest rooms and conces-

sions, and a new special education

life skills classroom with attached

storage.

The local share cost of Building Im-

provements is $13,044,327.

Complete descriptions of these pro-

jects are found in documents on the

District’s Referendum webpage.

More Information For detailed information, visit our web site at http://www.collsk12.org and look for the Referendum page. Email questions or comments to [email protected]

How Much?...Aid? The approximate, all-inclusive cost estimates for the Referendum are:

Now is the Time The Board of Education took consid-erable time studying the need for this project, soliciting community input, and adjusting the project scope based on community input. The positives in this economic cli-mate are that interest rates are near historic lows and we can take ad-vantage of that now by supporting the Collingswood Community Outdoor Enrichment program.

Tuesday

March 13, 2018

COMMUNITY

PRESENTATIONS

Feb. 1, 2018 4:00 PM Garfield ES Feb. 8, 2018 6:30 PM Newbie ES Feb. 6, 2018 3:30 PM Sharp ES Feb. 7, 2018 6:00 PM Tatem ES Feb. 6, 2018 7:00 PM Zane ES

Impact on Your Taxes The District’s financial advisors have made a preliminary analysis of the costs of the $13.7 M bonds, minus the debt service aid, over 20 years. The tax impact on the local average assessed home of $229,150 is $194 per year; or $84.66 per $100.000 of assessed value (not sales value).

Special Election on March 13, 2018

Site Work $ 9.4 M

Buildings $ 4.2 M

TOTAL COSTS $ 13.7 M

Collingswood Community Outdoor Enrichment

*** State Share *** Eligible Projects

5¢ for every dollar

The Referendum amount on which we will vote, is the total cost of $13.7 million. We have made applications for debt service aid and anticipate that the State of New Jersey will pay up to 5% of the cost of all eligible projects approved as part of the aid program. That is $664,600. These payments are made in annual installments.

There is a Tax Impact Calculator in the Ref-erendum section of the District website with which you can input your specific property’s assessed Value and obtain the specific esti-mated annual tax impact … there is no need to calcu-late from averages.

DISTRICTS VOTING PLACE

1, 4, 8 Community Center 30 W. Collings Ave

2, 12 Collingswood Library 771 Haddon Ave

3, 9, 10, 11 Scottish Rite Ballroom 315 White Horse Pike

5 Heights Park Club 700 West Browning Road

6, 7 McLaughlin Hall 744 South Atlantic

Page 2: Collingswood Community Outdoor Enrichment · referendum@collsk12.org The approximate, all-inclusive cost estimates for the Referendum are: Now is the Time The Board of Education took

ELEMENTARY SCHOOL PLAYGROUNDS

STADIUM FIELD & BUILDINGS IMPROVEMENTS

Demolish existing stadium

structures

Reorientation of fields

Convert natural grass football field

to multi-sport artificial turf field

Rubber surface running track to

6-lane 400m rubberized surface

running track.

Artificial turf multipurpose field and

softball field

Construct new 1-story conces-

sions, bathrooms and team room

building to include1,500 spectator

home grandstand with press box,

to align with the center of the new

turf field.

Install “state of the art” sports light-

ing system, that reduces

impact to neighboring properties.

Upgrade sound system

New Special Education Life Skills

Classroom with additional storage

attached

Install chain link fencing around the

entire running track & turf field

Improve ADA & emergency vehicle

access to the stadium

State aid for special education in-

struction portion of the project.

Remove Existing Mulch Play Surface and Provide New Poured Rubber Surface at each Elementary School

Storage Building

Life Skills Classroom

Team Rooms-Rest Rooms Concession

James Garfield Elementary School

Mark Newbie Elementary School Thomas Sharp Elementary School

William Tatem Elementary School Zane North Elementary School