collaboratively innovating and implementing pbn collaboratively innovating and implementing pbn doug

Download Collaboratively Innovating and Implementing PBN Collaboratively Innovating and Implementing PBN Doug

Post on 27-Jul-2020

2 views

Category:

Documents

0 download

Embed Size (px)

TRANSCRIPT

  • Collaboratively Innovating and

    Implementing PBN

    Doug Marek FAA Operations Manager,

    16 October 2012

    Greener Skies over Seattle

  • 2 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    Greener Skies Scope i1 –Design/Implement PBN instrument procedures into a complex airspace, with a mixed fleet, all while providing an environment for research.

    • OPD STARs and RNAV (RNP, GPS, RVFP) approaches • Flight Simulation (9) / Flight Trials (2067 flights over 50 days) • Environmental Study

    i2 - Evaluate concepts, research alternatives and establish requirements resulting in full implementation of PBN technologies within SEA/BFI airspace and NAS-wide.

    • RNP Established • Concurrent Approaches • RNP to ILS Capture • Procedurally Separating Arrivals/Departures

    i3 - Implementation of new procedure, rule making, and TFM/training.

    • Implement RVFP, RNP Establish, Concurrent Approaches, RNP to ILS • Waivers and DCPs • Ensure TFM/training is developed

  • 3 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    Actions

    Keys to Success:

    ATC/Pilot use Repeatable in all WX

    TFM

  • 4 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    Connecting RNAV STARs with RNP, RVFP,

    and ILS Approaches

  • RNAV vs. Conventional STAR

    Build speeds and altitudes into procedures

  • 6 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    One Track, Three Approaches, All Weather

    Visual / RVFP RNAV / RNP ILS / RNP to ILS

    Keeping It Simple

  • 7 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    WX / ATC Separation

    56.10%

    19.70% 17.00%

    7.20%

    5,000+ ft / 5+ nm 2,500+ ft / 3+ nm 800+ ft / 2+ nnm NA / 300 RVR

    Visual Charted

    RVFP GVFP RNP

    ILS

  • B6500 A6000

    6000

    5000

    12 miles further

    Continuous Glideslope from HEDDR

    8 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    Importance of One Track

    ATC issues and the pilots fly the same track every time, predictable and stabilized STAR connects to all approaches, continuous glideslope, no level-offs or vectors issued

  • 9 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    Simultaneous Operations

    Overlay: Visual/RVFP RNAV (RNP)

    RNAV/RNP to ILS

    Repeatable Track (LNAV/VNAV/SPD) Simultaneous Operations

    ATC/Pilot/TFM Predictability

  • 10 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    RNAV Visual Flight Procedure

  • 11 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    Guided Visual Flight Procedure

  • 12 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    Guided Visual Flight Procedure

    MARNR STAR

    1) ASA481, after DALTN, cleared RNAV Z Rwy 16R, report the airport in sight DALTN

    2) ASA481 has the airport insight

    3) ASA481, cleared Guided Visual

    7110.65, para. 7-4-4 separation visual separation

  • 13 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    RNP Established

  • 14 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    RNAV (TF)/RNP (RF) to ILS

    RNAV (TF)/RNP (RF) to ILS Mode Change

    ILS Section

    Parallel ILS/RNP/GPS

    RNAV/RNP Section

  • 15

    Concurrent Approaches

  • 16

    Key to Success

    Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    • Focused research, building off today's standards to deliver more benefits in the future

    • Create ATC separation procedures that use today’s aircraft avionics technology (RNP Established, Concurrent Approaches, RNP to ILS Capture, RVFP, etc.)

    • Overlay different types of PBN IFP, covering all

    weather conditions, keeping ATC/flight deck/TFM simple

  • 17

    Keys to Implementation

    Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    • Collaboration with all stakeholders, conduct flight trials, and integrate ATM/TFM procedures

    • Collect and analyze lessons learned for replication globally

    • Build an experienced cadre to implement the process

    in like facilities across the ATM system

  • 18

    Thank You

    Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle

    6L 6R

    24L

    34L

    16R

    34R

    16L

    Collaboratively Innovating�and �Implementing PBN Greener Skies Scope Actions Slide Number 4 RNAV vs. Conventional STAR�Build speeds and altitudes into procedures Keeping It Simple WX / ATC Separation Importance of One Track Simultaneous Operations RNAV Visual Flight Procedure Guided Visual Flight Procedure Guided Visual Flight Procedure RNP Established RNAV (TF)/RNP (RF) to ILS Concurrent Approaches Key to Success Keys to Implementation Thank You

Recommended

View more >