cold storage interior designing -...

88
www.acecodubai.ae ACE CURRENT CONTRACTING LLC ELECTRO MECHANICAL CONSTRUCTION INTERIOR DESIGNING COLD STORAGE www.acecodubai.ae

Upload: buituong

Post on 06-Mar-2018

222 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

1

www.acecodubai.ae

ACE CURRENTCONTRACTING LLC

ELECTRO MECHANICAL CONSTRUCTION

INTERIOR DESIGNINGCOLD STORAGE

www.acecodubai.ae

Page 2: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

2

ACE CURRENTCONTRACTING LLC

Page 3: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

3

www.acecodubai.ae

Contentsa Introduction .................................................... 04b Management .................................................... 05c Organizational Chart - ACECO Dubai ................................... 07d Our Main Clients .................................................... 09e Quality .................................................... 10f Environment .................................................... 11g Health & Safety .................................................... 12h Construction .................................................... 15i AIr Conditioning .................................................... 17j Interior Designing .................................................... 19k Building Services .................................................... 21l Maintenance Services .................................................... 23

m Electromechanical .................................................... 25n Electrical .................................................... 27o Organizational Chart - ACECO Branch Sharjah ................... 29p Projects - Electrical .................................................... 30q Cold Storage .................................................... 41r Centralised Refrigiration System ............................................ 42s Projects - HVAC & Electrical - UAE .......................................... 45t Projects - Running/Completed - Last 5 Years ........................ 57u Projects (Major) - Maintenance .............................................. 59v Images - At Work .................................................... 64w Licenses & Certificates .................................................... 80w Contact Us .................................................... 88

Page 4: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

4

ACE CURRENTCONTRACTING LLC

Consists of two divisions that are specialized in electromechanical and electrical projects.ACECO has been operating since 1974 and is registered with the Abu Dhabi Chamber of Commerce under serial number 740.

Our specialization is a varied are the jobs we have undertaken, the following gives as indication of the type of jobs that we have excelled in:

• Construction of transmission and distribution networks• Construction of power generation and desalination plants• Communication networks • Water distribution networks• Electro mechanical projects• Air conditioning installation• Building services• Maintenance projects• Low voltage electrical projects

With a view towards expansion and development ACECO has and still is undertaking projects in collaboration with local and international ventures in the power field. This includes construction of overhead lines etc. and the sale of:

• H.V. electrical equipment and apparatus• Complete electrical sub station• H.V transmission line projects, including transmission line equipment

About Us

4

ACE CURRENTCONTRACTING LLC

Page 5: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

5

www.acecodubai.ae

Ahmad Al-Hashmi General Manager

“We ensure that our clients always get the best.”

Management

Ahmad Al-QaraghuliOperations Manager

“We believe in timely delivery.”

Ahmad AbbasHead of MEP Section

“We provide turn-key solutions.”

Philip AnthonyProjects Manager

“We employ state-of-the-art technology to bring efficiency and effectiveness.”

Reza AfzaliHead of Designs Section

“Innovation and creativity are at the core of our every project.”

5

Page 6: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

6

ACE CURRENTCONTRACTING LLC

Technical StaffACECO consists of more than 450 employees including electrical, civil and mechanical engineers, foremen, supervisors, AC technicians, electricians/linemen, surveyors, pipe fitters, masons, painters, carpenters, plumbers and helpers.

QualityACECO has a dedicated commitment to quality and to this end the electromechanical division have achieved ISO 9001:2008 certificate from BVQI and the electrical division have attained 9001:2008 certificate form Global Certificate of Registration.

Customer SatisfactionIt is our ultimate aim and every opportunity is taken by ACECO to ensure that this is attained.improvement of these Processes

Health & SafetyACECO is active in pursuing safe working practices, staff training and awareness of our environment.

6

Page 7: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

7

www.acecodubai.aeACE CURRENTCONTRACTING LLC

Organizational Chart

General Manager

ManagementRepresentative

Snr. Project Engineer

Project Engineer

Accountant

AdministrationAssistant

Project Manager(Electrical)

Electrical Engineer

Supervisor /Foreman

Supervisor /Foreman

Supervisor /Foreman

Drivers Drivers Drivers

Electricians Technicians Technicians

Asst.Electricians

Asst.Technicians

Asst.Technicians

Head of Maintenance

Secretary /PA

HSE Manager

HSE Officer

Head of Purchasing

PurchasingOfficer

General Manager(HVAC)

Draughtsman/Qty Surveyor

Office Admin & HSE Co-ordinator

Office Assistant

ACECO Dubai

Page 8: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

8

ACE CURRENTCONTRACTING LLCACE CURRENTCONTRACTING LLC

Page 9: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

9

www.acecodubai.ae

ADNOCAbu Dhabi National Oil Company

ZADCO GASCO ADCO

ADDCAbu Dhabi Distribution Company

ADWEAAbu Dhabi Water and Electricity Authority

ADMAbu Dhabi Municipality

TRANSCOAbu Dhabi Transmission and Despatch Co

TOSHIBA ETAEmirates Technical Association Power Projects

ACTCO 3BAl Mansouri

EEEEmirates Electrical Engineering

L&TLarsen & Toubro LLC

SAMSUNG TAKREER

Our Main Clients

Liquefacation

Page 10: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

10

ACE CURRENTCONTRACTING LLC

QualityBy our Quality Management System (QMS) we ensure that our clients’ needs are met up to their satisfaction. With consistent feedback from our clients we improve our quality management system.

The scope of Quality and Management System covers all of our services including engineering, construction, maintenance and repairs to assess internal requirements and provide education and training to staff and clients.

This QMS has been organized to comply with the International Standard of ISO 9001: 2008.

Over number of years’ service we have identified the processes needed for the QMS and their application throughout the organization. In order to ensure that both the operation and control of these processes are effective, criteria and methods have also been put in place.

We always:

ensures the availability of resources and information necessary to support the operation and monitoring of these processes

monitors, measures and analyses these Processes and

implement actions necessary to achieve planned results and continual

Page 11: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

11

www.acecodubai.ae

EnvironmentalCommitmentWe are fully committed to the environmental issues arising from our actions - more specifically, we are committed to the following:

reduction of waste pollutants, conserving resources and recycling materials actively participate in educating our employees, subcontractors and the public at large about environmental conservation pursue the development and implementation of technologies to minimize pollution emission pursuing a goal of zero environmental incidents

Objectives

develop & maintain minimum standards expectations initiate periodic, independent reviews of all environmental aspects to ensure our works are conducted through risk- based audit plan and corrective action program strive for continual improvement of our environmental performance

11

Page 12: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

12

ACE CURRENTCONTRACTING LLC

Health & SafetyTo avoid injury risks, we ensure successful and safe execution of health and safety guidelines established by the relevant authorities wherever we conduct any projects.

The overall responsibility for Health, Safety & Environment rests at the highest level, however, all individual employees have important responsibility towards HSE and participate in carrying out the policy. Appropriate training, supervision and information are provided to encourage and enable them to carry out their duties safely.

Regular inspection and monitoring of the activities is undertaken and accidents or incidents are investigated promptly so that appropriate action is taken to prevent from re-occurrence. Unsafe work practices by an individual can often lead to accidents even in safe working environment. It is therefore our goal to eliminate both unsafe working condition and unsafe work practices.

It is the policy of our company to:

To take expedient actions to correct or isolate unsafe conditions or work practices

To promote Health, Safety & Environment awareness

Hold each employee accountable for their individual responsibility for Health, Safety & Environment

Every reasonable effort will be made to assure that employees can accomplish the safe completion of assigned tasks

Page 13: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

13

www.acecodubai.ae

SafetyNo Compromise!

www.acecodubai.ae

Page 14: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

14

ACE CURRENTCONTRACTING LLCACE CURRENTCONTRACTING LLC

Page 15: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

15

www.acecodubai.ae

ACECO has completed more than 230 diverse projects – residential/commercial buildings, luxury villas, high rise buildings, shopping malls, warehouses, schools, hotels and so on – in the course of the last three decades.

Our Services include:Design, Engineering and Constructability activitiesSubcontractor and Supplier Management, supervision and co-ordinationProcurement, materials management and expediting activitiesPlanning and project control activitiesHSSE compliance and managementQuality Assurance and Quality Control compliance and managementRisk and Opportunity ManagementInterface ManagementIndustrial Relations

Construction

Page 16: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

16

ACE CURRENTCONTRACTING LLC

16

ACE CURRENTCONTRACTING LLC

Page 17: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

17

www.acecodubai.ae

17

Air ConditioningACECO supply and install air-conditioning and ventilation systems and equipment of all capacities for residential, commercial and industrial applications.

Our personalized services ensure that your equipment is smoothly installed and main-tained. Whilst focusing on energy optimization and emphasizing condition-based mainte-nance.

ACECO offer a full range of installation services in the HVAC (Heating, Ventilation, Air-Conditioning) sector:

All types of air-conditioning, ventilation and related works including supply and in- stallation of air/water-cooled centrifugal, reciprocating, screw and absorption chillers and DX system (packaged / ducted / split / unitary equipment). Duct fabrication and installation, MS, GI, Cu. PVC, ABS piping, installation. Turnkey contracts in electromechanical works, including detailed system engineer- ing, selection and supply of equipment, erection, and installation.

Page 18: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

18

ACE CURRENTCONTRACTING LLC

18

ACE CURRENTCONTRACTING LLC

Page 19: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

19

www.acecodubai.ae

If you are looking for interior designing companies in Dubai, then you have just landed in the right place. We at ACECO takes pride in delivering our work performed by the top in-terior consultants and designers in Dubai. Whether you are looking for interior decoration, luxury interior designs, commercial Interior Design, restaurant interior design, office interior design, you name it. We have it!

Services include:Design, Engineering and Constructability activitiesSubcontractor and Supplier Management, supervision and co-ordinationProcurement, materials management and expediting activitiesPlanning and project control activitiesHSSE compliance and managementQuality Assurance and Quality Control compliance and managementRisk and Opportunity ManagementInterface Management

Interior Designing

19

Page 20: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

20

ACE CURRENTCONTRACTING LLC

20

ACE CURRENTCONTRACTING LLC

Page 21: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

21

www.acecodubai.ae

ACECO is one of the largest facility management services providers in the UAE. We offer state-of-the-art, dependable building maintenance services cost effectively. Our sub-stantial base of long-term clients demonstrates the importance that we place on building enduring relationships.

We have hundreds of satisfied clients in Gulf countries. Our painting and maintenance expertise means you can focus on your business.

Building Services

21

Page 22: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

22

ACE CURRENTCONTRACTING LLCACE CURRENTCONTRACTING LLC

Page 23: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

23

www.acecodubai.ae

ACECO provides all kind of maintenance services to its clients, whether it is electrical or mechanical, kitchen duct maintenance or general building the quality, safety and cost is always best you get from us.

Services include:Scheduling and MonitoringSubcontractor & supplier management, supervision and co-ordinationProcurement, materials management and expediting activitiesHSSE compliance and managementQuality Assurance and Quality Control compliance and management

Maintenance Services

Page 24: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

24

ACE CURRENTCONTRACTING LLC

24

ACE CURRENTCONTRACTING LLC

Page 25: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

25

www.acecodubai.ae

Electromechanical DivisionWe provide air conditioning installation (all types), maintenance (for related work) and low voltage power lighting installation and maintenance work. Within this division we have three technical departments:

HVAC Department (Mr B Lobo – Project Manager)Electrical Department (Mr M Hameed – Project Manager)Maintenance Department (Mr K Unnikrishnan – Head of Maintenance)

Plus a dedicated administrative support team that cover all the usual administration functions.

Our quality department ensures that twice yearly internal audits are conducted and that we keep up to date with external audits which are conducted for us by BVQI. Our aim is to ensure the provision of a good service and our customer’s feedback is regularly sought to ensure that customer satisfaction is maintained.

Health and safety of our employees is a matter of great concern to us and to this end we ensure that all our staff is made aware of the company health a safety policy and the

25

Page 26: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

26

ACE CURRENTCONTRACTING LLC

www.emirate

ssg.com

26

ACE CURRENTCONTRACTING LLC

Page 27: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

27

www.acecodubai.ae

27

Electrical DivisionOur core business is the supply, installation testing and commissioning of underground pow-er cables up to 132kV, overhead transmission lines, substations, switchgears and other distri-bution equipment. Since our inception is 1974 more than250 projects were executed across the country. With the supervision of qualified and well trained engineers, our dedicated and skilled workforce is carrying out work in compliance with our clients’ expectations.

We believe in excellence in everything we do. To achieve this, we have divided our orga-nization into different departments – Contract and Procurement, Projects, Finance, Human Resource, Quality and HSE department. The judicious relationship among the departments has always helped us to complete our projects on time and within cost.

Our awareness of quality and safety are two distinct advantages which we possess. A part of our quality assurance we have certified quality management system in accordance with ISO 9001:2008. Our philosophy is to impart services in compliance with our clients’ require-ments by avoiding anything which is detrimental to human resources of the environment. To motivate our employees to implement our quality and HSE system in its true sense, train-

Page 28: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

28

ACE CURRENTCONTRACTING LLC

28

HistoryACECO’s branch was registered in the Emirate of Sharjah in December 2008. Due to the re-lentless efforts of the management and staff for innovation and quality, a quantitative leap has taken place in 2008 where the turnover rate have doubled its size twice since beginning of the operations in 2008.

FacilitiesTools. The company owns a variety of tools and machinery, such as:

• Duct Installation Tools• Plumbing Tools• Pipe Fabrication Tools• Welding Machines (Fixed & Portable)• Welding Tools• Electrician Tools• Lifting Equipment (Portable)• Complete Insulation Spraying Facility (Portable)• Power Driven lock former, benders, shears, drills, and manual roller • M/C & bending tools, etc.• Testing Equipment for press, Airflow & Water flow, Temp & Humidity • Modern PCs and software

ACECO Branch Sharjah

Page 29: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

29

www.acecodubai.aeACE CURRENTCONTRACTING LLC

Organizational Chart

Managing Director

Project ManagerIT and Contracts Manager

Building ServiceMEP

Design &Tech Support

Project

Surveyor

Driver

DraftingPlumbing F.Fighting

Other Specialties

Transport

Engineers Vehicle Maint.

A/C , Vent. & Refrigeration Site

Site Engineer

Site Engineer

Foreman

Foreman

Foreman

Elect Works &

Low Current Systems

IT

Accounts

ACECO Branch Sharjah

Page 30: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

30

ACE CURRENTCONTRACTING LLC

30

1

B+G+P+21 Floors hotel Apartments on plot MS-026, Dubai – : /Private

Main Contractor M/S Al-Meezan Contracting Consultant M/S Aldana Engineering Consultant.Works MEP Design works.Contract value DHS. 250,000.00/-

System Description: Full design of MEP and builders works.

2

G+6 residential building alaweer ,Dubai : / private

Main Contractor M/S Al Meezan contracting Consultant M/S AlDana Engineering Works Air conditioning Control.Contract value DHS. 150,000/-

System Description:BMS control for the Chillers

3

G+ 3 Floors residential building – alhamrani – : /Private

Main Contractor M/S becon Contracting Consultant M/S adnan safarini Consultant.Works Electrical works.Contract value DHS. 1,450,000.00/-

System Description:Full electrical works

Electrical Projects - ACECO SharjahProjects

Page 31: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

31

www.acecodubai.ae

4

100 villas project at al bedia – Fujairah – : /republic works

Main Contractor M/S east coast Contracting Consultant M/S al sweedy consultancy Works Electrical works.Contract value DHS. 5,500,000.00/-

System Description: Full electrical works

5

G+3 residential building al musalah plot 158 , sharjah : / private

Main Contractor M/S remal alsahra contracting Consultant M/S al alamia Works MEP Contract value DHS. 450,000/-

System Description:Full Mep works

6

G+3 residential building al ghuwair plot 269 , sharjah : / private

Main Contractor M/S remal alsahra contracting Consultant M/S al alamia Works MEP Contract value DHS. 475,000/-

System Description:Full Mep works

Electrical Projects - ACECO Sharjah

31

Page 32: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

32

ACE CURRENTCONTRACTING LLC

32

7

G+1 residential villa al jurf ajman plot 63 , ajman : / private

Main Contractor M/S alqwya construction Consultant M/S adnan safarini Works ElectcticalContract value DHS. 185,000/-

8

G+1 residential villa AL Hoshi Albadi plot p-1446 , sharjah : / private

Main Contractor M/S Albasim construction Consultant M/S adnan safarini Works ElectricalContract value DHS.221,000/-

9

G+1 residential villa dubai land plot p-RD155 , dubai : / private

Main Contractor M/S reliant construction Consultant M/S makyia engineering Works MEP Contract value DHS.270 ,000/-

System Description:MEP works

Electrical Projects - ACECO Sharjah

Page 33: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

33

www.acecodubai.ae

10

G+1 residential villa al ramtha plot no. 693 , sharjah : / private

Main Contractor M/S alrawasy construction Consultant M/S adnan safarini Works Elect + plumbing Contract value DHS.180 ,000/-

System Description:Elect + plumbing works

11

G+1 residential villa dubai land plot p-8884345 , dubai : / private

Main Contractor M/S al tamimi construction Consultant M/S makyia engineering Works MEP Contract value DHS.320 ,000/-

12

G+1 residential villa albarsha plot p-6723886 R2/2 , dubai : / private

Main Contractor M/S reliant construction Consultant M/S makyia engineering Works MEP Contract value DHS.350 ,000/-

System Description:MEP works

Electrical Projects - ACECO Sharjah

33

Page 34: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

34

ACE CURRENTCONTRACTING LLC

34

13

G+1 residential villa al qarayn 4 plot 2403 , sharjah : / private

Main Contractor M/S remal alsahraconstruction Consultant M/S cubic silver consultancy Works A/C Contract value DHS.160,000/-

System Description:A/C works

14

G residential villa kaber 6 plot no. 16 , um quween : / private

Main Contractor M/S quway construction Consultant M/S adnan safarini Works elect Contract value DHS.185 ,000/-

System Description:Elect works

15

G only Villa , Sharjah , 2687 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 250,000/-

System DescriptionMEP works

Electrical Projects - ACECO Sharjah

Page 35: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

35

www.acecodubai.ae

16

G +1 Villa , Sharjah , plot 2059 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 350,000/-

System Description:MEP works

17

G +1 Villa , Sharjah , plot 1029 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 370,000/-

System Description:MEP works

18

G +1 Villa , Sharjah , plot 1126 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 300,000/-

System Description:MEP works

Electrical Projects - ACECO Sharjah

35

Page 36: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

36

ACE CURRENTCONTRACTING LLC

36

19

G +1 Villa , Sharjah , plot 1970 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 390,000/-

System Description:MEP works

20

G +3 Residential , Sharjah , plot 167 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Al-Alamyah Engineering Works MEP works .Contract value DHS. 800,000/-

System Description:MEP works

21

G +1 Villa , Sharjah , plot 2043 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 310,000/-

System Description:MEP works

Electrical Projects - ACECO Sharjah

Page 37: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

37

www.acecodubai.ae

22

G only Villa , Sharjah , plot 1968 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 290,000/-

System Description:MEP works

23

G +1 Villa , Sharjah , plot 1972 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 400,000/-

System Description:MEP works

24

G +1 Villa , Sharjah , plot 2049 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Islamic Arch. Engineering Works MEP works .Contract value DHS. 350,000/-

System Description:MEP works

Electrical Projects - ACECO Sharjah

37

Page 38: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

38

ACE CURRENTCONTRACTING LLC

38

25

G +1 Villa , Sharjah , plot 4237 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 320,000/-

System Description:MEP works

26

G +1 Villa , Sharjah , plot 1746 : / private

Main Contractor M/S Remal al sahra Co.Consultant M/S Sharjah Engineering Works MEP works .Contract value DHS. 300,000/-

System Description:MEP works

Electrical Projects - ACECO Sharjah

Page 39: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

39

www.acecodubai.ae

39

www.acecodubai.ae

Page 40: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

40

ACE CURRENTCONTRACTING LLC

40

ACE CURRENTCONTRACTING LLC

Page 41: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

41

www.acecodubai.ae

Cold StorageWe install cold rooms for chiller and freezer applications and the portfolio includes walk-in commercial cold rooms, warehouse cold storages, portable skid mounted cold rooms, off shore refrigerated containers and refrigerated vehicle bodies which can be manufactured as per customer specified sizes.

Depending on the size and use of the cold room, cold rooms can be broadly classified as walk-in cold rooms and warehouse cold stores.

Walk-in cold rooms are smaller in size compared to the large warehouse cold stores and are used primarily by the retail industry to store goods with fast shelf replenishment rate. Due to the small size of the rooms, the insulated floors are built strong enough only to allow the use of hand carts and not suitable for large power equipments such as forklifts. A few uses of walk-in cold rooms are in the super markets, hotels, restaurants etc.

41

Page 42: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

42

ACE CURRENTCONTRACTING LLC

42

Centralised Refrigeration System

We are proud to present our Power Pack System which is suitable for commercial and industrial sectors.

These systems are designed in a way to be highly efficient, easy to install and to require little maintenance.

Engineered professionally for high level performance, these systems have an advanced central monitoring system which helps to reduce the maintenance and running cost even lower.

Highly Intelligent Step Control

This system helps to:- Distribute the load on the compressors- Reduce the power consumption- Keep all the compressors running for the same amount of time- Intelligent compressor running strategy- 24/7 monitoring and control

Page 43: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

43

www.acecodubai.ae

43

Page 44: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

44

ACE CURRENTCONTRACTING LLC

44

ACE CURRENTCONTRACTING LLC

Page 45: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

45

www.acecodubai.ae

1

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Al Saada Hospital – Al AinPWD1975Air Conditioning WorksDhs 600, 000.00

2

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADDF Tarif Ammunition DeptADDF1975Air Conditioning WorksDhs 500,000.00

3

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADCO OfficesADCO1975Air Conditioning WorksDhs 670,000.00

4

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Ali Bin Khalfan Bldg.H.E. Ali Bin Khalfan / Dr Ali Alsao1976Air Conditioning WorksDhs 2,000,000.00

5

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

British EmbassyBritish Embassy / John R. Harris & Partners1976Air Conditioning WorksDhs 600,000.00

6

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADDF Sweihan CampADDF 1978Air Conditioning WorksDhs 900,000.00

7

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADMA – OPCO Main Office (Das Island)ADMA – OPCO /DGI1978Air Conditioning WorksDhs 1,200,000.00

8

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADDF Mafraq CampADDF 1978Air Conditioning WorksDhs 1,000,000.00

9

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADMA – OPCO Sahil Phase IIADMA – OPCO / Wilson Mason & Partners1979 Air Conditioning WorksDhs 2,200,000.00

10

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Ruwais Inst of Par. 400 menADNOC – Behtel1979Air Conditioning WorksDhs 600,00.00

ProjectsHVAC & Electrical Project Carried Out in Abu Dhabi

45

Page 46: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

46

ACE CURRENTCONTRACTING LLC

11

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADCO Amenities Center – ASABADCO / Michael Rayner & Partners1980Air Conditioning Works + 5 Years Maint. Cont.Dhs 850,000.00

12

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADCO Amenities Center – ASABADCO / Wilson Mason & Partners 1980Air Conditioning Works + 5 Years Maint. Cont.Dhs 850,000.00

13

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Residential Complex for ADCOADCO / Michael Rayner & Partners1981Air Conditioning Works + 5 Years Maint. Cont.Dhs 2,500,000.00

14

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

T.V Police BldgPWD / Arab Belgian Consultant Bureau1981Air Conditioning WorksDhs 700,000.00

15

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Abu Dhabi Custom BldgPWD / Arab Belgian Consultant Bureau1982Air Conditioning WorksDhs 1,050,000.00

16

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Emirtel Extension – Buteen (Presently called Etisalat)Emirtel / Khatib & Alami1982Air Conditioning WorksDhs 200,000.00

17

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Residential Complex & MosqueYousef al Khoury / Hisham Hussaini1983Air Conditioning WorksDhs 1,150,000.00

18

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

New Office for NPCC – SadiyatNPCC / Spectrum Eng. Consultant1983Air Conditioning WorksDhs 750,000.00

19

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADNOC THAMAMA ‘C’ ProjectsADNOC / Flour Middle East1983Air Conditioning WorksDhs 13,000,000.00

20

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Al Nahda national School for BoysAl Nahda School / New Form Consultants1983Air Conditioning Works & PlumbingDhs 1,650,000.00

HVAC & Electrical Project Carried Out in Abu Dhabi

46

Page 47: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

47

www.acecodubai.ae

21

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Abu Dhabi Vegetable MarketMinisry of Agriculture / Spectrum1984Air Conditioning WorksDhs 2,000,000.00

22

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Commercial Building for Sultan bin SurrorSultan bin Surror / Dar el Emara1984Air Conditioning WorksDhs 550,000.00

23

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Bateen Maternity & Child Care CentreIqra Consultants1984Air Conditioning Works, Plumbing & Medical Equip.Dhs 13,000,000.00

24

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

New Theatre Abu DhabiPWD / Iqra Consultants1985Air Conditioning WorksDhs 10,200,000.00

25

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Kitchen & Dining Facilities ASABADCO / Spectrum1985Air Conditioning WorksDhs 430,000.00

26

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

City TowerShk. Hamdan / Cassia1986Air Conditioning WorksDhs 2,300,000.00

27

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Main Bus Terminal – Abu DhabiMunicipality / Tayeb Engr.1987Air Conditioning WorksDhs 6,500,000.00

28

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mr Hazza al Darmaki / Iqra ConsultantAl Nanda School / New Form Consultant1988Air Conditioning WorksDhs 295,000.00

29

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

H.H. Shk Mohd Bin Zayed VillaPvt. Dept / Arkan1988Air Conditioning WorksDhs 4,500,000.00

30

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Midfa & Jaffar Bidg.ARDENT1989Air Conditioning WorksDhs 1,200,000.00

HVAC & Electrical Project Carried Out in Abu Dhabi

47

Page 48: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

48

ACE CURRENTCONTRACTING LLC

31

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Meat, Fish & Vegetable MarketPlanner S & J1992Air Conditioning WorksDhs 1,200,000.00

32

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Sheikha Mariam Bint Hamdan VillaThe Arab Office for Planning Architecture1992Electrical WorksDhs 750,000.00

33

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Police Border Post - SilaPan Emirates Consultants1993Air Conditioning WorksDhs 6,500,000.00

34

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Abdullah Hussain BuildingAl Ain Consultants1993Air Conditioning Works & Electrical WorksDhs 295,000.00

35

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Residential Complex – ASABGASCO / SCTP Middle East1994Air Conditioning WorksDhs 9,000,000.00

36

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Stores at Darwish & TarifAbu Dhabi Municipality1994Air Conditioning WorksDhs 1,500,000.00

37

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Abdullah Hassan Al ZaheryArchitectural Consulting Group1994Air Conditioning WorksDhs 650,000.00

38

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mohd Rashid Al RumaithyAl Mullah Engineering Consultant1994Air Conditioning WorksDhs 680,000.00

39

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mohd Mania Al Muhairy Bldg.SASCO Consultant1994Air Conditioning WorksDhs 670,000.00

40

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mosque at Shah & AsabADCO1994Air Conditioning Works & Electrical WorksDhs 400,000.00

HVAC & Electrical Project Carried Out in Abu Dhabi

48

Page 49: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

49

www.acecodubai.ae

41

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Khamis Juma Al Rumaihty Bldg.Woods Parker Ltd. 1994Air Conditioning WorksDhs 620,000.00

42

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Forestry Bldg. in Al AinAl Ain Municipality1995Air Conditioning WorksDhs 1,200,000.00

43

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mariam Bint Ramadan Al Harmoodi Bldg.Ardent1995Air Conditioning WorksDhs 500,000.00

44

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Naser Rashed Al Manea Bldg.Dewan1995Air Conditioning WorksDhs 450,000.00

45

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mohd. Bakheet Sabt Al Mazroui BldgAl Mullah Engineering Consultant01995Air Conditioning WorksDhs 700,000.00

46

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Khalid Eid Al Mureiki Bldg.Kennedy & Donkin Middle East1995Air Conditioning WorksDhs 1,425,000.00

47

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Marzouk Al Qubaisi Bldg.DSSCB / Dar El Emara1995Air Conditioning WorksDhs 750,000.00

48

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Khalifa Al Mari Bldg.DSSCB / Integrated Design Bureau1995Air Conditioning WorksDhs 800,000.00

49

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Hassan Mohd. Bin Safwan Bldg.DSSCB / Al Maktab1995Air Conditioning WorksDhs 350,000.00

50

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mafraq Sewage Treatment PlantAbu Dhabi Municipality1995Air Conditioning WorksDhs 1,400,000.00

HVAC & Electrical Project Carried Out in Abu Dhabi

49

Page 50: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

50

ACE CURRENTCONTRACTING LLC

51

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

T.E. Sheikhs Abdullah & Mansoor Bin ZayedPlanar S & J1996Air Conditioning Works & Electrical WorksDhs 12,200,000.00

52

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mohd Ismail Khoory Bldg.DSSCB / House of Planning1996Air Conditioning WorksDhs 750,000.00

53

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Hameed Mohd. Hafiz Al Mansoori Bldg.DSSCB / Hilal & Partners1996Air Conditioning WorksDhs 650,000.00

54

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Hamdan Humaid Al HamlyDSSCB / Al Ajmi1996Air Conditioning WorksDhs 750,000.00

55

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Saqr Ghobash BldgDSSCB / Planner S & J1996Air Conditioning WorksDhs 800,000.00

56

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Etisalat Std. Telecom Bldg.Etisalat / Arif Bintoak1996Air Conditioning Works & Electrical WorksDhs 1,200,000.00

57

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Marzouk Al Mashgoony Bldg.DSSCB / Al Ain Consulting Engr.1996Air Conditioning WorksDhs 850,000.00

58

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Rashid Harmash Al ManzouryDSSCB / Center Point Engr, Consultants1996Air Conditioning Works & Electrical Works Dhs 700,000.00

59

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mafraq Sewag Treatment PlantAbu Dhabi Municipality / Engineering Works1997Air Conditioning WorksDhs 3,500,000.00

60

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Mrs Herit Rashid Al Mazroui Bldg.DSSCB / United Arab Engineering Consultants1997Air Conditioning WorksDhs 900,000.00

HVAC & Electrical Project Carried Out in Abu Dhabi

50

Page 51: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

51

www.acecodubai.ae

61

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Zirku Project 7051ZADCO / Alexander Gibb & Partners1996Air Conditioning WorksDhs 1,100,000.00

62

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

5 Nos. Sub Stations in MussafahWater & Electricity Dept / Kennedy & Donkin1998Air Conditioning WorksDhs 3,000,000.00

63

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Sub Station in Mussafah (220/33/11kV)Water & Electricity Dept / Ansaldo1998Electrical Works ( Lighting & Small Power)Dhs 700,000.00

64

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Sub Station in Sweihan (220/33/11kV)Water & Electricity Dept / Kennedy & Donkin1999Air Conditioning Works & Lighting & Small PowerDhs 1,800,000.00

65

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADCO Amenities Center RenovationADCO1999Air Conditioning WorksDhs 500,000.00

66

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Additional Works at Abu Dhabi Golf CourseAbu Dhabi Municipality2000Air Conditioning WorksDhs 750,000.00

67

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADCO Mud & Cement Factory, MussafahADCO2000Air Conditioning Works & Electrical WorksDhs 400,000.00

68

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Grid Stations in ADPS (400/132kV)Water & Electrical Dept / Lahmeyer2000Electrical Works (Lighting & Small Power)Dhs 1,600,000.00

69

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Grid Stations in Sila (220/33kV)Water & Electrical Dept. Mott Mac Donald2001Air Conditioning WorksDhs 750,000.00

70

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Electromechanical Installation Works for Auxiliaries for 2x1.8 MW Generator Set at Arzanah IslandZADCO2001Electrical Works (Lighting & Small Power)Dhs 350,000.00

HVAC & Electrical Project Carried Out in Abu Dhabi

51

Page 52: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

52

ACE CURRENTCONTRACTING LLC

71

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

MWTW Admin Building (514/3)Abu Dhabi Municipality / Engineering Science2001Air Conditioning WorksDhs 1,050,000.00

72

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

400 kV Substation at TaweelahADWEA / Lahmeyer Intl.2002Air Conditioning Works & Lighting & Small PowerDhs 200,000.00

73

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Electromechanical Installation Works for Auxiliaries for 1x1.65 MW Generator Set at Arzanah IslanZADCO2002Electromechanical Works (Lighting & Small Power)Dhs 250,000.00

74

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

UAE Central Bank ExtensionUAE Central Bank2003Electrical WorksDhs 700,000.00

75

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

SVC Station at MussafahADWEA / Lahmeyer2004Electrical Works (Lighting & Small Power)Dhs 650,000.00

76

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

SVC Station at Al AinADWEA / Lahmeyer2004Electrical Works (Lighting & Small Power)Dhs 650,000.00

77

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

ADCO – BAB – Production Facilities ExpansionADCO / JGC Corp2004Air Conditioning WorksDhs 875,000.00

78

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

New Safety Building at BuhasaGASCO2004Air Conditioning WorksDhs 700,000.00

79

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

New 132/11kV Substation at Marina MallADWEA / Lahmeyer2006Air Conditioning Works & Its Power SupplyDhs 1,350,000.00

80

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

132/11kV Substation at W16ADWEA / Lahmeyer2006Air Conditioning WorksDhs 1,350,000.00

HVAC & Electrical Project Carried Out in Abu Dhabi

52

Page 53: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

53

www.acecodubai.ae

81

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. N-1999-132/11kV Substation at E14 & W47ADWEA/ Lahmeyer2006Air Conditioning Works & Its Power SupplyDhs 4,850,000.00

82

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

East Wing Expansion of Al Jimi MallAl Ain Municipality / GHD2006Air Conditioning WorksDhs 2,550,000.00

83

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

AC & Fire Water Pipe Replacement at ADCO J/DADCO2001Air Conditioning & Fire Fighting WorksDhs 1,550,000.00

84

Project Title Contract NoClient / ConsultantYear of CompletionScope of Work AirValue

220kV Substation at Bab, Buhasa & AsabPN – 100806-0ADCO / TRANSCO2007CCTV System, Camera & Cabling InstallationDhs 300,000.00

85

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

400kV Grid Station in SweihanTRANSCO / Mott MacDonald2008Electrical Works (Lighting & Small Power)Dhs 2,000,000.00

86

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. N-4263 LOT 1B – 132/33kV Substation at Khor KhawairTRANSCO / Mott MacDonaldWater & Electrical Dept. Mott Mac Donald2010Air Conditioning & Ventilation WorksDhs 3,265,000.00

87

Project Title

Client / ConsultantYear of CompletionScope of Work Air Value

Tameer Aerated Autoclaved Concrete Product Fac-tory ICADEIIC / UNECO2009Air Cond & Electrical Works Lighting & Small Power)Dhs 8,500,000.00

88

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. N-4777 – 220/33kV Grid Station at Al Ain Industrial CityTRANSCO / Mott MacDonald2010Air Conditioning & Ventilation WorksDhs 3,050,000.00

89

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. N-2107 – 220/33kV Grid Station at Ghan-toot and Umm Al OushTRANSCO / Lahmeyer International2010Air Conditioning & Ventilation WorksDhs 6,600,000.00

90

Project Title Client / Consultant

Year of CompletionScope of Work AirValue

Residential & Commercial Building at W10 – Plot C-68Zayed Higher Org for Humanitarian Care, Special Needs & Minor Care Affairs/ National Engineering2010Air Conditioning & Ventilation WorksDhs 12,000,000.00

HVAC & Electrical Project Carried Out in Abu Dhabi

53

Page 54: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

54

ACE CURRENTCONTRACTING LLC

91

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. N-5208 – 220/33kV Grid Station at e40, w41 & Raha ATRANSCO/PB2012Air Conditioning & Ventilation WorksDhs 8,800,000.00

92

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

5 Nos. VillaMaqta Bridge Consultancy 2012Air Conditioning WorksDhs 500,000.00

93

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Cont# STAR/001/2010, Yahsat SGS Pwr. Project De-sign & Bld Services for 33/11kV Subst. with Cable Lay-ingADDC/DECON2012Air Conditioning WorksDhs 1,600,000.00

94

Project TitleClient / ConsultantYear of CompletionScope of Work AirValue

Replacement of Air Handling units at Pres. PalaceMinistry of Presidential Affairs / Morganti2012Air Conditioning WorksDhs 1,795,000.00

95

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. N7204 – 132/33kV Sub Stations at Mash-tel Palace, E03, E25, Pres. Palace & 132/22kV Sub Sta-tion for Al Falah DevelopmentTRANSCO/ Lahmeyer International2012/on GoingAir Conditioning WorksDhs 14,600,000.00

96

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Ruwais Refinery Expansion Package #3Offsites and Utilities Project (SS 006, 009 & 027)TAKREER / ACTCO 2012Air Conditioning & Ventilation WorksDhs 4,650,000.00

97

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Ruwais Refinery Expansion Package #3Offsites and Utilities Project (SS018, 034 & 035)TAKREER / Gulf Asia2012Air Conditioning & Ventilation Works Dhs 4,650,000.00

98

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. N-11517 – Supply Instl & Communica-tion of 230V/33 AMO Duplex Sockets with 32 AMPTRANSCO2013Low Voltage Distribution SystemDhs 100,000.00

99

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. N-11519 – Rehabilitation Works & Addi-tional Equipment for HVAC in Abu Dhabi LDC Bldg.TRANSCO2013Air Conditioning & Ventilation WorksDhs 554,700.00

HVAC & Electrical Project Carried Out in Abu Dhabi

54

Page 55: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

55

www.acecodubai.ae

101

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. 12258B, Design, Supply, Installation, Testing and Commissioning of HVAC Works at Al Ma-fraq 132/22kV SSEmirates Electrical Engineering 2014 / Under Progress Air Conditioning & Ventilation WorksDhs 3,967,200.00

102

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. S.O. 860926Supply, Installation & Commissioning of AC Units of Zirkuh IslandZADCO2014 / Under Progress Air Conditioning & Ventilation WorksDhs 981,824.00

103

Project Title

Client / ConsultantYear of CompletionScope of Work AirValue

Contract No. CBDC – HVAC – SS – 001 Carbon Black & Delayed Coker (CBDC)Samsung Engineering 2014 / Under Progress Air Conditioning & Ventilation WorksDhs 18,363,200.00

104

Project Title Client / ConsultantYear of CompletionScope of Work AirValue

Installation of New MTS Panel in GDCGulf Design Centre2014 / Under Progress Electrical WorksDhs 98,000.00

HVAC & Electrical Project Carried Out in Abu Dhabi

55

Page 56: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

56

ACE CURRENTCONTRACTING LLC

56

ACE CURRENTCONTRACTING LLC

Page 57: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

57

www.acecodubai.aeACE CURRENTCONTRACTING LLC

57

SN Project Name Location Status Details Of Project

(Scope Of Works)Year of

Completion Value Client Role in Project

1 D-103321 Ghanada Island, Abu Dhabi Running Urgent Electricity Work for The tresidential Palace

at Ghanada Island 2013 8,370,100.00 ADDC Main Contractor

2 ADNOC 5677 Western Region RunningDesign and Building of External Utilities Con-nections Explosive Storage Facility and Western Regions

2013 9,910,300.00 ADNOC Main Contractor

3 D-101051 Central Region, Abu Dhabi RunningLong Term Contract for Emergency Works and Assets Replacement Works in Abu Dhabi Central Region

2012 – 2014 7,500,000.00 ADDC Main Contractor

4 D-101053 Eastern Region, Abu Dhabi RunningLong Term Contract for Emergency Works and Assets Replacement Works in Abu Dhabi Central Region

2012 – 2014 7,500,000.00 ADDC Main Contractor

5 D- 101703 Eastern Region, Abu Dhabi Running

Long Term Rate Agreement for Installation and Supply of Underground Cables, Electrical Distribution OHL and Allied Works in Abu Dhabi Eastern Region (Shahama & Related Islands)

2012 – 2014 12,000,000.00 ADDC Main Contractor

6 D 101723 Western Region, Abu Dhabi Running

Long Term Rate Agreement for Installation and Supply of Underground Cables, Electrical Distribution OHL And Allied Works in Abu Dhabi Western Region (Airfa/ Abu Al Abyadh/ Grein Al Elsh & Islands)

2012 – 2014 7,000,000.00 ADDC Main Contractor

7 D 101725 Western Region, Abu Dhabi Running

Long Term Rate Agreement for Installation and Supply of Underground Cables, Electrical Distribution OHL and Allied Works in Abu Dhabi Western Region (Ghyathi Town, Bida Malawea, Bida Mubarak, Jabal Dhana, Shuwaihat, Braka)

2012 – 2014 7,000,000.00 ADDC Main Contractor

8 D 101839 ADDC Running Cable Installation Works for the Replacement of 11kv Aged Cables in Central Region 2012 – 2014 8,121,575.00 ADDC Main Contractor

9 D 101448 ADDC Running Load Transformer to the New W59/02, 132/11kV Primary Substation 2011 – 2013 7,983,568.00 ADDC Main Contractor

10 A 10713 ADDC Running Trial Earthing in AADC Network 2011 – 2012 1,448,000.00 AADC Main Contractor

ProjectsDetails of Running / Completed Projects in the Last 5 Years

Page 58: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

58

www.acecodubai.aeACE CURRENTCONTRACTING LLC

SN Project Name Location Status Details Of Project

(Scope Of Works)Year of

Completion Value Client Role in Project

11 D 101103 Mussafah Completed Installation of 2 Nos 33/11kV Package Units 10 MVA at ME09 Area Including 33kV Cables 2010 – 2011 4,060,800.00 ADDC Main Contractor

12 D 10010/1 Eastern Region, Abu Dhabi Running Preventive, Corrective, Maintenance & Refur-bishment of Overhead Lines in Eastern Region 2010 – 2012 16,633,300.00 ADDC

13 A 4498 Al Ain Running Undergrounding of 11kVm LV, OHL in Urban Areas in Al Ain 2010 -2012 22,637,226.00 AADC Main Contractor

14 D-10219 Western Region, Abu Dhabi Running Preventive & Corrective Maintenance and Re-furbishment of Overhead Lines in WR Abu Dhabi 2009 – 2013 16,196,675.00 ADDC Main Contractor

15 CT002/0015 Mussafah East CompletedSupply & Installation of 33kV and 22kV Cables and Installation of 33/11 kV PU for temporary Power Supply for Package 1

2009 9,938,340.00 Manazel Main Contractor

16 D-9513 Abu Dhabi RunningDistribution Substation Construction and Upgrad-ing as Applicable to Cater for New Customer in Abu Dhabi

2009 – 2012 6,690,148.00 ADDC Main Contractor

17 D-9440 Eastern Region, Abu Dhabi Running 11kV Cabling OHL and Allied Work for Reinforce-ment of 11kV Network in Eastern Region 2009 – 2011 3,653,00,00 ADDC Main Contractor

18 D-9219 Abu Dhabi – Al Ain Road RunningDistribution & Substation Installation and Upgrad-ing to Cater for New Customer Connection in Eastern Region, Abu Dhabi – Al Ain Road

2009 – 2013 24,924,115.00 ADDC Main Contractor

19 D-9709/A Western Region, Abu Dhabi Running

Long Term Rate Agreement for Installation of Underground Cable, Electrical Distribution Equipment, OHL and Allied Works in Abu Dhabi Western Region

2009 – 2014 7,500,000.00 ADDC Main Contractor

20 D-9697/A Central Region, Abu Dhabi Running

Long Term Rate Agreement for Installation of Underground Cables, Electrical Distribution Equipment, OHL and Allied Works in Abu Dhabi Central Region

2009 – 2014 13,333,333.00 ADDC Main Contractor

21 D-8423 Al Hamra-Rowais Completed Rehabilitation & Corrective Maintenance of 33kV Al Hamrah Rowais SWT/SS Line RR 2009 – 2011 6,748,425.00 ADDC Main Contractor

22 N-6087Sila’a Shuweihat, Swellan,

Mussafah, Bahyi & Taweelah

CompletedSupply & Installation of Fiber Optic Cable & Its Accessories at Sila’a Shuweihat, Swellan, Mussa-fah, Bahyi & Taweelah

2008 – 2009 66,344,927.75 TRANSCO Main Contractor

Details of Running / Completed Projects in the Last 5 Years

Page 59: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

59

www.acecodubai.aeACE CURRENTCONTRACTING LLC

SN Project Client Value Nature of Work Period

1 HVAC Maintenance at ADCO Amenities Centre Asab ADCO A/C 1980 – 1985

2 Operation Maintenance of various Electromechanical Installations at ADCO Compound Abu Dhabi ADCO A/C & Electrical 1980 – 2009

3 HVAC Maintenance at Residential Complex for ADCO ADCO A/C & Electrical 1981 – 1986

4 HVAC Maintenance Services in Upper Zakum Field ZADCO A/C 1981 – 1993

5 Maintenance of HVAC Installation at Al Kubairat School Al Kubairat School A/C 1990 – 2008

6 Maintenance of Various Building / Villas in Abu Dhabi A/C & Electrical 1980 till date

7 HVAC Maintenance of Residential Complex at ASAB GASCO A/C 1991 – 1994

8 Abu Dhabi Municipality – Group 2 Abu Dhabi Municipality A/C & Electrical 1997 – 2003

9 Abu Dhabi Municipality – Group 3 Abu Dhabi Municipality A/C & Electrical 1997 – 2000

10 Abu Dhabi Municipality – Grand Stand Abu Dhabi Municipality A/C & Electrical 1998 – 2002

11

Maintenance of HVAC Installation at ADCO Fields and Terminalsa) Asab/Shah/ Shahilb) Bab/ Habshanc) Buhasad) Jebel Dhanna

ADCO A/C 1999 – 2002

12 Abu Dhabi Municipality – Group 6 Abu Dhabi Municipality A/C 1999 – 2001

ProjectsMajor Maintenance Projects

Page 60: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

60

www.acecodubai.aeACE CURRENTCONTRACTING LLC

SN Project Client Value Nature of Work Period

13 Abu Dhabi Municipality – Group 7 Abu Dhabi Municipality A/C 2000 – 2002

14 Mafraq Sewerage Treatment Plant WESCO/ Abu Dhabi Municipality A/C 2000 – 2005

15Maintenance of Electromechanical Installation at Mu-nicipality Fish & Meat Market in Baniyas, Rahba & Sha-hama

Abu Dhabi Municipality 3,200,000 A/C & Electrical 2002 – 2005

16

Maintenance of HVAC Installation at ADCO Fields and Terminals:a) Asab/ Shah/ Shahilb) Bab/ Habshanc) Buhasad) Jebel Dhannae) NEB/ Dabaiya

ADCO 3,200,000 A/C 2006 – 2010

17Maintenance and Repair Services (Electro-Mechanical & Civil Works) for ADNOC Distribution Head Office Build-ing, Salam Street, Abu Dhabi

ADNOC 2,160,000 Electromechanical & Civil 2011 – 2014

18

Provision of Maintenance of Air Conditioning Units & Re-frigeration Equipment in ADCO Fields & Terminals:a) Asab/ Shah/ Shahilb) Bab/ Habshanc) Buhasad) Jebel Dhannae) NEB/ Dabaiya

ADCO 35,000,000 HVAC 2013 – 2016

19Provision of Maintenance of Air Conditioning Units & Re-frigeration Equipment in Fujairah and Sweihan Contract No. 15099.01

ADCO 2,500,000 HVAC 2013 – 2016

20HVAC – Maintenance Works for TRANSCO Substation, Pumping Stations and Facilities in Al Ain Region and Northern Emirates Region. Contract No. 12428B

TRANSCO 2,040,000 HVAC 2013 – 2014

21 E9, E15 & E18 Rehabilitation & Replacement of LVAC Panel Boards 400V @ 132/11 kV SS. Contract No. 11043.1 TRANSCO Electrical Oct 2013 – Jan 2014

Major Maintenance Projects

Page 61: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

61

www.acecodubai.ae

EnsuringUn-interrupted Service

www.acecodubai.ae

Page 62: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

62

ACE CURRENTCONTRACTING LLC

At Work

Page 63: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

63

www.acecodubai.ae

At Work

Page 64: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

64

ACE CURRENTCONTRACTING LLC

At Work

Page 65: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

65

www.acecodubai.ae

At Work

Page 66: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

66

ACE CURRENTCONTRACTING LLC

At Work

Page 67: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

67

www.acecodubai.ae

At Work

Page 68: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

68

ACE CURRENTCONTRACTING LLC

At Work

Page 69: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

69

www.acecodubai.ae

At Work

Page 70: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

70

ACE CURRENTCONTRACTING LLC

At Work

Page 71: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

71

www.acecodubai.ae

At Work

Page 72: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

72

ACE CURRENTCONTRACTING LLC

At Work

Page 73: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

73

www.acecodubai.ae

At Work

Page 74: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

74

ACE CURRENTCONTRACTING LLC

At Work

Page 75: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

75

www.acecodubai.ae

At Work

Page 76: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

76

ACE CURRENTCONTRACTING LLC

At Work

Page 77: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

77

www.acecodubai.ae

At Work

Page 78: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

78

ACE CURRENTCONTRACTING LLC

At Work

Page 79: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

79

www.acecodubai.ae

At Work

Page 80: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

80

ACE CURRENTCONTRACTING LLC

Page 81: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

81

www.acecodubai.ae

Page 82: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

82

ACE CURRENTCONTRACTING LLC

Page 83: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

83

www.acecodubai.ae

Abu Dhabi National Oil Company (ADNOC)

Abu Dhabi Company for Onshore Operations (ADCO)

Abu Dhabi Gas Liquefaction Company Ltd (ADGAS)

Abu Dhabi Oil Refining Company (TAKREER)

Abu Dhabi Water & Electricity Authority (ADWEA)

Abu Dhabi Distribution Company (ADDC)

GASCO

Registrationwith Onshore and Offshore Oil Operations

Page 84: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

84

ACE CURRENTCONTRACTING LLC

Page 85: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

85

www.acecodubai.ae

Page 86: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

86

ACE CURRENTCONTRACTING LLC

Page 87: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

87

www.acecodubai.ae

Page 88: COLD STORAGE INTERIOR DESIGNING - acecodubai.aeacecodubai.ae/wp-content/uploads/2016/04/20160329-AceCurrent... · Administration Assistant Project Manager ... HSE Manager HSE Officer

88

ACE CURRENTCONTRACTING LLC

Dubai OfficeACECO (Dubai Office)ACE CURRENT CONTRACTING LLCOffice No. 204, SIT TowerSilicon Oasis - DubaiP.O. Box: 236988

Abu Dhabi OfficeACECO (Abu Dhabi Office)P.O. Box: 46635 Abu Dhabi

Sharjah OfficeP.O.Box 25486 Sharjah+971 6 5627470Fax: +971 6 5627471

Phone +971-4-2289214

Fax +971-4-3342113

Email [email protected]

www.acecodubai.ae

ACE CURRENTCONTRACTING LLC