coins cvr · coins cvr coins cost value reconciliation ... construction industry ... head office or...
TRANSCRIPT
COINS CVR
COINS Cost Value Reconciliation (CVR) helps house builders and contractors analyze cost and value as quickly as possible and provides dynamic links to the source data.
STREAMLINED CVR PREPARATION
Cost Value Reconciliation brings together the established
totals for costs and value to illustrate the profitability of a
project. Preparing CVRs manually is a resource-intensive
task that derives data from multiple sources, typically
performed on stand-alone spreadsheets that are time
consuming to prepare and therefore often inaccurate and
out of date.
The COINS Cost Value Reconciliation module streamlines
this task with integration to the COINS database for quick
and accurate collation, reconciliation, and corroboration
of the data. COINS CVR captures data already in COINS to
produce flexible CVR reports on demand, with a full audit
trail, while still allowing surveyors to make adjustments if
required. The completed CVR can be produced in various
report formats or reviewed online via dashboards.
CVR ITEMS
CVR items are the defined values that you choose to capture
for inclusion in a CVR, at either the detail or summary level.
The sources for CVR item data include:
COINS system transactional data via COINS Business Logic - costs, revenue, plot events, commitments & accruals and budgets. This data may be extracted from:
• LandAppraisals–originalandcurrent
• ContractandProjectinformation
• DevelopmentandPlotinformation
• CostCategories
• CostHeadAnalysissummaryinformationandCostHeaddetail
• Subcontractinformation
• MaterialandPlantOrderinformation
The CVR Workbench
provides access to
key information for
all Developments
and CVRs.
Construction Industry Solutions
6 Airport Park Blvd. T 518-242-7200Latham, NY 12110 F 518-242-7298USA E [email protected] W www.coins-global.com
User defined data (report stores, memo data, captions)
Calculations (using standard COINS calculation syntax)
Manualupdate(valuations,adjustments,datainput)
CHOICE OF CVR MODELS
Asitisbuilt,aCVRmodelisassociatedwithCVRitemsat
either the detail or summary level. COINS CVR supports
multiple CVR models or definitions to meet the needs of
different contract and development types for both house
builders and contractors. CVR models may be configured
and manipulated to match every business need.
Each contract or development is assigned to a CVR model.
Sample CVR models are provided, representing the varying needs of different types of contract and development.
Alertsandstylesareusedtohighlightcrucialoractionable items.
PERFORMING THE CVR
The CVR Workbench provides access to all contracts/
developments and CVRs. The CVR Calendar controls the
management and processing of CVRs and provides alerts
and monitoring for the CVR Workbench. Individual CVR
periods are typically aligned with the financial periods but
canbesetuptoallowforBankHolidaysorothercompany
requirements.
When a CVR is created for a contract or development, COINS
automatically processes the defined items and commits the
values into the CVR at the appropriate detail and summary
levels. The CVR can be updated repeatedly, allowing iterative
development of the CVR until it is flagged as complete or
locked.
CVRs are uniquely numbered, associated with a calendar period and user.
CVRs are defined as current, latest, or complete as required.
MultipleCVRscanbecreatedperperiod.
AllCVRItemsareupdatedwhenaCVRiscreated.
AtanystageintheCVRprocessone,some,orallofthe CVR Items can be updated
Definedsummaryvalues,valueadjustments,andnotes can be entered into the CVR.
Notes are available at every level, updateable, visible,
reportable; shown as a flag and quickly and easily
viewable with Tool Tips.
Once it has been created, reviewing, enquiring and reporting
on the CVR is straightforward, using pre-defined views.
Links from the CVR into COINS Enquiries allow for drill
downcapabilityfromtheCVR.AlldefinedCVRViewscanbe
made available as reports. In addition, interactive executive
dashboardscouldbecreatedinDesigner,sousersinthe
head office or on site can quickly monitor and investigate
the financial status of projects.
The review and update process may be automated to
incorporate an authorization process using COINS Workflow.
Attheendofthereviewandupdatecycle,theCVRcanbe
marked as complete.
BENEFITS OF COINS CVR Savings in time and staff resources in CVR
preparation.
Enhanced reliability through integration with COINS Financials.
Improved data integrity and clarity.
MultipleCVRmodelstomeetvaryingbusinessrequirements.
Flexible presentation in print or online formats.
CVRs remain in COINS for consolidated reporting and centralized storage.
OACVR1108