Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

Mark LeesonChristopher Pountnay

Marvin LeeJonathan Portlock

David Richards

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

2

brief

concept

design development

ground conditions

energy strategy

costs

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

3

brief

•centre for computing history

•storage & sorting area

•technology incubating unit

•Offices

•meeting spaces

• possible commercial use

•WC’s & reception

•gateway to the site

• maintain the view down to the pump room

•consider modular options

•energy strategy - renewable

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

4

Centre for computing history

•known to be considering a move

•currently visits by appointment only

•only 5% of the exhibits on show

•Proposals for £120m new build scheme

Technology Incubator

•administration facilities

•flexible space

•potential for growth

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

5

concept - iconic

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

6

design proposal option 1: Site Location

Centre for Computing History and museum administration/office space

Pedestrian and vehicular entrance

Technology Incubator

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

7

•Steel frame construction

•Lightweight Cladding

•On site construction

•Standard techniques

•Lack of Flexibility

•Lose the site during construction

design proposal option 1: Construction

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

8

shared car park

storage

loading

energy centre

pedestrian entrance

vehicular entrance

design proposal option 2: Site Location

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

9

design proposal option 2: site layout

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

10

concept

old/ historic

new/ contemporary

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

11

design proposal option 2: development

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

12

design proposal option 2: development

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

13

design proposal option 2: view from cheddars lane

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

14

ground conditions:

• brown field site

• Metals (lead, zinc >SGV)

• minimize disturbance

• MG/RTG ~ 25 kN/m2

• lightweight building 20kN/m2

GC

MGRTG

• raft foundation• modify pathway

• Support large point loads

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

15

energy strategy

•‘exhibit in action’

•minimise running costs

•solution dependent on size

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

16

Option 1: Costs

Spec: Tin Shed Cladding

Price: £494,413.92

700m2 (GIFA: 490)

£29,635.20 £29,635.20

£64,209.60

£10,372.32

£12,348.000

£133,358.40

£41,242.32£17,385.98

£35,216.50

£32,104.80

£88,905.60

Substructure (6%)

Frame and Upper Floor (13%)

Roof (2.1%)

Stairs (2.5%)

Walls, Partitions, Windows, Doors & Finishes (27%)

Floor, Ceiling & Fittings (3.52%)

Sanitary, Disposal, Water, Heating & Air (8.35%)

M & E (7.13%)

Protective Installations (6.5%)

Preliminaries (18%)

Contingency (6%)

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

17

Option 2: Costs

£70,623.24

£24,693.44 £37,734.96

£72,071.17

£7,165.18

£6,135.11

£146,215.08

£23,543.11

£33,211.70

£48,519.25

£24,007.77

Substructure (7.64%)

Frame and Upper Floor (14.59%)

Roof (1.24%)

Stairs (1.45%)

Walls, Partitions, Windows, Doors & Finishes (29.6%)

Floor, Ceiling & Fittings (4.77%)

Sanitary, Disposal, Water, Heating & Air (6.72%)

Ventiliation, Electrical, Lifts (6.82%)

Communication, Protective Installations (4.8%)

Preliminaries (14.3%)

Contingency (5%)

Spec: GRP

Price: £1,347,639.74

700m2 (GIFA: 490)

Modular Pre-Fab

Option 2 costs approx.x 2.5 more.

Cohort 16 & 17: Team 10Design Studio Dec 2010: Cambridge Museum of Technology

conclusion

•adopt modular system

•start with current bin store area

•prove viability

•look to expand going forward

18