coe simaris project

19
SIMARIS PROJECT (1) PATEL SHIVAM S. 120220109013 (2) PATEL BHARGAV A. 120220109017 (3) SHAH JAY J. 120220109024 (4) PATEL DHARMIK K. 120220109026 (5) PATEL CHINTANKUMAR M. 120220109027

Upload: chintan027

Post on 17-Jan-2017

88 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: coe simaris project

SIMARIS PROJECT (1) PATEL SHIVAM S. 120220109013 (2) PATEL BHARGAV A. 120220109017 (3) SHAH JAY J. 120220109024 (4) PATEL DHARMIK K. 120220109026 (5) PATEL CHINTANKUMAR M. 120220109027

Page 2: coe simaris project

Introduction SIMARIS project allows to create a quick overview of the space

requirements and budget for power distribution inside buildings that covers medium-voltage switchgear, transformers, low-voltage switchboards and busbar trunking systems, as well as distribution boards feeding final load circuits.

Convenient output options for project documentation, e.g. graphic views and specifications (bills of quantities).

Easy adaptation of the planning is possible, when things have been defined more precisely.

Import of a project created in SIMARIS design for further processing in SIMARIS project.

Page 3: coe simaris project

SIMARIS Project Steps1. Project definition2. System planning3. Budget4. Project output

Page 4: coe simaris project

Project definition1. Medium Voltage Switchgear2. Transformer3. Low Voltage Switchgear4. Bus bar trunking system5. Distribution board6. Single components

Page 5: coe simaris project

Medium Voltage Switchgear

Page 6: coe simaris project
Page 7: coe simaris project

Transformers

Page 8: coe simaris project
Page 9: coe simaris project

Low voltage switchgear

Page 10: coe simaris project
Page 11: coe simaris project

System planning In System Planning you will

find the system-specific library on the left, from which you can select the required project components from component templates.

Systems library

Page 12: coe simaris project

Quantity Infeed / Coupling Feeder

Device distribution board

Library

Page 13: coe simaris project

Front view

Page 14: coe simaris project

If you want to move a withdrawable or fixed-mounted unit to another distribution board, this is only possibleif the two boards are of the same type. Panels must be of the following design types, for example:

• in-line design• universal mounting design•fixed-mounted design with compartment door

Page 15: coe simaris project

Editing complete panels• You can move entire panels around by selecting the whole panel(→ aquamarine colour frame) and move it around the graphics window keeping the left mouse button pressed.

Page 16: coe simaris project

Budget In order to obtain a specific budget outline for the project you are

planning ‒ up-to-date and focused on a specific region ‒ and for further project support please contact your Siemens Consultant Support expert.

You can transmit project data by first saving the project and then sending the exported project file in .sp format per e-mail.

Your Siemens contact will set up a budget outline for all components in your power distribution project for you. You will find the contact data for the Consultant Support expert responsible for your region at www.siemens.com/simaris/contact .

Page 17: coe simaris project

Project output

Project tree for component/product selection

Selection of the desired output variants

Page 18: coe simaris project
Page 19: coe simaris project

Thank you