· pdf filecode programme code days month venue participants content ... to do it safety in...

Upload: phamkhue

Post on 31-Mar-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

mmh ic

inhouse training programme

april - september 2014

Dear Colleagues,

Keeping in mind the compe ve environment and limited opportunies available in the present market, it is high me we rise to the occasion and reinforce our stand of being the market leaders in execung voluminous & complex projects.

The market, because of economic and technological changes, has become very demanding and fierce in nature which praccally leaves no room for negligence / error. demanding and fierce in nature which praccally leaves no room for negligence / error. The changes have been so stern and mammoth that some organizaons are in chaos, and majority of them are on the verge of non-existent.

To manage and survive through the difficult environment there is dire necessity to sharpen our skills and increase the present knowledge base. We also need to focus on creang a talent pool keeping in mind the future requirement of the organisaon. Given creang a talent pool keeping in mind the future requirement of the organisaon. Given the pace of globalizaon, there is also a need to train people in meeng the internaonal standards.

At MMH IC we need to create an inquisive and learning culture which will complement the values our IC holds. Strong, Innovaon, Creavity and Futurisc approach are the new pillars we need to bank upon.

While releasing the training calendar, I wish the best to all the parcipants who will undertake these training programs and remind them of the expectaons of the undertake these training programs and remind them of the expectaons of the management that go along with such opportunies that are being made available to them. I also convey my best wishes to the faculty and the support staff involved in making these programs happen, since they help us build people who make our tomorrow's business beer.

With my warm regards,

Derek Michael ShahExecuve Vice President & HeadExecuve Vice President & HeadMetallurgical & Material Handling IC

Message from Mr. Derek Michael Shah, EVP & Head - MMH IC

Dear Colleagues,

We in the Learning & Development team are delighted to announce the Annual Training Calendar of our IC for the year 2014 – 15.

We are connuously striving to align our training intervenons to IC’s strategic goals. Individual needs idenfied through FAIR process and inputs from BUs / Departments / Individual needs idenfied through FAIR process and inputs from BUs / Departments / Clusters on current business priories). Increasingly Learning design and delivery are being directed towards meeng the emerging business needs also. In the days ahead our endeavour would be on offering blended learning soluons to our staff members, thereby a mix of class-room programs, e-learning facilies, on-the-job training, mentoring, special assignments etc. would be rolled out.

Sharing of knowledge and experience is the fuel for our growth engine. Recognizing this Sharing of knowledge and experience is the fuel for our growth engine. Recognizing this need we have started facilitang Knowledge Sharing Sessions at our offices/sites where employees periodically present their learning from various programs that they have aended. I would request all the parcipants of the training programs to share their knowledge / take-aways with team members through these forums. I would also urge each one of you to take full advantage of the ATL (Any Time Learning, our online learning portal) which would enable pursuing a host of courses at your own pace, place and convenience. convenience.

I look forward to receiving your connued support in all our iniaves.

Regards,

Jagannath Ole Head- Human ResourcesMetallurgical & Material Handling IC

Message from Mr. Jagannath Oleti, Head - Human Resources, MMH IC

1MMH IC

GENERAL MANAGEMENT DEVELOPMENT PROGRAMMES

TECHNICAL PROGRAMMES

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODERole of Supervisor - Basics of Accounting - Working Capital Management - I.R. & Labour Management - Materials Management - Safety - Quality - Interpersonal Effectiveness - Time Management - Team Player - Communication Skills

Staff in S-2 and O-1 Cadres

KolkataEDRC KolkataBMH/EDRC

ChennaiJamshedpur

April'14May'14May'14

August'14

6Supervisory Development ProgrammeD028

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODE

Autodesk Inventor Basic 2014 - Autodesk Plant 3D 2014Mech & Elec Engineers

BMH/EDRC Chennai

April'14April'14April'14

3Autodesk Plant Design SuiteA228

Autodesk Revit Structure 2014Civil EngineersApril'14April'14

September'14Introduction to the Tekla viewer - Creation of various grid views - Creation of various grid views - Use of cut planes in the model - Checking of model (member size, length, levels etc.) and effective utilization of filter command - Working with Phase manager -Explained about the drawing properties and tools which is available in the viewer - Creation of reports such as Section wise list, Assembly part list, Material list etc - Explanation of advanced option -IFC Change management - Nesting File for CNC input

Civil EngineersBMH/EDRC ChennaiAugust'142TEKLA Software RC StructureC359

Foundation & Surface Preparations - Static & Rotary Equipments - Installation, Assembly & Maintenance

Specific requirements of a target group

DelhiAhmedabad

August'14September'141Millwright TechniquesH021

Fabrication of Structures - Bends - Mitre - Pre-assembly of Piping and PipelinesProductivity

Engineers in S-1 to O-2 CadresDelhiMay'141Fabrication TechniquesH032

2MMH IC

TECHNICAL PROGRAMMES

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODECranes & Derricks - Strand Jack Lift - Safety - Structural Steel Assessment - M&E Assessment - Specialized Jobs - On Site Learning

Engineers in S1 to O2 CadresDelhiJamshedpur

April'14June'142Rigging MethodsH114

Design Principles of Coal Handling Plants for Power Plants - Technology trends in design - Case study of best practices in design - International Standards

Mechanical Engineers in BMH BUHyderabadAugust'142Design Principles of Coal Handling

Plants for Power PlantsH371

Design Principles - Technology standards and compliance systems

Mechanical Engineers in BMH BUAhmedabadJuly'141Design principles for Wagon Loading &

Unloading SystemsH373

Coke Oven technology with special reference to Recovery Type Coke Ovens - Non-Recovery and recovery coke making - Wet Vs Dry Quenching - Environmental norms - Treatment of Raw Coke Oven Gas - Treatment - Liquor separation and gas purification - Waste water treatment

Engineers in O1 to M2-C cadresJamshedpurHQ Kolkata

May'14September'141Design of Coke OvenH394

About Heavy Lifting - What is Rigging? Identifying the requirement? Procedure to do it Safety in Erection/Dis-mantling, Dos & Don’ts in Rigging Checks need to be undertaken during Rigging About Material handling - Planning for Material storage - Safety in Material handling Dos & Don'ts in Material Handling Material Handling-w.r.t Project Nature Effective Material Handling - Merits Areas of Concern

Site employees S1 to M1-BAhmedabadMay'141Rigging Methods & Heavy Lift Errection & Material ManagementH407

Project Beta - A brief, Agendas, Targets set by our Management, Modules created for achieving this, Ways to Implement the same Monitoring results.

All employees PGET/GET, O1 to M1-CAhmedabadApril'141Importance of Beta ImplementationH413

BMH - System Commissioning & Operation - Industry compliance and challenges

Mechanical Engineers in BMH BUAhmedabadJune'141BMH System, Commissioning &

OperationH914

Autodesk P&ID - Autodesk Plant 3D - Autodesk Inventor - Autodesk Navis Works Manager

Drafting Personnel/ Engineers (Multiple Batches )EDRC KolkataApril'1453D Engineering - Plant Design SuitNEW

3MMH IC

TECHNICAL PROGRAMMES

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODERevit Structures - Revit Architecture - Revit MEP

Drafting Personnel/ Engineers (Multiple Batches )EDRC KolkataApril'1453D Engineering - RevitNEW

GA Input, Checking and DocumentationAll Design EngineersBMH/ EDRCChennaiApril'140.5GA Input, Checking and DocumentationNEW

ISO Preparation & DocumentationAll Design EngineersBMH/ EDRCChennaiApril'140.5ISO Preparation & DocumentationNEW

BF

GET's/ DET's/ Engineers joined after 2012 upto M1AEDRC Kolkata

April'141

Mechanical & UtilitiesNEWSinter and PelletJune'141BeneficiationJuly'140.5SMSAugust'140.5Belt Conveying SystemSeptember0.5Concept on Basic Automation System

GET's/ DET's/ Engineers joined after 2012 upto M1AEDRC Kolkata

April'14

0.5Electrical & InstrumentationNEWVariable voltage & variable frequency driveMay'14C&S involvement in Electrical LayoutsJune'14Mech. & Utility involvement in E&I SystemAugust'14Design of Steel Bins / bunker

GET's/ DET's/ Engineers joined after 2012 upto M1AEDRC Kolkata

May'140.5Civil & StructuralNEW Design of Crane girdersJuly'14

Design of Long span roofsSeptember'14

Interdisciplenary Interface CheckingAll Design EngineersBMH/ EDRCChennaiMay'140.5Interdisciplenary Interface CheckingNEW

Operating Job Planning, Scheduling & ExecutionAll Design EngineersBMH/ EDRC

ChennaiMay'140.5Operating Job Planning, Scheduling & ExecutionNEW

Use of Hollow sectionsAll Design EngineersBMH/ EDRCChennaiMay'140.5Use of Hollow sectionsNEW

Plate Element AnalysisAll Design EngineersBMH/ EDRCChennaiJune'140.5Plate Element AnalysisNEW

Wagon Tippler - Function & Loading (Mech/Elec)All Design EngineersBMH/ EDRC

ChennaiJune'140.5Wagon Tippler - Function & Loading (Mech/Elec)NEW

Planning Analysis & Design of StructuresAll Design EngineersBMH/ EDRCChennaiJuly'140.5Planning Analysis & Design of

StructuresNEW

MCC & Pump House BuildingsAll Design EngineersBMH/ EDRCChennaiJuly'140.5MCC & Pump House BuildingsNEW

4MMH IC

TECHNICAL PROGRAMMES

PROJECT & CONSTRUCTION MANAGEMENT PROGRAMMES

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEConveyor Gallery - Function,Loading, Analysis & New SystemsAll Design EngineersBMH/ EDRC

ChennaiAugust'140.5Conveyor Gallery - Function,Loading, Analysis & New SystemsNEW

Junction House - Function, Loading, Analysis & EconomyAll Design EngineersBMH/ EDRC

ChennaiAugust'140.5Junction House -Function, Loading, Analysis & EconomyNEW

Cable Gallery - Function, Loading & AnalysisAll Design EngineersBMH/ EDRC

ChennaiAugust'140.5Cable Gallery - Function, Loading & AnalysisNEW

Stacker /Reclaimer/ Barrel FoundationsAll Design EngineersBMH/ EDRCChennaiAugust'140.5Stacker /Reclaimer/ Barrel FoundationsNEW

Foundation EngineeringAll Design EngineersBMH/ EDRCChennaiAugust'140.5Foundation EngineeringNEW

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEContract Management, Pre-Qualification, Type Of Tenders And Submission Procedure- Site Investigation Report - Tendering UsingConstruction Computer Software - Claims,Disputes, Resolution Aspects In Contracts - Tendering Rate Analysis, Top Sheet Working - Contract Administration And Documentation - Technical Specification, Measurement - Case Studies

O-1 to M1-BHQ KolkataMay'142Principles of ContractingA024

Formwork - Precast Construction - Construction Equipment - Heavy Erection - Specialized - Construction

Engineers in S1 to M1-C cadresKolkata

JamshedpurHQ Kolkata

June'14August'14August'14

2Construction MethodsA026

Project Life Cycle - Scheduling & Network Techniques - Project Resource Management - Safety Management - Quality Management - Risk Management - Case studies

Staff members in M1-A to M2-C Cadres

KolkataJamshedpurAhmedabadHQ Kolkata

July'14August'14August'14

September'14

2Project ManagementA027

Importance of Contracts Management - Contracts Review - Documentation - FIDIC Condition of Contracts - Scope & Duties in Contracts Management - Claims

Staff Members in Contracts Department

KolkataKolkata

Jamshedpur

June'14July'14

September'142Contracts ManagementA033

Introduction to Primavera - Organizing Data - Updation - Developing progress % - Resource Loading- Global Changes - Report Generation

Planning EngineersJamshedpurJuly'145Primavera Project Management ToolC140

5MMH IC

PROJECT & CONSTRUCTION MANAGEMENT PROGRAMMES

ENVIRONMENT, HEALTH & SAFETY PROGRAMMES

QUALITY MANAGEMENT PROGRAMMES

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEConcepts of Productivity - Methods of Improving Productivity - Tips & TechniquesEngineers in S1 to O2 CadresKolkata

JamshedpurAugust'14

September'142Productivity Improvement in Construction ProjectsG077

Construction Planning - Quantity Survey - Contracts Management - Labour S/C Mgmt, Material Control - P&M Productivity - Billing Control - Execution Package-Micro Planning & Work Break - down Structures (WBS)

Resident Engineers, Planning Engineers & Site In-Charges

KolkataJamshedpur

Delhi

August'14September'14September'14

2Construction Planning & Control SystemsQ505

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODESafety Mgmt - an Overview - Safety in Excavation - Safety while Working at Heights - Safety in Material Handling - Safe Use of Electrical Power - Safety in Gas Cutting & Welding - Safety in P&M Operation - Fire Prevention & Control - Principles of Accident Prevention - Case Studies

All Site Staff Members

AhmedabadDelhi

KolkataJamshedpurJamshedpur

April'14April'14May'14June'14

September'14

2Safety in Construction IndustryS001

EHS Management - An Overview - Safety in Excavation & Blasting - Safety in Material - Handling, Gas Cutting, Welding & Grinding - Occupational Health - Electrical Safety - Safety while working at Height - Safety in P&M Operation - Environmental Aspect & Impact - Fire prevention & Control - Case Studies

All Site Staff MembersRaipurMay'142EHS in Construction IndustryS295

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEWelding Processes - Procedures Qualification - Various NDT Methods - VT, PT, MT, RT and UT Techniques

Engineers in S1 to M1-C Cadres JamshedpurHyderabad

Kolkata

May'14June'14

August'142Welding Techniques & NDTH007

6MMH IC

QUALITY MANAGEMENT PROGRAMMES

PLANT & MACHINERY PROGRAMMES

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEPre & Post Erection Checks for Steel Structures - Handling Precautions for Steel Structures - Pre-Grouting Checks

Staff Members in S1 to O2 CadresRaipurJuly'141Pre & Post Erection Checks for

Structural ErectionH306

Painting Basics & Corrosion in Metals - Painting Defects, Causes & Remedies - Quality Management System in Painting - Types of Paint & Measures

Staff Members in S1 to O2 CadresRaipurJune'141Painting Techniques, Defects &

SolutionsH929

Basic Concepts - Definitions - QMS Principles - ISO 9001:2000 Standards - Various Quality Tools, PQP

Staff Members in S1 to O2 Cadres

JamshedpurHyderabad

Delhi

April'14April'14June'14

2Quality Management QA/QCJ109

Project Management & Planning - Excavation, Backfilling & Compaction - Good Practices in Concreting - Formwork & its types - Elements of Mechanical for Civil Engineers - The Art of Masonary - Safety Practices followed in Construction Industry - Surveying & Usage of Equipment in Surveying - Elements of Electrical for Civil Engineers - Welding & its Techniques - Quality Management System - Plant & Machinery - Role of an Engineer at Site - Finishing Works in CIvil Engineering - Soil Investigation & Piling - Material Handling & its Types

Staff Members in O1 CadresHyderabadMay'141In-house Civil QA / QC Training CourseJ256

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEBasic study of Diesel Engines - TATA Cranes - Air Induction System - Cooling System -Lubricants, Fuel System - Value Mechanism & Starting System

Staff members in TA/CA, S1 to O2 CadresKolkataMay'142A TO Z CranesN028

7MMH IC

PLANT & MACHINERY PROGRAMMES

CMPC & FORMWORK MANAGEMENT PROGRAMMES

FINANCE, ACCOUNTS & ADMINISTRATION PROGRAMMES

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEBasics of Crane-Classification-Crane Structure-Crane Terminology - Load charts - Applications - Selection of crane - Wire rope Inspection - Introduction to Heavy Cranes - Crane Maintenance - Crane Productivity - Crane Safety Case Studies

Staff members in S1 to M1-A CadresJamshedpurAugust'142A to Z CranesN143

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEBroad Knowledge on L&T Formwork System, Performance Parameter’s Improvement Formwork Inventory Materials Management Planning of Materials at the beginning of Project Costing Safety in Formwork with case study Broad Knowledge on Slipforming Technology Slipforming Material Planning/Execution Costing Safety during Construction with Case Study

Staff Members upto M1-ACadres

JamshedpurAhmedabad

KolkataDelhi

April'14May'14July'14

September'14

2Slipform Technology & Formwork ManagementA988

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEBascis of Indirect Taxes – Concepts & Scheme of value added Tax - Sales vs Deemed Sales - Concepts & Scheme of CST Act - Concepts & Procedure for Central Excise - Deemed Export

Resident Engineers, Planning Engineers and Staff Members in Tendering and Materials Department

HQ KolkataKolkataDelhi

April'14June'14July'14

2Indirect Taxes for Technical & Non Technical StaffF281

Basics of Accounting - Costing & Analysis - Financial Reporting - Working Capital Management - Ratio Analysis

Staff Members in O2 to M1-C Cadre

DelhiKolkata

August'14September'141Finacial ManagementF481

Meaning & Objective of IR, Functions of IR Dept, Effects of Poor IR, Legistations - CSR Initiatives Contract Labour (R&A) Act, 1970 - Scope, Applicability & Coverage along with minimum wages Act, Payment of wages Act, Payment of Bonus Act, Employees PF & Misc Provisions Act, BOCW Act, ISMW Act ID Act WMS importance & Advantages

Staff Members upto O2 Cadre who are handling Time Office Functions

JamshedpurJuly'142Industrial Relations for Time KeepersL062

8MMH IC

INFORMATION TECNOLOGY PROGRAMMES

COMPETENCY DEVELOPMENT / BEHAVIOURAL SKILLS PROGRAMMES

ORIENTATION/MID - TERM INTERACTION PROGRAMMES

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEWOM for Billing EngineersBilling Engineers in S1 to M1-BKolkataAugust1EIP-Plan & Communciation in Site EIPC252CRM/EIP Plan for CRM users, Planning Engineers.

Planning Engineers/CRM users in O2 to M1-B

JamshedpurJuly2

EIP Plan/CRMC879

WOM for Billing EngineersBilling Engineers in S1 to M1-BWOM & Communication in Site EIPC252EIP-Finance/Costing FOR SITE Accounts staffs.Site Accountants in S1 to M1-AEIP Finance/Costing & SCMS287

EIP Overview - SCM - WOMStaff Members in O1 to M1-C CadresHQ KolkataMay1EIPNEW

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODEIntroduction to Communication - Communication Process - Conversation Skills - Listening Skills - Email Communication - Telephone Communication

Staff Members in M1-A to M2-C CadresKolkataJune'142Effective Communication SkillsB001

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODE

Overview of L&T - MMH IC and SBG / Business Units / DepartmentsGETs

HQ KolkataAhmedabad

BMH/ EDRCChennai

DelhiEDRC Kolkata

JamshedpurKolkata

Hyderabad

July'141Orientation for GETsZ001

Overview of L&T - MMH IC and SBG / Business Units / DepartmentsDETs / New Joinees

AhmedabadBMH/ EDRC

ChennaiDelhi

EDRC KolkataJamshedpur

KolkataHyderabad

August'141Orientation for DETsZ003

9MMH IC

COMPETENCY DEVELOPMENT / BEHAVIOURAL SKILLS PROGRAMMES

CONTENTPARTICIPANTSVENUEMONTHDAYSPROGRAMME CODECODENeed for developing Interpersonal skills -Understanding human behavior - Practical Tips Business benefits of strong interpersonal skills

Staff in M1-A to M2-CHQ KolkataJune'142Inter Personal EffectivenessB004

Prioritization - Organizing - Planning -Handling Time Wasters- Changing Habits - Tips & Techniques - Case Studies

Staff Members in S2 to M1-C Cadres

JamshedpurKolkataSeptember'142Time ManagementB010

Understanding Assertive Behavior - Building Self-Confidence and Improving Self-Esteem - Assertive Inventory Test - How to Say ‘No’ to a Key Customer - Assertive Communication - Handling Difficult Customers and Situations - Techniques to Develop Powerful Assertiveness Skills

Staff Members in M1-A to M2-C CadresHQ KolkataAugust'141Assertiveness SkillsB018

Speech Communication-Creating Impacts in Face-to-Face Communication - Preparing for Presentation - Use of Visuals Aids - Styles of presentation Key aspects - Do's and Don't's during presentation Body language while presentation

Staff Members in M1-A to M2-C Cadres

JamshedpurKolkata

June'14July'142Effective Communication SkillsB095

Competency for Modern Managers - Roles & Responsibilities - Managerial Functions - Self Awareness - Motivation &Influencing - Delegation - Coaching, Developing & Empowering Subordinates

Staff Members in M1-A to M2-C Cadres

JamshedpurAhmedabad

June'14September'142Managerial EffectivenessB195

Develop the Skills & Competencies required for a Trainer, Group handling skills,Understanding of Group (audience) Dynamics, Facilitation skills, Roles that trainer play, Questioning skills

Staff in M1-A and aboveHQ KolkataAugust'142Train the TrainersB230

Head QuartersTechnopolis Building, 6th floor, Plot 4, Block BP, Sector V,

Salt Lake City, Kolkata - 700 091