    DCO-DT-000-ZZZZZ-071902 I February 2014

    Code of Construction Practice

    Part B: Site-specificrequirements

    Blackfriars Bridge Foreshore

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    2/15

    Code of Construction Practice Part B

    This page intentionally left blank

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    3/15

    Code of Construction Practice Part B i

    Thames Tideway Tunnel

    Code of Construction Practice Part B

    Blackfriars Bridge Foreshore

    List of contents

    Page number

    1 Introduction ...................................................................................................................12 General Requirements ................................................................................................23 Communications and community/stakeholder liaison ......................................24 Site operation ................................................................................................................35 Public access, highway and river transport .........................................................46 Noise and vibration .....................................................................................................57 Air quality .......................................................................................................................68 Water resources ...........................................................................................................79 Land quality ...................................................................................................................710 Waste management and resource use ...................................................................711 Ecology (aquatic and terrestrial) .............................................................................712 Historic environment ..................................................................................................813 Other................................................................................................................................8

    Table of figures

    Page number

    Figure 1.1 Blackfriars Bridge Foreshore: Site context and location plan ........................2Figure 13.1 Outline location of Roman boat at Blackfriars Bridge Foreshore...............9

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    4/15

    Code of Construction Practice Part B ii

    This page intentionally left blank

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    5/15

    Blackfriars Bridge Foreshore

    Code of Construction Practice Part B 1

    1 Introduction

    1.1.1 All works described in this document are to be managed and performed tomeet the health and safety vision of Zero Incidents, Zero Harm, Zero

    Compromise for the Thames Tideway Tunnel project (the project).

    1.1.2 The Code of Construction Practice(CoCP) comprises two parts:

    a. Part A: General requirements. These measures are applicable projectwide.

    b. Part B: Site-specific requirements. These are site-specific measureswhere deviations from the general requirements are indicated in PartA.

    1.1.3 This document forms the CoCPPart B for the project works at theBlackfriars Bridge Foreshore site and sets out detailed site-specificmeasures including working hours, site set-up and servicing arrangements,

    taking into account environmental matters and consultations with the City ofLondon Corporation and other stakeholders.

    1.1.4 For ease of reference,this sets out site-specific issues and deviations fromPart A; therefore where no site-specific measures are specified, referenceshould be made to PartA.

    1.1.5 A plan showing the location of the site is shown in the Figure 1.1 overleaf.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    6/15

    Blackfriars Bridge Foreshore

    Code of Construction Practice Part B 2

    Figure 1.1 Blackfriars Bridge Foreshore: Site context and location plan

    Note: For detailed limits of land to be acquired or used, refer to the drawings in the Book of Plans.

    2 General Requirements

    2.1.1 As per the CoCPPart A.

    3 Communications and community/stakeholderliaison

    3.1.1 The community liaison plan shall be developed taking account of the City ofLondon CorporationsCode of Practice for Deconstruction and ConstructionSites,Section 2,paras. 2.5 to 2.10. The plan will include details of liaisonwith the City of London Boys School with regards to the relocation ofBlackfriars Millennium Pier.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    7/15

    Blackfriars Bridge Foreshore

    Code of Construction Practice Part B 3

    4 Site operation

    Topic Site-specific requirementWorking hours The following working hours shall apply to this site:

    a. standard

    b. extended.

    When other types of working hours (see CoCPPartA, Table 4.1) are required, these shall be subject toconsent from the local authority under Section 61 ofthe Control of Pollution Act 1974 or other agreedsubmissions.

    The contractor shall engage with the City of LondonCorporation regarding planned works, working hoursand predicted noise levels when developing theconstruction environmental management plan.

    The City of London Corporation normally restrictsnoisy works to six-hour periods on weekdays. Thecontractor shall schedule noisy working operationsduring the following hours: 08:00 to 10:00, 12:00 to14:00, 16:00 to 18:00 weekdays and 08:00 to 13:00Saturdays, with no noisy work on Sundays or BankHolidays. However,standard hours may apply if

    agreed with the City of London Corporation.Other noisy works, including deliveries andmaintenance,outside of the standard hours shall bethe subject of a Section 61 application or otheragreed submissions to the City of LondonCorporation (a site hours variation request thatjustifies the work and methods). This includes workcategorised in the CoCPPart A as extended workinghours, continuous working, out of hours, possessionworking, tidal working and short-notice working.

    Site layout Temporary in-river construction works shall belimited within the authorised navigation channel.The detailed proposals shall be agreed with the Portof London Authority and the Environment Agency(relevant protective provisions) and the MarineManagement Organisation (Deemed Marine Licenceconditions) and subject to any additional requiredlicenses, navigational risk assessments andconsents.

    Site security/hoardingrequirements

    The hoarding shall incorporate suitable artwork andviewing windows, as defined in CoCPPart A para.4.3.4a and b.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    8/15

    Blackfriars Bridge Foreshore

    Code of Construction Practice Part B 4

    Topic Site-specific requirement

    The local authority shall approve the externalappearance of the hoarding.

    River works As per the CoCPPart A.

    Other items The contractor shall produce a site-specific lightingmanagement plan. The lighting scheme shallminimise impacts on aquatic ecology and include theuse of low level directional lighting,where possible,while providing safe working conditions.

    The contractor shall consider quiet hours (eg, 10:00to 12:00 and 14:00 to 15:00 weekdays) as set out inCity of London Corporation Code of Practice forDeconstruction and Construction Sitesto protectworking premises including offices and schools.

    5 Public access, highway and river transport

    Topic Site-specific requirement

    Site access and gates A new site entrance from the Blackfriars Bridgewestbound off-ramp shall be created duringconstruction but not used while the Low Level SewerNo. 1 interception chamber works are carried out.During this construction phase,access shall be from

    Blackfriars underpass.Traffic management Lorry arrivals shall be strictly limited to set times and

    coordinated to ensure that no lorries queue outsideof the site.

    The Blackfriars Bridge westbound off-ramp can onlytake standard heavy goods vehicles and noabnormal loads.

    The temporary traffic lane closure at the end of thewestbound off-ramp shall be used when requiredand then restored to highway use as soon as

    practicable.The contractor shall seek to minimise the duration ofworks affecting traffic lanes, including closure of thewestbound off-ramp.

    The minimum width of traffic lanes to be retained onthe westbound off-ramp shall be 3.25m.

    Prior to suspending any coach parking spaces,alternative parking spaces shall be provided. Thespaces shall be reinstated on completion of theworks,unless agreed otherwise with the highway

    authority. It is proposed that,subject to obtaining therelevant highway consents,the spaces will be

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    9/15

    Blackfriars Bridge Foreshore

    Code of Construction Practice Part B 5

    Topic Site-specific requirement

    relocated to the southbound carriageway ofBlackfriars Road (A201) between Webber Street andWestminster Bridge Road/Borough Road (A3202).

    The existing coach parking and loading bay on thewestbound off-ramp and Victoria Embankment(A3211) shall be suspended.

    Event restrictions The contractor shall liaise with City of LondonCorporation, Westminster City Council andTransport for London event planning teams withregard to the London Marathon and other majorevents when producing the traffic management planand traffic management schemes to ensure thatappropriate measures are in place.

    River transport The relocated Blackfriars Millennium Pier shall be inplace before the existing pier is closed. Access to theexisting and relocated piers shall be maintained forboth pedestrians and services. The contractor shallliaise with London River Services (Transport forLondon).

    The contractor shall carry out a detailed navigationalrisk assessment as part of the River Works Licenseto confirm that the river transport arrangements forthe site are safe and acceptable to the Port ofLondon Authority.

    Other The contractor shall provide clear signage for thediversion of the Thames Path.

    The contractor shall coordinate with both the City ofLondon Corporation and Transport for London on therequirements for amended pedestrian routes to therelocated Blackfriars Millennium Pier,includingnotices, pamphlets, guides and signage for thepublic.

    The contractor shall attend highways liaisonmeetings as required by the City of LondonCorporation, which shall provide the contractor with14 days notice of such meetings.

    6 Noise and vibration

    Topic Site-specific requirement

    General

    The noise and vibration controlmeasures shall be detailed(and may be modified or addedto) in Section 61 consent

    The City of London Corporation requires thecontractor to submit a site-specific scheme ofprotective works for noise and vibration for works at

    Blackfriars Bridge Foreshore,including the works torelocate the President and Blackfriars Millennium

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    10/15

    Blackfriars Bridge Foreshore

    Code of Construction Practice Part B 6

    Topic Site-specific requirement

    applications or other agreedsubmissions to the localauthority.

    Pier. This supersedes the requirement for aseparate Section 61 application as required in CoCPPart A, Section 6.3. The statement should includedetails of:

    a. noise and vibration assessments andcalculations normally included within a Section61 application

    b. noise and vibration monitoring, includingreal-time monitoring

    c. non-compliance procedures for noise andvibration monitoring, including a notificationprocedure

    The contractor shall liaise with the City of LondonCorporation in respect of these elements beforesubmitting the statement.

    The employer retains the right to submit Section 61applications to the City of London Corporation.

    Barges shall be loaded and unloaded duringstandard hours only.

    Except for the anchor piles, the contractor shall usepush piling to construct the cofferdam for theBlackfriars Millennium Pier dredged pocket unlessthis is impossible. The anchor piles shall be installedas far away from the City of London Boys School asis practicable.Where push piling is determined to be impossible,this shall be demonstrated by the contractor whoshall make an application to the local authority to usean alternative piling method through the Section 61dispensation process (see Appendix A, Section A.1in the CoCPPart A),through contingency measuresand arrangements if included in the original Section61 consent or other agreed submissions.The contractor shall liaise with the school to agree

    periods when piling can proceed without causingadverse noise impacts.

    Control measures As per the CoCPPart A.

    Other N/A

    7 Air quality

    Topic Site-specific requirement

    Vehicle and plant emissions As per the CoCPPart A.

    Dust emissions/control As per the CoCPPart A.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    11/15

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    12/15

    Blackfriars Bridge Foreshore

    Code of Construction Practice Part B 8

    Topic Site-specific requirement

    species, size, source, pit design and finish,shall beagreed with Transport for London.

    Other N/A

    12 Historic environment

    Topic Site-specific requirement

    Other The contractor shall select working methods thatminimise the risk of vessels accidentally striking thelisted Blackfriars Bridge. Protection barriers shall beinstalled,as required,but not attached to the listedstructure unless otherwise agreed with the City of

    London Corporation.During construction of the new river wall as part ofthe Blackfriars underpass works, a Roman boat wasuncovered in the cofferdam (see Figure 13.1overleaf) between the Blackfriars Road and RailBridges. The contractor shall select a method for theriver works, including suitable river equipment andoperating procedures, that minimises the risk ofimpacts on the boatslocation.

    The sturgeon lamp stands shall be carefullyremoved, stored and reinstated in their currentpositions as far as possible following construction.The existing replica lamp stands shall be replacedwith originals from elsewhere (by agreement with thelocal authority) or new castings from the originalmoulds.

    Existing granite blocks shall be used to join the newand old sections of the river wall.

    13 Other

    Topic Site-specific requirement

    Other As per the CoCPPart A.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    13/15

    Blackfriars Bridge Foreshore

    Code of Construction Practice Part B 9

    Figure 13.1 Outline location of Roman boat at Blackfriars Bridge Foreshore

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    14/15

    Blackfriars Bridge Foreshore

    Code of Construction Practice Part B 10

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite agains

    15/15

    Document comparison by Workshare Compare on 10 February 2014 14:37:01

    Input:

    Document 1 ID interwovenSite://VRT-DMS-01/Legal/34198317/1

    Description#34198317v1 - CoCP Part B BBF Revised 3 Feb

    2014Document 2 ID interwovenSite://VRT-DMS-01/Legal/34241709/1

    Description #34241709v1 - CoCP B BBF - 12 Feb 2014

    Rendering set no change numbers no summary

    Legend:

    Insertion

    Deletion

    Moved from

    Moved to

    Style change

    Format change

    Moved deletion

    Inserted cell

    Deleted cell

    Moved cell

    Split/Merged cell

    Padding cell

    Statistics:

    Count

    Insertions 0

    Deletions 1

    Moved from 0

    Moved to 0

    Style change 0

    Format changed 0

    Total changes 1