COCO PALMS
SITE SAFETY PRACTICES
WORK AT HEIGHT SAFETY
Project Brief:
Project Scale : 12 blocks / 12 to 16 storeys building with 2
basement car parks
Total Units : 944 Units, 6 Ancillary Commercial Units
Site Area : 41,514 sqm (or approximate 446,857 sqft)
Contract Commencement Date : 10th July 2014
Contract Completion Date Phase 1 : 09th Oct 2017 – (39 months)
Contract Completion Date Phase 2 : 09th Jan 2018 – (42 months)
Project Team:
Developer/Owner : Hong Realty (Private) Limited
Project Manager : CDL Management Services Pte Ltd
Architect / QP For Building Plan : Axis Architects Planners Pte Ltd
Structural Engineer : Parsons Brinckerhoff Pte Ltd
Quantity Surveyor : Langdon & Seah Singapore Pte Ltd
M&E : Meinhardt (Singapore) Pte Ltd
Interior Designer : Axis ID Pte Ltd
Landscape Consultant : Tinderbox Pte Ltd
Builder : Woh Hup (Private) Limited
CCP WSHE ORGANIZATION CHART
Roy ChiaConstruction Manager
Tang Chun KeatSite Manager
Tan Ee PongSite Manager
Scaffold Team Scaffold Sup – Sekar
Scaffold Erector – 16Blk 3-4
Padmanaban
Blk 1-2Paulo
Lifting TeamLifting Sup – Dinesh
Sig/Rig - 18
Mohd FadzliWSHEO
Blk 5-6Shanmugam
Blk 9-10Tan Siang Weng
Blk 7-8Ganesh
Blk 11-12Suresh
WH’s Safety Awards Achieved For The Past 3 Years
WOH HUP 2015 EHS ACHIEVEMENTS
RoSPA Gold Award
RoSPA Guardian Angel Award 2015
RoSPA Ocupational Safety Award
Winner of the Housebuilding & Property Development Sector
SCAL WSH Innovation Convention
Silver – WSHE Team
Bronze – Corals At Keppel bay
MOM WSH SHARP Award
MOM WSH Award For Supervisor
Happy Toilet 5 Star Award
COCO PALMS EHS ACHIEVEMENTS
RoSPA Gold Award 2014
RoSPA Gold Award 2015
MOM SHARP Award 2014
MOM SHARP Award 2015
Happy Toilet 5 Star Award 2014
Happy Toilet 5 Star Award 2015
CDL 5 STAR AWARDS
• WH Management’s Top-Down Driven Safety Culture
• WH’s Internal Monthly Housekeeping Audits
• External Safety Audits on site’s safety standards
• CDL quarterly 5 Stars Audits
WORK AT HEIGHT
SAFETY
TOPICS FOR THE DAY
WORK AT HEIGHT
SAFETY
WORK AT HEIGHT (WAH) SAFETY
WAH SAFETYFall Prevention Plan
WAH SAFETYFall Prevention Plan – Structural Stage
External Safety Screen
External Gap CoveringFormwork Edge Railings
Floor Opening
Cover
Rigid Barricade
Lift Shaft Jump Form Access to Construction Floor Formwork Edge Railings
Detachable Barricade External scaffold
WAH SAFETYFall Prevention Plan – Finishing Stage
Lift Shaft Fencing
External Safety Screen Catch Screen Opening Cover
Staircase Railings
Drop Down Lifeline External Gap Covering Rigid Barricade External scaffold
Bay Window Barricade
IDENTIFICATION OF TOP 5 CRITICAL HIGH RISK ACTIVITIES
Installation of MLP
1
2
Dropdown lifeline pre
installed for user to
anchor on during the
shifting of MLP.
Dropdown lifeline pre
installed for user to
anchor on during the
shifting of MLP.
Installation of MLP
3
4
MLP door hinge is
provided with a knob to
prevent it from dislodge
during operation or
lifting.
MLP door hinge is
provided with a knob to
prevent it from dislodge
during operation or
lifting.
3
4
Safe working load
(SWP) to be displayed
for user awareness.
Lifting point for MLP
Installation of MLP
AC ledgeInstallation of barricade
Horizontal
GI pipe
Vertical GI
pipe
1m GI pipe
2.5m GI
pipe
AC Ledge
Base plate
Legend:Drop down lifeline
Steps:
1)Drill 10mm hole to
the ac ledge.
2) Insert 10mm wall
plug into the hole.
3)Install the GI
column pipe and
screw in with 10mm
bolt.
4) Complete with 5
layer horizontal
guardrail and
toeboard
Toeboard
Planter boxInstallation of barricade
Planter
Horizontal GI
pipe
Vertical GI pipe
0.5m GI pipe
1m GI pipe
1.5m GI pipe
Base plate
Legend:Drop down lifeline
Steps:
1)Drill 10mm hole to
the planter box.
2) Insert 10mm wall
plug into the hole.
3)Install the GI column
pipe plate and screw in
with 10mm bolt.
4) Complete with 3
layer horizontal
guardrail without
toeboard.
StaircaseInstallation of barricade
Legend:Drop down lifeline
Staircase mid landing
Horizontal GI
pipe
Vertical GI pipe
0.5m GI pipe
1m GI pipe
1.5m GI pipe
Base
plate
Steps:
1)Drill 10mm hole
to the staircase
midlanding and
200mm away from
the edge.
2) Insert 10mm wall
plug into the hole.
3)Install the GI
column pipe plate
and screw in with
10mm bolt.
4) Complete with 3
layer horizontal
guardrail with
toeboard.200mm
Toeboard
INSTALLATION OF WINDOW FRAME
1
3
Rope will be used
to secure the
window frame
and the other end
to the safety
barricade.
4
2 Worker will hook his
harness to the
safety barricade or
the dropdown
lifeline when
slotting the window
frame into its
position.
Using an explosive powered tools,
worker will then secured the window
frame to the concrete surface.
Once window frame installed,
barricades will be transferred to the
window frame itself.
Installation of precast finwallPrecast Finwall – Installation sequence
High detachable barricade in
placed prior precast Finwall is
installed.
4 5
Lifting gear released after tie
back is installed and secured.
1. Brickcage to be installed at the exterior façade
of the work area
A
Layering AAC block or installing Acotec panel at the edge of the building
1. Brickcage will be shifted up to the next level for
the following level (Common staircase area)
B
1. Brickcage to be installed at the exterior façade
of the work area (Planter area)
C
Layering AAC block or install Acotec panel at the edge of the building
Tower Crane Operator AccessTypical erection of tower crane access
1
2
3
4
1 2
43
1
2
3
4
Tower Crane Operator AccessTypical erected of tower crane access
1
43
2
Passenger HoistLocation of passenger hoist
Site AccessPerimeter access
Site perimeter access to be clean. Any deviation in the
height of the walkway needs to be mark with a visible sign.
Site AccessAccess to higher slab
Steps access provided for personnel to cross higher slab
area
Site AccessAccess to formwork areas
Access provided to formwork
areas.
Internal In House TrainingJoint training between Woh Hup & Subcontractors - Classroom
Internal In House TrainingJoint training between Woh Hup & Subcontractors – On Site Training
WAH SAFETYCompetency of WAH
Worker Supervisor
Assessor Manager
WAH
WAH SAFETYEmergency Response
Rescue Kits
SITE WALK
SITE WALK ROUTEG2Site Office
THANK YOU