co2 cooling and ibl interface meeting tooling cooling line at pp1

18
CO2 cooling and IBL interface meeting Tooling cooling line at PP1 Didier Laporte CNRS – LPNHE Paris 06 février 2014 EDMS IN2P3 : I-036854 – V2

Upload: candra

Post on 23-Feb-2016

54 views

Category:

Documents


0 download

DESCRIPTION

CO2 cooling and IBL interface meeting Tooling cooling line at PP1. Didier Laporte CNRS – LPNHE Paris 06 février 2014 EDMS IN2P3 : I-036854 – V2. Assembling tooling. First cooling line. Montage splitter box, Début montage des lignes, soudure. 6/8 lines on tools. Fitting stoppers. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

CO2 cooling and IBL interface meeting

Tooling cooling line at PP1

Didier LaporteCNRS – LPNHE Paris

06 février 2014EDMS IN2P3 : I-036854 – V2

Page 2: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

Assembling tooling

Page 3: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

First cooling line

• Montage splitter box,• Début montage des lignes, soudure

Page 4: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

6/8 lines on tools

Page 5: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

Fitting stoppers

Page 6: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

Ready to install

Page 7: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

In the pit, on scaffolding

• LPSC table

Page 8: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

Mainframe

Elcom 20x20

Page 9: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

Z table (axis)

• Elcom

Page 10: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1
Page 11: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1
Page 12: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1
Page 13: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

Final position

Page 14: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

Same operation for the 6 lines

Page 15: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1
Page 16: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

Final position

Page 17: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1
Page 18: CO2  cooling and IBL interface  meeting Tooling cooling  line at  PP1

To do list :

• Update of the lines (6 / 8 ), LAPP• Design side A, LPNHE• Splitter box interface, LAPP• Escargot interface, LAPP• Protection for travel, LPNHE• Connection links at PP1 (for tests), LPNHE• Command to do (Elcom), LAPP/LPNHE

• Delivery date ?