cmo_architect mirco monti
DESCRIPTION
ÂTRANSCRIPT
ProfileMirco Monti
Milan24/05/1987
mobile +39 333 5297138mail [email protected]
ProfileMirco Monti
Milan 24/05/1987
mobile +39 333 5297138mail [email protected]
Professional Education2012 - Member of architects association of Milan_Lincesed Italian Architect
2011 - Master Degree in Architecture with 110/110 at Politecnico di Milano -Thesis mentioned for Mantero Prize.2009 - Bachelor in Architecture with 110L/110 at Politecnico di Milano
Professional Education2012 - Member of architects association of Milan_Lincesed Italian Architect
2011 - Master Degree in Architecture with 110/110 at Politecnico di Milano -Thesis mentioned for Mantero Prize.2009 - Bachelor in Architecture with 110L/110 at Politecnico di Milano
Work Experience - Professional Career2013- Founding CMO an innovative office for architecture of the future
2013 - Architect at office of architecture "Scott Mahaffey Architects" in New York (USA)2013 - Architect at office of architecture "Santoscoy Arquitectos" in Guadalajara (Mexico)
2010-2014 - Architect at office of architecture OPERASTUDIO in Milan2010 - Stage at office of architecture OPERASTUDIO in Milan
2009 - Collaboration at office of architecture "Cagella" di Castellanza (Va)2008 - Collaboration at office of architecture BEMAA in Milan
Work Experience - Professional Career2013- Founding CMO an innovative office for architecture of the future
2013 - Architect at office of architecture "Scott Mahaffey Architects" in New York (USA)2013 - Architect at office of architecture "Santoscoy Arquitectos" in Guadalajara (Mexico)
2010-2014 - Architect at office of architecture OPERASTUDIO in Milan2010 - Stage at office of architecture OPERASTUDIO in Milan
2009 - Collaboration at office of architecture "Cagella" di Castellanza (Va)2008 - Collaboration at office of architecture BEMAA in Milan
Awards2013 - FIRST PRICE EUROPAN 12 ADATABLE CITY - WITTENBERGE with the project RE-HUB WITTENBERGE: health/wellness/food
with Operastudio Architetti, Francesco Nobili and Andrea Zecchetti2013 - FIRST PRICE RESTRICTED PRIVATE COMPETITION.New mall,office and housing in HIGH PARK, Queretaro (MX)
con Santoscoy Arquitectos2011 - THESIS MENTIONED FOR MANTERO: PRIZE San Cristoforo & Porta Genova
with Paolo Citelli and Marco Olgiati
Awards2013 - FIRST PRICE EUROPAN 12 ADATABLE CITY - WITTENBERGE with the project RE-HUB WITTENBERGE: health/wellness/food
with Operastudio Architetti, Francesco Nobili and Andrea Zecchetti2013 - FIRST PRICE RESTRICTED PRIVATE COMPETITION.New mall,office and housing in HIGH PARK, Queretaro (MX)
con Santoscoy Arquitectos2011 - THESIS MENTIONED FOR MANTERO: PRIZE San Cristoforo & Porta Genova
with Paolo Citelli and Marco Olgiati
Personal Education2012 - Experience of voluntary work with Dancing Animation to the earthquake-stricken areas of the Emilia Romagna region
2011 - Summer Mission in Malawi with the "Malawi nel cuore" association to the orphanage "Alleluya care center" and to Namandanje parish2009 -Experience of voluntary work with Dancing Animation to the earthquake-stricken areas of the Abruzzo region
2007 - Summer Mission in Mexico with "Misioneros del Espiritu Santo" to the Matehuala diocese
Personal Education2012 - Experience of voluntary work with Dancing Animation to the earthquake-stricken areas of the Emilia Romagna region
2011 - Summer Mission in Malawi with the "Malawi nel cuore" association to the orphanage "Alleluya care center" and to Namandanje parish2009 -Experience of voluntary work with Dancing Animation to the earthquake-stricken areas of the Abruzzo region
2007 - Summer Mission in Mexico with "Misioneros del Espiritu Santo" to the Matehuala diocese
Languages Italian, mother tongue
English, B2 level TOEIC certificationSpanish, excelent knowledge
French, Basic knowledge
Languages Italian, mother tongue
English, B2 level TOEIC certificationSpanish, excelent knowledge
French, Basic knowledge
RE-HUB WITTENBERGE: healt / wellness / food
EUROPAN 12 WINNER
with Operastudio architetti, Francesco Nobili and Andrea Zecchetti
The open space, the protagonist of the project, is constructed through the combination of three different landscapes that offer different ways to live in contact with nature and at the same time be in direct relation-ship with the city: an alternation between built-up areas, green glades and a part like an urban forest.This suggestion comes from the character of the sur-rounding landscape that alternates between patches of dense vegetation to extensive lawns.1_the fi rst “metaphorical” level consists of the land-scape that can be seen from the river: it is attended by adding a few new buildings that are going to strengthen the system of cross-river views and attracting the type of existing ones.2_The second level is the riverside promenade which becomes a pedestrian and bicycle path that runs along the entire riverfront site, alternating enlargements set-backs or relaxing areas that are home to small docks and relaxation. The riverside promenade is related in a direct manner to the existing store house buildings to be restored and the designed new ones.3_The third level is made up of a broad green glade, which because of its nature offers the ability to host different temporary activities or remain free. This is crossed by paths that connect the urban forest to the entrances of the storehouses and the riverside.At the east end of the Park towards the city center there is a pavilion bar that marks an entrance to the Park. 3 other little buildings used for storage, mark the longitu-dinal path that runs through the area.4_The fourth level is characterized by the features of a dense forest of trees on a plot of clay, which acts as a fi lter and permeable boundary between bad-Wilsnack-er-strasse, the city and the park. Within the forest there are small pavilions that can accommodate different functions (bar, newsagent, bike storage), playground for children, chairs, bowls, wifi .The forest is interrupted by the square of access to the park, at the intersection of bad-Wilsnacker strabe and Packhofstrabe. Here is also a small info- point to inform people about the activities taking place in the buildings of the park.by making the riverbank more accessible and increas-ing its function as a gateway to the transnational bio-sphere Reserve, by the project of the different open spaces and the buildings inside the area, the project helps the city to further develop its identity on the con-tinuum between cityscape and rural nature.
THe
RiV
eR-P
RO
men
AD
e A
nD
TH
e PA
RK
2re-hub wittmberge
The open space, the protagonist of the project, is constructed through the combination of three different landscapes that offer different ways to live in contact with nature and at the same time be in direct relation-ship with the city: an alternation between built-up areas, green glades and a part like an urban forest.This suggestion comes from the character of the sur-rounding landscape that alternates between patches of dense vegetation to extensive lawns.1_the fi rst “metaphorical” level consists of the land-scape that can be seen from the river: it is attended by adding a few new buildings that are going to strengthen the system of cross-river views and attracting the type of existing ones.2_The second level is the riverside promenade which becomes a pedestrian and bicycle path that runs along the entire riverfront site, alternating enlargements set-backs or relaxing areas that are home to small docks and relaxation. The riverside promenade is related in a direct manner to the existing store house buildings to be restored and the designed new ones.3_The third level is made up of a broad green glade, which because of its nature offers the ability to host different temporary activities or remain free. This is crossed by paths that connect the urban forest to the entrances of the storehouses and the riverside.At the east end of the Park towards the city center there is a pavilion bar that marks an entrance to the Park. 3 other little buildings used for storage, mark the longitu-dinal path that runs through the area.4_The fourth level is characterized by the features of a dense forest of trees on a plot of clay, which acts as a fi lter and permeable boundary between bad-Wilsnack-er-strasse, the city and the park. Within the forest there are small pavilions that can accommodate different functions (bar, newsagent, bike storage), playground for children, chairs, bowls, wifi .The forest is interrupted by the square of access to the park, at the intersection of bad-Wilsnacker strabe and Packhofstrabe. Here is also a small info- point to inform people about the activities taking place in the buildings of the park.by making the riverbank more accessible and increas-ing its function as a gateway to the transnational bio-sphere Reserve, by the project of the different open spaces and the buildings inside the area, the project helps the city to further develop its identity on the con-tinuum between cityscape and rural nature.
THe
RiV
eR-P
RO
men
AD
e A
nD
TH
e PA
RK
2re-hub wittmberge
HIGH PARK:MALL, OFFICES AND HOUSING
RESTRICTED COMPETITION WINNER_QUERETARO (MX)
with Santoscoy Arquitectos
VIALIDAD DEL PROYECTOE INTEGRACIÓN EN EL CONTEXTO
NUEVA AREADE VIVIENDA
NUEVA AREADE COMERCIO
NUEVA PLAZA: FUNCIONES Y RELACIONES
CINES TIENDAS ANCLA
FOOD COURT Y JARDÍN ELEVADO
CENTRO
DISPOSICIÓN TRADICIONAL DE LAS TORRES
DISPOSICIÓN EN RELACION AL CONTEXTO
CENTRO
SIERRA
TORSIÓN DEL VOLUMEN PARA MEJOR ORIENTACIÓN DE CADA NIVEL
RISTORANTE
RISTORANTE
SALA MULTIUSO
SALA MULTIUSO
BLOCCO SERVIZI
CUCINA
CUCINA
BAGNO
BAGNO
SCALA
SCALA
INGRESSO
INGRESSO
RIP.
RIP.
RAGGRUPPARE E RAZIONALIZZARE LE VARIE FUNZIONI IN MODO DA OTTENERE UNO SCHEMA MOLTO SEMPLICE:
PORRE UN INVOLUCRO CHE CONTENGA TUTTE LE FUNZIONI E CHE PERMETTA DI VEDERLE ANCHE ALL’ESTERNO:FACCIATA IN VETRO
RISOLUZIONE PROBLEMA 1:
RISTORANTE
RISTORANTE
SALA MULTIUSO
SALA MULTIUSO
BLOCCO SERVIZI
CUCINA
CUCINA
BAGNO
BAGNO
SCALA
SCALA
INGRESSO
INGRESSO
RIP.
RIP.
RAGGRUPPARE E RAZIONALIZZARE LE VARIE FUNZIONI IN MODO DA OTTENERE UNO SCHEMA MOLTO SEMPLICE:
PORRE UN INVOLUCRO CHE CONTENGA TUTTE LE FUNZIONI E CHE PERMETTA DI VEDERLE ANCHE ALL’ESTERNO:FACCIATA IN VETRO
RISOLUZIONE PROBLEMA 1:
RISOLUZIONE PROBLEMA 2:
RISTORANTE
RISTORANTE
RISTORANTE
BLOCCOSERVIZI
BLOCCOSERVIZI
BLOCCOSERVIZI
SALAMULTIUSO
SALAMULTIUSO
SALAMULTIUSO
SITUAZIONE TIPO EDIFICIO-SOLE:
PROLUNGAMENTO COPERTURA PER PROTEGGERE LA FACCIATA:
CREAZIONE COPERTURA LEGGERA PER FAR CIRCOLARE L’ARIA:
PIANO TERRA:
“CIRCOLO SESTESE” REQUALIFICATION: a project for the territory and expo 2015
CULTURAL AND SPORT CENTER_SESTO CALENDE (VA)
with Operastudio architetti
CITTA’ DI SESTO CALENDE RIQUALIFICAZIONE CIRCOLO SESTESE Arch. CAMILLO MAGNI
CANOTTIERI
SPIAGGIA
PEDANA PER EVENTI E GIOCHI
PARCO GIOCHI
RISTORANTE
PERCORSO VITA
NUOVO ATTRACCO DI SESTO CALENDE
CULTURA
PROGETTO
CITTA’ DI SESTO CALENDE RIQUALIFICAZIONE CIRCOLO SESTESE Arch. CAMILLO MAGNI
pista da ballo
NUOVO CIRCOLO SESTESE: LUOGO DI EVENTI_Il nuovo parterre
concerto
giochi d’acqua
pista di pattinaggio
CITTA’ DI SESTO CALENDE RIQUALIFICAZIONE CIRCOLO SESTESE Arch. CAMILLO MAGNI
pista da ballo
NUOVO CIRCOLO SESTESE: LUOGO DI EVENTI_Il nuovo parterre
concerto
giochi d’acqua
pista di pattinaggio
RAMP UPRAMP UP
LIVING
/DIN
ING
19'-7" x 11'-6"
LIVING
/DIN
ING
19'-7" x 11'-6"
BEDR
OO
M 1
11'-0" x 10'-10"
BEDR
OO
M 2
10'-8" x 11'-0"
FOYER
KITCH
EN
FOYER
KITCH
EN
BEDR
OO
M 1
11'-0" x 10'-10"
BATH 2
BATH 1
BEDR
OO
M 2
10'-8" x 11'-0"
CO
MM
ERC
IAL SPACE
TOILET
RM
1
TOILET
RM
2 STAIR
B
STAIR A
LOBBY
ENTR
ANC
E A
BATH 1
BATH 2
APA6
APA6
BPB
6
BPB
6
1PB73PB7
4PB72PB7
REAR
YARD
ENTR
ANC
E B
SIDEW
ALK
37'-0"
29'-3"
ELECTR
ICM
ETER R
OO
M ELEV.EQ
UIP.
TRASH
RO
OM
APB
6APB
6
BPB
6
BPB
6
LAUN
DR
Y RO
OMBU
ILDIN
GSTO
RAG
EBIC
YCLES/
STOR
AGE
FIRE
PUM
PSR
OO
M
GAS/W
ATERR
OO
M
CO
MM
ERC
IALSPAC
E
1PB4
BASEMEN
T1/8" = 1'-0"
2PB4
FIRST FLO
OR
PLAN1/8" = 1'-0"
SHEET N
O:
DR
AWN
BY:
FILE NAM
E:
PRO
JECT N
O:
SHEET TITLE:
CO
NSU
LTANTS:
CLIEN
T:
PRO
JECT:
ISSUED
FOR
:D
ATE:
442 West 151
ST Street New
York New
York 10031
ofÞce.sma@
earthlink.net 6 46 820 9178
MM
PACIFIC
PRO
JECT N
O
PB4First Floor Plan
SCOTT
NEW
BUILD
ING
AT:312-314 PA
CIFIC AVE
Jersey City N
J
MAHAFFEY
Proposed Basement and
CITY PLAN
NIN
G STAFF R
EVIEW032114
LIVING
/DIN
ING
20'-7" x 11'-6"
LIVING
/DIN
ING
20'-7" x 11'-6"
BEDR
OO
M 1
11'-0" x 10'-10"
BEDR
OO
M 2
10'-8" x 11'-0"
FOYER
KITCH
EN
FOYER
KITCH
EN
BEDR
OO
M 1
11'-0" x 10'-10"
BATH 2
BATH 1
BEDR
OO
M 2
10'-8" x 11'-0"
FOYER
FOYER
KITCH
EN
KITCH
EN
LIVING
/DIN
ING
20'-7" x 11'-6"
LIVING
/DIN
ING
15'-4" x 11'-6"
BEDR
OO
M 2
10'-7" x 11'-0"
BATH 1
BATH 2
BEDR
OO
M 1
11'-0" x 10'-10"
BATH BEDR
OO
M 1
12'-4" x 10'-10"
BEDR
OO
M 2
10'-0" x 8'-10"
STAIR A
STAIR B
BATH 1
BATH 2
BPB
6
BPB
6
APA6
APA6
STAIR B
ELEVATOR
PENTH
OU
SE
RO
OF
RO
OF
CO
ND
EN
SE
RS
CO
ND
EN
SE
RS
10'-0"
10'-0"
36" HIG
H PAR
APET
APA6
APA6
BPB
6
BPB
6
1PB5
TYPICAL FLO
OR
PLAN1/8" = 1'-0"
2PB5
RO
OF FLO
OR
PLAN1/8" = 1'-0"
SHEET N
O:
DR
AWN
BY:
FILE NAM
E:
PRO
JECT N
O:
SHEET TITLE:
CO
NSU
LTANTS:
CLIEN
T:
PRO
JECT:
ISSUED
FOR
:D
ATE:
442 West 151
ST Street New
York New
York 10031
ofÞce.sma@
earthlink.net 6 46 820 9178
MM
PACIFIC
PRO
JECT N
O
PB5R
oof Floor Plan
SCOTT
NEW
BUILD
ING
AT:312-314 PA
CIFIC AVE
Jersey City N
J
MAHAFFEY
Proposed Typical and
CITY PLAN
NIN
G STAFF R
EVIEW032114
SCOTT
PROPOSED NEW BUILDING AT 312-314 PACIFIC AVE Jersey City NJ
MAHAFFEYNORTHWEST (PACIFIC AVENUE) ELEVATIONScale 1/8" = 1'-0" Date 04/29/2014
ALUM AND GLASSSTOREFRONT
STAIR BBUILKHEADBEYOND
ELEVATORPENTHOUSEBEYOND
ACCONDENSERSBEYOND
42"HIGH GUARDBEYOND
314PACIFIC
AVE
BLUESTONE BASED WOOD DOORS AND TRIM
METAL PANEL
ALUM FIXED WINDOWS
HOLLOW METAL DOOR & FRAME
BUILDINGSIGNATURE
ALUM CASEMENT/FIXED WINDOWS
JOINT
BRICK
METAL PANEL
METAL COPING
CORNICEPROJECTION
METAL TRIM @ SIGN BAND/ FASCIA OVER COILING DOORS
JOINT
BRICK
ALUM CASEMENT/FIXED WINDOWS
METAL PANEL
CORNICEPROJECTION
METAL COPING
WOOD DOOR ALUM FIXED/WINDOWS
LINE OFCELLAR BELOW
FF @SECOND FLOOR12'0"
FF @FIRST FLOOR0"
FF @THIRD FLOOR22'6"
FF @FOUR FLOOR33'0"
FF @ROOF44'2"
FF @BASEMENT-8'2" (9.0' ASL)
(17.3' ASL)
S T O R ES T O R E
SCOTT
PROPOSED NEW BUILDING AT 312-314 PACIFIC AVE Jersey City NJ
MAHAFFEYSOUTHEAST (REAR YARD) ELEVATIONScale 1/8" = 1'-0" Date date
ADJACENTEXISTING3 STORYBUILDING
ADJACENTEXISTING4 STORYBUILDING
FF @SECOND FLOOR12'0"
FF @FIRST FLOOR0"
FF @THIRD FLOOR22'6"
FF @FOURTH FLOOR33'0"
FF @ROOF44'2"
FF @BASEMENT-8'2" (9.0' ASL)
(17.3' ASL)
STUCCO
STAIR BBUILKHEADBEYOND
6'0" HIGHWOOD FENCE
ALUM CASEMENT/FIXED WINDOWS
ELEVPENTHOUSEBEYOND
REARYARD
ACCONDENSERSBEYOND
LINE OF CELLAR BELOWWOODDOOR
JOINT
6'0" HIGHWOOD FENCE
METAL COPING
ALUM CASEMENT/FIXED WINDOWS
STOP
carga y descarga
carrettera 15Guadalajara-Tepic
techonologypark
L1060 mq
Banco200 mq
WC21 mq
L 0250 mq
L 0350 mq
L 0450 mq
L 0550 mq
L 0650 mq
L 0750 mq
L 0850 mq
Gourmet125 mq
Banco200 mq
L1160 mq
L1260 mq
L1360 mq
Lobby58 mq
3.00
9.85
3.00
3.00
3.00
RESTRICCION SCT
15.00
RESTRICCION MUNICIPIOL 09
100 mq
FT 0230 mq
FT 0322 mq
FT 0424 mq
FT 0524 mq
FT 0125 mq
FT 0624 mq
L 0124 mq
WC26 mq
Carga/Descarga47 mq
CONFIRMAR RESTRICCION
PLANTA BAJA m² 2350CIRCULACION m² 300AREAS VERDES m² 365ESTACIONAMENTO m² 3294
santoscoy TECHNOLOGY PARK
ESCALA 1:500
SCHEDA 3.1a_PROTOTIPO DI RIFERIMENTO
ALLINEAMENTO OBBLIGATORIO
PIANO TERRA
PIANO PRIMO
LIMITE AREA DI GALLEGGIAMENTO
with Paolo Citelli and Marco Olgiati
SAN CRISTOFORO & PORTA GENOVA
MASTER THESIS MENTIONED FOR MANTERO PRIZE
with Dancing Animation
2012_VOLUNTARY WORK_EARTHQUAKE-STRICKEN AREAS OF THE EMILIA ROMAGNA
with Malawi nel cuore
2011_MISSION IN MALAWI_ORPHANAGE ALLELUYA CARE CENTER AND NAMANDANJE PARISH
2009_VOLUNTARY WORK_EARTHQUAKE-STRICKEN AREAS OF THE ABRUZZO
with Dancing Animation
with Missioneros del Espiritu Santo
2007_MISSION IN MEXICO_”DEJA TU CASA Y VIEN” MATEHUALA DIOCESE
CMOArch. Mirco Monti
Milan (Italy)- Dakar (Senegal)mobile it> 0039 333 5297138mobile sn> 00221 70 783 95 60mail>[email protected]