cmc, 25 jan. 07 page 1 jaxa ccsds status january 25, 2007 cmc colorado springs, usa yoshitaka...

13
CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( [email protected] )

Upload: roger-ramsey

Post on 14-Jan-2016

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 1

JAXA CCSDS Status

January 25, 2007

CMC

Colorado Springs, USA

Yoshitaka Taromaru

JAXA CCSDS Secretary Office( [email protected] )

Page 2: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 2

JAXA CCSDS Principal Delegate and Staff membersPrincipal Delegate Junjiro Nakahara

Area WG/BOF Staff

SE Area Space/Ground Interoperability Architecture BOF 1 staff Takahiro Yamada

Delta-DOR SIG 1 staff Hiroshi Takeuchi

MOIMS Area Navigation WG 3 staff Mina Ogawa

Spacecraft Monitor & Control WG Yamada Takahiro

Makoto Kawai

CSS Area Service Management WG 1 staff Nobuhiro Yagi

Cross Support Transfer Services WG

SOIS Area Subnetwork Services WG 1 staff Hiroshi Anegawa

Application Support Service WG

Onboard Plug & Play BOF

SLS Area RF Modulation WG 2 staff Masanobu Yajima

Space Link Protocols WG Takahiro Yamada

High Rate Uplink WG

SIS Area CFDP Interoperability Testing WG 2 staff Yoshitaka Taromaru

Asynchronous Message Service WG Takahiro Yamada

JAXA CCSDS Secretary Office 3 staff Kaneaki Narita

Yoshitaka Taromaru

Kiyohisa Suzuki

Page 3: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 3

CCSDS Implementation Status

Spacecraft JAXA adopted AOS (including TM) and/or TC for 10 spacecrafts

was launched and 5 spacecrafts will be launched in the near future.

Other Japanese organization adopted AOS and/or TC for 4 spacecrafts was launched.

Mission / Time

Telecommunication, ţ Ű Ű ţ Ţ

Positioning, Engeneering expt. ETS-VII USERS SERVIS1 ETS-VIII WINDS

Earth Observation ţ ţ ALOS ŢADEOS-II GOSAT

Lunar and Planetary ţ ţ Ţ

Exploration PLANET-B MUSES-C SELENE

Astronomical Observation ţ ASTRO-EII ţ ţ ţASTRO-E ASTRO-F SOLAR-B

Meteorological Å° Å°MTSAT-1R MTSAT-2

ISS Program Ţ Ţ ŢJ EM HTV

ţ:JAXA's satellite was launchedŢ:JAXA's satellite will be launched

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Page 4: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 4

CCSDS Implementation Status

Overview of SELENE

SELENE will be launched by H-IIA rocket in FY 2007.

The SELenological and ENgineering Explorer "SELENE", Japan’s first large lunar explorer, will be launched by the H-IIA rocket in 2007.

The major objectives of the mission are to understand the Moon’s origin and evolution, and to observe the moon in various ways in order to utilize it in the future.

Main orbiter↑ ←VRAD sat. (Vstar)

←Relay sat. (Rstar)

Page 5: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 5

CCSDS Implementation Status

Overview of JEM

JEM will be launched by Space Shuttle in FY 2007.

The Japanese Experiment Module (JEM) "KIBO," the first Japanese manned experimental facility, will be docked to the ISS in 2007.

KIBO consists of two facilities. The Pressurized Module which is 11.2 metres long and 4.4 metres in diameter, will allow astronauts to work in a comfortable environment with air composition and pressure similar to Earth’s. The Exposed Facility will be a staging area for long-term experiments in open space, as well as Earth and astronomical observations. The Exposed Facility is a unique facility in that it enables astronauts to conduct experiments with direct exposure to space without any modification.

Page 6: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 6

CCSDS Implementation Status

Overview of WINDS

WINDS will be launched by H-IIA rocket in FY 2007.

WINDS will be launched by an H-IIA Launch Vehicle in the fiscal year 2007 to establish the world's most advanced information and telecommunications network.

The WINDS project is responsible for the demonstration of the validity and usefulness of technologies related to large-capacity data communications in our space infrastructure project, "i-Space," the purpose of which is to promote the use of satellites in such fields as Internet communications, education, medicine, disaster measures and Intelligent Transport Systems.

Page 7: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 7

CCSDS Implementation Status

Overview of GOSAT

GOSAT will be launched by H-IIA rocket in FY 2008.

GOSAT is a satellite that aims to contribute to the Kyoto Protocol by monitoring the distribution of the density of carbon dioxide, which is one Greenhouse gas. GOSAT is scheduled to be launched in 2008 August.

GOSAT will enable the precise monitoring of the density of carbon dioxide by combining global observation data sent from space with data obtained on land, and with simulation models.

Page 8: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 8

CCSDS Implementation Status

Space Link Service (SLS)[Implementation] JAXA ground network provides the Telecommand and AOS co

mpatible capability (5 domestic stations and 4 overseas stations)

Katsuura, Masuda, Okinawa, Usuda and Uchinoura (Domestic)Kiruna, Perth, Maspalomas and Santiago (Overseas)

Two refurbished antennas at Katsuura and Okinawa will be added to the network in FY2007.

[Under studying]

As coding method, Turbo Code Decoder compliant with CCSDS standard is under studying for deep space mission.

Page 9: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 9

Katsuura [KTU1, S-band, 10m] [KTU2, S-band, 13m]

Masuda [MSD1, S-band, 10m]

Okinawa [OKN1, S-band, 10m][OKN2, S-band, 18m]

Usuda [UDSC, S/X-band, 64m]

Uchinoura [USC, S/X-band, 34m/20m/10m]

Tsukuba Space Center [TKSC] Tracking And Control Center [TACC]

Maspalomas [MSP1, S-band, 10m]

Santiago [SNT1, S-band, 10m]

Kiruna [KRN1, S-band, 10m]

Perth [PRT1, S-band, 10m]

Data Relay Test Satellite [DRTS, S/Ka-band, 90.75degE]

Sagamihara Space Operation Center [SSOC]

JAXA Network location

CCSDS Implementation Status

Page 10: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 10

CCSDS Implementation Status

SLE Transfer Service

JAXA implemented SLE GW at TACC (Tracking And Control Center at Tsukuba) and SSOC (Sagamihara Space Operation Center) , and these GWs are supporting LEOP and routine operations of ASTRO-F and SOLAR-B.

SLE GW at SSOC is also enabling MUSES-C and SELENE mission to utilize JPL/DSN.

JAXA started coordination with ESA on SLE connection for future emergency cross support architecture.

Page 11: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 11

CCSDS Implementation Status

@ Tsukuba@ Tsukuba @ Sagamihara@ Sagamihara

Usuda DeepSpace Center

UchinouraSpace Center

GN SN DSN

JPLJPL

SLE(RAF / FCLTU)

MUSES-C, SELENE

SLE(RAF / FCLTU)

ALOS, ETS-VIII, WINDS, GOSAT,MUSES-C,

ASTRO-E2, ASTRO-F, SOLAR-B, SELENE,

INDEX, etc.

ESAESA

SLE GWSLE GWSLE GW

Tracking and Control Center

(TACC)

Sagamihara Space Operation Center

(SSOC)

JAXA CCSDS S/C

Under coordinationSLE

JAXA Internal SLE connection

ESTRACK

CNESCNES

Page 12: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 12

CCSDS Implementation Status

SLE Service Management

Based upon IOAG-10 discussion, JAXA started development of Service Management prototype system for interoperability test.

2007 2008

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 ~

SM Red-1 compliant prototype

SM Red-2 compliant prototype Development

Interoperability TestDevelopment

Page 13: CMC, 25 Jan. 07 Page 1 JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp

CMC, 25 Jan. 07 Page 13

CCSDS Implementation Status

MOIMS/Navigation

For SELENE mission, JAXA is implementing ODM module on Flight Dynamics System.

JAXA/ISAS VLBI staff joined Delta-DOR SIG for white book development with ESA and NASA to contribute toward standardization of Delta-DOR method and related data transfer service.