clou energy reference

2
China, Qinghai province, Yushu Start Operation : 2015 wer stations: 159 Capacity :3.087MW/5.2MWh Power:20kW to 160kW Application: Off-grid China, Sinkiang, Daban Cheng Start Operation : 2014 Application : Off-grid wind commercial power station System Size : 50kW/100kWh China, Shanghai, Shangzhong University Start Operation : 2014 Application : Micro-Grid power station System Size : 100kW/100kWh China, Hunan Province, Changsha Start Operation : 2014 Application : Industrial harvester Battery capacity : 16kWh Amount of ESS: 50 www.clouenergy.com

Upload: leon-zhang

Post on 12-Jan-2017

67 views

Category:

Documents


0 download

TRANSCRIPT

China, Qinghai province, Yushu Start Operation : 2015 wer stations: 159 Capacity :3.087MW/5.2MWh Power:20kW to 160kW Application: Off-grid

China, Sinkiang, Daban ChengStart Operation : 2014Application : Off-grid wind commercial power stationSystem Size : 50kW/100kWh

China, Shanghai, Shangzhong UniversityStart Operation : 2014Application : Micro-Grid power stationSystem Size : 100kW/100kWh

China, Hunan Province, ChangshaStart Operation : 2014Application : Industrial harvesterBattery capacity : 16kWhAmount of ESS: 50

www.clouenergy.com

2014System Size: 100kW/750kWh PV Installed Capacity: 240kWp

China, Qinghai Province, Qumalai Start Operation: 2014PV Installed Capacity: 7.203MWpLead Acid Battery Capacity:20.7MWhLFP Battery Capacity: 5MWh Application: Off-grid

System Size: 550W/4.8kWh Capacity: 6kWh

China, Gansu Province, YumenStart Operation: 2015PV Installed Capacity:15MWpWind Turbine Installed Capacity:10MWpSystem Size: 10MW/6MWh

www.clouenergy.com