closed coke slurry system (ccs system - refining...

27
www.triplan.com GERMANY Folie Nr. 1 Folie Nr. 1 www.triplan.com Closed Coke Slurry System (CCS System) Presenter Bernd Lankers [email protected] Co-Presenter Josef Wadle [email protected] TRIPLAN TRIPLAN AG Auf der Krautweide 32 65812 Baden Soden/Ts. www.triplan.com Coking and Catcracking Conference New Delhi, India – October 2013

Upload: votuyen

Post on 20-Mar-2018

256 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

GERMANY

Folie Nr. 1Folie Nr. 1

www.triplan.com

Closed Coke Slurry System (CCS System)

Presenter Bernd Lankers

[email protected] Wadle

[email protected]

TRIPLAN

TRIPLAN AGAuf der Krautweide 3265812 Baden Soden/Ts.www.triplan.com

Coking and Catcracking ConferenceNew Delhi, India – October 2013

Page 2: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 2Folie Nr. 2

The Future In Delayed Coker Operations…

The Closed Coke Slurry System

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 3: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

To understand the future a look at available coker solids handling systems:

PAD/PIT Systems Most common procedure for 95% of coker units Environmentally questionable Poor reliability record Difficult sludge handling Low cost design

Gravity Flow Dewatering Bin Systems Only one installation Expensive/ tall design Difficult sludge handling via decanter/ settling tank

Slurry Dewatering Bin System Coke & water is pumped into a dewatering bin Overflow of sludge and foam to settling tank/ skimming decanter Difficult sludge handling

Folie Nr. 3

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 4: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 4Folie Nr. 4

What can you expect from the new innovative

Closed Coke Slurry System…?

Fluidized operation:

A step change in coke handling operation

between cutting and load-out

Efficent coke dewatering

Environmentally sound system

Clever sludge & water management

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 5: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

How the CCS-system works:

No overflow of sludge & foam to settling tank

Total coke batch is used as filtration bed in the dewatering bin resultingin

Fast water entrainment within 6 hours

Effective fines retention of > 99.5 % in bed

Consequent separation of clean water from remaining settled fines via clean water basin

No further sludge handling required

Folie Nr. 5

Page 6: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Typical Economical opportunities compared to othersystems

(actual achivable return figures to be defined on a case by case basis)

Cycle time reduction with shorter drainage time: up to 4 hrs achivable forgreenfield coker E.g. 1 hour gain equiv. To 10 Mio €/year on uplift effect for clean products

Manpower savings (O&M) through consequent automatisation: 6…8 operators & technicans

Freshwater savings with remarkable steam plume reduction: approx. 300 m³/ Batch

No losses/ outage time for PAD/PIT repair work (e.g. crane & grizzly) E.g. 200 hours/ year equiv. To 5 Mio €/year on uplift effect for clean products

Space requirement savings of up to 90% compared to PAD/PIT systems forgreenfield coker

Folie Nr. 6

Page 7: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 7Folie Nr. 7

Environmental and Safety benefits…

Benchmark for zero dust coker, zero Volatile Organic Components (VOC's) & minimum steam plume losses

Creates safe and healthy environment for fellow workers and neighbourhood

Improves fire and accident records for coker units instantly

Effective fines- & water-management / mess free sludge handling

Unmatched system reliability (99,5% +) through unique design & construction features plus material selection

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 8: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 8

Cycle Time Reduction with shorter

drainage time up to 4 Hours

achievable for Greenfield Coker.

Downstream Equipment capacity

permitted.

Cycle Time Reduction enables

more clean Products

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 9: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 9Folie Nr. 9

Closed Coke Slurry System (CCS System)

NextPrev

Page 10: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 10Folie Nr. 10

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 11: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 11Folie Nr. 11

NextPrev

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 12: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

GERMANY

Folie Nr. 12Folie Nr. 12

8

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 13: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 13Folie Nr. 13

NextPrev

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 14: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 14Folie Nr. 14

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 15: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 15

The Crusher principle….

….acts as a bucket-wheel type device, serving multiple purposes:

Holding positively back the full coke batch – no avalanche surprises

Unlimited pulling/ ‘swallow’ capacity from upstream coke batch

Coping with any type of coke

Matches any impact loads & any cutting rates in future

Transporting and releasing uniformly crushed coke to downstream sluice

Independent high torque direct drive each roll

automatic chute raising and docking to drum flange or bottom valve

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 16: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 16

80 tons of special material

unique design and construction features

50 mm / 2” wall casing thickness

Coke Crusher assembly

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 17: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 17Folie Nr. 17

Unique system components & features provides safe, reliable and long life cycle operation

Double Roll Crusher with integrated Chute (Proprietary Design)

High Torque direct drive each roll

Crushing ratio 10:1; e.g. 1.000 mm --> 100 mm ; 40” --> 4” resp.

Safe & remote operation:

Hydraulic chute raising

Docking automatic to drum flange or bottom valve

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 18: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 18Folie Nr. 18

Closed Slurry Pipe

Design and construction for optimum slurry transportation

Special material selection for long life cycle

(Proprietary Design)

Design, construction and materials for long life cycle

Designed to run in cavitation region

Slurry Pump

(Proprietary Design)

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 19: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 19Folie Nr. 19

DEWATERING PRINCIPLES

Open Pile

Free water drainage is hampered by counterflow steam out

Dry surface, but wet central & floor region of pile (wet foot)

overall high water content remaining --> 'after-drainage' during transport

manual hosing down and handling of sludge via maze

Closed System Dewatering

Drum walls and cone section fitted with screens for uniform dewatering

Minimum travel time and short, uniform distances for water to screen

Standardized lump size of 4" /100 mm provides maximum free channels between coke for high water velocity

high water velocity results in maximum fines retention (sludge retention rate in Dewatering bin: 99,5 %)

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 20: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 20

DEWATERING IN A COKE PILE / OPEN PIT

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 21: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 21Folie Nr. 21

DEWATERING BINS (PROPRIETARY DESIGN)

0

10

20

30

40

50

60

70

80

90

100

0 0,5 1 1,5 2 2,5 3 3,5 4 4,5 5 5,5 6

Free

Wat

er in

Cok

e [ %

]

Dewatering Time [ Hours ]

Bin Dewatering Effect over Time

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 22: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 22

Typical Dewatering Schedule

Folie Nr. 22

hours 1 2 3 4 5 6 7 8 9 10 11 12

Drum decoking / cutting 3

Coke crushing ( In-Line ) 3

Instant coke dewatering in the dewatering bin 6

Coke transport/ load-out

Total Time for dewatering : 6 hours

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 23: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 23

Experience facts on an existing unit with over 6 Years operation,representing latest CCS-system technology

No dedicated field operators required

Maintenance free; reliability factor 99,5% +

6 Years uninterupted operation equivalent to 3.000 Cycles

No deterioration in the slurry & cutting water pump performances

No corrosion and erosion in the total CCS System

No fire, no incidents

Delivers commercially dry coke with 10% humidity

only 0.5% of coke fines ends in the slurry pit and pumped to next coke batch

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 24: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 24Folie Nr. 24

How Will The Closed Coke Slurry System Be Implemented?

Retrofit e.g. Replacement for Open PAD/ PIT Suitable for Multi-Drum Coker

footprint fits into any existing coker, maximum layout flexibility, even offsites

CCS-System footprint to suit in than idle open pit or elsewhere

Implementation within regular coker turnaround possible

Basin construction in concrete (UG) or steel work (AG) possible

Greenfield installation

takes away authorities environmental concerns during project approval phase

for optimum project embetting, early involvement in FEED phase suggested

higher throughput with shorter cycle time possible with planned-in of downstream equipment capacity reserve

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 25: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 25Folie Nr. 25

Immediate and sustainable Health, Safety and Environmental benefits

Payout time < 1.5 years for greenfield application achievable

Proven state-of-the-art technology

Automated operation

Typical refining process steps, high workers acceptance level

Summary - main advantages of the CCS-System

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 26: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 26

TYPICAL LAYOUT FOR 2 DRUM COKER

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)

Page 27: Closed Coke Slurry System (CCS System - Refining …refiningcommunity.com/wp-content/uploads/2017/07/Closed-Coke... · Closed Coke Slurry System (CCS System) Presenter ... Gravity

www.triplan.com

Folie Nr. 27Folie Nr. 27

Thanks for your attention

TRIPLAN AGAuf der Krautweide 32

D-65 812 Bad Soden/Ts.www.triplan.com [email protected]

India contact:[email protected]

Houston contact:[email protected]

CLOSED COKE SLURRY SYSTEM (CCS SYSTEM)