close-hipp building - 3rd floor uofsc restroom …purchasing.sc.edu/solicitations/drawings 20001...

11
DRAWING CONVENTIONS N A 1 View Name 1/8" = 1'-0" 1 1 A101 LEVEL NAME ELEVATION 1 A101 1 A101 1 A101 A101 A B C D REFERENCE SYMBOLS IDENTITY SYMBOLS LINE SYMBOLS CENTER LINE DEMOLISHED HIDDEN OVERHEAD PROPERTY LINE 1 HOUR RATING 2 HOUR RATING 3 HOUR RATING 4 HOUR RATING EXIT SEPARATION 1 2' - 0" 2' - 0" MATCH LINE 12 6 A401 2 BUILDING SECTION WALL SECTION ELEVATION INTERIOR ELEVATION EXTERIOR ELEVATION DIMENSION CONVENTIONS SLOPE CONVENTION COLUMN GRID BLOWUP DETAIL VIEW INDICATOR NORTH ARROW ELEVATION INDICATOR REVISION CLOUD # POUND OR NUMBER & AND @ AT A.C.T. ACOUSTICAL CEILING TILE A.F.F. ABOVE FINISHED FLOOR ALUM. ALUMINUM ANOD. ANODIZED APPROX. APPROXIMATE B.O. BOTTOM OF C.I.P. CAST IN PLACE C.J. CONTROL JOINT CLG. CEILING CLR. CLEAR CMU CONCRETE MASONRY UNIT COL. COLUMN CONC. CONCRETE CONT. CONTINUOUS CPT. CARPET C.T. CERAMIC TILE DEMO DEMOLISH DIA. DIAMETER DIM. DIMENSION DIMS. DIMENSIONS DN. DOWN DR. DOOR DWG. DRAWING EA. EACH ELEC. ELECTRICAL ELEV. ELEVATION OR ELEVATOR EPDM ETHYLENE PROPYLENE DIENE M - CLASS (ROOFING) EQ. EQUAL EXIST. EXISTING EXP. JT. EXPANSION JOINT EXT. EXTERIOR E.W.C. ELECTRIC WATER COOLER F.D. FLOOR DRAIN F.E. FIRE EXTINGUISHER F.E.C. FIRE EXTINGUISHER CABINET FLR. FLOOR F.O. FACE OF GA. GAUGE GALV. GALVANIZED GYP. GYPSUM GYP. BRD. GYPSUM WALLBOARD H. HIGH H.M. HOLLOW METAL HVAC HEATING, VENTILATION, AND AIR CONDITIONING INSUL. INSULATION MAX. MAXIMUM M.O. MASONRY OPENING MECH. MECHANICAL MIN. MINIMUM MTL. METAL N.I.C. NOT IN CONTRACT NO. NUMBER NOM. NOMINAL O.C. ON CENTER O.H. OVERHEAD O.P.C.I. OWNER PROVIDED CONTRATOR INSTALLED OPP. HAND OPPOSITE HAND PLYWD. PLYWOOD P.T. PRESSURE TREATED PVC POLYVINYL CHLORIDE R.C.P. REFLECTED CEILING PLAN R.D. ROOF DRAIN REQD. REQUIRED RM. ROOM SIM. SIMILAR SS STAINLESS STEEL STL. STEEL STRUCT. STRUCTURAL T TEMPERED T&G TONGUE AND GROOVE TELE. TELEPHONE TLT. TOILET T.O. TOP OF T.O.S. TOP OF STEEL TYP. TYPICAL U.O.N. UNLESS OTHERWISE NOTED V.I.F. VERIFY IN FIELD W. WIDTH W/ WITH WD. WOOD ABBREVIATIONS PROJECT INFORMATION NAME OF PROJECT: ADDRESS: PROPOSED USE: OWNER OR AUTHORIZED AGENT: OWNED BY: CODE ENFORCEMENT JURISDICTION: OFFICE OF THE STATE ENGINEER PROJECT DESIGN TEAM ARCHITECTURAL: CIVIL: STRUCTURAL: PLUMBING: FIRE PROTECTION: MECHANICAL: STUDIO 2LR, INC. -- DESIGNER FIRM ELECTRICAL: OTHER: SPRINKLER-STANDPIPE: CONTACT (803) 233-6602 PHONE # (---) -------- (---) -------- (803) 731-9834 (---) -------- (803) 731-9834 (---) -------- (803) 731-0650 (---) -------- BUILDING CODE SUMMARY CODE COMPLIANCE INTERNATIONAL BUILDING CODE: INTERNATIONAL PLUMBING CODE: INTERNATIONAL MECHANICAL CODE: INTERNATIONAL FIRE CODE: NATIONAL ELECTRIC CODE: ICC/ANSI - 117.1: 2018 EDITION WITH SC MODIFICATIONS 2018 EDITION ADA STANDARDS FOR ACCESSIBLE DESIGN 2018 EDITION 2018 EDITION WITH SC MODIFICATIONS 2017 EDITION 2017 EDITION BUILDING DATA CONSTRUCTION TYPE (TABLE 503): SPRINKLERS: STANDPIPES: FIRE DISTRICT: BUILDING HEIGHT: MEZZANINE: 1B YES - UNDER CONSTRUCTION BY OWNER / SEPARATE SCOPE OF WORK NO N/A FEET NO 118 NUMBER OF STORIES 8 UNLIMITED PER -- HIGH RISE: NO GROSS BUILDING AREA: FLOOR EXISTING (SQ. FT.) NEW (SQ. FT.) TOTAL 39,157 3RD FLOOR -- 39,157 EXIT REQUIREMENTS NUMBER AND ARRANGEMENTS OF EXITS EXIT WIDTH PLUMBING FIXTURE REQUIREMENTS -- MECHANICAL DESIGN INC. -- MECHANICAL DESIGN INC. -- BELKA ENGINEERING ASSOCIATES -- -- -- DANA FULMER -- JUSTIN VARCO -- JASON AREHART -- INTERNATIONAL ENERGY CONSERVATION CODE 2009 EDITION 2010 EDITION ANN DERRICK BUSINESS USC ADVISING RENOVATION FOR CLOSE SIDE 3RD FLOOR RESTROOMS 1705 COLLEGE STREET, COLUMBIA, SC UNIVERSITY OF SOUTH CAROLINA EXISTING EXITS TO REMAIN EXISTING EXIT WIDTH TO REMAIN EXISTING PLUMBING FIXTURE COUNTS TO REMAIN, REPLACEMENT OF EXISTING FIXTURES AND FINISHES. NOTE TO THE AUTHORITY HAVING JURISDICTION: THIS IS AN INTERIOR RENOVATION OF 2 GROUP TOILETS FOR FINISHES AND FIXTURES ONLY. HIPP SIDE CLOSE SIDE PROJECT NUMBER DATE THIS DRAWING AND THE DESIGN SHOWN THEREON ARE PROPERTY OF STUDIO 2LR, INC. THE REPRODUCTION, COPYING, OR OTHER USE OF THIS D RAWING WITHOUT WRITTEN CONSENT OF STUDIO 2LR, INC. IS PROHIBITED AND INFRINGEMENTS WILL BE SUBJECT TO LEGAL ACTION. STUDIO 2LR, INC. 2428 MAIN STREET COLUMBIA, SC 29201 P 803.233.6602 STUDIO2LR.COM CLIENT NAME PROJECT NAME LOCATION SHEET NAME SHEET NUMBER C D B A 3 2 1 1/4/2021 3:50:27 PM 20001 01/04/2021 CVR UofSC CLOSE-HIPP 3RD FLR TOILET RENOVAITONS COVER SHEET UNIVERSITY OF SOUTH CAROLINA ISSUED FOR BIDDING - 01/04/2021 1705 COLLEGE ST. COLUMBIA, SC DRAWING LIST SHEET NO. SHEET NAME CURRENT REVISION CURRENT REVISION DATE GENERAL CVR COVER SHEET ARCHITECTURAL DEMOLITION AD01 DEMOLITION PLANS ARCHITECTURE A101 FLOOR PLANS A121 REFLECTED CEILING PLANS A401 INTERIOR ELEVATIONS & TOILET DETAILS A701 FINISH SPECIFICATIONS & SCHEDULE PLUMBING P100 PLBG NOTES, SCHEDS AND SPECIFICATIONS P200 PLBG FLOOR PLANS - 3RD FLOOR MECHANICAL M101 HVAC RENOVATION FLOOR PLANS M301 HVAC NOTES, DTL'S, SCHD'S, AND SPECS ELECTRICAL E100 THIRD FLOOR RESTROOMS ELECTRICAL PLANS UofSC RESTROOM RENOVATIONS CLOSE - HIPP BUILDING - 3RD FLOOR COLUMBIA, SOUTH CAROLINA Note to Permitting Authority: Studio 2LR, Inc. and their consultants are not under contract with the Owner to provide construction administration services for this project. 1/32" = 1'-0" 2 THIRD FLOOR KEY PLAN N PLAN NORTH TRUE NORTH N REVISIONS NO. DATE DESCRIPTION

Upload: others

Post on 10-Feb-2021

11 views

Category:

Documents


0 download

TRANSCRIPT

  • DRAWING CONVENTIONS

    N

    A

    1

    View Name1/8" = 1'-0"

    1

    1A101

    LEVEL NAMEELEVATION

    1A101

    1A101

    1A101

    A101

    A

    B

    C

    D

    REFERENCE SYMBOLSIDENTITY SYMBOLS LINE SYMBOLS

    CENTER LINE

    DEMOLISHED

    HIDDEN

    OVERHEAD

    PROPERTY LINE

    1 HOUR RATING

    2 HOUR RATING

    3 HOUR RATING

    4 HOUR RATING

    EXIT SEPARATION

    1

    2' -

    0"

    2' -

    0"

    MATCH LINE

    126

    A401

    2

    BUILDING SECTION

    WALL SECTION

    ELEVATION

    INTERIOR ELEVATION

    EXTERIOR ELEVATION

    DIMENSION CONVENTIONS

    SLOPE CONVENTION

    COLUMN GRID

    BLOWUP DETAIL

    VIEW INDICATOR

    NORTH ARROW

    ELEVATION INDICATOR

    REVISION CLOUD

    # POUND OR NUMBER& AND@ ATA.C.T. ACOUSTICAL CEILING TILEA.F.F. ABOVE FINISHED FLOORALUM. ALUMINUMANOD. ANODIZEDAPPROX. APPROXIMATEB.O. BOTTOM OFC.I.P. CAST IN PLACEC.J. CONTROL JOINTCLG. CEILINGCLR. CLEARCMU CONCRETE MASONRY UNITCOL. COLUMNCONC. CONCRETECONT. CONTINUOUSCPT. CARPETC.T. CERAMIC TILEDEMO DEMOLISHDIA. DIAMETERDIM. DIMENSIONDIMS. DIMENSIONSDN. DOWNDR. DOORDWG. DRAWINGEA. EACHELEC. ELECTRICALELEV. ELEVATION OR ELEVATOREPDM ETHYLENE PROPYLENE DIENE M-CLASS (ROOFING)EQ. EQUALEXIST. EXISTINGEXP. JT. EXPANSION JOINTEXT. EXTERIORE.W.C. ELECTRIC WATER COOLERF.D. FLOOR DRAINF.E. FIRE EXTINGUISHERF.E.C. FIRE EXTINGUISHER CABINETFLR. FLOORF.O. FACE OF

    GA. GAUGEGALV. GALVANIZEDGYP. GYPSUMGYP. BRD. GYPSUM WALLBOARDH. HIGHH.M. HOLLOW METALHVAC HEATING, VENTILATION, AND AIR CONDITIONINGINSUL. INSULATIONMAX. MAXIMUMM.O. MASONRY OPENINGMECH. MECHANICALMIN. MINIMUMMTL. METALN.I.C. NOT IN CONTRACTNO. NUMBERNOM. NOMINALO.C. ON CENTERO.H. OVERHEADO.P.C.I. OWNER PROVIDED CONTRATOR INSTALLEDOPP. HAND OPPOSITE HANDPLYWD. PLYWOODP.T. PRESSURE TREATEDPVC POLYVINYL CHLORIDER.C.P. REFLECTED CEILING PLANR.D. ROOF DRAINREQD. REQUIREDRM. ROOMSIM. SIMILARSS STAINLESS STEELSTL. STEELSTRUCT. STRUCTURALT TEMPEREDT&G TONGUE AND GROOVETELE. TELEPHONETLT. TOILETT.O. TOP OFT.O.S. TOP OF STEELTYP. TYPICALU.O.N. UNLESS OTHERWISE NOTEDV.I.F. VERIFY IN FIELDW. WIDTHW/ WITHWD. WOOD

    ABBREVIATIONSPROJECT INFORMATIONNAME OF PROJECT:ADDRESS:PROPOSED USE:OWNER OR AUTHORIZED AGENT:OWNED BY:CODE ENFORCEMENT JURISDICTION: OFFICE OF THE STATE ENGINEER

    PROJECT DESIGN TEAM

    ARCHITECTURAL:CIVIL:STRUCTURAL:PLUMBING:FIRE PROTECTION:MECHANICAL:

    STUDIO 2LR, INC.--

    DESIGNER FIRM

    ELECTRICAL:OTHER:

    SPRINKLER-STANDPIPE:

    CONTACT

    (803) 233-6602

    PHONE #

    (---) --------(---) --------(803) 731-9834(---) --------(803) 731-9834(---) --------(803) 731-0650(---) --------

    BUILDING CODE SUMMARY

    CODE COMPLIANCEINTERNATIONAL BUILDING CODE:INTERNATIONAL PLUMBING CODE:INTERNATIONAL MECHANICAL CODE:INTERNATIONAL FIRE CODE:NATIONAL ELECTRIC CODE:

    ICC/ANSI - 117.1:

    2018 EDITION WITH SC MODIFICATIONS2018 EDITION

    ADA STANDARDS FOR ACCESSIBLE DESIGN

    2018 EDITION2018 EDITION WITH SC MODIFICATIONS2017 EDITION

    2017 EDITION

    BUILDING DATACONSTRUCTION TYPE (TABLE 503):SPRINKLERS:STANDPIPES:FIRE DISTRICT:BUILDING HEIGHT:MEZZANINE:

    1BYES - UNDER CONSTRUCTION BY OWNER / SEPARATE SCOPE OF WORK NON/A

    FEETNO

    118 NUMBER OF STORIES8 UNLIMITED PER --

    HIGH RISE: NO

    GROSS BUILDING AREA:FLOOR EXISTING (SQ. FT.) NEW (SQ. FT.) TOTAL

    39,1573RD FLOOR -- 39,157

    EXIT REQUIREMENTS

    NUMBER AND ARRANGEMENTS OF EXITS

    EXIT WIDTH

    PLUMBING FIXTURE REQUIREMENTS

    --MECHANICAL DESIGN INC.--MECHANICAL DESIGN INC.--BELKA ENGINEERING ASSOCIATES--

    ----DANA FULMER--JUSTIN VARCO--JASON AREHART--

    INTERNATIONAL ENERGY CONSERVATION CODE 2009 EDITION

    2010 EDITION

    ANN DERRICKBUSINESS

    USC ADVISING RENOVATION FOR CLOSE SIDE 3RD FLOOR RESTROOMS1705 COLLEGE STREET, COLUMBIA, SC

    UNIVERSITY OF SOUTH CAROLINA

    EXISTING EXITS TO REMAIN

    EXISTING EXIT WIDTH TO REMAIN

    EXISTING PLUMBING FIXTURE COUNTS TO REMAIN, REPLACEMENT OF EXISTING FIXTURES AND FINISHES.

    NOTE TO THE AUTHORITY HAVING JURISDICTION:THIS IS AN INTERIOR RENOVATION OF 2 GROUP TOILETS FOR FINISHES AND FIXTURES ONLY.

    HIPP SIDE

    CLOSE SIDE

    PROJECT NUMBER

    DATETHI

    S DR

    AWIN

    G A

    ND T

    HE D

    ESIG

    N SH

    OW

    N TH

    EREO

    N AR

    E PR

    OPE

    RTY

    OF

    STUD

    IO 2

    LR, I

    NC.

    THE

    REPR

    ODU

    CTIO

    N, C

    OPY

    ING

    , OR

    OTH

    ER U

    SE O

    F TH

    IS D

    RAW

    ING

    WIT

    HOUT

    WRI

    TTEN

    CO

    NSEN

    T O

    F ST

    UDIO

    2LR

    , INC

    . IS

    PRO

    HIBI

    TED

    AND

    INFR

    ING

    EMEN

    TS W

    ILL

    BE S

    UBJE

    CT T

    O L

    EGAL

    ACT

    ION.

    STU

    DIO

    2LR

    , IN

    C.

    24

    28

    MA

    IN S

    TR

    EE

    TC

    OLU

    MB

    IA, S

    C2

    92

    01

    P 8

    03

    .23

    3.6

    60

    2S

    TU

    DIO

    2LR

    .CO

    M

    CLI

    EN

    T N

    AM

    E

    PR

    OJE

    CT

    NA

    ME

    LOC

    ATI

    ON

    SHEET NAME

    SHEET NUMBER

    C DBA

    32

    1

    1/4/

    2021

    3:5

    0:27

    PM

    20001

    01/04/2021

    CVR

    Uo

    fSC

    CLO

    SE

    -HIP

    P 3

    RD

    FLR

    TOIL

    ET

    RE

    NO

    VA

    ITO

    NS

    COVER SHEET

    UN

    IVE

    RS

    ITY

    OF

    SO

    UTH

    CA

    RO

    LIN

    A

    ISS

    UE

    D F

    OR

    BID

    DIN

    G -

    01/0

    4/20

    21

    1705

    CO

    LLE

    GE

    ST.

    CO

    LUM

    BIA

    , SC

    DRAWING LIST

    SHEET NO. SHEET NAMECURRENTREVISION

    CURRENTREVISION

    DATE

    GENERALCVR COVER SHEET

    ARCHITECTURAL DEMOLITIONAD01 DEMOLITION PLANS

    ARCHITECTUREA101 FLOOR PLANSA121 REFLECTED CEILING PLANSA401 INTERIOR ELEVATIONS & TOILET DETAILSA701 FINISH SPECIFICATIONS & SCHEDULE

    PLUMBINGP100 PLBG NOTES, SCHEDS AND SPECIFICATIONSP200 PLBG FLOOR PLANS - 3RD FLOOR

    MECHANICALM101 HVAC RENOVATION FLOOR PLANSM301 HVAC NOTES, DTL'S, SCHD'S, AND SPECS

    ELECTRICALE100 THIRD FLOOR RESTROOMS ELECTRICAL PLANS

    UofSC RESTROOM RENOVATIONSCLOSE-HIPP BUILDING - 3RD FLOOR

    COLUMBIA, SOUTH CAROLINA

    Note to Permitting Authority: Studio 2LR, Inc. and their consultants are not under contract with the Owner to provide construction administration services for this project. 1/32" = 1'-0"

    2 THIRD FLOOR KEY PLANN

    PLAN NORTH

    TRUE NORTH

    N

    REVISIONS

    NO. DATE DESCRIPTION

  • CHASECHASE

    MEN336 WOMEN

    382

    X XX

    NO WORK THIS AREA

    NO WORK THIS AREA

    NO WORK THIS AREA

    NO WORK THIS AREANO WORK THIS AREA

    AD013

    AD015

    CHASECHASE

    NO WORK THIS AREA

    NO WORK THIS AREA

    NO WORK THIS AREA

    NO WORK THIS AREANO WORK THIS AREA

    MEN336 WOMEN

    382

    AD014

    AD016

    GENERAL DEMOLITION NOTES1. EXISTING CONDITIONS AND DEMOLITION NOTES BASED ON EXISTING DRAWINGS BUT NOT ON AS BUILTS. GENERAL CONTRACTOR TO FIELD VERIFY CONDITIONS PRIOR TO START OF CONSTRUCTION. IF GENERAL CONTRACTOR DISCOVERS EXISTING CONDITIONS DIFFER FROM THOSE SHOWN, NOTIFY OWNER OR ARCHITECT IMMEDIATELY.2. GENERAL CONTRACTOR TO PROTECT ALL ADJACENT SURFACES TO REMAIN FROM DAMAGE DURING DEMOLITION. GENERAL CONTRACTOR TO REPAIR/REPLACE ANY ADJACENT SURFACES DAMAGED DURING CONSTRUCTION TO MATCH ORIGINAL CONDITIONS.

    SELECTIVE DEMOLITION1. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT REQUIRED BY NEW CONSTRUCTION AND AS INDICATED. USE METHODS REQUIRED TO COMPLETE THE WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS.2. PROCEED WITH SELECTIVE DEMOLITION SYSTEMATICALLY, FROM HIGHER TO LOWER LEVEL.3. DISPOSE OF DEMOLISHED ITEMS AND MATERIALS PROMPTLY. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED, SALVAGED, REINSTALLED, OR OTHERWISE INDICATED TO REMAIN, REMOVE DEMOLISHED MATERIALS FROM SITE AND LEGALLY DISPOSE OF THEM IN AN EPA-APPROVED LANDFILL. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.4. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS. MAINTAIN PORTABLE FIRE SUPPRESSION DEVICES DURING FLAME-CUTTING OPERATIONS.5. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES.6. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR UNSUITABLE MATERIALS AND PROMPTLY DISPOSE OF OFF-SITE.7. LOCATE SELECTIVE DEMOLITION EQUIPMENT AND REMOVE DEBRIS AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE LOADS ON SUPPORTING WALLS, FLOORS OR FRAMING.8. SALVAGE ALL WINDOW TREATMENTS FROM EXISTING WINDOW UNITS TO BE REMOVED.9. REMOVE AND LEGALLY DISPOSE ALL EXISTING PLANT MATERIAL.

    UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS1. EXISTING SERVICES/SYSTEMS: MAINTAIN EXISTING SERVICES AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS.2. SERVICE/SYSTEM REQUIREMENTS: LOCATE, IDENTIFY, DISCONNECT AND SEAL OR CAP OFF INDICATED UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS SERVICING AREAS TO BE SELECTIVELY DEMOLISHED.

    MASONRY1. DEMOLISH IN SMALL SECTIONS. CUT MASONRY AT JUNCTURES WITH CONSTRUCTION TO REMAIN, USING POWER-DRIVEN SAW, THEN REMOVE MASONRY BETWEEN SAW CUTS.

    CLEANING1. CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST, DIRT AND DEBRIS CAUSED BY SELECTIVE DEMOLITION OPERATIONS. RETURN ADJACENT AREAS TO CONDITION EXISTING BEFORE SELECTIVE DEMOLITION OPERATIONS BEGAN.

    TEMPORARY SHORING1. PROVIDE AND MAINTAIN SHORING, BRACING AND STRUCTURAL SUPPORTS AS REQUIRED TO PRESERVE STABILITY AND PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF CONSTRUCTION AND FINISHES TO REMAIN, AND TO PREVENT UNEXPECTED OR UNCONTROLLED MOVEMENT OR COLLAPSE OF CONSTRUCTION BEING DEMOLISHED. STRENGTHEN OR ADD NEW SUPPORTS WHEN REQUIRED DURING PROGRESS OF SELECTIVE DEMOLITION.

    DEMOLITION PLAN NOTESDP1. EXISTING SHEETROCK JOINT COMPOUND ON CLOSE SIDE HAS TESTED POSITIVE FOR ASBESTOS. ALL

    SHEETROCK DISTURBANCE, REMOVAL & ABATEMENT IN THESE AREAS TO BE COORDINATED BY OWNER UNDER SEPARATE CONTRACT & SCOPE OF WORK.

    DP2. REMOVE EXISTING CERAMIC WALL TILE COMPLETE. PREPARE WALLS FOR CERAMIC WALL TILE.DP3. REMOVE EXISTING CERAMIC FLOOR TILE AND MARBLE THRESHOLDS COMPLETE. PREPARE SUBFLOOR FOR

    FLOATING, LEVEL CERAMIC FLOOR TILE.DP4. EXISTING ACOUSTICAL CEILING GRID AND TILE TO REMAIN. DP5. REMOVE EXISTING LIGHTS COMPLETE.DP6. REMOVE EXISTING CERAMIC BASE COMPLETE. PREPARE WALL FOR FINISHES.DP7. REMOVE EXISTING TOILET ACCESSORIES. DELIVER TO OWNER.DP8. REMOVE EXISTING TOILET PARTITIONS COMPLETE. PATCH AND REPAIR WALLS FOR TOILET PARTITIONS.DP9. REMOVE EXISTING SINKS AND VANITIES COMPLETE. PATCH AND REPAIR WALLS FOR SINKS AND VANITIES.DP10. REMOVE EXISTING TOILETS AND URINALS COMPLETE.DP11. REMOVE EXISTING CEILING GRID, TILE, AND GRILLES COMPLETE.DP12. EXISTING DOOR AND FRAME TO REMAIN. PROTECT DURING DEMOLITION AND CONSTRUCTION.

    MEN336

    DP1DP2DP3DP5DP6DP7DP8DP9DP10DP11

    DP12

    MEN336

    DP5 DP5

    DP11

    DP5 DP5

    WOMEN382

    DP1DP2DP3DP4DP5DP6DP7DP8DP9DP10

    DP12

    WOMEN382

    DP4

    DP5

    DP5

    DP5

    PROJECT NUMBER

    DATETHI

    S DR

    AWIN

    G A

    ND T

    HE D

    ESIG

    N SH

    OW

    N TH

    EREO

    N AR

    E PR

    OPE

    RTY

    OF

    STUD

    IO 2

    LR, I

    NC.

    THE

    REPR

    ODU

    CTIO

    N, C

    OPY

    ING

    , OR

    OTH

    ER U

    SE O

    F TH

    IS D

    RAW

    ING

    WIT

    HOUT

    WRI

    TTEN

    CO

    NSEN

    T O

    F ST

    UDIO

    2LR

    , INC

    . IS

    PRO

    HIBI

    TED

    AND

    INFR

    ING

    EMEN

    TS W

    ILL

    BE S

    UBJE

    CT T

    O L

    EGAL

    ACT

    ION.

    STU

    DIO

    2LR

    , IN

    C.

    24

    28

    MA

    IN S

    TR

    EE

    TC

    OLU

    MB

    IA, S

    C2

    92

    01

    P 8

    03

    .23

    3.6

    60

    2S

    TU

    DIO

    2LR

    .CO

    M

    CLI

    EN

    T N

    AM

    E

    PR

    OJE

    CT

    NA

    ME

    LOC

    ATI

    ON

    SHEET NAME

    SHEET NUMBER

    C DBA

    32

    1

    1/4/

    2021

    3:5

    0:22

    PM

    20001

    01/04/2021

    AD01

    Uo

    fSC

    CLO

    SE

    -HIP

    P 3

    RD

    FLR

    TOIL

    ET

    RE

    NO

    VA

    ITO

    NS

    DEMOLITION PLANS

    UN

    IVE

    RS

    ITY

    OF

    SO

    UTH

    CA

    RO

    LIN

    A

    ISS

    UE

    D F

    OR

    BID

    DIN

    G -

    01/0

    4/20

    21

    1705

    CO

    LLE

    GE

    ST.

    CO

    LUM

    BIA

    , SC

    1/8" = 1'-0"1DEMOLITION PLAN

    1/8" = 1'-0"2THIRD FLOOR REFLECTED CEILING DEMOLITION PLAN

    N

    PLAN NORTH

    TRUE NORTH

    N

    N

    PLAN NORTH

    TRUE NORTH

    N

    1/4" = 1'-0"3ENLARGED DEMOLITION PLAN - 336

    1/4" = 1'-0"4ENLARGED DEMOLITION RCP - 336 1/4" = 1'-0"5

    ENLARGED DEMOLITION PLAN - 3821/4" = 1'-0"6ENLARGED DEMOLITION RCP - 382

    N

    PLAN NORTH

    TRUE NORTH

    N N

    PLAN NORTH

    TRUE NORTH

    N N

    PLAN NORTH

    TRUE NORTH

    N N

    PLAN NORTH

    TRUE NORTH

    N

    REVISIONS

    NO. DATE DESCRIPTION

  • CHASECHASE

    MEN336

    WOMEN382

    NO WORK THIS AREA

    NO WORK THIS AREA

    NO WORK THIS AREA

    NO WORK THIS AREANO WORK THIS AREA

    A1013

    A1014

    MEN336

    TA1

    TA1

    TA1

    TA2

    TA2

    TA5

    TA7

    TA12A401

    5

    A4012 4

    10' - 6" V.I.F.

    V.I.F

    .

    3'-0

    "

    V.I.F

    .

    2'-1

    1"

    V.I.F

    .

    2'-1

    1"

    V.I.F

    .

    2'-2

    "

    V.I.F

    .

    2'-3

    "

    V.I.F

    .

    2'-3

    "

    V.I.F

    .

    2'-2

    "

    V.I.F

    .

    1' -

    1"

    V.I.F

    .

    2' -

    3"

    V.I.F

    .

    2' -

    3"

    V.I.F

    .

    2' -

    3"

    V.I.F

    .

    1' -

    6"

    V.I.F

    .

    3' -

    0"

    V.I.F

    .

    2' -

    11"

    V.I.F

    .

    1' -

    5"

    2' - 0" 5' - 0"

    2' -

    0"

    FD

    NOTE 3

    TA7

    TA5

    8' -

    10" V

    .I.F.

    EXISTING AMBULATORY STALL

    WOMEN382

    TA5

    TA5

    TA12 TA7TA1TA10

    TA1TA10

    TA1TA10

    TA1TA10

    TA1TA10TA2

    TA2

    A401 83

    V.I.F

    .

    1'-5

    "

    V.I.F

    .

    2'-1

    1"

    V.I.F

    .

    2'-1

    1"

    V.I.F

    .

    2'-1

    1"

    V.I.F

    .

    3'-0

    "

    V.I.F

    .

    1'-6

    "

    5' - 0" 2' - 0"

    10' -

    0" V

    .I.F.

    V.I.F

    .

    3'-1

    "

    V.I.F

    .

    2'-1

    1"

    V.I.F

    .

    2'-1

    1"

    V.I.F

    .

    2'-1

    1"

    V.I.F

    .

    2'-1

    0"

    FD

    NOTE 3

    TA7

    TA11

    14' -

    8" V

    .I.F.

    EXISTING AMBULATORY

    STALL

    EQEQ

    PROJECT NUMBER

    DATETHI

    S DR

    AWIN

    G A

    ND T

    HE D

    ESIG

    N SH

    OW

    N TH

    EREO

    N AR

    E PR

    OPE

    RTY

    OF

    STUD

    IO 2

    LR, I

    NC.

    THE

    REPR

    ODU

    CTIO

    N, C

    OPY

    ING

    , OR

    OTH

    ER U

    SE O

    F TH

    IS D

    RAW

    ING

    WIT

    HOUT

    WRI

    TTEN

    CO

    NSEN

    T O

    F ST

    UDIO

    2LR

    , INC

    . IS

    PRO

    HIBI

    TED

    AND

    INFR

    ING

    EMEN

    TS W

    ILL

    BE S

    UBJE

    CT T

    O L

    EGAL

    ACT

    ION.

    STU

    DIO

    2LR

    , IN

    C.

    24

    28

    MA

    IN S

    TR

    EE

    TC

    OLU

    MB

    IA, S

    C2

    92

    01

    P 8

    03

    .23

    3.6

    60

    2S

    TU

    DIO

    2LR

    .CO

    M

    CLI

    EN

    T N

    AM

    E

    PR

    OJE

    CT

    NA

    ME

    LOC

    ATI

    ON

    SHEET NAME

    SHEET NUMBER

    C DBA

    32

    1

    1/4/

    2021

    3:5

    0:02

    PM

    20001

    01/04/2021

    A101

    Uo

    fSC

    CLO

    SE

    -HIP

    P 3

    RD

    FLR

    TOIL

    ET

    RE

    NO

    VA

    ITO

    NS

    FLOOR PLANS

    UN

    IVE

    RS

    ITY

    OF

    SO

    UTH

    CA

    RO

    LIN

    A

    ISS

    UE

    D F

    OR

    BID

    DIN

    G -

    01/0

    4/20

    21

    1705

    CO

    LLE

    GE

    ST.

    CO

    LUM

    BIA

    , SC

    1/8" = 1'-0"1THIRD FLOOR PLAN

    1/4" = 1'-0"3ENLARGED PLAN - 336

    1/4" = 1'-0"4ENLARGED PLAN - 382

    N

    PLAN NORTH

    TRUE NORTH

    N

    N

    PLAN NORTH

    TRUE NORTH

    NN

    PLAN NORTH

    TRUE NORTH

    N

    FLOOR PLAN NOTES

    1. CONTRACTOR VERIFY EXISTING FLOOR DRAIN LOCATIONS AND COORDINATE WITH TILE SPECIFICATIONS AND INSTALLATION PER MANUFACTURERS WRITTEN INSTRUCTIONS. TILE INSTALLATIONS TO MEET NTMA GUIDELINES.

    2. EXISTING PLUMBING CONNECTIONS TO BE REUSED. COORDINATE PLUMBING FIXTURES WITH PLUMBING DRAWINGS.

    3. EXISTING DOORS TO REMAIN. PROTECT DURING DEMOLITION AND CONSTRUCTION. CLEAN DOORS AND PAINT DOOR FRAMES P1.

    4. ALL EXISTING CONDITIONS AND DIMENSIONS TO BE FIELD VERIFIED.5. REFERENCE DEMOLITION PLANS FOR EXTENT OF DEMOLITION.

    REVISIONS

    NO. DATE DESCRIPTION

  • X'-X" AFF CEILING HEIGHT ABOVE FINISHED FLOOR

    REFLECTED CEILING PLAN LEGEND

    2'x2' LIGHTING FIXTURE

    2'x4' LIGHTING FIXTURE

    GYPSUM BOARD CEILING. HEIGHT VARIES.

    2'x2' MECHANICAL DIFFUSER

    2'x2' MECHANICAL RETURN

    2'x2' ACOUSTICAL CEILING TILE. HEIGHT VARIES.

    EF EXHAUST FAN 1'x4' LIGHTING FIXTURE

    RECESSED CAN LIGHT

    REFLECTED CEILING PLAN NOTES1. EXISTING ACOUSTICAL CEILING GRID AND TILE IN ROOM 382 TO REMAIN.2. ACOUSTICAL CEILING GRID AND TILE IN ROOM 336 TO BE CONTRACTOR PROVIDED.3. THIS BUILDING CONTAINS ASBESTOS. ASBESTOS ABATEMENT, AS REQUIRED FOR THE SCOPE OF

    WORK, TO BE PROVIDED BY OWNER. CONTRACTOR TO ASSESS ALL AREAS UNDER SCOPE OF WORK TO DETERMINE IF ABATEMENT HAS BEEN COMPLETED PRIOR TO COMMENCING WORK. IF ANY ADDITIONAL AREAS REQUIRE ABATEMENT TO ACHIEVE COMPLETED PROJECT, CONTRACTOR IS TO STOP WORK IN AFFECTED AREA AND IMMEDIATELY CONTACT THE OWNER FOR REVIEW, ASSESSMENT, AND ABATEMENT IF REQUIRED.

    4. ALL PROJECT CEILINGS AND CEILING ELEMENTS TO BE INSTALLED PER THE REQUIREMENTS OF SEISMIC DESIGN CATEGORY C PER IBC 2018 UNLESS NOTED OTHERWISE IN THE PROJECT DOCUMENTS. GC COORDINATE WITH ARCHITECT/ INTERIOR DESIGNER AS NEEDED.

    5. COORDINATE MECHANICAL GRILLE LOCATIONS WITH MECHANICAL DRAWINGS.6. COORDINATE LIGHT FIXTURES WITH ELECTRICAL DRAWINGS.

    CHASECHASE

    NO WORK THIS AREA

    NO WORK THIS AREA

    NO WORK THIS AREA

    NO WORK THIS AREANO WORK THIS AREA

    MEN336 WOMEN

    382A1212

    A1215

    MEN336

    9' - 0"

    SEE NOTE 2.

    WOMEN382

    9' - 0"

    SEE NOTE 1.

    PROJECT NUMBER

    DATETHI

    S DR

    AWIN

    G A

    ND T

    HE D

    ESIG

    N SH

    OW

    N TH

    EREO

    N AR

    E PR

    OPE

    RTY

    OF

    STUD

    IO 2

    LR, I

    NC.

    THE

    REPR

    ODU

    CTIO

    N, C

    OPY

    ING

    , OR

    OTH

    ER U

    SE O

    F TH

    IS D

    RAW

    ING

    WIT

    HOUT

    WRI

    TTEN

    CO

    NSEN

    T O

    F ST

    UDIO

    2LR

    , INC

    . IS

    PRO

    HIBI

    TED

    AND

    INFR

    ING

    EMEN

    TS W

    ILL

    BE S

    UBJE

    CT T

    O L

    EGAL

    ACT

    ION.

    STU

    DIO

    2LR

    , IN

    C.

    24

    28

    MA

    IN S

    TR

    EE

    TC

    OLU

    MB

    IA, S

    C2

    92

    01

    P 8

    03

    .23

    3.6

    60

    2S

    TU

    DIO

    2LR

    .CO

    M

    CLI

    EN

    T N

    AM

    E

    PR

    OJE

    CT

    NA

    ME

    LOC

    ATI

    ON

    SHEET NAME

    SHEET NUMBER

    C DBA

    32

    1

    1/4/

    2021

    3:5

    0:09

    PM

    20001

    01/04/2021

    A121

    Uo

    fSC

    CLO

    SE

    -HIP

    P 3

    RD

    FLR

    TOIL

    ET

    RE

    NO

    VA

    ITO

    NS

    REFLECTED CEILINGPLANS

    UN

    IVE

    RS

    ITY

    OF

    SO

    UTH

    CA

    RO

    LIN

    A

    ISS

    UE

    D F

    OR

    BID

    DIN

    G -

    01/0

    4/20

    21

    1705

    CO

    LLE

    GE

    ST.

    CO

    LUM

    BIA

    , SC

    1/8" = 1'-0"1THIRD FLOOR REFLECTED CEILING PLAN

    1/4" = 1'-0"2ENLARGED RCP - 336

    1/4" = 1'-0"5ENLARGED RCP - 382

    N

    PLAN NORTH

    TRUE NORTH

    N

    N

    PLAN NORTH

    TRUE NORTH

    N N

    PLAN NORTH

    TRUE NORTH

    N

    REVISIONS

    NO. DATE DESCRIPTION

  • TOILET ACCESSORY NOTES1. GC COORD. ALL ACCESSORIES WITH OWNER.2. INSTALL ALL TOILET ACCESSORIES PER MANUFACTURER'S WRITTEN INSTRUCTIONS AND PER ADA AND ANSI A117.1 GUIDELINES AS REQUIRED.3. GC FURNISH AND INSTALL BLOCKING AS REQUIRED FOR ALL TOILET ACCESSORIES.4. INSTALL ADA SIGNAGE PER ADA AND ANSI A117.15. COORDINATE INSTALLATION OF LED LIT MIRRORS WITH ELECTRICAL DRAWINGS.

    TOILET ACCESSORIES

    TA1 TOILET TISSUE DISPENSERTA2 GRAB BAR 42"TA3 GRAB BAR 36"TA4 GRAB BAR 18" VERTICALTA5 SOAP DISPENSERTA6 NOT USEDTA7 PAPER TOWEL DISPENSERTA8 NOT USEDTA9 NOT USEDTA10 SANITARY NAPKIN DISPOSALTA11 BABY CHANGIN STATIONTA12 FULL LENGTH MIRROR

    TOP

    OF

    RIM

    17" M

    AX.

    TO O

    PER

    ABLE

    PAR

    T O

    F FI

    XTU

    RE

    48" M

    AX.

    TA7 - PAPER TOWELDISPENSER

    TA7

    URINAL

    MIN

    .

    9"

    MIN

    .

    27" M

    IN. MIN.

    8"

    MAX.

    6"

    34" M

    AX.

    24" -

    30"

    TA10 - SANITARY NAPKIN

    DISPOSAL

    LAVATORY

    TA10

    TO

    OPE

    RAB

    LE

    DEV

    ICE

    17" -

    19"

    TA1

    DOUBLE TOILETPAPER DISPENSER

    44" -

    48"

    TA5

    TA5 - WALL MOUNTED

    SOAP DISPENSER

    18" M

    IN.

    39" - 41"

    TA1

    TA2TA3

    TA4

    TA3TA2

    TA4

    WATER CLOSETTA1 - TOILET PAPER DISPENSER

    TA2 - 42" GRAB BARTA3 - 36" GRAB BAR

    TA4 - 18" VERTICAL GRAB BAR

    7" - 9"

    12" MIN.

    18" MIN.

    TA12

    TA12 - FULL LENGTH MIRROR

    2' - 0"

    5' -

    0"

    TOP

    OF

    SEAT

    17" -

    19"

    MAX

    .

    33" -

    39"

    TO

    P O

    F BA

    R

    15" M

    IN.

    TA11 - BABY CHANGING STATION

    2' -

    4 3/

    4"

    PL1

    C1

    T1. FULL TILE AT TOP OF WALL. ALIGN GROUT

    JOINTS WITH FLOOR TILE GROUT JOINTS.

    LED LIT MIRROR, CENTER OVER SINKS, SEE ELECTRICAL

    DRAWINGS AND SPECS. PROVIDE BLOCKING.

    2' -

    8"3'

    - 0"

    6"2'

    - 10

    "

    9' -

    0" V

    .I.F.

    1

    A401

    10' - 0" V.I.F.

    1' - 2" 1' - 2"EQ EQ EQ

    TA5 TA11

    MAX

    .3'

    - 4"

    A.F

    .F. PROVIDE BLOCKING.INDICATES JOINT IN VANITY

    APRON. MAXIMUM WIDTH 1/4".EQ EQ

    PL1

    C1

    LED LIT MIRROR, CENTER OVER SINKS, SEE ELECTRICAL

    DRAWINGS AND SPECS. PROVIDE BLOCKING.

    1

    A401

    10' - 6" V.I.F.

    1' - 4" 1' - 4"EQ EQ EQ

    2' -

    10"

    6"3'

    - 0"

    2' -

    8"

    9' -

    0" V

    .I.F.

    TA5

    MAX

    .

    3' -

    4" A

    .F.F

    .

    T1. FULL TILE AT TOP OF WALL. ALIGN GROUT

    JOINTS WITH FLOOR TILE GROUT JOINTS.

    PROVIDE FINISHED END PANEL PL1 TO CONCEAL PLUMBING AND SUPPORTS.

    INDICATES JOINT IN VANITY APRON. MAXIMUM WIDTH 1/4".

    EQEQ

    3/4"

    6 1/

    4"1'

    - 6"

    9"

    8"10"6"

    2' - 0"

    PLASTIC LAMINATE ADA APRON FRONT WITH

    REMOVABLE ACCESS PANEL AND CONCEALED CLIPS, PL1.

    DROP-IN SINK AS SPECIFIED

    FAUCET AS SPECIFIED

    A.F.

    F.

    2' -

    10" M

    AX.

    C1, EASED EDGE

    PL1

    BOTT

    OM

    OF

    REF

    LEC

    TIVE

    SU

    RFA

    CE

    3' -

    4" M

    AX.

    LED LIT MIRROR. SEE ELECTRICAL DRAWINGS

    AND SPECS.

    T1

    PROVIDE CONTINUOUS CONCEALED BLOCKING.

    PROVIDE BLOCKING FOR LED LIT MIRROR.

    1' -

    0"5'

    - 0"

    3' -

    0"

    9' -

    0" V

    .I.F.

    TP1. CENTER SCREENS BETWEEN FIXTURES.

    T1

    B1

    T1. FULL TILE AT TOP OF WALL. ALIGN GROUT JOINTS WITH FLOOR TILE GROUT JOINTS.

    2' -

    0"1'

    - 0"

    5' -

    0"1'

    - 0"

    9' -

    0" V

    .I.F.

    B1

    TP1

    T1. FULL TILE AT TOP OF WALL. ALIGN GROUT

    JOINTS WITH FLOOR TILE GROUT JOINTS.

    TP1

    2' -

    0"1'

    - 0"

    5' -

    0"1'

    - 0"

    9' -

    0" V

    .I.F.

    B1

    T1. FULL TILE AT TOP OF WALL. ALIGN GROUT

    JOINTS WITH FLOOR TILE GROUT JOINTS.

    PROJECT NUMBER

    DATETHI

    S DR

    AWIN

    G A

    ND T

    HE D

    ESIG

    N SH

    OW

    N TH

    EREO

    N AR

    E PR

    OPE

    RTY

    OF

    STUD

    IO 2

    LR, I

    NC.

    THE

    REPR

    ODU

    CTIO

    N, C

    OPY

    ING

    , OR

    OTH

    ER U

    SE O

    F TH

    IS D

    RAW

    ING

    WIT

    HOUT

    WRI

    TTEN

    CO

    NSEN

    T O

    F ST

    UDIO

    2LR

    , INC

    . IS

    PRO

    HIBI

    TED

    AND

    INFR

    ING

    EMEN

    TS W

    ILL

    BE S

    UBJE

    CT T

    O L

    EGAL

    ACT

    ION.

    STU

    DIO

    2LR

    , IN

    C.

    24

    28

    MA

    IN S

    TR

    EE

    TC

    OLU

    MB

    IA, S

    C2

    92

    01

    P 8

    03

    .23

    3.6

    60

    2S

    TU

    DIO

    2LR

    .CO

    M

    CLI

    EN

    T N

    AM

    E

    PR

    OJE

    CT

    NA

    ME

    LOC

    ATI

    ON

    SHEET NAME

    SHEET NUMBER

    C DBA

    32

    1

    1/4/

    2021

    3:5

    0:13

    PM

    20001

    01/04/2021

    A401

    Uo

    fSC

    CLO

    SE

    -HIP

    P 3

    RD

    FLR

    TOIL

    ET

    RE

    NO

    VA

    ITO

    NS

    INTERIOR ELEVATIONS& TOILET DETAILS

    UN

    IVE

    RS

    ITY

    OF

    SO

    UTH

    CA

    RO

    LIN

    A

    ISS

    UE

    D F

    OR

    BID

    DIN

    G -

    01/0

    4/20

    21

    1705

    CO

    LLE

    GE

    ST.

    CO

    LUM

    BIA

    , SC

    1/4" = 1'-0"8INTERIOR ELEVATION - 382 E

    1/4" = 1'-0"5INTERIOR ELEVATION - 336 S

    1/2" = 1'-0"1TYP. VANITY SECTION

    1/4" = 1'-0"2INTERIOR ELEVATION - 336 W

    1/4" = 1'-0"3INTERIOR ELEVATION - 382 W

    1/4" = 1'-0"4INTERIOR ELEVATION - 336 E

    REVISIONS

    NO. DATE DESCRIPTION

  • MEN336

    LAY FLOOR TILE SO LONG EDGES RUN PLAN NORTH TO PLAN SOUTH. CENTER

    FLOOR TILE IN ROOM

    FD

    CLEAN EXISTING DOOR. PAINT FRAME P1.

    3

    A701

    WOMEN382

    LAY FLOOR TILE SO LONG EDGES RUN PLAN NORTH TO PLAN SOUTH. CENTER FLOOR TILE IN ROOM.

    FD

    CLEAN EXISTING DOOR. PAINT FRAME P1.

    3

    A701

    TILE

    SUBFLOOR

    SCHLUTER RENO-U AEU100 TRANSITION STRIP. CONFIRM ADA COMPLIANCE.

    EXISTING VINYL TILE

    EQ EQCL

    DOOR

    GENERAL FINISH NOTES

    1. WALL FINISH DIRECTION IS BASED ON PLAN ORIENTATION (I.E. NORTH WALL REFERS TO PLAN NORTH)

    2. PROVIDE CODE COMPLIANT TRANSITION STRIPS WHERE NEEDED.3. PREP ALL SUB SURFACES TO RECEIVE NEW FINISH PER MANUFACTURER'S WRITTEN

    INSTRUCTIONS4. ALL FINISHES TO BE SUBMITTED TO OWNER FOR APPROVAL PRIOR TO

    ORDERING/FABRICATING.5. ALL DIMENSIONS ARE FROM EXISTING CONDITIONS. VERIFY IN FIELD AND CONTACT

    ARCHITECT IF DISCREPANCIES PRIOR TO INSTALLATION.6. TRANSITIONS AT DOORWAYS TO OCCUR AT CENTERLINE OF CLOSED DOOR (SEE DETAIL).

    PROVIDE FLOOR TRANSITION STRIPS BETWEEN NEW AND EXISTING FLOORING. CONTRACTOR CONFIRM ALL LOCATIONS.

    PROJECT NUMBER

    DATETHI

    S DR

    AWIN

    G A

    ND T

    HE D

    ESIG

    N SH

    OW

    N TH

    EREO

    N AR

    E PR

    OPE

    RTY

    OF

    STUD

    IO 2

    LR, I

    NC.

    THE

    REPR

    ODU

    CTIO

    N, C

    OPY

    ING

    , OR

    OTH

    ER U

    SE O

    F TH

    IS D

    RAW

    ING

    WIT

    HOUT

    WRI

    TTEN

    CO

    NSEN

    T O

    F ST

    UDIO

    2LR

    , INC

    . IS

    PRO

    HIBI

    TED

    AND

    INFR

    ING

    EMEN

    TS W

    ILL

    BE S

    UBJE

    CT T

    O L

    EGAL

    ACT

    ION.

    STU

    DIO

    2LR

    , IN

    C.

    24

    28

    MA

    IN S

    TR

    EE

    TC

    OLU

    MB

    IA, S

    C2

    92

    01

    P 8

    03

    .23

    3.6

    60

    2S

    TU

    DIO

    2LR

    .CO

    M

    CLI

    EN

    T N

    AM

    E

    PR

    OJE

    CT

    NA

    ME

    LOC

    ATI

    ON

    SHEET NAME

    SHEET NUMBER

    C DBA

    32

    1

    1/4/

    2021

    3:5

    0:16

    PM

    20001

    01/04/2021

    A701

    Uo

    fSC

    CLO

    SE

    -HIP

    P 3

    RD

    FLR

    TOIL

    ET

    RE

    NO

    VA

    ITO

    NS

    FINISH SPECIFICATIONS& SCHEDULE

    UN

    IVE

    RS

    ITY

    OF

    SO

    UTH

    CA

    RO

    LIN

    A

    ISS

    UE

    D F

    OR

    BID

    DIN

    G -

    01/0

    4/20

    21

    1705

    CO

    LLE

    GE

    ST.

    CO

    LUM

    BIA

    , SC

    TP1 SOLID PHENOLIC FLOORMOUNTED TOILET PARTITIONSGENERAL

    PARTITIONSPL2 ON BLACK SOLID PHENOLIC CORE. PROVIDE MFR. STANDARD COAT

    HOOK IN EACH STALL, TYP. PROVIDE SHOP DRAWINGS FOR REVIEW. -- REFER TO SPECIFICATION SECTION 102113.17

    TOILET PARTITIONS (TP)

    B1 PROFILE TRANSITION SCHLUTER PROFILE: DILEX-EKE; COLOR: GRAY 3/16"

    BASE (B)

    C1 QUARTZ WILSONART PATTERN: SALAR; COLOR: #Q4028; PRODUCT TYPE 62 65" X 130" SLAB / 2CM ALL COUNTERTOPS TO BE CONTINUOUS WITH NO JOINTS.

    COUNTERTOP (C)

    PL2 PLASTIC LAMINATE WILSONART PATTERN: CLASSIC LINEN; COLOR: 4943-38 4'W X 8'L TOILET PARTITIONS

    PL1 PLASTIC LAMINATE FORMICA PATTERN: DANISH MAPLE; FINISH: MATTE 4'W X 8'L APRONS AT ALL VANITIES

    PLASTIC LAMINATE (PL)

    P1 DOOR FRAME PAINT SHERWIN WILLIAMS COLOR: DOVETAIL #SW7018; FINISH: SATIN --

    PAINT (P)

    GT1 GROUT LATICRETE COLOR: #78 STERLING SILVER --

    GROUT (GT)

    T2 PORCELAIN FLOOR TILE MILESTONE PATTERN: FAROE; COLOR: SEASHELL 12"L X 24"W; 3/8"THICKINSTALL IN MONOLITHIC PATTERN PER FINISH PLAN; RUN GRAIN AS

    INDICATED ON FINISH PLANS; CENTER PATTERN IN ROOM; ALIGNGROUT JOINTS WITH WALL TILE GROUT JOINTS; USE GT1.

    T1 PORCELAIN WALL TILE ROCA PATTERN: LINEN; COLOR: WHITE 12"L X 24"W; 3/8"THICKINSTALL IN HORIZONTAL STACK BOND PATTERN PER INTERIOR

    ELEVATIONS; ALIGN GROUT JOINTS WITH FLOOR TILE JOINTS; USEGT1.

    TILE (T)

    TAG ITEM MANUFACTURER DESCRIPTION SIZE NOTES

    FINISH SPECIFICATION

    ROOM FINISH SCHEDULE

    NO. NAMEFLOOR BASE CEILING WALL FINISH

    COMMENTSMATERIAL MATERIAL MATERIAL HEIGHT NORTH SOUTH EAST WEST

    336 MEN T1 B1 ACT 9'-0" T2 T2 T2 T2 WALL TILE TO CEILING ON ALL WALLS. CENTER FLOOR TILE PATTERN IN ROOM AS INDICATED ON FINISH PLANS. FLOORTILE TO CONTINUE BELOW VANITY.

    382 WOMEN T1 B1 EXIST. ACT 9'-0" T2 T2 T2 T2 WALL TILE TO CEILING ON ALL WALLS. CENTER FLOOR TILE PATTERN IN ROOM AS INDICATED ON FINISH PLANS. FLOORTILE TO CONTINUE BELOW VANITY.

    1/4" = 1'-0"1FINISH PLAN - 336

    1/4" = 1'-0"2FINISH PLAN - 382

    N

    PLAN NORTH

    TRUE NORTH

    NN

    PLAN NORTH

    TRUE NORTH

    N

    12" = 1'-0"3TILE TO VINYL

    REVISIONS

    NO. DATE DESCRIPTION

  • EVAV-3.16B EVAV-3.16A

    SEE ENLARGED FLOOR PLAN THIS SHEET

    MEN336

    SEE ENLARGED FLOOR PLAN THIS SHEET

    WOMEN382

    (850 CFM)(850 CFM)

    E150

    E150

    E250

    E150

    E150

    E250

    MECHANICALDESIGNINCCONTACT: Justin Varco

    4403 Broad River RoadColumbia, S.C. 29210

    T:(803) 731-9834F:(803) 731-9837

    COMM. NO. 203647

    3300

    12400

    MEN336

    CTE

    CTE

    10"ø

    12"x12"

    12"x

    12"

    12400

    3300

    WOMEN382

    CTE

    CTE

    12"x12"

    10"ø

    10"ø

    DESI

    GN,

    S

    A

    OUTH

    CARO

    L IN

    C

    MECH

    ANIC

    AL

    No. 0

    096

    N

    ERT I FI CA

    T EOF

    AUTH

    ORIZA

    TIO

    No. 3

    2935

    S

    A

    OUTH

    CARO

    L IN

    J

    O

    U ST

    I NJ

    .VA

    RC

    L

    R

    ICESED

    PROF

    ES

    SIO

    NA

    LE N GI N E E

    PROJECT NUMBER

    DATE

    THIS

    DRA

    WIN

    G A

    ND T

    HE D

    ESIG

    N SH

    OW

    N TH

    EREO

    N AR

    E PR

    OPE

    RTY

    OF

    STUD

    IO 2

    LR, I

    NC.

    THE

    REPR

    ODU

    CTIO

    N, C

    OPY

    ING

    , OR

    OTH

    ER U

    SE O

    F TH

    IS D

    RAW

    ING

    WIT

    HOUT

    WRI

    TTEN

    CO

    NSEN

    T O

    F ST

    UDIO

    2LR

    , INC

    . IS

    PRO

    HIBI

    TED

    AND

    INFR

    ING

    EMEN

    TS W

    ILL

    BE S

    UBJE

    CT T

    O L

    EGAL

    ACT

    ION.

    CLI

    EN

    T N

    AM

    E

    PR

    OJE

    CT

    NA

    ME

    LOC

    ATI

    ON

    SHEET NAME

    SHEET NUMBER

    C DBA

    32

    1

    01/0

    4/21

    STU

    DIO

    2LR

    , IN

    C.

    24

    28

    MA

    IN S

    TR

    EE

    TC

    OLU

    MB

    IA, S

    C2

    92

    01

    P 8

    03

    .23

    3.6

    60

    2S

    TU

    DIO

    2LR

    .CO

    M

    12/2

    1/20

    20 2

    :28:

    56 P

    M

    20001

    JANUARY 2021

    M101

    Uo

    fSC

    CLO

    SE

    -HIP

    P 3

    RD

    FLR

    TOIL

    ET

    RE

    NO

    VA

    TIO

    NS

    HVAC RENOVATIONFLOOR PLANS

    UN

    IVE

    RS

    ITY

    OF

    SO

    UTH

    CA

    RO

    LIN

    A

    BID

    DO

    CU

    ME

    NT

    S

    1705

    CO

    LLE

    GE

    ST.

    CO

    LUM

    BIA

    , SC

    1/8" = 1'-0"

    HVAC RENOVATION FLOOR PLAN - 3RD FLOOR

    NO

    RTH

    1/4" = 1'-0"

    HVAC ENLARGED FLOOR PLAN - MEN'S RR1/4" = 1'-0"

    HVAC ENLARGED FLOOR PLAN - WOMEN'S RR

    REMOVE EXISTING SUPPLY AND EXHAUST GRILLE IN EACH RESTROOM ALONG WITH FLEXIBLE DUCT COMPLETE.

    PROVIDE NEW GRILLES AND FLEX DUCT AS INDICATED. TRIM/EXTEND DUCT AS REQUIRED FOR NEW GRILLE LOCATIONS. BALANCE SYSTEM TO VALUES LISTED

    DEMOLITION NOTESD1

    D2

    REVISIONS

    NO. DATE DESCRIPTION

  • J J J J

    OS

    OS

    A/V

    GTD

    GTD

    JJ

    JJ

    OS

    OS

    A/V

    GTD

    GTD

    VV

    E-100

    4

    E-100

    5

    E-100

    2

    E-100

    3

    336MEN

    AE

    A

    A

    AE

    A

    AE

    A

    V V V V

    15cd

    LS2-9

    LS2-9

    1

    TYP.

    3

    NL

    382WOMEN

    A AE

    AAE

    A A

    AE

    V

    V

    V

    V

    15cd

    LS2-9

    LS2-9

    1

    TYP.

    3

    NL

    R

    R R

    R

    R

    336MEN

    2

    R

    R

    R

    R R

    R

    R

    382

    WOMEN

    2

    ELECTRICAL SYMBOL LEGEND

    DESCRIPTIONSYMBOL SYMBOL DESCRIPTIONFIRE ALARM SPEAKER/VISUAL DEVICE (CEILING

    MOUNTED) WHITE DEVICES WITH NO LETTERINGA/VJ JUNCTION BOX (WALL MTD)

    LIGHT SWITCH, SINGLE POLE

    LOWER CASE SUBSCRIPT INDICATES SWITCH-LEGa

    OS OCCUPANCY SENSOR (CEILING MOUNTED)

    OS OCCUPANCY SENSOR (WALL MOUNTED)

    KEY NOTE CALLOUT (REFER TO KEY NOTES ON

    SHEET)#

    V FIRE ALARM VISUAL DEVICE (WALL MOUNTED)

    SHADING INDICATES EMERGENCY FIXTURE CONNECTED TO GENERATOR BACKED EMERGENCY SYSTEM.

    CE = UPPERCASE LETTER / LETTERS INDICATE FIXTURE TYPEd = LOWERCASE LETTER INDICATES SWITCH IDENTIFICATION NL or EM = INDICATES NON SWITCHED "NIGHT LIGHT" / "EMERGENCY"A:9 = DESIGNATES PANEL NAME: CIRCUIT NUMBER

    NOTE:

    ALL "EM" FIXTURES INDICATED IN PLAN CONTAIN TRANSFER DEVICE (GTD) AND HAVE CONNECTION TO GENERATOR. ALL EMERGENCY FIXTURES REQUIRE AN EXTRA CONSTANT POWER CONDUCTOR TO BE CONNECTED TO THE EMERGENCY GTD FOR SENSING. CONDUCTOR MUST NOT BE CONTROLLED BY ANY LIGHTING SYSTEM OR HAVE POWER INTERUPTED AT ANY TIME. "NL" FIXTURES SHALL HAVE ABSOLUTELY NO LIGHTING CONTROL & SHALL BE OPERATIONAL AT ALL TIMES.

    NL A:2

    CE

    LIGHT FIXTURE PLAN KEY

    d

    (803) 731-0650 Office | (803) 467-7657 Cell

    7 CLUSTERS COURT, SUITE 201 | COLUMBIA, SC

    [email protected]: JASON AREHEART

    No. C00953

    ASSOC. INC.

    BELKA

    ENGINEERING

    A

    NILOR

    ACHTUO

    S

    CE

    RT

    I FI CATE OF AUT

    HOR

    I ZA

    TIO

    N

    No. C00953

    ASSOC. INC.

    BELKA

    ENGINEERING

    A

    NILOR

    ACHTUO

    S

    CE

    RT

    I FI CATE OF AUT

    HOR

    I ZA

    TIO

    N

    No. C00953

    ASSOC. INC.

    BELKA

    ENGINEERING

    A

    NILOR

    ACHTUO

    S

    CE

    RT

    I FI CATE OF AUT

    HOR

    I ZA

    TIO

    N

    No. 26181

    R

    A

    NILORACHTU

    O

    S

    J EE

    NI

    GN

    E

    LAN

    OISSEFOR

    PD

    ES

    NE

    CILA

    S

    ON E

    AR

    T

    L.HERA

    No. 26181

    R

    A

    NILORACHTU

    O

    S

    J EE

    NI

    GN

    E

    LAN

    OISSEFOR

    PD

    ES

    NE

    CILA

    S

    ON E

    AR

    T

    L.HERA

    No. 26181

    R

    A

    NILORACHTU

    O

    S

    J EE

    NI

    GN

    E

    LAN

    OISSEFOR

    PD

    ES

    NE

    CILA

    S

    ON E

    AR

    T

    L.HERA

    PROJECT NUMBER

    DATE

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E D

    ES

    IGN

    SH

    OW

    N T

    HE

    RE

    ON

    AR

    E P

    RO

    PE

    RT

    Y O

    F B

    EL

    KA

    EN

    GIN

    EE

    RIN

    G A

    SS

    OC

    IAT

    ES

    , IN

    C.

    TH

    E R

    EP

    RO

    DU

    CT

    ION

    , C

    OP

    YIN

    G,

    OR

    OT

    HE

    R U

    SE

    OF

    TH

    IS D

    RA

    WIN

    G W

    ITH

    OU

    T W

    RIT

    TE

    N C

    ON

    SE

    NT

    OF

    BE

    LK

    A E

    NG

    INE

    ER

    ING

    AS

    SO

    CIA

    TE

    S,

    INC

    . IS

    PR

    OH

    IBIT

    ED

    AN

    D I

    NF

    RIN

    GE

    ME

    NT

    S W

    ILL

    B

    E S

    UB

    JE

    CT

    TO

    LE

    GA

    L A

    CT

    ION

    .

    STU

    DIO

    2LR

    , IN

    C.

    24

    28

    MA

    IN S

    TR

    EE

    T

    CO

    LU

    MB

    IA, S

    C2

    92

    01

    P 8

    03

    .23

    3.6

    60

    2

    STU

    DIO

    2LR

    .CO

    M

    CLIE

    NT

    NA

    ME

    PR

    OJE

    CT

    NA

    ME

    LO

    CA

    TIO

    N

    SHEET NAME

    SHEET NUMBER

    C DBA

    32

    1

    01-04-21

    LR22002

    12/1

    7/2

    020 1

    :58:0

    8 P

    M

    20001

    01/04/2021

    E-100

    Uo

    fSC

    CL

    OS

    E-H

    IPP

    3R

    D F

    LR

    TO

    ILE

    T R

    EN

    OV

    AIT

    ON

    S

    THIRD FLOOR

    RESTROOMS

    ELECTRICAL PLANS

    UN

    IVE

    RS

    ITY

    OF

    SO

    UT

    H C

    AR

    OLIN

    A

    IS

    SU

    ED

    FO

    R C

    ON

    ST

    RU

    CT

    IO

    N 1

    .04

    .202

    1

    17

    05

    CO

    LLE

    GE

    ST

    . C

    OL

    UM

    BIA

    , S

    C

    SCALE: 1/8" = 1'-0"E-100

    1 THIRD FLOOR - ADVISING RESTROOMS LIGHTING PLAN

    SCALE: 1/4" = 1'-0"E-100

    4 ENLARGED VIEW - MEN 336 RENOSCALE: 1/4" = 1'-0"E-100

    5 ENLARGED VIEW - WOMEN 382 RENO

    LIGHT FIXTURE SCHEDULE

    SYMBOL

    FIXTURE SPECIFICATIONS LAMPING ELECTRICAL

    MOUNTING REMARKS NOTESTYPE FIXTURE DESCRIPTION MANUFACTURER CAT. # NO. LAMP TYPEFIXT.LOAD VOLTS

    A 2'X2' LED RECESSED TROFFER HE WILLIAMS LT-22-L27/835-AF-UNV - LED (2700LUMENS, 835)

    21 277 V RECESSED IN GRID CEILING 1,2,3,4

    AE SAME AS TYPE "A" EXCEPT FEDFROM GENERATOR-BACKED CIRCUIT

    THROUGH A GTD.

    HE WILLIAMS LT-22-L27/835-AF-UNV - LED (2700LUMENS, 835)

    21 277 V RECESSED IN GRID CEILING 1,2,3,4

    V EDGE LIT VANITY MIRROR LIGHTING SQUARED WM3035-3624-30-80-HO - LED (3300LUMENS, 80)

    33 277 V WALL MOUNTED MIRROR 1,2,3,4

    LIGHT FIXTURE SCHEDULE NOTES1 LUMENS LISTED IN SCHEDULE REPRESENT DELIVERED LUMENS OF FIXTURES.

    2 THREE DIGIT NUMBERS LISTED IN LAMP COLUMN REPRESENT CRI AND COLOR TEMPERATURE. FIRST DIGIT INDICATES MINIMUM CRI AND LAST TWO DIGITS INDICATE COLOR TEMPERATURE.EXAMPLE: 830 INDICATES MINIMUM CRI OF 80 AND A COLOR TEMPERATURE OF 3000K.

    3 SEE ARCHITECTURAL RCP AND ELEVATIONS FOR EXACT LOCATION AND MOUNTING HEIGHTS.

    4 CONFIRM QUANTITIES OF FIXTURES SHOWN IN RCP MATCH QUANTITIES SHOWN ON ELECTRICAL PLANS PRIOR TO BID. IF NO DISCREPANCIES ARE NOTED PRIOR TO BID THE HIGHESTQUANTITY OF EACH FIXTURE TYPE SHOWN SHALL BE PROVIDED.

    J 0 8' - 0" 12' - 0" 16' - 04' - 0"

    SCALE: 1/4" = 1'-0"

    0 16' - 0" 24' - 0" 32' - 08' - 0"

    SCALE: 1/8" = 1' - 0"

    GENERAL "ELECTRICAL" NOTES1 BRANCH CIRCUIT WIRING SHALL BE COPPER (THHN/THWN-2) NO. 12 AWG

    IN 3/4" CONDUIT UNLESS NOTED OTHERWISE. WHERE CONDUCTOR AND

    RACEWAY SIZE ARE SHOWN AT HOMERUN, SUCH SIZE SHALL BE USED FOR

    THE ENTIRE CIRCUIT. EXCEPTION: FINAL CONNECTION TO DEVICES, INOUTLET BOXES, IS NOT REQUIRED TO BE LARGER THAN NO. 12 AWG.

    2 RACEWAYS SHALL BE INSTALLED CONCEALED IN NEW WALL CONSTRUCTIONABOVE CEILINGS, BELOW FLOOR, AND IN OTHER CAVITIES TO THE GREATEST

    EXTENT POSSIBLE. WHERE EXPOSED RACEWAYS MUST BE USED, LAYOUT

    RACEWAYS TO MINIMIZE THE NUMBER OF VERTICAL RUNS.

    3 THE ARRANGEMENT, GROUPING, AND ROUTING OF BRANCH CIRCUITS SHALLBE PROVIDED AT THE CONTRACTOR'S DISCRETION IN ACCORDANCE WITH

    GENERALLY ACCEPTED PRACTICE FOR ELECTRICAL WORK, THE NATIONAL

    ELECTRICAL CODE REQUIREMENTS, LOCAL ORDINANCES, AND THE FOLLOWING:

    4 A COMMON NEUTRAL MAY NOT BE INSTALLED IN A HOMERUN FOR 2 OR 3BRANCH CIRCUITS.

    5 A GROUND CONDUCTOR SHALL BE PROVIDED IN ALL RACEWAYS UNLESSNOTED OTHERWISE.

    6 THE USE OF MC CABLE IS NOT ALLOWED.

    7 SEAL ALL EXISTING AND NEW FIRE RATED WALL AND FLOOR PENETRATIONSIN THE CONSTRUCTION AREA

    8 IN AREAS WHERE THE EXISTING CEILINGS ARE NOT SLATED TO BEREMOVED, THE CONTRACTOR SHALL WORK THRU THE EXISTING CEILINGS

    (SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR AREA OF WORK). THE

    CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY DAMAGED TILEOR GRID THAT IS A RESULT OF THEIR WORK.

    9 ALL ELECTRICAL EQUIPMENT TO BE REMOVED SHALL REMAIN THE PROPERTYOF THE OWNER. THE CONTRACTOR SHALL NOT DISPOSE OF ANY MATERIALS

    UNTIL RELEASED BY OWNER'S PROJECT MANAGER. MATERIALS THAT OWNER'S

    PROJECT MANAGER CHOOSES TO RETAIN SHALL BE DELIVERED BY THECONTRACTOR TO A LOCATION DESIGNATED BY THE PROJECT MANAGER. ALL

    OTHER MATERIALS SHALL BE PROPERLY DISPOSED OF BY THE CONTRACTOR.

    10 ELECTRICAL DEVICES NOT SHOWN ON WALLS TO BE DEMOLISHED SHALL BEDEMOLISHED AT NO ADDITIONAL COST TO OWNER.

    11 ELECTRICAL DEVICES NOT SHOWN ON CEILINGS OR WALLS TO REMAIN SHALLREMAIN IN PLACE. PROTECT FROM DAMAGE DURING CONSTRUCTION

    12 ELECTRICAL DEVICES NOT SHOWN ON CEILINGS TO BE REMOVED SHALL BETEMPORARILY DISCONNECTED AND REMOVED DURING DEMOLITION AND

    RE-INSTALLED ON NEW CEILING IN SAME LOCATION.

    13 SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR THE EXACT LOCATION OFALL CEILING MOUNTED LIGHTING FIXTURES.

    14 REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING DETAILS OF LIGHTFIXTURE TO ACOUSTICAL CEILING SYSTEM AND STRUCTURE.

    15 EXISTING FIRE ALARM SYSTEM IS GAMEWELL E3 SERIES.

    SCALE: 1/4" = 1'-0"E-100

    2 ENLARGED VIEW - MEN 336 DEMOSCALE: 1/4" = 1'-0"E-100

    3 ENLARGED VIEW - WOMEN 382 DEMO

    DEMOLITION/RENOVATION NOTATIONIF NO ANNOTATION IS SHOWN ASSUME EXISTING TO REMAIN INPLACE FOR SOLID LINES AND DEMOLISH FOR DASHED LINES.

    DEVICES AND EQUIPMENT NOT SHOWN SHALL BE ASSUMED TOBE EXISTING TO REMAIN IN PLACE.

    E EXISTING FIXTURE OR DEVICE TO REMAIN IN PLACE. REPLACEANY BROKEN DEVICES OR PLATES; COLOR TO MATCH EXISTING.

    R EXISTING FIXTURE OR DEVICE TO BE REMOVED BY THEELECTRICAL CONTRACTOR. MAINTAIN CONTINUITY OF REMAINING

    PORTIONS OF BRANCH CIRCUIT.

    RE EXISTING DEVICE TO BE REMOVED BY THE ELECTRICALCONTRACTOR. EXISTING CIRCUIT SHALL BE RETAINED.

    PROVIDE NEW DEVICE AS SHOWN ON RENOVATION PLANS.

    RN RELOCATED FIXTURE (NEW LOCATION).

    RR EXISTING FIXTURE TO BE RELOCATED BY THE ELECTRICALCONTRACTOR TO NEW LOCATION SHOWN ON RENOVATION PLAN.

    KEY NOTES

    1 RE-USE EXISTING 277V LIGHTING BRANCH CIRCUIT(S) CURRENTLY INTHESE SPACES. CONTRACTOR SHALL FIELD VERIFY WHICH BRANCH

    CIRCUIT(S) ARE CURRENTLY IN THIS SPACE AND UPDATE THE

    PANELBOARD DIRECTORY TO INDICATE WHICH CIRCUITS ARE IN THISSPACE.

    2 PROVIDE BLANK STAINLESS-STEEL WALL PLATE OVER BOX.

    3 ALL GTD'S SHALL BE DUAL RELAY TYPE. FIXTURES SHALL BE SWITCHEDWITH NORMAL CIRCUIT, BUT BYPASS CONTROL IN EVENT OF A NORMAL

    POWER FAILURE.

    REVISIONS

    NO. DATE DESCRIPTION

    2021_0104 Issued for Bidding - Arch20001_USC_Advising_Toilet_Reno_Central_R20_Close Side_tbeaudrot - Sheet - CVR - COVER SHEETSheetsA101 - FLOOR PLANSA121 - REFLECTED CEILING PLANSA401 - INTERIOR ELEVATIONS & TOILET DETAILSA701 - FINISH SPECIFICATIONS & SCHEDULEAD01 - DEMOLITION PLANSCVR - COVER SHEET

    20001_USC_Advising_Toilet_Reno_Central_R20_Close Side_tbeaudrot - Sheet - AD01 - DEMOLITION PLANSSheetsA101 - FLOOR PLANSA121 - REFLECTED CEILING PLANSA401 - INTERIOR ELEVATIONS & TOILET DETAILSA701 - FINISH SPECIFICATIONS & SCHEDULEAD01 - DEMOLITION PLANSCVR - COVER SHEET

    20001_USC_Advising_Toilet_Reno_Central_R20_Close Side_tbeaudrot - Sheet - A101 - FLOOR PLANSSheetsA101 - FLOOR PLANSA121 - REFLECTED CEILING PLANSA401 - INTERIOR ELEVATIONS & TOILET DETAILSA701 - FINISH SPECIFICATIONS & SCHEDULEAD01 - DEMOLITION PLANSCVR - COVER SHEET

    20001_USC_Advising_Toilet_Reno_Central_R20_Close Side_tbeaudrot - Sheet - A121 - REFLECTED CEILING PLANSSheetsA101 - FLOOR PLANSA121 - REFLECTED CEILING PLANSA401 - INTERIOR ELEVATIONS & TOILET DETAILSA701 - FINISH SPECIFICATIONS & SCHEDULEAD01 - DEMOLITION PLANSCVR - COVER SHEET

    20001_USC_Advising_Toilet_Reno_Central_R20_Close Side_tbeaudrot - Sheet - A401 - INTERIOR ELEVATIONS & TOILET DETAILSSheetsA101 - FLOOR PLANSA121 - REFLECTED CEILING PLANSA401 - INTERIOR ELEVATIONS & TOILET DETAILSA701 - FINISH SPECIFICATIONS & SCHEDULEAD01 - DEMOLITION PLANSCVR - COVER SHEET

    20001_USC_Advising_Toilet_Reno_Central_R20_Close Side_tbeaudrot - Sheet - A701 - FINISH SPECIFICATIONS & SCHEDULESheetsA101 - FLOOR PLANSA121 - REFLECTED CEILING PLANSA401 - INTERIOR ELEVATIONS & TOILET DETAILSA701 - FINISH SPECIFICATIONS & SCHEDULEAD01 - DEMOLITION PLANSCVR - COVER SHEET

    2021_0104 Rebid Plumbing3rd flr toil P13rd flr toil P2

    Advising TLT - MECH Bid Docs 21.01.04Advising TLT - M101SheetsM101 - HVAC RENOVATION FLOOR PLANS

    Advising TLT - M301

    E-100 - THIRD FLOOR RESTROOMS ELECTRICAL PLANSSheetsE-100 - THIRD FLOOR RESTROOMS ELECTRICAL PLANS