COMPANY PORTFOLIO

Introduction

GVJ Electrical and Instrumentation Contractors (Pty) are electrical contractors

and we specialize in electrical reticulation for industrial and commercial

projects. Our focus is in the Mining Industry and Power Generation, including

Wind, Solar, Hydro, Gas and Coal generation. This entails procuring and

installing LV and MV cables, wireways, transformers, VSDs, MCCs (Motor

Control Centres), DBs (Distribution Boards), MV switchgear (Incl. RMUs and

Minisubstations), PLC Panels, Small Power (Lighting and socket outlets),

Containerized Solutions (MCCs, PLCs, Generators etc), Process Instruments,

Instrumentation Cables, and Motors/Generators. We also do testing and

commissioning of the above, as well as issuing of C.O.Cs (Certificates of

Compliances). Our installations comply with SANS 10142-1:2012 (LV Wiring

Code), as well as 10142-2:2012 (MV Wiring Code). What makes GVJ unique is

the fact that we provide a combined Electrical (LV and MV) and

Instrumentation service, which very few companies are able to offer. GVJ is

CIDB registered and BBBEE accredited.

Major Project Involvement:

• Cape Town Stadium – MV/LV Reticulation

• De Aar 50MW PV Plant – MV/LV and Instrumentation reticulation

• Droogfontein 50MW PV Plant – MV/LV and Instrumentation reticulation

• Nobelsfontein 75MW Wind Farm – MV Reticulation

• Sere 100MW Wind Farm – LV/MV and Instrumentation Reticulation

• Exxaro/ Namakwa Sands Saldanha : DC - Furnace 1 Plant

• Saldanha Steel – Corex Plant

• Tronox Namakwa Sands – Various projects, Complete E,C&I reticulation

• MSR Tormin Mine - Various projects, Complete E,C&I reticulation

Page 3: Click to view our GVJ Company Profile

3

Our Personnel

Our qualified Management, Artisans and Semi skilled personnel constitute a

professional work force and are committed to service and productivity. We are able

to mobilise and engage our work force at short notice to accommodate any contract.

Mission Statement

GVJ mission statement is

“Total Quality Commitment”

We are committed to providing our clients with professional expertise in the Electrical

and Instrumentation Industry combined with our international training and

experience.

Page 4: Click to view our GVJ Company Profile

4

Company Analysis

Reputational Objectives

• Product quality and competitive pricing are seen as key factors.

• Smaller premises with less staff and overheads kept to a minimum.

• Outsourcing to affirmative companies.

• Create a demand for Specialisation.

Motivation

• To be able to tender competitively.

• Vigilant monitoring of contract costs.

• Lasting relationship with our customers through performance and a

positive reputation for quality.

• Management and human resource skills.

• Comprehensive and well documented Safety program enforced on Sites.

• QA / QC Policies and Procedures conform to ISO 9000 standards.

Services offered

We offer the highest quality Industrial and Commercial Electrical &

Instrumentation package from concept through:

• Electrical, Control and Instrumentation design

• Competitive Procurement

• HV/LV Reticulation – underground and overhead

• Electrical and Instrumentation Installations

• Electrical Installation, Building complexes

• Professional Testing and Commissioning

Page 5: Click to view our GVJ Company Profile

5

Leadership Approach

Our leadership approach will be aimed at creating the climate and culture for

service excellence because we value our customer and employee satisfaction.

Key to service Excellence:

• Human resource practices to promote employee upliftment.

• Active retention of existing customers.

• There is attention to details regarding the quality of staff and the resources

needed to deliver the above.

To sum up our leadership approach and the creating of a successful environment in

the organisation we quote Jack Welsch, CEO of General Electric:

“The three most important things you need to measure in a business are

customer satisfaction, employee satisfaction and cash flow. If you are growing

customer satisfaction, your market share is sure to grow too. Employee

satisfaction gets you productivity, quality, pride and creativity. Cash flow is the

pulse – the key vital sign of a company.

Page 6: Click to view our GVJ Company Profile

6

Conclusion

Customer satisfaction is the key to having the competitive edge

In an ever-changing industry, the company, as any other organisation, is compelled

to transform to survive.

Companies that want to win the game through value innovation, with leaders who are

committed to the inherent competitive advantage of their people, fully accept that

customers will ultimately only be loyal to themselves.

This means strategically managing customer value throughout the organisation.

Superior value delivery builds customer loyalty, which in turn contributes to market

share growth and improved profitability.

Strategic approach to managing market perceived value

Customer and stakeholder’s needs and competitive value perceptions define the

criteria for organisational success and how our organisation performs.

Creative strategic thinking identifies the goal posts for the future and the challenges

to be met along the way.

Effective market focused improvement closes the gaps between the future and your

current competitive reality.

The extent, to which measurement, strategy and performance are integrated, aligned

and implemented based on value innovation will separate the leaders of tomorrow

from those that follow.

Page 7: Click to view our GVJ Company Profile

7

Company Project Resources Structure

BOARD OF DIRECTORS

PERSONEL & INDUSTRIAAL RELATIONS

TRAINING OFFICERS

SAFETY OFFICERS

OPERATIONS

PROJECT ADMINISTRATION

PROCUREMENT MECHANICAL CONSTRUCTION

ELECTRICAL CONSTRUCTION

INSTRUMEN TATION

CONSTRUCTION

OVERHEAD LINE CONSTRUCTION

QA/QC & TESTING

Time Keeper

PROJECT ADMINISTRATION

PROJECT MANAGER

Surveyor

Site Store

Document Control

QC Inspectors Supervisor lighting & small

Power

Supervisor Mechanical

Supervisor LV Distribution

Supervisor HV Distribution

Technician Instrumentation

Supervisor Overhead Lines

Foreman

Electrical Artisans

General Workers

Foreman

Boilermaker Artisans

General Workers

Foreman

Electrical Artisans

General Workers

HT Cable Jointers

Electrical Artisans

General Workers

Foreman

Instrument Mechanicians

General Workers

Foreman

Line Crew

General Workers

Page 8: Click to view our GVJ Company Profile

8

Recent projects (2012-Present)

• Tronox – Namakwa Sands Mining

Permanent on site since – 2000

MV; LV; Control; Instrumentation Installations; MCC’s and PLC Supply and

Installations.

Turnover 2012 Financial Year ZAR 36.5 Million

Ref: B. Engelbrecht - Electrical Engineer

Tel: +27 27 217 3374

• Group Five Structured Ingenuity – Tronox Namakwa Sands CO-Generation

Plant

MV; LV; Control; Instrumentation Installations; MCC’s and PLC Supply and

Installations. All C.O.C’s issued by our MIE - QA/QC Manager: Arrie Ferreira

Value ZAR 10 Million

Ref: P. Kantor – Senior Electrical Integration Engineer

Tel: +27 11 513 7559

• Siemens AG – 50MW – Solar PV – Project De Aar SA

MV and DC Cables; 19 x 4 Inverter Substation with 4 x 630kVA Transformers

and RMU’s

Value ZAR 24 Million

Ref: H. Mumm

Tel: +27 82 718 3322

• Siemens AG – 50MW – Solar PV – Project Kimberley SA

MV and DC Cables; 19 x 4 Inverter Substation with 4 x 630kVA Transformers

and RMU’s

Value ZAR 25 Million

Ref: H. Mumm

Tel: +27 82 178 3322

Page 9: Click to view our GVJ Company Profile

9

• Group Five/ Iberdrola JV – Noblesfontein Wind Energy Facility

Assembly and Commissioning works of the Medium Voltage infrastructure of

the Noblesfontein Wind Farm

Value ZAR 10 Million

Ref: Antonio Perez Iglesias

Tel: + 27 71 383 6535

• Mineral Sands Resources – Tormin Mineral Sands Project

New Minerals Separation Plant at Koekenaap

Value ZAR 13 Million at present/ ongoing

Ref: Cobus Robertson

Tel: + 27 79 885 2513

• Siemens – 100MW – Sere Wind Farm

MV and DC Cables

46 Substations & RMU’s

Value ZAR 20 Million

Ref: R. Sumbana

Tel: +27 71 607 9474

Other Completed Projects

• Exxaro – Namakwa Sands

Various Projects at the Smelter,

Mineral Separation Plant and the

Brand se Baai Mine

Since 2000 till to date at the

Value of ZAR 60 Million

Ref: B. Engelbrecht Electrical Engineer

Tel: +27 27 217 3374

Page 10: Click to view our GVJ Company Profile

10

• Arcelormittal – Saldanha Steel

Various Projects: MV/LV Reticulation,

Electrical Instrumentation Installation

Since 2000 till to date at the

Value of ZAR 25 Million

Ref: Charles Le Roux

Tel: +27 22 709 4000

•••• Tekpro Projects (Pty) Ltd – 2.4KM

Dual Carry Conveyor at Namakwa Sands

Brand se Baai – Installation of 2.4KM

22KV Overhead Line c/w Pole Transformers,

complete new 22KV Substation, 450KW-VSD Drives

PLC controlled, complete Electrical-Instrumentation at the

Value of ZAR 34 Million

Ref: J. Gerber Electrical Engineer

Tel: +27 11 789 8138

•••• Tekpro Projects (Pty) Ltd

MV/LV / Instrumentation Installation

For the Material Handling System

at the Douglas Collery Witbank at the

Value of ZAR 12 Million

Ref. as above

•••• SAB – Newlands Breweries

MV/LV Lighting & Small Power for the

Cellar Enclosure and Administration Building

Revamp at the value of ZAR 8.5 Million

Ref. M. Smith Electrical Engineer

Tel: +27 21 658 7511

Page 11: Click to view our GVJ Company Profile

11

•••• Anglo American Corporation – Namakwa Sands – MSP Plant.

Fire damaged Plant complete Re-cabling

Electrical, Control, Instrumentation and new

MCC’s and PLC’s at the

Value of ZAR 31 Million

Ref: B. Engelbrecht Electrical Engineer

Tel: +27 27 217 3374

•••• Anglo American Corporation – Black Mountain Deeps Project.

Electrification of new Shaft, underground Sub – and

Pumpstations. MV/LV/ Control Installation at the

Value of ZAR 17 Million

Ref: Hennie Botha

Tel: +27 54 983 9542

•••• Anglo American Corporation – Skorpion Zink Mine Namibia Upgrade Thickener

& Pond

Electrical / Instrumentation Installation at the

Value of ZAR 9 Million

Ref: Kallie Le Roux

Tel: +264 63 271 2390

•••• Sulzer South Africa (Pty) Ltd - Bergriver

Water Project – Dasbos and Drakenstein

Pumpstations MV/11KV Overhead Line/LV and Instrumentation Installation

At the Value of ZAR 18 Million

Ref: T. Joubert Projects Manager

Tel; +27 82 562 4072

Page 12: Click to view our GVJ Company Profile

12

•••• Siemens AG – Eskom Atlantis Open Cycle Gas

Turbine Powerstation MV/LV/Control /

Instrumentation Installation at the

Value of ZAR 7.5 Million

Ref: P. Rabie Projects Director

Tel: +27 11 652 2680

•••• Siemens AG – Eskom GAS1 - Mosselbay

Two additional Open Gas Turbine Powerstations

MV/LV/Control & Instrumentation Installation at the

Value of ZAR 8.5 Million

Ref: As Above

•••• Siemens AG – Eskom GAS1 – Atlantis Cape Town

Five additional Open Gas Turbine Powerstations

MV/LV/Control & Instrumentation Installation at the

Value of ZAR 19 Million

Ref: As above

•••• Murray & Roberts – Cape Town

Commercial Airport Parking Garage MSP 1

MV/LV/ Lighting Small Power Installation

At the Value of ZAR 8.5 Million

2007-2008

Ref: Mr. G. Kriedeman - Project Manager

Tel: +27 21 507 3200

•••• Grinaker – LTA / Stocks JV – Cape Town

International Airport Parking Garages MSP 2

MV/LV/ Lighting Small Power Installation at the

Value of ZAR 12 Million

2008-2010

Ref: Mr. J. KeoghTel:

+27 21 703 1040

Page 13: Click to view our GVJ Company Profile

13

•••• WBHO/Murray and Roberts JV Green Point Stadium Cape Town

MV/LV Installation

Value of ZAR 135 Million

Ref: M. Lewis Project Manager

Tel: +27 82 554 1416

•••• Exxaro – Namakwa Sands Smelter Saldanha

Fumex Project – SA Five Engineering - JV

Electrical & Instrumentation Installation at the

Value of ZAR 8.3 Million

Ref: SA Five – B. O’Brien MD

Tel: +27 21 905 4110

• Exxaro Namakwa Sands Smelter Saldanha

Furnace 1 – Off Gas Plant – NAC - JV

E & I Upgrade

Value ZAR 4 Million

Ref: NAC – A. Taylor

Tel: +27 11 445 2051

• ABB/SA – Exxaro – Namakwa Sands Smelter Saldanha

33KV – Consumer Substation Switchboard Replacement

HV & Control Cable – Installation of the

Value ZAR 5 Million

Ref: D. Weeks - ABB Project Manager

Tel: +2710 202 5599

• Consol Glass – Bellville

Furnace B4 – Rebuild

HV; LV; Control; Instrumentation Installation

Shut – down work – 2 Months

Value ZAR 7.5 Million

Ref: R. Silvester

Tel: +27 11 874 2042

Page 14: Click to view our GVJ Company Profile

14

Contact Details:

GVJ Electrical and Instrumentation

Contractors (Pty) Ltd

Website: www.gvj.co.za

HEAD OFFICE (Cape Town)

Contact Person: Russell Sabor Cell No.: 082 415 8443

8 Natal Street Paarden Eiland, Cape Town 7405 P.O. Box 1152 Milnerton 7435 South Africa

Tel: (+27 21) 511 3171 Fax: (+27 21) 511 3174 email: [email protected]

BRANCHES (Vredenburg) Contact Person: Mick Vermooten

Cell No.: 082 415 3142 17A Proses Street, Vredenburg 7380

P.O. Box 844 Vredenburg 7380 Tel: (+27 22) 713 1997 Fax: (+27 22) 713 1999

email: [email protected]

BRANCHES (Vredendal) Contact Person: Henk Smit

Cell No.: 083 230 3415 18 Grens Street Vredendal 8160

P.O. Box 68 Vredendal 8160 Te: (+27 27) 213 3731 Fax: (+27 27) 213 3731

email:[email protected]