cleveland park streetscape and drainage …...cleveland park streetscape and drainage improvement...

14
Cleveland Park Streetscape and Drainage Improvement Project Public Meeting #2 – June 8, 2017

Upload: others

Post on 18-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape

and Drainage Improvement

Project

Public Meeting #2 – June 8, 2017

Page 2: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

PROJECT STAKEHOLDERS

2 |

Page 3: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

PROJECT VISION

• Address Corridor Drainage Concerns

• Improve safety and Multimodal Accessibility

• Promote Sense of Place Enhancements & Embrace Corridor History

3 |

MEETING PURPOSE • Provide an update on the current design

• Review Existing Corridor Concerns & Design Approach

• Seek Public Comments and Ideas

• Identify Next Steps

Page 4: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Cleveland Park 2013 Transportation Study

Key Issues / Concerns Identified in 2013 Study:

• Reoccurring Drainage Concerns*

• Green Infrastructure Improvements*

• Public Realm Improvements*

• Pedestrian and Multimodal Safety Concerns*

• Porter Street Redesigns*

• Peak Hour Parking Availability Note*: Will be evaluated under the current project

4 |

Page 5: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Cleveland Park Drainage Study

5 |

In 2013, DDOT conducted a flood study within Cleveland Park to identify source and contributing factor information.

Page 6: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Cleveland Park Metro Flooding 6/21/16

6 |

Flooding Flow Patterns: East and West on Ordway Street North and South on Connecticut Avenue. Majority of the flow comes from neighborhoods to the west and from the alleys

adjacent to Connecticut Avenue .

Page 7: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Reoccurring Drainage Concerns

Contributing Factors:

• Undersized Stormdrain System

• Limited Storage Capacity

• Natural Sump / Low Point

• Large Contributing Drainage Area

• Major Storm Events w/Heavy Rain Intensity

7 |

Page 8: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Cleveland Park Metrorail Station Plan and Existing Conditions

8 |

Existing

Page 9: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Cleveland Park Metrorail Station Proposed Rendering

9 |

Page 10: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Multimodal Accessibility • Porter Street Pedestrian Crossing & Circulation

10 |

• Crosswalk Pedestrian Timing

• Limited On-Road Bike Accommodations • Pedestrian Trip Hazards

Page 11: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Public Realm Enhancements • Café Permits & Accommodations

11 |

• Wide Sidewalk Opportunities

• Tree Pit Layout Consistency • Sense of Place Branding

Page 12: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Evolution of Public Realm Enhancements • Public input was received at the first Public Meeting in September 2016

– Service lane improvements

– Intersection of Connecticut Avenue and Porter Street

– Types of public realm enhancements

– Stormwater management considerations

• Coordination with District of Columbia State Historic Preservation Office (SHPO) and incorporate review comments into concept design

• Concept was presented to the Commission of Fine Arts (CFA) in February 2017

• Revised Concept was presented to the CFA in May 2017

• Concept will be revised per comments received during last CFA meeting

12 |

Page 13: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Milestone Schedule

• Project Kick-off…………………………………………….July 2016

• Data Collection………………………………………..….Summer / Fall 2016

• Public Meeting #1……………………………………….September 15, 2016

• Presentation to Commission of Fine Arts…….February and May 2017

• Design Submissions…………………………………….May 2017-December 2018

• Public Meeting #2…………………………………..….June 2017

• Construction Advertisement…………………..….January 2018

• Construction Begins……………………………….….Summer 2018

13 |

Page 14: Cleveland Park Streetscape and Drainage …...Cleveland Park Streetscape and Drainage Improvement Project Evolution of Public Realm Enhancements • Public input was received at the

Cleveland Park Streetscape and Drainage Improvement Project

Comments and Questions?

Stay Connected

• Greg Wissman, Assistant Project Manager

[email protected]

• Stacee Hemby, Community Outreach Coordinator

[email protected]

14 |